Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Integrity Assessment of Hanford 242-A Evaporator Facility E-A-1 Re-boiler Vessel via Fluorescein Liquid Tracer Test Methods - 17357

The 242-A Evaporator Facility is critical to the United States Department of Energy's (DOE) Hanford Site clean-up mission due to limited space within the existing Double-Shell Tanks (DSTs) used to store nuclear and chemical waste until future processing. The 242-A Evaporator Facility is currently the sole waste volume reduction process used at Hanford, and the E-A-1 Re-boiler is essential to the Evaporator process. Due to the potential for cross-contamination between the Re-boiler tubes through which waste passes and the tube sheets of uncontaminated steam, an assessment of the Re-boiler vessel's integrity is required for continuing operations of the facility. In order to meet these requirements, an independent integrity assessment was designed to use fluorescein liquid tracer (LT) to verify the leak-tightness of the Re-boiler vessel in accordance with Washington River Protection Solutions, LLC (WRPS) tightness test standards, as well as, the ASME Boiler and Pressure Vessel (B and PV) Code, Section III, Division 1, NB-6300. LT test methodologies were evaluated and determined to be appropriate for a vessel with restricted access, such as the E-A-1 Re-boiler, as it provided the needed sensitivity, reliability, and cost; as well as, exceeded the leak-tightness specifications required by both WRPS and ASME B and PV Code standards. The integrity test requires water laced with fluorescein be circulated through the waste processing loop of the 242-A Evaporator and samples of steam condensate be collected and analyzed for traces of fluorescein to determine leak-tightness. Liquid condensate sampling was conducted prior to and during testing and the samples were analyzed for fluorescein tracer to determine the amount of fluorescein that flowed out of the tubes of the Re-boiler into the steam side of the vessel. Given the established criteria for 'leak-tight,' test results determined that the Re-boiler passed the integrity assessment. After further scrutiny of the 2014 test and data results, it was determined that although the Re-boiler was 'leak-tight,' as established by the test criteria, there was concern of future leakage. The DOE and the DOE Office of River Protection (ORP) requested that WRPS repeat the integrity assessment in two and a half years to determine if the potential leak was growing, which could threaten continuing operations of the 242-A Evaporator. The 2017 test has been redesigned using lessons learned from the 2014 test and was modified to account for ergonomic and safety considerations, ease of repeatability, and accuracy of results. The liquid tracer methodology and test plan developed for the Re-boiler will continue to be implemented in 5 year increments to monitor current and future integrity. The method may also prove useful for other aging components across the Hanford Site, where appropriate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Update on the Waste Treatment and Immobilization Plant Pulse- Jet Mixed Vessel Testing Program - 16286

The Waste Treatment and Immobilization Plant (WTP) is designed to use cylindrical-shaped pulse-jet mixers in the black cell vessels to mix the radioactive waste during process operations. Pulse-jet mixers operate like large turkey basters, using air pressure to suck radioactive waste up into the mixer and eject it back into the vessel at high velocity. Using pulse-jet mixers for keeping waste in process vessels adequately mixed is one of the design features that ensures that there are no mechanical parts inside the black cells that would require maintenance. The WTP Project is conducting a testing program to ensure the pulse-jet mixed vessels can address three design and nuclear safety concerns: 1) pulse jet mixer controls, 2) hydrogen gas generation, and 3) the potential for inadvertent criticality in the vessels. The currently planned pulse-jet mixed vessel testing program is divided into three major test campaigns. The first campaign consists of testing to demonstrate pulse-jet mixed vessel control system design and operating concepts. The second test campaign consisted of informational testing of select prototypic PJM vessel features in a reduced scale facility. This testing informed decision making on selection of different mixing system configurations. This test campaign was completed in March 2015. The third test campaign is planned to test the complete functionality of a pulse-jet mixed vessel at full-scale using a prototype standardized high-solids vessel design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ORNL Package Testing Program Overview

Radioactive materials are widespread in our everyday activities which are used in many different types of industries: Consumer products, Medicine, Industry, Energy, and Defense. In the United States there is about 3 million shipments of radioactive materials per year. With radioactive material being very widespread the number of new applications to ship these quantities increases daily. As such, ensuring the safe and secure transport of these materials is paramount, necessitating stringent packaging, transportation, and certification requirements. Shipments of radioactive materials have been made from Oak Ridge National Laboratory (ORNL) for the past 65 years. Since the 1940s ORNL has been at the forefront of the early development of regulations pertaining to the transport of radioactive shipments and associated regulatory testing. The early involvement resulted in ORNL being one of the leaders in the development of regulations and testing standards pertaining to the testing and design of packages. Today all package testing activities are conducted under the Package Testing Program (PTP) at ORNL at the Package Evaluation Facility (PEF). The PTP develops and evaluates testing solutions – ensuring that they are safe, efficient, and meet regulatory requirements ORNL PTP has extensive experience in the regulatory testing of radioactive material packages, supporting certification of Type A, Type, B, Type AF, and special form packages. The PEF serves as a one-stop-shop for design, testing, and certification of a wide variety of packages needed for shipment of radioactive materials. The facility provides the space, expertise, and equipment necessary to conduct rigorous performance testing under both normal and accident conditions or transport environments including free drop, dynamic crush, puncture, penetration, compression, vibration, water spray, water immersion, and thermal test. The PTP remains a key contributor to the safety and compliance of radioactive material transportation. This presentation will provide an overview of the program’s history, capabilities, and its ongoing role in advancing regulatory standards and transportation safety.

Martinez, Oscar [ORNL] (ORCID:0000000181814046)↗

Vibration Fixture Design and Testing for Rigid - Y Cable Mount on MMRTG F4

INL is responsible for the fueling and testing of Radioisotope Thermoelectric Generators for NASA space missions. For the upcoming NASA mission "DRAGONFLY," INL is tasked with fueling and testing the Multi-Mission Radioisotope Thermoelectric Generator F4 (MMRTG F4). This involves conducting various tests, such as vibration testing and mass properties testing. For these tests, an interface is required between the MMRTG and the testing equipment, provided by cables mounted on a legacy bracket. Due to design changes in the cooling lines, a new cable – the Rigid Y cable – is to be used. The test described in this poster was to verify if the Rigid Y cable would survive the vibration tests. The results will determine the procedure for conducting the vibration tests on the MMRTG F4.

42 - ENGINEERING↗

Resumption of water capsule reactivity-initiated accident testing at TREAT

A series of integral reactivity-initiated accident (RIA) commissioning experiments were completed in a new static water capsule in the Transient Reactor Test Facility (TREAT), marking the first such tests in the U.S. in more than 40 years. The test campaign included a verification test followed by five tests in the Static Environment Rodlet Transient Test Apparatus (SERTTA) capsule. The capsule initial conditions varied from room temperature and pressure up to 200°C and 2.5 MPa, with energy depositions varying between ~500–1100 J/gUO 2 . The series of tests allowed for a number of instrumentation qualifications and demonstrations, including cladding thermometry, rodlet plenum pressure, cladding elongation, and an electro-impedance boiling detector. Post transient examinations such as gamma emission spectroscopy, profilometry, and microscopy were performed to document the end state of the fuel rods. Furthermore, the results from the experiments show that the fuel rodlets behaved very similar to historical tests under similar energy depositions. This paper documents the design of the capsule and highlights some results from the commissioning tests and post-transient examination.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Cavity Collapse and Surface Crater Formation at the Salut Underground Nuclear Test in U20ak, Nevada National Security Site, and the Impact of Stability of the Ground Surface

At the request of Jerry Sweeney, the LLNL Containment Program performed a review of nuclear test-related data for the Salut underground nuclear test in U20ak to assist in evaluating this legacy site as a test bed for application technologies for use in On-Site Inspections (OSI) under the Comprehensive Nuclear Test Ban Treaty. Review of the Salut site is complicated because the test experienced a subsurface, rather than surface, collapse. Of particular interest is the stability of the ground surface above the Salut detonation point. Proposed methods for on-site verification include radiological signatures, artifacts from nuclear testing activities, and imaging to identify alteration to the subsurface hydrogeologogy due to the nuclear detonation. Sweeney's proposal requires physical access at or near the ground surface of specific underground nuclear test locations at the Nevada Nuclear Test Site (NNSS, formerly the Nevada Test Site), and focuses on possible activities such as visual observation, multispectral measurements, and shallow, and deep geophysical surveys.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Blade Testing Equipment Development and Commercialization: Cooperative Research and Development (Final Report)

Blade testing is required to meet wind turbine design standards, reduce machine cost, and reduce the technical and financial risk of deploying mass-produced wind turbine models. NREL's National Wind Technology Center (NWTC) in Colorado is the only blade test facility in the U.S. capable of performing full-scale static and fatigue testing of multi-megawatt-scale wind turbine blades. Rapid growth in wind turbine size over the past two decades has outstripped the size capacity of the NWTC blade test facility leaving the U.S. wind industry without a suitable means of testing blades for large land-based and offshore turbines. This CRADA will develop and commercialize testing technologies and test equipment, including scaling up, value engineering, and testing of equipment to be used at blade testing facilities in the U.S. and around the world.

17 WIND ENERGY↗

R&D to Ensure a Scientific Basis for Qualification Tests and Standards (Final Report)

Project return on investment in a photovoltaic (PV) system depends increasingly on maintaining high energy yields, and the system lifetime is a major factor in levelized cost of electricity (LCOE). Thus, the rate of PV deployment and the success of these assets depends upon reliable long-term power generation. The overarching objective of this program is to improve photovoltaic (PV) module reliability via development of tests and standards. Where reliability problems or risk are discovered, we can design tests to ensure that these liabilities don't affect future generations of products. Customers can use these tests to understand which products are susceptible to certain degradation mechanisms, and manufacturers can use the tests to design unwanted characteristics out of their products. The work under this program identifies PV reliability needs, performs characterization that provides scientific understanding of targeted degradation mechanisms, and translates those data into practical and predictive test protocols and standards. Major accomplishments include: A model for polarization-type potential induced degradation (PID-p) was developed and validated against experimental data. NREL is currently leading a new edition of IEC 62804-1 for PID detection. PID-p can cause large losses in current and voltage for some module designs on cloudy days. Finite element modeling (FEM) and experiment was used to determine when cells crack in a module. It was shown that cells in landscape orientation are much more likely to crack than those on portrait orientation. Shortly thereafter, the first products with portrait-oriented cells were introduced. Studies of how to test for light and elevated temperature degradation (LeTID) culminated with the publication of IEC TS 63342. Software to predict the progression of LeTID was developed, validated, and made publicly available. Field validated tests and international standards for durability of PV module coatings abrasion, backsheets, and encapsulants were developed. Examples are IEC 62788-1-1, IEC 62788-2 ED2, IEC TS 62788-7-2, IEC 62788-7-3 ED1, IEC 63209-2. NREL led the development a high-temperature testing technical specification, and published guidelines that enable installers to determine whether higher-temperature testing is needed, simply based on location and mounting configuration. In a number of our case studies, variations in the bills of materials or workmanship have been associated with variations in reliability. These observations emphasize the importance of quality assurance to reliability. A framework for criticality (i.e. Pareto) analysis was developed and published. The framework helps us and other researchers determine what problems should be addressed for reliability research to have the biggest industry impact. NREL continues to participate actively in international standards development and stakeholder engagement activities, including organizing an annual PV Reliability Workshop. These activities are important for ensuring we address issues that are relevant and timely, and that we convey our results to those who may benefit.

14 SOLAR ENERGY↗

BENEFIT with Northeastern University: HVAC Hardware-in-the-Loop Experimental Testing of a Heat Pump and Air Conditioner

This dataset includes HVAC Hardware-in-the-Loop (HIL) experimental results for a single stage, SEER 16, HSPF 9.5, 3-ton single-speed air source heat pump with 15 kW of backup auxiliary heating tested in both cooling and heating mode, and a two stage, SEER 21, 2-ton central air conditioner tested in cooling mode for a set of outdoor temperatures and indoor setpoint temperatures. In addition to these tests, experimental tests focused on the operation of auxiliary heating for the heat pump for winter condition were also conducted. The laboratory experiments for transient testing of the heat pump and air conditioner were conducted using the two HIL systems in the Systems Performance Laboratory (SPL) at NREL’s Energy Systems Integration Facility (ESIF). Further information on laboratory design and capabilities of the SPL along with the architecture of HVAC HIL system can be found in: Sparn, B. F. 2018. Laboratory Resources and Techniques to Evaluate Smart Home Technology (No. NREL/CP-5500-71696). National Renewable Energy Laboratory (NREL), Golden, CO (United States). https://www.nrel.gov/docs/fy18osti/71696.pdf and the experimental setup and validation of HVAC HIL platform can be found in: Ramaraj, S. and Sparn, B. 2022. Validation of HVAC Hardware-In-the-Loop Simulation for Advanced Control Strategies in Smart Homes (No. NREL/CP-5500-82562). National Renewable Energy Lab (NREL), Golden, CO (United States). https://www.nrel.gov/docs/fy22osti/82562.pdf. These experimental results can be used to validate how we currently model the cycling behavior of heat pumps and air conditioners. Additionally, many demand response programs implement heat pump and air conditioner control by changing the thermostat set point – these data may also be used to verify our models for heat pump and air conditioner demand response control are implemented correctly. The Test_Matrix file describes all the indoor and outdoor test conditions for heat pump and air conditioner and the file names of data sets include information about the test conditions. A wide range of outdoor air temperatures were chosen to accommodate summer and winter conditions. In addition to operating the HVAC equipment with different outdoor temperatures, we also operate the system with different indoor temperature set points to represent different grid signals or different operating conditions. For cooling conditions, the baseline set point is 72°F. To represent Load Up signals, the setpoint is changed to 68°F. The Load Shed set point is 76°F. For heating conditions, the baseline set point was assumed to be 68°F. The Load add set point is 72°F and the Load shed set point is 64°F. The starting indoor temperature for cooling conditions was set ~2°F above the indoor setpoint temperature so that the equipment turned on quickly. Similarly, the initial indoor temperature was set ~2°F lower than setpoint for heating mode tests to ensure that heating began quickly. The return air temperature was assumed to be equal to the indoor setpoint temperature in all cases. The experimental data are sampled at 1-second intervals. The data from ecobee thermostat at 5-minute interval are resampled and added to the corresponding file. The content of each data set is as follows: • T_Return (C): Measured return air temperature [C] • T_Return_SP (C): Return air temperature setpoint from E+ model, sent to HIL [C] • T_Supply (C): Measured supply air temperature at evaporator outlet [C] • T_Outdoor (C): Measured outdoor air temperature [C] • T_Outdoor_SP (C): Outdoor air temperature setpoint from weather file, sent to HIL [C] • T_Indoor (C): Measured indoor air temperature [C] • T_Indoor_SP (C): Indoor air temperature setpoint from E+ model, sent to HIL [C] • Outdoor Unit Power (W): Measured power of the outdoor unit [W] • Indoor Unit Power (W): Measured power of the indoor unit [W] • Evaporator Airflow Rate (CFM): Measured evaporator or indoor unit airflow rate sent to E+ model [CFM] • Cooling/Heating Capacity (kW): Calculated cooling/heating capacity sent to E+ model [kW] • T_SP_Thermostat (C): Thermostat cooling/heating setpoint temperature [C] • T_Indoor_Thermostat (C): Thermostat indoor air temperature [C]

24 POWER TRANSMISSION AND DISTRIBUTION↗

EMT Model Validation of a 2 MVA PV Inverter Using Transient and Frequency-Domain Hardware Testing: Preprint

This paper presents results and new insights gained from a hardware test campaign on a 2 MVA PV inverter for validating its vendor-supplied EMT model. The test campaign was conducted using a 7 MVA grid simulator and a 2 MW PV emulator. It considered both time-domain transient tests and frequency-domain impedance scan tests. The paper highlights the inadequacy of transient tests in capturing all critical resonance modes of the inverter, and the effectiveness of the frequency scan testing in addressing this problem. The paper shows the frequency scan testing as an effective tool for EMT model validation of IBR units which can highlight inaccuracies in the EMT models that are easy to overlook when model validation is performed using only the time-domain transient tests such as voltage ride-through and phase jump tests.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wave Energy Prize - 1/50th Testing - Float Inc. BergerABAM Rho-Cee Hybrid WEC

This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for Float Inc. During the testing of its 1/50th-scale device, Float Inc. Berger ABAM was deemed ineligible due to the fact that they brought a device with them to test and did not ship the device by the deadline stipulated in the Wave Energy Prize Rules. Because of this, analysis, results, and judging were not completed for this team/device. This submission included files such as: - 1/50th test data (raw & processed) - 1/50th test data video and pictures - 1/50th Test plans and testing documents

1/50th scale↗

A pulse-controlled modified-burst test instrument for accident-tolerant fuel cladding

Pellet-cladding mechanical interaction due to thermal expansion of nuclear fuel pellets during a reactivity-initiated accident (RIA) is a potential mechanism for failure of nuclear fuel cladding. To investigate the mechanical behavior of cladding during an RIA, we developed a mechanical pulse-controlled modified burst test instrument that simulates transient events with a pulse width from 10 to 300 ms. This paper includes validation tests of unirradiated and prehydrided ZIRLO cladding tubes. A ZIRLO cladding sample with a hydrogen content of 168 wt. ppm showed ductile behavior and failed at the maximum limits of the test setup with hoop strain to failure greater than 9.2%. ZIRLO samples showed high resistance to failure even at very high hydrogen contents (1,466 wt. ppm). When the hydrogen content was increased to 1,554 wt. ppm, brittle-like behavior was observed at a hoop strain of 2.5%. Preliminary scoping tests at room temperature with FeCrAl tubes were conducted to imitate the pulse behavior of transient test reactors during integral tests. The preliminary FeCrAl tests are informative from the perspective of characterizing the test rig and supporting the design of integral tests for current and potentially accident tolerant cladding materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct measurement and calculation of rubber bulk modulus by piston-cylinder method using conventional mechanical testing equipment

This article describes a method to directly measure the bulk modulus of rubber using a piston-cylinder type apparatus. The function of the testing apparatus is to reliably transfer load to the water inside the vessel and allow for the accurate and continuous measurement of volumetric displacement as the contents are compressed. During the test, load is applied to a piston-cylinder containing the rubber test sample and water using a conventional mechanical testing load frame. Load and the travel of the piston are recorded by a load cell and extensometer, respectfully. A brass or stainless steel plug of the same dimensions as the test sample is tested as a control sample to isolate the compliance of the system, including the compressibility of water and compliance of the piston-cylinder. The results from this control test are used to disincorporate the compliance of the system from the sample test results. Load-linear displacement data are mathematically converted to pressure-volumetric displacement data, from which bulk modulus is calculated. The test apparatus and method are validated using the known bulk modulus of water. Finally, the bulk modulus for two similar rubbers is evaluated. The validity of the results and limitations of the device are discussed.

36 MATERIALS SCIENCE↗

EVALUATION OF ARG-1 SAMPLES PREPARED BY CESIUM CARBONATE DISSOLUTION DURING THE ISOLOK SME ACCEPTABILITY TESTING

Evaluation of Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) recently completed the evaluation of one of these opportunities - the possibility of using an Isolok sampling valve as an alternative to the Hydragard valve for taking DWPF process samples at the Slurry Mix Evaporator (SME). The use of an Isolok for SME sampling has the potential to improve operability, reduce maintenance time, and decrease CPC cycle time. The SME acceptability testing for the Isolok was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 and was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNLRP-2011-00145. RW-0333P QA requirements applied to the task, and the results from the investigation were documented in SRNL-STI-2011-00693. Measurement of the chemical composition of study samples was a critical component of the SME acceptability testing of the Isolok. A sampling and analytical plan supported the investigation with the analytical plan directing that the study samples be prepared by a cesium carbonate (Cs{sub 2}CO{sub 3}) fusion dissolution method and analyzed by Inductively Coupled Plasma - Optical Emission Spectroscopy (ICP-OES). The use of the cesium carbonate preparation method for the Isolok testing provided an opportunity for an additional assessment of this dissolution method, which is being investigated as a potential replacement for the two methods (i.e., sodium peroxide fusion and mixed acid dissolution) that have been used at the DWPF for the analysis of SME samples. Earlier testing of the Cs{sub 2}CO{sub 3} method yielded promising results which led to a TTR from Savannah River Remediation, LLC (SRR) to SRNL for additional support and an associated TTQAP to direct the SRNL efforts. A technical report resulting from this work was issued that recommended that the mixed acid method be replaced by the Cs{sub 2}CO{sub 3} method for the measurement of magnesium (Mg), sodium (Na), and zirconium (Zr) with additional testing of the method by DWPF Laboratory being needed before further implementation of the Cs{sub 2}CO{sub 3} method at that laboratory. While the SME acceptability testing of the Isolok does not address any of the open issues remaining after the publication of the recommendation for the replacement of the mixed acid method by the Cs{sub 2}CO{sub 3} method (since those issues are to be addressed by the DWPF Laboratory), the Cs{sub 2}CO{sub 3} testing associated with the Isolok testing does provide additional insight into the performance of the method as conducted by SRNL. The performance is to be investigated by looking to the composition measurement data generated by the samples of a standard glass, the Analytical Reference Glass - 1 (ARG-1), that were prepared by the Cs{sub 2}CO{sub 3} method and included in the SME acceptability testing of the Isolok. The measurements of these samples were presented as part of the study results, but no statistical analysis of these measurements was conducted as part of those results. It is the purpose of this report to provide that analysis, which was supported using JMP Version 7.0.2.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LNG Cascading Damage Study Volume I: Fracture Testing Report

As part of the liquefied natural gas (LNG) Cascading Damage Study, a series of structural tests were conducted to investigate the thermal induced fracture of steel plate structures. The thermal stresses were achieved by applying liquid nitrogen (LN 2 ) onto sections of each steel plate. In addition to inducing large thermal stresses, the lowering of the steel temperature simultaneously reduced the fracture toughness. Liquid nitrogen was used as a surrogate for LNG due to safety concerns and since the temperature of LN 2 is similar (-190°C) to LNG (-161°C). The use of LN 2 ensured that the tests could achieve cryogenic temperatures in the range an actual vessel would encounter during a LNG spill. There were four phases to this test series. Phase I was the initial exploratory stage, which was used to develop the testing process. In the Phase II series of tests, larger plates were used and tested until fracture. The plate sizes ranged from 4 ft square pieces to 6 ft square sections with thicknesses from ¼ inches to ¾ inches. This phase investigated the cooling rates on larger plates and the effect of different notch geometries (stress concentrations used to initiate brittle fracture). Phase II was divided into two sections, Phase II-A and Phase II-B. Phase II-A used standard A36 steel, while Phase II-B used marine grade steels. In Phase III, the test structures were significantly larger, in the range of 12 ft by 12 ft by 3 ft high. These structures were designed with more complex geometries to include features similar to those on LNG vessels. The final test phase, Phase IV, investigated differences in the heat transfer (cooling rates) between LNG and LN 2 . All of the tests conducted in this study are used in subsequent parts of the LNG Cascading Damage Study, specifically the computational analyses.

03 NATURAL GAS↗

Evaluation of Cavity Collapse and Surface Crater Formation for Selected Lawrence Livermore National Laboratory Underground Nuclear Tests - 2011, Part 2

This report evaluates collapse evolution for selected Lawrence Livermore National Laboratory (LLNL) underground nuclear tests at the Nevada National Security Site (NNSS, formerly called the Nevada Test Site). The work is being done to support several different programs that desire access to the ground surface above expended underground nuclear tests. The programs include: the Borehole Management Program, the Environmental Restoration Program, and the National Center for Nuclear Security Gas-Migration Experiment. Safety decisions must be made before a crater area, or potential crater area, can be reentered for any work. Evaluation of cavity collapse and crater formation is input into the safety decisions. Subject matter experts from the LLNL Containment Program who participated in weapons testing activities perform these evaluations. Information used included drilling and hole construction, emplacement and stemming, timing and sequence of the selected test and nearby tests, geology, yield, depth of burial, collapse times, surface crater sizes, cavity and crater volume estimations, ground motion, and radiological release information. Both classified and unclassified data were reviewed. The evaluations do not include the effects of erosion that may modify the collapse craters over time. They also do not address possible radiation dangers that may be present. Various amounts of information are available for these tests, depending on their age and other associated activities. Lack of data can hamper evaluations and introduce uncertainty. We make no attempt to quantify this uncertainty. Evaluation of Cavity Collapse and Surface Crater Formation for Selected Lawrence Livermore National Laboratory Underground Nuclear Tests - 2011 was published on March 2, 2011. This report, considered Part 2 of work undertaken in calendar year 2011, compiles evaluations requested after the March report. The following unclassified summary statements describe collapse evolution and crater stability in response to a recent request to review 6 LLNL test locations in Yucca Flat, Rainier Mesa, and Pahute Mesa. They include: Baneberry in U8d; Clearwater in U12q; Wineskin in U12r, Buteo in U20a and Duryea in nearby U20a1; and Barnwell in U20az.

07 ISOTOPE AND RADIATION SOURCES↗

Legacy Vehicle Fuel System Testing with Intermediate Ethanol Blends

The effects of E10 and E17 on legacy fuel system components from three common mid-1990s vintage vehicle models (Ford, GM, and Toyota) were studied. The fuel systems comprised a fuel sending unit with pump, a fuel rail and integrated pressure regulator, and the fuel injectors. The fuel system components were characterized and then installed and tested in sample aging test rigs to simulate theexposure and operation of the fuel system components in an operating vehicle. The fuel injectors were cycled with varying pulse widths during pump operation. Operational performance, such as fuel flow and pressure, was monitored during the aging tests. Both of the Toyota fuel pumps demonstrated some degradation in performance during testing. Six injectors were tested in each aging rig. The Fordand GM injectors showed little change over the aging tests. Overall, based on the results of both the fuel pump testing and the fuel injector testing, no major failures were observed that could be attributed to E17 exposure. The unknown fuel component histories add a large uncertainty to the aging tests. Acquiring fuel system components from operational legacy vehicles would reduce theuncertainty.

09 BIOMASS FUELS↗

Duration Test Report for the SWIFT Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Duration testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, safety and function, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

17 WIND ENERGY↗