Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “site”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Factors Affecting Bait Site Visitation: Area of Influence of Baits

Baiting is a fundamental strategy for the global management of wild pigs (Sus scrofa); however, little information exists on how anthropogenic bait affects wild pig movements on a landscape. We investigated factors that are important in determining the spatial area of attraction for wild pigs to bait (‘area of influence’ of a bait site) using data from Global Positioning System (GPS) collars and locations of bait sites. We monitored movements of wild pigs in 2 distinct study areas in the United States from February to September 2016 and used locational data using GPS collars to analyze the influence of habitat quality (dependent on site), home range size, number of bait sites in the home range, distance to a bait site, and sex in relation to movement in time and space. We determined the average area of influence by calculating the area of a circle with the radius as the average maximum distance travelled by wild pigs to reach a bait site. The average area of influence for our bait sites was 6.7 km 2 (or a radius of approximately 1.5 km), suggesting a bait spacing of approximately 1.5 km would be adequate to capture visitation by most wild pigs and a spacing of 3 km could allow substantial visitation while minimizing redundant effort depending on the spatial structure of the populations. Eighty percent of wild pigs first visited bait sites within 8.9 days after bait deployment; and they visited earlier when their home range size was larger. As the number of bait sites in an individual's home range increased, individual pigs visited more bait sites, and the probability of a visit increased dramatically up to approximately 5 bait sites and much less thereafter. Wild pigs travelled farther distances to visit bait sites in lower quality habitat. Our results support the hypothesis that habitat quality can mediate the efficacy of baiting programs for wildlife by influencing their movement patterns and motivation to use anthropogenic resources. Our results suggest wild pigs will travel extensively within their home range to visit bait sites, and that in lower quality habitat, most animals will find bait sites more quickly. Determining the area of influence of bait sites can increase the efficacy of planning and monitoring management programs. Overall, our study provides new information to help managers plan baiting designs to attract the greatest number of pigs.

59 BASIC BIOLOGICAL SCIENCES↗

Endovascular Revascularization of Chronically Thrombosed Arteriovenous Fistulas and Grafts for Hemodialysis: A Retrospective Study in 15 Patients With 18 Access Sites

The current study retrospectively evaluated whether endovascular revascularization of chronically thrombosed and long-discarded vascular access sites for hemodialysis was feasible. Technical and clinical success rates, postintervention primary and secondary patency rates, and complications were reported. During a 1-year period, we reviewed a total of 924 interventions performed for dysfunction and/or failed hemodialysis vascular access sites and permanent catheters in 881 patients. In patients whose vascular access-site problems were considered untreatable or were considered treatable with a high risk of failure and access-site abandonment, we attempted to revascularize (resurrect) the chronically occluded and long-discarded (mummy) vascular access sites. We attempted to resurrect a total of 18 mummy access sites (mean age 46.6 {+-} 38.7 months; range 5-144) in 15 patients (8 women and 7 men; mean age 66.2 {+-} 11.5 years; age range 50-85) and had an overall technical success rate of 77.8%. Resurrection failure occurred in 3 fistulas and in 1 straight graft. The clinical success rate was 100% at 2 months after resurrection. In the 14 resurrected vascular access sites, 6 balloon-assisted maturation procedures were required in 5 fistulas; after access-site maturation, a total of 22 interventions were performed to maintain access-site patency. The mean go-through time for successful resurrection procedures was 146.6 {+-} 34.3 min (range 74-193). Postmaturation primary patency rates were 71.4 {+-} 12.1% at 30 days, 57.1 {+-} 13.2% at 60 days, 28.6 {+-} 13.4% at 90 days, and 19 {+-} 11.8% at 180 days. Postmaturation secondary patency rates were 100% at 30, 60, and 90 days and 81.8 {+-} 11.6% at 180 days. There were 2 major complications consisting of massive venous ruptures in 2 mummy access sites during balloon dilation; in both cases, prolonged balloon inflation failed to achieve hemostasis, but percutaneous N-butyl cyanoacrylate glue seal-off was performed successfully. Percutaneous resurrection of mummy vascular access sites for hemodialysis is technically feasible with high clinical success rates. In selected patients, resurrection of mummy access sites provides long-discarded access sites one more chance to be used for hemodialysis in an effort to preserve potential extremity sites for future access-site placement and to prevent long-term catheter indwelling.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Assessment of oil and gas fields in California as potential CO 2 storage sites

California's total annual greenhouse gas (GHG) emissions (425.3 MtCO 2 e) in 2018 were about 6.4% of the US total (6,677 MtCO 2 e) and around 1% of global emissions. About 39% of 2018 GHG emissions in California were from the industrial and electrical sectors. Many of these emissions were from large stationary point sources and were suitable for carbon capture retrofit with subsequent storage of the captured carbon dioxide (CO 2 ) in geological formations. Previous studies of California found suitable geology and CO 2 storage resource. This study refines and furthers prior work using a three-stage screening process of oil fields, gas fields, and underground natural gas storage (UGS) sites by combining criteria from previous studies while excluding sites that pose technical risk or are located in regions with surface restrictions including sensitive habitats and dense populations. In the first stage, 129 CO 2 storage sites in California were identified using qualification criteria based upon formation properties including geological conditions and pore pressure. The second stage identified sensitive sites by applying conservative screens including seismic activity, faulting, population density, restricted lands, and sensitive habitats. During the third stage, 61 CO 2 potential storage sites were identified by subtraction of stage 2 areas from stage 1. The potential storage volume in the third stage ranged from 1.0 to 2.0 GtCO 2 . Finally, we applied a scoring system with seven parameters to rank the 61 potential sites based on subsurface technical criteria. The scored sites are classified as high priority, medium priority, and sites for future study. Prospective CO 2 storage sites with high and moderate priority were selected and linked to CO 2 sources. There are 14 prospective sites (above 20 MtCO 2 storage resource per site) with a total storage resource of 1024 MtCO 2 distributed in Northern and Southern California. Of these sites, there are 9 potential CO 2 -EOR sites and 1 depleted oil field with a total estimated CO 2 storage volume of ~800 MtCO 2 in the Southern San Joaquin and Ventura Basin. These 10 prospective sites with a storage resource greater than 20 MtCO 2 could potentially deliver more than 20 years of storage with an average injection rate of 40 MtCO 2 /year. The remaining 4 highly prospective sites are in Northern California. Additionally, study results suggest that saline formations should be re-evaluated in concert with storage in oil, gas, and natural gas storage reservoirs.

58 GEOSCIENCES↗

Validation of Remotely Sensed and Modeled Soil Moisture at Forested and Unforested Sites

Soil moisture is an important driver for forest ecosystems, influencing fire occurrence and extent, insect and pathogen impacts, and tree growth, which creates a need for regular, globally extensive soil moisture information that only satellite-based sensors or models can achieve. However, the reliability of soil moisture measurements in forests is not well understood due to a lack of suitable validation sites (especially relative to unforested ecosystems) and interference caused by high vegetation water content on remotely sensed measurements; although recent studies have started to address this gap [1], [2], [3], [4]. Here we validate the performance of multiyear remotely sensed (SMAP/Sentinel), remotely sensed data assimilation modelled (SMAP-L4), and modelled (NLDAS) surface and root zone (0-1 m) soil moisture datasets with data from in-situ sensors at 39 National Ecological Observatory Network (NEON) sites throughout the contiguous US. Due to differences in spatial resolution, NEON soil moisture (~0.2 km measurement zone) correlations were expected to be stronger with the SMAP/Sentinel product (3 km resolution) than with coarser resolution SMAP-L4 (9 km resolution) or NLDAS products (13 km resolution). However, given the sensitivity of satellite measurements to vegetation water content we expected a deterioration in the correlations based on remotely sensed measurements (SMAP/Sentinel and SMAP-L4) as aboveground biomass increased, whereas the model-based data (NLDAS) was expected to be largely insensitive to vegetation type. We recognize that the SMAP/Sentinel product was developed for unforested regions, therefore our application is outside its primary use case. Soil moisture is measured at up to 8 depths in five soil plots spaced up to 40 m apart at each NEON terrestrial site. Correlation parameters were calculated for the three remotely sensed and modelled data products relative to in-situ measurement following Entekhabi et al. [5]. The datasets comprised 94 (SMAP-L4), 28 (SMAP/Sentinel), and 106 (NLDAS) sites-years for surface soils and 13 (SMAP-L4) and 14 (NLDAS) site-years for the root zone. At unforested sites, the performance of the three remotely sensed and modelled data products was similar for surface soils (Table 1). For example, unbiased RMSD (ubRMSD), which SMAP uses as its primary performance metric [6], ranged from 0.05 to 0.06 m3 m-3 (Table 1), indicating the ability of all three products to track changes in soil moisture over time. The performance of the three products deteriorated at forested sites, however, while the difference in performance was modest for SMAP-L4 and NLDAS, the deterioration in SMAP/Sentinel performance was substantial. For instance, SMAP/Sentinel ubRMSD increased from 0.06 to 0.11 m3 m-3 and absolute mean difference (Abs MD; which includes measurement bias and spatial representativeness errors) increased from 0.06 to 0.16 m3 m-3, indicating both a reduction in ability to track temporal changes and absolute amounts of soil moisture in forest ecosystems. SMAP-L4 and NLDAS had lower unbiased RMSD for root zone (0-1 m) than surface soils at both forested and unforested sites (Tables 1 and 2; SMAP/Sentinel does not produce a root zone measurement). However, in most cases the correlation coefficient (r) was lower for the root zone than surface soils, suggesting the lower unbiased RMSD may be attributed to greater temporal stability of soil moisture in the root zone rather than improved data product performance. Mean difference and absolute mean difference, which encompass measurement bias and spatial representativeness errors, were greater for root zone than surface soils at unforested sites for both data products, but the opposite was generally true at forested sites. As with surface soils, there was relatively little change in the performance of SMAP-L4 and NLDAS between the unforested and forested sites. In summary, all three data products were able to adequately represent soil moisture at unforested sites, at least when aggregating across sites. However, while the performance of all three products deteriorated at forested sites, SMAP-L4 and NLDAS maintained sufficient performance to remain suitable for some use cases (ubRMSD <0.06 m3 m-3 and RMSD <0.13 m3 m-3). In contrast, the relatively poorer performance of the SMAP/Sentinel product at forested sites seems insufficient for most use cases (ubRMSD >0.1 m3 m-3 and RMSD >0.2 m3 m-3). We attribute the large reduction in the performance of the SMAP/Sentinel product in forests to its use of C-band wavelengths, which are particularly sensitive to vegetation interference, and apparently outweighed any gains provided by its higher spatial resolution. A combined SMAP/NISAR soil moisture product may provide improved performance relative to SMAP/Sentinel due to NISAR’s use of L-band wavelengths, which are less sensitive to vegetation (NISAR is scheduled for launch in early 2024).

Edward Ayres↗

Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming - 16614

By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17 sites remediated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) to the current inventory of 90 sites that it manages. Among the new sites are ones where federal public lands occur within the proposed long-term care boundary, the boundary determined by the Nuclear Regulatory Commission and LM as necessary to maintain site protectiveness for the entombed uranium mill tailings and residual groundwater contamination. For these sites, public land withdrawals for land and minerals will need to be established. LM's primary mission at UMTRCA sites is to protect the public and the environment from exposure to contamination at the sites. For the sites with public lands or federally controlled minerals that will be transferring to LM, the Office will apply to the Department of the Interior (DOI) Bureau of Land Management (BLM) for new, public land and mineral withdrawals. At most current LM UMTRCA sites that involved public lands and minerals, DOI granted DOE 'full administrative jurisdiction' and permanent withdrawals. Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing laws and regulations. LM is coordinating with DOI/BLM in Wyoming to permanently withdraw full and partial jurisdiction at future UMTRCA Title II sites in that state. This approach would allow LM to fully administer surface lands and minerals, where necessary, and DOI and LM to administer surface lands and leasable minerals where it would not jeopardize sites' radiological safety and long-term public and environmental protection. This 'shared-jurisdiction approach' will meet LM's strategic goal of protecting human health and the environment but also allow BLM to fulfill their mission to 'manage and conserve the lands under the mandate of multiple-use and sustained yield'. In addition, LM could also fulfill the fourth goal of its Strategic Plan, to optimize land use and assets. The portions of the sites where LM will ask for full jurisdiction are those that contain the disposal cell and any adjacent lands and minerals required to maintain and protect it. It is anticipated that the shared jurisdiction portion of the withdrawal would largely coincide with land where known or projected contaminated groundwater from the past ore processing exists or will migrate over time. Examples of BLM-authorized activities on the shared jurisdiction portions of the withdrawals may include livestock grazing, wildlife habitat improvement projects, recreation, and rights of ways for roads, pipelines, utilities, and communication sites. In addition, BLM could authorize subsurface uses such as oil and gas, coal, or geothermal development or groundwater pumping from deeper aquifers if the proposal would not disturb groundwater contamination. For areas of the withdrawal where the agencies will share jurisdictional authority, DOE LM and BLM will develop an interagency agreement (IA) to define acceptable uses and associated roles and responsibilities. To ensure maximum protection of human health and the environment, each site's IA will include a provision allowing DOE LM the right of first refusal against any action it believes might affect radiological safety at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Efficiency and Infrastructure Upgrades on Nuclear Clean-up Sites: The Hanford Experience - 18641

The Hanford site, located in southeastern Washington, produced much of our nation's weapons-grade plutonium for the Defense nuclear weapons program. This production lasted the better part of four decades with production ending in 1987. Since 1987, the focus of the Hanford site has turned to clean-up activities. Mission Support Alliance (MSA) is the integrator of the multi-contractor effort to clean up the Hanford site. MSA collaborates with the U.S. Department of Energy (DOE) and all Hanford site contractors in finding and implementing new, cost-saving, safe and practical solutions to cleanup challenges with a continual focus on innovative processes and technologies that reduce costs, energy use and bring safety improvements to the site. Support Services include environmental integration and land management; fleet and road maintenance; water/electric and utilities; cyber security and information management as well as the preservation of the site's cultural artifacts. This paper describes the process, challenges, and focus on infrastructure upgrade and energy efficiency projects in the context of a multi-contractor nuclear clean-up site. Project development and new technology deployment at Hanford has long been plagued with economic challenges. For example, despite extensive auditing, analysis, and project development, most of the energy-related projects on the Hanford site have gone unfunded due to the low cost of electricity, the relatively high cost of labor, and costs associated with detailed safety and cultural reviews. - The Hanford site is a direct-service customer of the Bonneville Power Administration (BPA) and has a marginal electricity rate of $0.033/kWh. - Labor costs on the Hanford site track high because of the requirements associated with the safety and security necessary to operate a legacy nuclear weapons complex. - In partnership with three federally recognized and other affected Native American tribes (Yakama Nation, Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Tribe, and Wanapum People), most activities on the Hanford site are afforded in-depth cultural reviews. To work within these constraints, the MSA Energy Management team has embarked on a three-pronged approach to energy project development: Program Visibility: The MSA Energy Management team has promoted both project opportunities and requirements across the Hanford site. This information comes in the form of site-wide newsletters, group meetings, e-mails, success stories, and recognition of staff. Single-point Analysis: To by-pass the inevitable duplications of effort, learning curve issues, and to improve project consistency/delivery, the MSA Energy Management team serves as the single resource to the site for energy project analysis. This resource includes initial assessment, engineering analysis, efficiency calculation and project recommendations. Contractor/utility Interface: In addition to the infrastructure under its own purview, MSA provides all support services for the contractor/utility interface. These activities include formulation and submission of incentive-based efficiency projects, project tracking, and incentive awards. All incentive awards are forwarded to the relevant contractor and then highlighted in the visibility campaign. Successful energy efficiency projects at Hanford have included high efficiency heating, ventilation, air conditioning (HVAC) systems, interior and exterior lighting/lighting control systems, pump and motor systems, and the right-sizing of transformers and area-wide electrical distribution systems. Prior to the initiation of this program and structure (roughly 3 years ago) the average annual energy efficiency incentive applied for and received was under $10,000, with an annual energy savings of approximately 36,000 kilowatt hours (kWh). In fiscal year 2017, the annual incentive received was over $419,000, with identified energy savings of over 1.3 million kWh. Details and case studies of the major project accomplishments are included. The success of this program can be traced to an understanding of the constraints, the development of a program to address these constraints, and good communication/coordination across DOE and the multiple contractors serving the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Used Nuclear Fuel From Nine Shutdown Sites

The Blue Ribbon Commission on America’s Nuclear Future identified removal of stranded used nuclear fuel at shutdown sites as a priority so that these sites may be completely decommissioned and put to other beneficial uses. In this report, a preliminary evaluation of removing used nuclear fuel from nine shutdown sites was conducted. The shutdown sites included Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion. At these sites a total of 7649 used nuclear fuel assemblies and a total of 2813.2 metric tons heavy metal (MTHM) of used nuclear fuel are contained in 248 storage canisters. In addition, 11 canisters containing greater-than-Class C (GTCC) low-level radioactive waste are stored at these sites. The evaluation was divided in four components: • characterization of the used nuclear fuel and GTCC low-level radioactive waste inventory at the shutdown sites • an evaluation of the onsite transportation conditions at the shutdown sites • an evaluation of the near-site transportation infrastructure and experience relevant to the shipping of transportation casks containing used nuclear fuel from the shutdown sites • an evaluation of the actions necessary to prepare for and remove used nuclear fuel and GTCC low-level radioactive waste from the shutdown sites. Using these evaluations the authors developed time sequences of activities and time durations for removing the used nuclear fuel and GTCC low-level radioactive waste from a single shutdown site, from three shutdown sites located close to each other, and from all nine shutdown sites.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT

This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review of an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework for the applications and resulted in the successful issuance of three ESPs. Still, formal guidance from both NRC and industry is needed for issues involving merchant plants; data collection issues; and interactions between NRC, the public, and the applicants. Specific Plant Parameter Issues: The use of the Plant Parameter Envelope (PPE) approach, when the applicant has not yet chosen a reactor technology, proved to be a major source of confusion between applicants and NRC. This issue had also been a topic of discussion during the NRC ESP hearings. Based upon North Anna and Grand Gulf COLA experiences, the need should be evaluated for future NRC guidance pertaining to the PPE approach to clarify these issues. In addition, NRC, applicants, and industry spent considerable time and resources deciding how to employ new seismic analysis approaches. Future guidance in this area would also be very useful. Best Project Practices: A variety of good practices were identified, such as using specific project tracking and milestone items, handling very large documents electronically, employing a formal and rigorous document review process, and sharing large files across organizational sites. This report also includes a set of general recommendations to assist future ESP applicants. Several recommendations highlight the need for NRC and industry to continue to work together to improve the ESP process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The transportation factor in site evaluations for spent nuclear fuel storage and disposal facilities - 15460

New facility siting studies will be necessary to fulfill the Blue Ribbon Commission (BRC) on America's Nuclear Future 2012 recommendation to develop consolidated interim storage (CIS) for spent nuclear fuel in the next decade. Future site evaluations for used nuclear fuel (UNF) storage and disposal facilities must address transportation requirements, especially access to mainline railroads, early in the site selection process. The U.S. Department of Energy (DOE) in 2013 proposed a strategy for managing spent nuclear fuel in accordance with the BRC recommendations by establishing a pilot interim storage facility by 2021 and a consolidated interim storage facility by 2025. The authors demonstrate that currently available geographic information systems and already adopted siting criteria (defining favorable and unfavorable conditions) allow the identification of the transportation portion of a storage facility siting process to begin without delay. Ready access to the mainline rail system is absolutely critical since existing rail access, or easily constructed access, is a highly favorable condition for successful siting. Despite widespread rail abandonments over the past three decades, vast areas of the United States retain mainline rail service or could connect to existing mainlines by building new rail spurs of less than 25-50 miles. This precondition for transportation planning is critical. Planners need to start with the beginning - availability of rail transportation to and from the interim storage facility/facilities. A second step in transportation screening would be to evaluate those potential site locations within 50 miles of existing mainline railroads using other appropriate variables. This effort could begin with the application of the 1984 repository siting guidelines for transportation (10 CFR 960.5-2-7)[1]. Repository surface facilities have essentially the same transportation requirements as storage facilities. The guidelines in 10 CFR 960 provide a readily available template for evaluating sites based on transportation risks, impacts and costs. Initial site screening, after considering proximity to mainline railroads as the precursory step, should evaluate: 1) proximity to highly populated areas; 2) proximity to interstate highways; 3) proximity to environmentally sensitive areas and lands protected by federal, state, or tribal governments; and 4) proximity to military installations, hazardous materials facilities, or other facilities that might impact transportation safety and security.Several challenges exist which prevent effective transportation planning. The diversity of canister and cask types and SNF characteristics and conditions, the increasingly limited rail access at the shipping sites and the ease with which public attention can be marshalled against a waste management program, all suggest that future efforts need to identify potential storage sites that reduce transportation impacts and costs by reducing near-site transportation construction and reduce total system transportation impacts. This can most easily be accomplished by reducing shipping distances in a process that is easily defined and implemented. The paper concludes that the DOE should develop a site screening and evaluation program with transportation as a central consideration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concentration of Actinides in Plant Mounds at Safety Test Nuclear Sites in Nevada

Plant mounds or blow-sand mounds are accumulations of soil particles and plant debris around large shrubs and are common features in deserts in the southwestern United States. Believed to be an important factor in their formation, the shrubs create surface roughness that causes wind-suspended particles to be deposited and resist further suspension. Shrub mounds occur in some plant communities on the Nevada Test Site, the Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR), including areas of surface soil contamination from past nuclear testing. In the 1970s as part of early studies to understand properties of actinides in the environment, the Nevada Applied Ecology Group (NAEG) examined the accumulation of isotopes of Pu, {sup 241}Am, and U in plant mounds at safety test sites. The NAEG studies found concentrations of these contaminants to be greater in shrub mounds than in the surrounding areas of desert pavement. For example, at Project 57 on the NTTR, it was estimated that 15 percent of the radionuclide inventory of the site was associated with shrub mounds, which accounted for 17 percent of the surface area of the site, a ratio of inventory to area of 0.85. At Clean Slate III at the TTR, 29 percent of the inventory was associated with approximately 32 percent of the site covered by shrub mounds, a ratio of 0.91. While the total inventory of radionuclides in intershrub areas was greater, the ratio of radionuclide inventory to area was 0.40 and 0.38, respectively, at the two sites. The comparison between the shrub mounds and adjacent desert pavement areas was made for only the top 5 cm since radionuclides at safety test sites are concentrated in the top 5 cm of intershrub areas. Not accounting for radionuclides associated with the shrub mounds would cause the inventory of contaminants and potential exposure to be underestimated. As part of its Environmental Restoration Soils Subproject, the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office has proposed that the majority of its contaminated soil 'Corrective Action Units', including the safety test sites, be closed by fencing and posting with administrative controls. The concentration of actinides in the shrub mounds has important implications for postclosure management of the safety test sites. Because resuspension factors at safety test sites can be three to four orders-of-magnitude higher than soil sites associated with atmospheric tests where criticality occurred, the shrub mounds are an important factor in stabilization of actinide contaminants. Loss of shrubs associated with mounds from fire or plant die-back from drought could cause radionuclides at these sites to become more prone to suspension and water erosion until the sites are stabilized. Alternatively, although shrub mounds are usually composed of predominantly fine sand size particles, smaller silt and clay size particles in them are often high in CaCO{sub 3} content. The CaCO{sub 3} may act as a cementing agent to limit erosion of the shrub mounds even if the vegetation cover is temporarily lost.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Ce{sub 11}Ge{sub 3.73(2)}In{sub 6.27}: Solid-state synthesis, crystal structure and site-preference

A novel intermetallic compound of Ce{sub 11}Ge{sub 3.73(2)}In{sub 6.27} has been synthesized through the high-temperature solid-state reaction using Nb-ampoules. A batch of well grown block-/short bar-shaped single-crystals has been obtained, and the crystal structure of the title compound has been characterized by single-crystal X-ray diffraction analyses. Ce{sub 11}Ge{sub 3.73(2)}In{sub 6.27} adopts the Ho{sub 11}Ge{sub 10}-type structure belonging to the tetragonal space group I4/mmm (Z=4, Pearson symbol tI84) with nine crystallographically unique atomic positions in the asymmetric unit. The lattice parameters are a=12.0163(1) Å and c=16.5396(2) Å. The overall crystal structure can simply be depicted as an assembly of three different types of co-facial cationic polyhedra centered by anions, which is further enclosed by the three-dimensional (3-D) cage-like anionic framework. The extra amount of In is observed in one of three isolated anionic sites resulting in introducing the Ge/In-mixed site at the Wyckoff 4e site. This unique site-preference of In substitution for Ge at the 4e site has been enlightened via the atomic size-aspect which was fully supported and rationalized by the site- and bond-energies analyses using tight-binding linear muffin-tin orbital (TB-LMTO) calculations. Energy-dispersive X-ray spectroscopy (EDS), density of states (DOS), crystal orbital Hamilton population (COHP), and electron localization function (ELF) analyses for the title compound are also presented. Magnetic susceptibility measurement proves that an antiferromagnetic ordering of Ce atoms at a low temperature with a paramagnetic Curie temperature of −23.2 K. - Graphical abstract: Reported is experimental and theoretical investigations for Ce{sub 11}Ge{sub 3.73(2)}In{sub 6.27}, which is the first reported example having the extra amounts of In substitution for Ge at one of three “isolated” anionic sites in the Ho{sub 11}Ge{sub 10}-type phase. The observed In site-preference toward the particular anionic site was rationalized via the atomic size-aspect supported by comprehensive analyses for the site-energies including the Wyckoff 4e and 8j sites. - Highlights: • Block or short-bar shaped single-crystals of Ce{sub 11}Ge{sub 3.73(2)}In{sub 6.27} were synthesized. • The first example of having the In/Ge mixture at the “isolated” anionic site. • The site-preference of In was rationalized by the site- and bond-energies.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Site Management Guide (Blue Book)

The U.S. Department of Energy (Department) Office of Legacy Management (LM), established in 2003, manages the Department’s postclosure responsibilities and ensures the future protection of human health and the environment. During World War II and the Cold War, the Federal government developed and operated a vast network of industrial facilities for the research, production, and testing of nuclear weapons, as well as other scientific and engineering research. These processes left a legacy of radioactive and chemical waste, environmental contamination, and hazardous facilities and materials at well over 100 sites. Since 1989, the Department has taken an aggressive accelerated cleanup approach to reduce risks and cut costs. At most Departmental sites undergoing cleanup, some residual hazards will remain at the time cleanup is completed due to financial and technical impracticality. However, the Department still has an obligation to protect human health and the environment after cleanup is completed. LM fulfills DOE’s postclosure obligation by providing long-term management of postcleanup sites which do not have continuing missions. LM is also responsible for sites under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Currently, the U.S. Army Corps of Engineers (USACE) is responsible for site surveys and remediation at FUSRAP sites. Once remediation is completed, LM becomes responsible for long-term management. LM also has responsibility for uranium processing sites addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). UMTRCA Title II sites are sites that were commercially owned and are regulated under a U.S. Nuclear Regulatory Commission (NRC) license. For license termination, the owner must conduct an NRC-approved cleanup of any on-site radioactive waste remaining from former uranium ore-processing operations. The site owner must also provide full funding for inspections and, if necessary, ongoing maintenance. Once site cleanup is complete, LM accepts title to these sites on behalf of the United States and assumes long-term management.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Validation Package November 2015 Groundwater and Surface Water Sampling at the Old and New Rifle, Colorado, Processing Sites February 2016

Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Processing Sites. Duplicate samples were collected from New Rifle locations 0659 and 0855, and Old Rifle location 0304. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008 Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920), with one exception: New Rifle location 0635 could not be sampled because it was inaccessible; a fence installed by the Colorado Department of Transportation prevents access to this location. DOE is currently negotiating access with the Colorado Department of Transportation. Analytes measured at the New Rifle site included contaminants of concern (COCs) (arsenic, molybdenum, nitrate + nitrite as nitrogen, selenium, uranium, and vanadium) ammonia as nitrogen, major cations, and major anions. Field measurements of total alkalinity, oxidation- reduction potential, pH, specific conductance, turbidity, and temperature were made at each location, and the water level was measured at each sampled well. A proposed alternate concentration limit (ACL) for vanadium of 50 milligrams per liter (mg/L), specific to the compliance (POC) wells (RFN-0217, -0659, -0664, and -0669) is included in the New Rifle GCAP. Vanadium concentrations in the POC wells were below the proposed ACL as shown in the time-concentration graphs in the Data Presentation section (Attachment 2). Time-concentration graphs from all other locations sampled are also included in Attachment 2. Sampling location RFN-0195 was misidentified for the June/August 2014 and November 2014 sampling events. (Well RFN-0609 was inadvertently sampled instead of RFN-0195 in 2014.) The results for RFN-0195 have been corrected, and are included in associated time-concentration graphs for this location. Recent results for RFN-0195 are consistent with established trends with the possible exception of vanadium. The most recent result for vanadium showed an increase over recent values. Vanadium concentrations at RFN-0195 and other locations will continue to be evaluated in the future to determine the potential for deviations from established trends. The surface water locations were sampled to monitor the impact of groundwater discharge. COC concentrations at Colorado River surface water locations RFN-0324 and RFN-0326, downgradient of the site, remained low and were consistent with historical results, as shown in the time-concentration graphs. COC concentrations did not indicate there are any impacts related to groundwater discharge to the river. In many cases, elevated COC concentrations at the New Rifle site pond locations were observed, as shown in the time-versus concentration graphs. As noted in the GCAP, this indicates impacts from groundwater discharge to the ponds. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Groundwater Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR). Analytes measured at the Old Rifle site included COCs (selenium, uranium, and vanadium), major cations, and major anions. Field measurements of total alkalinity, oxidation-reduction potential, pH, specific conductance, turbidity, temperature, were made at each location, and the water level was measured at each sampled well. The monitoring strategy described in the GCAP is designed to determine progress of the natural flushing process in meeting compliance standards for site COCs. Standards for selenium and vanadium are the proposed ACLs of0.05 mg/L and 1.0 mg/L, respectively. For uranium the cleanup goal is the UMTRA standard of 0.044 mg/L or background, whichever is higher. As shown in the time concentration graphs, the uranium concentration exceeds the cleanup goal at groundwater monitoring locations RF0-0304, -0305, -0310, -0655, and -0656. The surface water locations were sampled to monitor the impact of groundwater discharge at Colorado River surface water locations adjacent to (RF0-0396) and downgradient of the site (RF0-0741). COC concentrations remain low and consistent with historical concentrations as shown in the time-concentration graphs (Attachment 2), which indicate no impacts from groundwater discharge to the river.

2015 Old and New Rifle↗

Update of Erosion Conditions and Assessment of Mitigation Options for the L-Bar Site

The L-Bar former uranium milling site was remediated and closed per regulations and is now under the long-term stewardship of the U.S. Department of Energy, Office of Legacy Management (DOE/LM). Since assuming stewardship in 2004, DOE/LM has observed erosion and sedimentation processes at the L-Bar Site that will challenge meeting the design closure criteria in the long term, and therefore erosion control structures were installed in several areas. Portions of these structures were subsequently damaged by summer convective storm events and they are being redesigned. At the request of DOE/LM, Desert Research Institute (DRI) reviewed the proposed redesign plans of the erosion control structures. The purpose of this review is to support DOE/LM decisions regarding mitigation of ongoing erosion processes, including assessing possible repair of the existing erosion control structures, as well as plan for effective long-term site management. This design review is performed in reference to the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards contained in 40 CFR 192.02 that require containment of residual radioactive material be effective for up to 1,000 years (if achievable, but certainly for 200 years), limit radon release, protect groundwater, and minimize future maintenance. The erosion control structures under review are not subject to the UMTRCA standard directly, but they contribute to the performance of the overall containment system by virtue of their relationship with the large diversion channels bounding the disposal cell. The 11 design drawings included in “Erosion Control Alternatives Analysis, L-Bar, New Mexico, Disposal Site, LTS-111-0043-08-002,” dated January 11, 2019, and listed in Appendix A, and supporting calculations in Weston (2019) are the focus of the review. Additionally, DOE/LM provided supporting data such as a 2018 photogrammetry-based digital elevation model of the site, precipitation records collected from an on-site weather station, and sedimentation records collected at an on-site basin. This assessment includes review of the proposed design to mitigate current site conditions but also addresses site changes between the initial erosion assessment report (Miller et al., 2012) and current conditions. The analysis is at a predesign engineering level and does not include development of hydraulic or sediment transport models. Site precipitation data are included in Miller et al. (2012). The natural conditions of the site, the design of site diversion systems, observed erosion at the site, and predesign engineering analysis are used to develop a holistic view of the challenges to L-Bar Site stability and possible responsive actions.

54 ENVIRONMENTAL SCIENCES↗

State Enabling Legislation for Commercial-Scale Wind Power Siting and the Local Government Role

Siting of commercial-scale wind facilities (>5MW) is determined primarily by state laws. State laws either leave siting regulation to local governments, prescribe and constrain the role for local governments, establish state standards, or preempt local governance by having state institutions govern siting. Siting regulation is extremely important to the advancement of wind generation in the United States. Major siting decisions lie ahead for state and local governments as the nation diversifies its energy portfolio. An increase in the number of new wind facilities, siting in more locations and in more heavily populated areas, will require attention to the laws and regulations that govern siting. Local governments exercise some authority over commercial-scale wind facility siting in 48 of the 50 states. In 34 states, local governments have substantial autonomy to regulate the siting of most or all commercial-scale wind facilities. A few states authorize local governments to regulate wind facility siting, but make the scope of local regulation subject to limitations defined by state law. Eleven states set size thresholds for state regulatory involvement – with local governments in these states regulating smaller facilities and state boards regulating larger ones (either exclusively or concurrently with local governments). In just under a third of the states, siting of most or all commercial-scale wind facilities requires approval by both state and local government bodies. Only a few states reserve the regulation of siting of all or virtually all commercial-scale wind facilities to state boards and commissions. The content of the applicable regulations is more important, in general, than the level of government responsible for the decision. Several states that assign siting responsibilities to local governments have specified some of the content and the limits of local regulation. About 1/5 of the states have directed boards and commissions to develop statewide regulations to deal with wind facility siting issues subject to state approval. These requirements most often specify standards for setbacks, wildlife, noise, decommissioning, and other issues.

17 WIND ENERGY↗

Radiation Protection Considerations at USACE Formerly Utilized Sites Remedial Action Program (FUSRAP) Projects

The Formerly Utilized Sites Remedial Action Program (FUSRAP) was initially authorized by Congress in 1974. FUSRAP was enacted to address residual radioactive contamination associated with numerous sites across the U.S. at which radioactive material (primarily Uranium ores and related milling products) had been processed in support of the nation's nuclear weapons program dating back to the Manhattan Project and the period immediately following World War II. In October 1997, Congress transferred the management of this program from the Department of Energy to the United States Corp of Engineers. Through this program, the Corps addresses the environmental remediation of certain sites once used by DOE's predecessor agencies, the Manhattan Engineer District and the Atomic Energy Commission. The waste at FUSRAP sites consists mainly of low levels of uranium, thorium and radium, along with some mixed wastes. Upon completion of remedial activities, these sites are transferred to DOE for long-term stewardship activities. This paper presents and contrasts the radiological conditions and recent monitoring results associated with five large ongoing FUSRAP projects including Maywood, N.J.; the Linde site near Buffalo, N.Y.; Colonie in Albany N.Y. and the St Louis, Mo. airport and downtown sites. The radiological characteristics of soil and debris at each site and respective regulatory clean up criteria is presented and contrasted. Some differences are discussed in the radiological characteristics of material at some sites that result in variations in radiation protection monitoring programs. Additionally, summary data for typical personnel radiation exposure monitoring results are presented. In summary: 1. The FUSRAP projects for which data and observations are reported in this paper are considered typical of the radiological nature of FUSRAP sites in general. 2. These sites are characterized by naturally occurring uranium and thorium series radionuclides in soil and debris, at concentrations typically < E4 pCi/ gram total activity. 3. Although external exposure rates are generally low resulting in few exposures above background, occasional 'hot spots' are observed in the 1- 10 mR / hr range or higher. However personnel and general area external exposure monitoring programs consistently demonstrate very low potential for external exposure at theses sites. 4. Potential for airborne exposure is controlled by wetting and misting techniques during excavation and movement of materials. Air sampling and bioassay programs confirm low potential for airborne exposure of workers at these sites. 5. Radiation protection and health physics monitoring programs as implemented at these sites ensure that exposures to personal are maintained ALARA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrogeologic Modeling at the Sylvania Corning FUSRAP Site - 13419

A comparative groundwater hydrogeologic modeling analysis is presented herein to simulate potential contaminant migration pathways in a sole source aquifer in Nassau County, Long Island, New York. The source of contamination is related to historical operations at the Sylvania Corning Plant ('Site'), a 9.49- acre facility located at 70, 100 and 140 Cantiague Rock Road, Town of Oyster Bay in the westernmost portion of Hicksville, Long Island. The Site had historically been utilized as a nuclear materials manufacturing facility (e.g., cores, slug, and fuel elements) for reactors used in both research and electric power generation in early 1950's until late 1960's. The Site is contaminated with various volatile organic and inorganic compounds, as well as radionuclides. The major contaminants of concern at the Site are tetrachloroethene (PCE), trichloroethene (TCE), nickel, uranium, and thorium. These compounds are present in soil and groundwater underlying the Site and have migrated off-site. The Site is currently being investigated as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). The main objective of the current study is to simulate the complex hydrogeologic features in the region, such as numerous current and historic production well fields; large, localized recharge basins; and, multiple aquifers, and to assess potential contaminant migration pathways originating from the Site. For this purpose, the focus of attention was given to the underlying Magothy formation, which has been impacted by the contaminants of concern. This aquifer provides more than 90% of potable water supply in the region. Nassau and Suffolk Counties jointly developed a three-dimensional regional groundwater flow model to help understand the factors affecting groundwater flow regime in the region, to determine adequate water supply for public consumption, to investigate salt water intrusion in localized areas, to evaluate the impacts of regional pumping activity, and to better understand the contaminant transport and fate mechanisms through the underlying aquifers. This regional model, developed for the N.Y. State Department of Environmental Conservation (NYSDEC) by Camp Dresser and McKee (CDM), uses the finite element model DYNFLOW developed by CDM, Cambridge, Massachusetts. The coarseness of the regional model, however, could not adequately capture the hydrogeologic heterogeneity of the aquifer. Specifically, the regional model did not adequately capture the interbedded nature of the Magothy aquifer and, as such, simulated particles tended to track down-gradient from the Site in relatively straight lines while the movement of groundwater in such a heterogeneous aquifer is expected to proceed along a more tortuous path. This paper presents a qualitative comparison of site-specific groundwater flow modeling results with results obtained from the regional model. In order to assess the potential contaminant migration pathways, a particle tracking method was employed. Available site-specific and regional hydraulic conductivity data measured in-situ with respect to depth and location were incorporated into the T-PROG module in GMS model to define statistical variation to better represent the actual stratigraphy and layer heterogeneity. The groundwater flow characteristics in the Magothy aquifer were simulated with the stochastic hydraulic conductivity variation as opposed to constant values as employed in the regional model. Contaminant sources and their exact locations have been fully delineated at the Site during the Remedial Investigation (RI) phase of the project. Contaminant migration pathways originating from these source locations at the Site are qualitatively traced within the sole source aquifer utilizing particles introduced at source locations. Contaminant transport mechanism modeled in the current study is based on pure advection (i.e., plug flow) and mechanical dispersion while molecular diffusion effects are neglected due to relatively high groundwater velocities encountered in the aquifer. In addition, fate of contaminants is ignored hereby to simulate the worst-case scenario, which considers the contaminants of concern as tracer-like compounds for modeling purposes. The results of the modeling analysis are qualitatively compared with the County's regional model, and patterns of contaminant migration in the region are presented. (authors)

54 ENVIRONMENTAL SCIENCES↗

Alternative Endpoints and Approaches for the Remediation of Contaminated Groundwater at Complex Sites - 13426

The goal of United States (U.S.) Department of Energy's (DOE)'s environmental remediation programs is to restore groundwater to beneficial use, similar to many other Federal and state environmental cleanup programs. Based on past experience, groundwater remediation to pre-contamination conditions (i.e., drinking water standards or non-detectable concentrations) can be successfully achieved at many sites. At a subset of the most complex sites, however, complete restoration is not likely achievable within the next 50 to 100 years using today's technology. This presentation describes several approaches used at complex sites in the face of these technical challenges. Many complex sites adopted a long-term management approach, whereby contamination was contained within a specified area using active or passive remediation techniques. Consistent with the requirements of their respective environmental cleanup programs, several complex sites selected land use restrictions and used risk management approaches to accordingly adopt alternative cleanup goals (alternative endpoints). Several sites used long-term management designations and approaches in conjunction with the alternative endpoints. Examples include various state designations for groundwater management zones, technical impracticability (TI) waivers or greater risk waivers at Superfund sites, and the use of Monitored Natural Attenuation (MNA) or other passive long-term management approaches over long time frames. This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and approaches for groundwater remediation at complex sites under a variety of Federal and state cleanup programs. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed to evaluate alternative endpoints for groundwater remediation at complex sites. A statistical analysis of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) sites receiving TI waivers will be presented as well as case studies of other types of alternative endpoints and alternative remedial strategies that illustrate the variety of approaches used at complex sites and the technical analyses used to predict and document cost, time frame, and potential remedial effectiveness. This presentation is intended to inform DOE program managers, state regulators, practitioners and other stakeholders who are evaluating technical cleanup challenges within their own programs, and establishing programmatic approaches to evaluating and implementing long-term management approaches. Case studies provide examples of long-term management designations and strategies to manage and remediate groundwater at complex sites. At least 13 states consider some designation for groundwater containment in their corrective action policies, such as groundwater management zones, containment zones, and groundwater classification exemption areas. Long-term management designations are not a way to 'do nothing' or walk away from a site. Instead, soil and groundwater within the zone is managed to be protective of human health and the environment. Understanding when and how to adopt a long-term management approach can lead to cost savings and the more efficient use of resources across DOE and at numerous other industrial and military sites across the U.S. This presentation provides context for assessing the use and appropriate role of alternative endpoints and supporting long-term management designations in final remedies. (authors)

54 ENVIRONMENTAL SCIENCES↗