Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Managing Solar Photovoltaic Integration in the Western United States Appendix: Reference and High Solar Photovoltaic Scenarios for Three Regions [Slides]

This slide deck is an appendix to a paper series that examines potential challenges related to planning future power systems with higher solar photovoltaic (PV) penetrations. The series uses the western U.S. power system for these investigations because it is a region the authors and their colleagues have already extensively studied. We are therefore well-suited to analyze even higher PV penetrations and then examine the results in multiple models to determine whether our current approaches are missing key details that only emerge at higher PV penetrations. This deck details the systems underlying those analyses and how they were modeled using the Resource Planning Model (RPM), a capacity expansion modeling tool. We examine both Western Interconnection-wide and regional results for three regions in the Western U.S. with significantly different existing power systems and connections to neighboring regions; this provides a more balanced picture as to how power systems with high PV penetration might emerge in different contexts and what the resulting grid challenges, if any, might be.

14 SOLAR ENERGY↗

HMMR (High-Resolution Multifrequency Microwave Radiometer) Earth observing system, volume 2e. Instrument panel report

Recommendations and background are provided for a passive microwave remote sensing system of the future designed to meet the observational needs of Earth scientist in the next decade. This system, called the High Resolution Multifrequency Microwave Radiometer (HMMR), is to be part of a complement of instruments in polar orbit. Working together, these instruments will form an Earth Observing System (EOS) to provide the information needed to better understand the fundamental, global scale processes which govern the Earth's environment. Measurements are identified in detail which passive observations in the microwave portion of the spectrum could contribute to an Earth Observing System in polar orbit. Requirements are established, e.g., spatial and temporal resolution, for these measurements so that, when combined with the other instruments in the Earth Observing System, they would yield a data set suitable for understanding the fundamental processes governing the Earth's environment. Existing and/or planned sensor systems are assessed in the light of these requirements, and additional sensor hardware needed to meet these observational requirements are defined.

Source record↗

Phase III integrated water recovery testing at MSFC - Design, plans, and protocols

A series of tests is being conducted at the NASA Marshall Space Flight Center (MSFC) to evaluate the performance of a closed-loop water recovery system. Testing will be conducted at various levels of integration and loop-closure, culminating in complete closure of the water system with man-in-the-loop. This paper summarizes the test goals and objectives as well as the system design, plans, and protocols which have been established.

Bagdigian, Robert M.↗

A decision support system for technology R&D planning: connecting the dots from information to innovation

This paper describes an information technology innovation developed to assist decision makers faced with complex R&D tasks. The decision support system (DSS) was developed and applied to the analysis of a 10-year, 700 million dollar technology program for the exploration of Mars. The technologies were to enable a 4.8 billion dollar portfolio of exploration flight missions to Mars.

DSS↗

Solar System Exploration Technology Requirements and Planning Process

The NASA Office of Space Science, in alliance with the Office of Advanced Concepts and Technology, has developed an Integrated Technology Strategy to guide its investment in technology for space science missions. This strategy establishes goals and strategic objectives that ensure that NASA and the nation derive the greatest possible scientific and economic benefits from investments in space science missions and technologies. Within the Office of Space Science, the Solar System Exploration Division in collaboration with the Office of Space Access and Technology, is developing a Technology Plan to implement these goals and to identify specific goals and to identify specific technology needs for solar system missions. This paper describes the philosophy, processes, and preliminary results of the systematic process being established for the identification and prioritization of solar system exploration technology needs.

space↗

Towards a knowledge-based system to assist the Brazilian data-collecting system operation

A study is reported which was carried out to show how a knowledge-based approach would lead to a flexible tool to assist the operation task in a satellite-based environmental data collection system. Some characteristics of a hypothesized system comprised of a satellite and a network of Interrogable Data Collecting Platforms (IDCPs) are pointed out. The Knowledge-Based Planning Assistant System (KBPAS) and some aspects about how knowledge is organized in the IDCP's domain are briefly described.

Rodrigues, Valter↗

Scenarios for Future Energy Systems

Energy systems in the U.S. and globally have continuously changed and expanded over the past 200 years, from animal and biomass based energy to electricity and petroleum for heat, light, transportation, and industries of all kinds. The most recent two decades have experienced a significant increase in the use of natural gas, solar, and wind energy, as well as energy efficiency, due to both technology breakthroughs and public policy. With history as a guide, we can expect on-going transformation of our energy system in future decades, including increased electrification and advanced energy technologies, ideally helping meet societal goals of reducing pollution, improving quality of human life, and preserving ecosystems. Scenario modeling is an important tool for planning energy system transformations toward specific goals - such as net-zero greenhouse gas emissions, 100% renewable energy, or energy security - particularly when there are multiple options, conflicting objectives, and significant unknowns about a path forward. This presentation will review the history of energy transitions and the future policy and societal objectives on energy. Then it will summarize multiple scenario studies of future energy systems, with a focus on "100% studies" and the challenges to meeting those objectives. It will also outline of a few of the technologies being researched now that could advance the ongoing energy transition.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY,↗

ARC disruption physics and strategy

Commonwealth Fusion Systems (CFS) plans to operate a tokamak power plant called ARC in the early 2030s. Tokamak plasmas have stability limits that, if crossed, lead to a rapid termination of the plasma, referred to as a disruption. Disruptions pose a melt risk to the first wall resulting from thermal and non-thermal particle heat fluxes, and an electromagnetic loading risk on all metal components within the equilibrium coils. A comprehensive set of models is used herein to provide an assessment of both mitigated and unmitigated ARC disruption loads. A preliminary massive gas injection system is baselined and a runaway electron mitigation coil option is proposed to close possible gaps in the baseline. It is predicted that all ARC disruption loads are within a factor of 2 of the disruption loads in SPARC, a tokamak presently under construction by CFS, and therefore SPARC provides an opportunity to calibrate models, test solutions and inform the design of ARC. The goal for ARC is disruption-free operation, however, the pragmatic design target is to withstand one mitigated disruption per day, and to restart the plasma following mitigation in tens of seconds without interrupting the power output. Unmitigated disruptions must be rare, and experience with unmitigated disruption impacts in SPARC will better define what rare means. The implications of this strategy for plasma disruptivity and disruption prediction are discussed, and operating the ARC scenario on SPARC is expected to refine the ARC final design and operational plan.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Object sense and avoid system for autonomous vehicles

A system for determining a travel path for an autonomous vehicle (“AV”) to travel to a target while avoiding objects (i.e., obstacles) without the use of an imaging system is provided. An object sense and avoid (“OSA”) system detects objects in an object field that is adjacent to the AV and dynamically generates, as the AV travels, a travel path to the target to avoid the objects. The OSA system repeatedly uses sensors to collect sensor data of any objects in the object field. An object detection system then detects the objects and determines their locations based on triangulating ranges to an object as indicated by different sensors. The path planner system then plans a next travel direction for the AV to avoid the detected objects while seeking to minimize the distance traveled. The OSA system then instructs the AV to travel in the travel direction.

Beer, N. Reginald↗

Lockheed Martin Response to the OSP Challenge

The Lockheed Martin Orbital Space Plane System provides crew transfer and rescue for the International Space Station more safely and affordably than current human space transportation systems. Through planned upgrades and spiral development, it is also capable of satisfying the Nation's evolving space transportation requirements and enabling the national vision for human space flight. The OSP System, formulated through rigorous requirements definition and decomposition, consists of spacecraft and launch vehicle flight elements, ground processing facilities and existing transportation, launch complex, range, mission control, weather, navigation, communication and tracking infrastructure. The concept of operations, including procurement, mission planning, launch preparation, launch and mission operations and vehicle maintenance, repair and turnaround, is structured to maximize flexibility and mission availability and minimize program life cycle cost. The approach to human rating and crew safety utilizes simplicity, performance margin, redundancy, abort modes and escape modes to mitigate credible hazards that cannot be designed out of the system.

Sullivan, Robert T.↗

Methane Mitigation Thermoelectric Generator (MMTEG) (Final Scientific/ Technical Report)

Gas Technology Institute (GTI) has completed a $1.815M (plus $500K cost share), 54-month Co-operative agreement with the Department of Energy’s National Energy Technology Laboratory to develop a Methane Mitigation Thermoelectric Generator (MMTEG) system for gas field applications. This novel system uses fugitive gas to produce electrical power and consists of Thermoelectric Generators (TEG) driven by a linear burner, an air compressor, an accumulator, valves, batteries, and power electronics. The electrical power generated by the system is used to compress air and, in turn, the air is used to operate the pneumatic valves at the well site instead of using natural gas (NG) which would then be vented. The team completed the project objectives which included (1) Design, fabricate and test an integrated 6We nominal MMTEG prototype system, (2) Design a “retrofit kit” MMTEG system capable of being field tested at a gas well production site, and (3) build and test the field MMTEG system in a laboratory environment. Multiple system options were developed prior to selecting a “Passive” system which meets cost, NG savings, and greenhouse gas (GHG) reduction targets although not as efficient as initially planned. The MMTEG system is built primarily from commercial off-the-shelf parts (in some cases re-purposed) including the heat exchanger, heat rejection, electronic components, and also the TEGs. The team developed and implemented a novel system including the control system developed by Morrison Applied Sciences (MAS). The team completed incremental demonstrations of the hardware prior to the MMTEG system demonstration. A one-year simulation of the air delivery and battery charging subsystems was completed prior to the integration into the MMTEG system. In addition, the team simulated two-years of thermal cycles for integrated Burner/TEG/heat rejection subsystem. Finally, the entire MMTEG system was assembled, and troubleshooting was completed over a two-week period. Next, the MMTEG system was tested to simulate over 15 weeks of entire system operation over approximately four weeks in an accelerated test fashion with minimal intervention (such as changing fuel tanks). The MMTEG system met the key goals of a unit cost of under $1500 while saving 97% of NG expended today (including leakage) on average by pneumatic systems venting to the atmosphere. The MMTEG system reduced GHG emissions by 1000X (using the methane intensification factor of 28 relative to CO2). GTI is currently pursuing a field test of the MMTEG system. Interfacing with producers has provided additional insight into system improvements. Planned improvements include additional weather protection and control system improvements including the implementation of a long- range radio capability to notify operators if there is a fault.

03 NATURAL GAS↗

Powered By CADET

The Capacity Expansion Decision Support for Distribution Networks (CADET) is a Python-based library and framework for creating electrical distribution system capacity planning tools for cost-effective, reliable power delivery. It enables the creation of modular, scalable, and extensible distribution capacity planning tools by providing a high-level optimization interface, parameter and options data managers, optimization constraint and objective libraries, generalized nomenclature, a system for tracking and modifying distribution network changes, optimization solution validation, and other capabilities. This webinar will describe 1) the motivation for creating CADET, 2) key designs, and 3) several use cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Structural stability augmentation system design using BODEDIRECT: A quick and accurate approach

A methodology is presented for a modal suppression control law design using flight test data instead of mathematical models to obtain the required gain and phase information about the flexible airplane. This approach is referred to as BODEDIRECT. The purpose of the BODEDIRECT program is to provide a method of analyzing the modal phase relationships measured directly from the airplane. These measurements can be achieved with a frequency sweep at the control surface input while measuring the outputs of interest. The measured Bode-models can be used directly for analysis in the frequency domain, and for control law design. Besides providing a more accurate representation for the system inputs and outputs of interest, this method is quick and relatively inexpensive. To date, the BODEDIRECT program has been tested and verified for computational integrity. Its capabilities include calculation of series, parallel and loop closure connections between Bode-model representations. System PSD, together with gain and phase margins of stability may be calculated for successive loop closures of multi-input/multi-output systems. Current plans include extensive flight testing to obtain a Bode-model representation of a commercial aircraft for design of a structural stability augmentation system.

Goslin, T. J.↗

Reflective Focused Schlieren System Improved for Use in 10- by 10-Foot Supersonic Wind Tunnel

The reflective focused schlieren system that was developed for use in the 10- by 10-Foot Supersonic Wind Tunnel (10x10 SWT) at the NASA Glenn Research Center at Lewis Field as part of the Unstart Test Program was improved this past year. In April 1999, the development and use of the system was presented at the Supersonic Tunnel Association International in Bedford, England. A focused schlieren system is similar to a standard schlieren system in that shock waves coming from an object in supersonic flow can be seen using a standard video camera. Unlike the standard schlieren system, which produces a two-dimensional schlieren image, a focused schlieren system can produce a threedimensional image. The preceding drawing shows the components of the reflective focused schlieren system being developed for use in the 10x10 SWT. Although the system worked well for the Unstart Test Program, it was not sensitive enough to be classified as a facility capability. Therefore, a program was implemented to improve the sensitivity of the reflective focused schlieren system so that it could be a facility capability for Glenn's 10x10 SWT. Several techniques were implemented to increase the sensitivity and to improve the overall operation of the system. These included refinement of the source grid, improvement in the cutoff grid production, improvement of the source grid and cutoff grid alignment, installation of an improved light source, and incorporation of an image-enhancing system. These changes are being implemented with the system set up in the laboratory. A checkout test of the system is planned in the 10x10 SWT in March 2000. Of these techniques, the most developed is the refinement of the source grid. The original system had a pattern of -in. by -in. squares on -in. centers (distance between the center points of adjacent squares). This gave a ratio of light to dark (reflective to nonreflective area) of 3:1. The recommended ratio is 1:1. In order to accomplish this, a pattern of -in.-diameter dots on 3/8-in. centers was developed. Preliminary tests with this pattern showed an increase in system sensitivity and image clarity. Further testing and refinement are scheduled. The former and improved dot patterns are shown. The use of glass plates to produce the cutoff grid improved the cutoff grid's quality and helped to align it with the source grid. The cutoff grid, which is the negative of the source grid, is made by exposing photography film (or glass plates) to the proper light while it is installed in the focused schlieren system. The exposed film or plate is removed from the system and then developed as a photograph negative. Because the glass plates are rigid, they eliminate the risk of distortion when the negative is reinstalled in the system and realigned with the source grid.

Williamson, Gary Scott↗

Iterative Repair Planning for Spacecraft Operations Using the Aspen System

This paper describes the Automated Scheduling and Planning Environment (ASPEN). ASPEN encodes complex spacecraft knowledge of operability constraints, flight rules, spacecraft hardware, science experiments and operations procedures to allow for automated generation of low level spacecraft sequences. Using a technique called iterative repair, ASPEN classifies constraint violations (i.e., conflicts) and attempts to repair each by performing a planning or scheduling operation. It must reason about which conflict to resolve first and what repair method to try for the given conflict. ASPEN is currently being utilized in the development of automated planner/scheduler systems for several spacecraft, including the UFO-1 naval communications satellite and the Citizen Explorer (CX1) satellite, as well as for planetary rover operations and antenna ground systems automation. This paper focuses on the algorithm and search strategies employed by ASPEN to resolve spacecraft operations constraints, as well as the data structures for representing these constraints.

Rabideau, G.↗

The foundations of reusability: Successful experience and important conclusions from planning and scheduling of space operations

NASA's Office of Space Communications is sponsoring a combined technical and management initiative to dramatically decrease the cost of preparing for and conducting space operations. The authors present their successful experience and important conclusions from producing generalized and readily reusable solutions and systems for planning and scheduling applications. While generality by itself should enable reuse, generality alone may not produce the desired cost savings. Generality achieved by accumulating numerous special cases within a software system often increases the complexity of the software to the extent that maintenance costs overtake development savings. Because of this phenomenon, the authors have insisted on simplicity, as well as generality, to achieve cost-effective operation reusability. Simplicity and generality can be accomplished simultaneously when the basic 'Building Blocks' for a problem domain, in this paper, planning and scheduling, are discovered and implemented with reuse in mind. The Building Blocks for planning and scheduling are described. The authors also present examples of how these Building Blocks have accommodated various scenarios that were previously treated as mission-peculiar. Two case histories are presented to demonstrate operational reusability and cost effectiveness.

Hornstein, Rhoda Shaller↗

Residential solar-heating/cooling system

Report documents progress of residential solar-heating and cooling system development program at 5-month mark of anticipated 17-month program. System design has been completed, and development and component testing has been initiated. Report includes diagrams, operation overview, optimization studies of subcomponents, and marketing plans for system.

Source record↗