Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Small Business Innovation Research. Program solicitation. Closing date: July 21, 1992

The National Aeronautics and Space Administration (NASA) invites small businesses to submit Phase 1 proposals in response to its Small Business Innovation Research (SBIR) Program Solicitation 92-1. Firms with research or research and development capabilities (R/R&D) in science or engineering in any of the areas listed are encouraged to participate. This, the tenth annual SBIR solicitation by NASA, describes the program, identifies eligibility requirements, describes the proposal evaluation and award selection process, and provides other information to assist those interested in participating in NASA's SBIR program. It also identifies, in Section 8.0, the technical topics and subtopics in which SBIR Phase 1 proposals are solicited in 1992. These topics and subtopics cover a broad range of current NASA interests but do not necessarily include all areas in which NASA plans or currently conducts research. The NASA SBIR program seeks innovative approaches that respond to the needs, technical requirements, and new opportunities described in the subtopics. The focus is on innovation through the use of emerging technologies, novel applications of existing technologies, exploitation of scientific breakthroughs, or new capabilities or major improvements to existing technologies. NASA plans to select about 320 high-quality research or research and development proposals for Phase 1 contract awards on the basis of this Solicitation. Phase 1 contracts are normally six months in duration and funded up to $50,000, including profit. Selections will be based on the competitive merits of the offers and on NASA needs and priorities.

Source record↗

CLOSURE OF HLW TANKS FORMULATION FOR A COOLING COIL GROUT

The Tank Closure and Technology Development Groups are developing a strategy for closing the High Level Waste (HLW) tanks at the Savannah River Site (SRS). Two Type IV tanks, 17 and 20 in the F-Area Tank Farm, have been successfully filled with grout. Type IV tanks at SRS do not contain cooling coils; on the other hand, the majority of the tanks (Type I, II, III and IIIA) do contain cooling coils. The current concept for closing tanks equipped with cooling coils is to pump grout into the cooling coils to prevent pathways for infiltrating water after tank closure. This task addresses the use of grout to fill intact cooling coils present in most of the remaining HLW tanks on Site. The overall task was divided into two phases. Phase 1 focused on the development of a grout formulation (mix design) suitable for filling the HLW tank cooling coils. Phase 2 will be a large-scale demonstration of the filling of simulated cooling coils under field conditions using the cooling coil grout mix design recommended from Phase 1. This report summarizes the results of Phase 1, the development of the cooling coil grout formulation. A grout formulation is recommended for the full scale testing at Clemson Environmental Technology Laboratory (CETL) that is composed by mass of 90% Masterflow (MF) 816 (a commercially available cable grout) and 10% blast furnace slag, with a water to cementitious material (MF 816 + slag) ratio of 0.33. This formulation produces a grout that meets the fresh and cured grout requirements detailed in the Task Technical Plan (2). The grout showed excellent workability under continuous mixing with minimal change in rheology. An alternative formulation using 90% MF 1341 and 10% blast furnace slag with a water to cementitious material ratio of 0.29 is also acceptable and generates less heat per gram than the MF 816 plus slag mix. However this MF 1341 mix has a higher plastic viscosity than the MF 816 mix due to the presence of sand in the MF 1341 cable grout and a lower water to solids ratio. Nevertheless, the higher viscosity grout may still meet the requirements for the cooling coil grout under certain pumping conditions or alternatively, the mix may be made more fluid by a short period of high shear mixing during production. The mixes have not been optimized for large scale production. It may be possible, for example, to adjust the water to cementitious materials ratio to provide improved performance of these mixes based on the results and conclusions of the large scale testing at CETL. Recommendations from this task include incorporation of a backup mixing/pumping system that is either integrated into the system or is available for immediate use in case of a pump or mixer failure of the primary system. A second recommendation is to conduct a laboratory scale investigation to determine the impact of operational variation on the properties of the grout. This effort would be initiated after feedback is received from the large scale testing at CETL. The purpose of this proposed variability testing is to better understand the limits of the operational variations (such as temperature and mixing time), and to identify possible approaches for remediation to ensure that the grout produced will flow effectively in the coils while still meeting the performance requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improved Manufacturability and Throughput of Ultra- Transparent, Super-Insulating Aerogels

AeroShield Materials produces a novel silica aerogel material with exemplary thermal performance and unprecedented optical clarity, offering the potential for super-insulating fenestration and insulated glass to reduce thermal losses in the built environment by billions of dollars every year. One of the most significant challenges facing AeroShield today is the total amount of time that is required to produce large monolithic aerogel samples. This overall process can require as much as 144 hours total, which can significantly hinder scale-up to an economically viable product. The purpose of this Phase 1 research was to continue development of our novel aerogel manufacturing process to reduce material processing time by up to 10x, greatly improving product throughput and reducing cost. AeroShield’s manufacturing process can be divided into 4 major stages, each with their own distinct set of parameters and time requirements. Under this Phase 1 award, AeroShield was able to identify and optimize a number of these parameters, including molding materials, solvent rinse conditions, critical point drying time, and annealing conditions. AeroShield also performed thorough analyses on how these optimized parameters affected important final characteristics of the gels, including optical clarity, thermal conductivity, and dimensional stability. This campaign culminated in the production of laboratory scale aerogel samples using significantly lower process times of both 36 and 18 total hours, which represent Phase 1 Target and Stretch goals. In order to achieve widespread market adoption, monolithic sheets of the aerogel material must be made to industry-standard sizes (8’ x 12’) at a cost that provides 5-7 year or less breakeven energy savings for consumers (<$2 sq/ft). The work performed under this Phase 1 award shows that time and materials required to make aerogel samples, which make up a significant portion of their overall cost, can be greatly reduced without sacrificing quality. AeroShield plans to use these optimized processes to produce larger, product-relevant sized aerogels in order to achieve target final material costs.

Wilke, Kyle↗

HAL/S-FC and HAL/S-360 compiler system program description

The compiler is a large multi-phase design and can be broken into four phases: Phase 1 inputs the source language and does a syntactic and semantic analysis generating the source listing, a file of instructions in an internal format (HALMAT) and a collection of tables to be used in subsequent phases. Phase 1.5 massages the code produced by Phase 1, performing machine independent optimization. Phase 2 inputs the HALMAT produced by Phase 1 and outputs machine language object modules in a form suitable for the OS-360 or FCOS linkage editor. Phase 3 produces the SDF tables. The four phases described are written in XPL, a language specifically designed for compiler implementation. In addition to the compiler, there is a large library containing all the routines that can be explicitly called by the source language programmer plus a large collection of routines for implementing various facilities of the language.

Source record↗

Transformation toughened ceramics for the heavy duty diesel engine technology program, phase 2

The objective of this program is to develop an insulating structural ceramic for application in a heavy duty adiabatic diesel engine. The approach is to employ transformation toughening (TT) by additions of zirconia-hafnia solid solution (ZHSS). The feasibility of using ZHSS as a toughening agent in mullite and alumina has been demonstrated in Phase 1 of this work. Based on Phase 1 results, a decision was made to concentrate the Phase 2 effort on process optimization of the TT mullite. A strong factor in that decision was the low thermal conductivity and high thermal shock resistance of the mullite. Results of the Phase 2 effort indicate that optimum toughening of mullite by additions of ZHSS is difficult to achieve due to apparent sensitivity to morphology. The 48 ksi room temperature modulus-of-rupture (MOR) achieved in selected specimens is approximately 50% of the original strength target. The MOR deteriorated to 34 ksi at 800 C.

Musikant, S.↗

NYSEG Seneca Compressed Air Energy Storage (CAES) Demonstration Project

Compressed Air Energy Storage (CAES) is a hybrid energy storage and generation concept that has many potential benefits especially in a location with increasing percentages of intermittent wind energy generation. The objectives of the NYSEG Seneca CAES Project included: for Phase 1, development of a Front End Engineering Design for a 130MW to 210 MW utility-owned facility including capital costs; project financials based on the engineering design and forecasts of energy market revenues; design of the salt cavern to be used for air storage; draft environmental permit filings; and draft NYISO interconnection filing; for Phase 2, objectives included plant construction with a target in-service date of mid-2016; and for Phase 3, objectives included commercial demonstration, testing, and two-years of performance reporting. This Final Report is presented now at the end of Phase 1 because NYSEG has concluded that the economics of the project are not favorable for development in the current economic environment in New York State. The proposed site is located in NYSEG’s service territory in the Town of Reading, New York, at the southern end of Seneca Lake, in New York State’s Finger Lakes region. The landowner of the proposed site is Inergy, a company that owns the salt solution mining facility at this property. Inergy would have developed a new air storage cavern facility to be designed for NYSEG specifically for the Seneca CAES project. A large volume, natural gas storage facility owned and operated by Inergy is also located near this site and would have provided a source of high pressure pipeline quality natural gas for use in the CAES plant. The site has an electrical take-away capability of 210 MW via two NYSEG 115 kV circuits located approximately one half mile from the plant site. Cooling tower make-up water would have been supplied from Seneca Lake. NYSEG’s engineering consultant WorleyParsons Group thoroughly evaluated three CAES designs and concluded that any of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $\$$125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for further development. As a result of all of these factors, the Phase 1 FEED developed an installed CAES plant cost estimate of approximately $\$$2,300/KW for the 210MW CAES 1A and 2 cycles. The capital cost for the 136 MW CAES 1 cycle was even higher due to the lower generating capacity of the cycle. Notably, the large equipment could have generated additional capacity (up to 270MW) which would have improved the cost per KW; however, the output was limited by the night time transmission system capability. The research herein, therefore, is particular to the site-specific factors that influenced the design and the current and forecasted generation mix and energy prices in Upstate New York and may not necessarily indicate that CAES plants cannot be economically constructed in other places in New York State or the world.

25 ENERGY STORAGE↗

Using Pilots to Assess the Value and Approach of CMMI Implementation

At Goddard Space Flight Center (GSFC), we have chosen to use Capability Maturity Model Integrated (CMMI) to guide our process improvement program. Projects at GSFC consist of complex systems of software and hardware that control satellites, operate ground systems, run instruments, manage databases and data and support scientific research. It is a challenge to launch a process improvement program that encompasses our diverse systems, yet is manageable in terms of cost effectiveness. In order to establish the best approach for improvement, our process improvement effort was divided into three phases: 1) Pilot projects; 2) Staged implementation; and 3) Sustainment and continual improvement. During Phase 1 the focus of the activities was on a baselining process, using pre-appraisals in order to get a baseline for making a better cost and effort estimate for the improvement effort. Pilot pre-appraisals were conducted from different perspectives so different approaches for process implementation could be evaluated. Phase 1 also concentrated on establishing an improvement infrastructure and training of the improvement teams. At the time of this paper, three pilot appraisals have been completed. Our initial appraisal was performed in a flight software area, considering the flight software organization as the organization. The second appraisal was done from a project perspective, focusing on systems engineering and acquisition, and using the organization as GSFC. The final appraisal was in a ground support software area, again using GSFC as the organization. This paper will present our initial approach, lessons learned from all three pilots and the changes in our approach based on the lessons learned.

Godfrey, Sara↗

Axisymmetric and Focusing Analyzers to Enable Efficient Powder and Residual Stress Neutron Diffractometers

Project Summary: Company: Adelphi Technology, Inc., Redwood City, CA 94063-4121 DOE Phase 1 STTR PI: Dr. Jay Theodore Cremer, Jr. Chief Scientist at Adelphi Technology, Inc. DOE Phase 1 STTR with: Dr. Boris Khaykovich of Massachusetts Institute of Technology (MIT) MIT Nuclear Reactor Laboratory DOE Phase 1 STTR Title: Axisymmetric and Focusing Analyzers to Enable Efficient Powder and Residual Stress Neutron Diffractometers Statement of the problem or situation that is being addressed: Although thermal and cold neutron scattering is widely used, and is critical for success in many areas of materials science and engineering, relatively low neutron fluxes severely limit applications of not only laboratory neutrons generators, but also large national neutron facilities. State-of-the-art thermal and cold neutron sources are large expensive national facilities, which serve diverse community of scientific and industrial users. The constant need to improve the instruments performance, stems from the fact that neutron methods are gaining in popularity, and becoming more and more powerful, while new neutron sources are not being constructed, so as to keep pace with the developments and needs of the scientific community. Small research reactors at universities and National Labs, and laboratory-based neutron generators, are necessary not only for education and training, but also when samples cannot be transported to other facilities. However, the standard neutron techniques, which were developed for high-flux facilities, require much higher efficiencies to be used effectively with the low fluxes of small sources. Thus, the efficient use of neutron sources, such as with our proposed analyzer, is important for the progress and broader use of these neutron techniques. General statement of how this problem is being addressed: We strive to achieve the goal of efficient use of available thermal and cold neutrons, by introducing here, novel analyzers for powder diffraction and stress-strain measurements. These analyzers will enable polychromatic cold and thermal neutron diffractometers, which will have much higher throughput than existing instruments. At large national facilities, such as at Oak Ridge National Laboratory, these analyzers would enable very fast instruments for screening of multiple samples, for measuring kinetic processes, or for measuring residual stress tensors. Commercial Applications and Other Benefits: By combining the novel analyzers with the Adelphi thermal neutron generator, we will open a new market, which includes the testing of samples that cannot be transported, such as nuclear fuels, or the testing of parts during production. Given the reasonable cost and size of our proposed analyzer systems, along with the continuing development of more powerful thermal neutron generators, the proposed analyzers will be suitable for weak neutrons sources, which are installed at small to large university, industrial, and government laboratories. Key Words: Neutron powder diffraction, residual stress measurements, thermal neutron generators, TRIGA reactors, low flux thermal and cold neutron sources, neutron diffraction. Summary for Members of Congress: Thermal and cold neutron beams are a powerful materials science probe, which provide unique information about the structure of matter. The proposed innovations expand the reach of neutron-based investigations to new materials and industries by enabling new instrumentation capabilities, thereby greatly enhancing and expanding the role of small, laboratory-based neutron instrumentation, and improving education and training of neutron users.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SkyMine Carbon Mineralization Pilot Project

This Topical Report addresses accomplishments achieved during Phase 1 of the SkyMine{reg_sign} Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO{sub 2} from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO{sub 2} to products having commercial value (i.e., beneficial use), show the economic viability of the CO{sub 2} capture and conversion process, and thereby advance the technology to a point of readiness for commercial scale demonstration and proliferation. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at commercial scale. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine{reg_sign} process chemistry to commercial pilot-scale operation and complete the preliminary design ('Reference Plant Design') for the pilot plant to be built and operated in Phase 2. Additionally, during Phase 1, information necessary to inform a DOE determination regarding NEPA requirements for the project was developed, and a comprehensive carbon lifecycle analysis was completed. These items were included in the formal application for funding under Phase 2. All Phase 1 objectives were successfully met on schedule and within budget.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Anti-proliferative actions of 2-decylamino-5,8-dimethoxy-1,4-naphthoquinone in vascular smooth muscle cells

Highlights: {yields} 2-Decylamino-DMNQ inhibited PDGF-BB-induced VSMC proliferation in a dose-dependent manner with no apparent cytotoxicity. {yields} 2-Decylamino-DMNQ inhibited PDGF-BB-induced phosphorylation of Erk1/2 and PLC{gamma}1. {yields} 2-Decylamino-DMNQ arrested a G{sub 0}/G{sub 1} cell cycle progression in association with pRb phosphorylation and PCNA expression. {yields} Both U0126, an Erk inhibitor, and U73122, a PLC{gamma} inhibitor, arrested a G{sub 0}/G{sub 1} phase of the cell cycle. -- Abstract: Naphthoquinone derivatives have been reported to possess various pharmacological activities, such as antiplatelet, anticancer, antifungal, and antiviral properties. In this study, we investigated the effects of a newly-synthesized naphthoquinone derivative, 2-decylamino-5,8-dimethoxy-1,4-naphthoquinone (2-decylamino-DMNQ), on VSMC proliferation and examined the molecular basis of the underlying mechanism. In a dose-dependent manner, 2-decylamino-DMNQ inhibited PDGF-stimulated VSMC proliferation with no apparent cytotoxic effect. While 2-decylamino-DMNQ did not affect PDGF-R{beta} or Akt, it did inhibit the phosphorylation of Erk1/2 and PLC{gamma}1 induced by PDGF. Moreover, 2-decylamino-DMNQ suppressed DNA synthesis through the arrest of cell cycle progression at the G{sub 0}/G{sub 1} phase, including the suppression of pRb phosphorylation and a decrease in PCNA expression, which was related to the downregulation of cell cycle regulatory factors, such as cyclin D1/E and CDK 2/4. It was demonstrated that both U0126, an Erk1/2 inhibitor, and U73122, a PLC{gamma} inhibitor, increased the proportion of cells in the G{sub 0}/G{sub 1} phase of the cell cycle. Thus, these results suggest that 2-decylamino DMNQ has an inhibitory effect on PDGF-induced VSMC proliferation and the mechanism of this action is through cell cycle arrest at the G{sub 0}/G{sub 1} phase. This may be a useful tool for studying interventions for vascular restenosis in coronary revascularization procedures and stent implantation.

60 APPLIED LIFE SCIENCES↗

Analysis of coupled-bunch instabilities for the NSLS-II storage ring with a 500MHz 7-cell PETRA-III cavity

The NSLS-II storage ring is designed to operate with superconducting RF-cavities with the aim to store an average current of 500 mA distributed in 1080 bunches, with a gap in the uniform filling for ion clearing. At the early stage of the commissioning (phase 1), characterized by a bare lattice without damping wigglers and without Landau cavities, a normal conducting 7-cell PETRA-III RF-cavity structure has been installed with the goal to store an average current of 25 mA. In this paper we discuss our analysis of coupled-bunch instabilities driven by the Higher Order Modes (HOMs) of the 7-cell PETRA-III RF-cavity. As a cure of the instabilities, we apply a well-known scheme based on a proper detuning of the HOMs frequencies based upon cavity temperature change, and the use of the beneficial effect of the slow head–tail damping at positive chromaticity to increase the transverse coupled-bunch instability thresholds. In addition, we discuss measurements of coupled-bunch instabilities observed during the phase 1 commissioning of the NSLS-II storage ring. In our analysis we rely, in the longitudinal case, on the theory of coupled-bunch instability for uniform fillings, while in the transverse case we complement our studies with numerical simulations with OASIS, a novel parallel particle tracking code for self-consistent simulations of collective effects driven by short and long-range wakefields.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A study of space-rated connectors using a robot end-effector

The main research activities have been directed toward the study of the Robot Operated Materials Processing System (ROMPS), developed at GSFC under a flight project to investigate commercially promising in-space material processes and to design reflyable robot automated systems to be used in the above processes for low-cost operations. The research activities can be divided into two phases. Phase 1 dealt with testing of ROMPS robot mechanical interfaces and compliant device using a Stewart Platform testbed and Phase 2 with computer simulation study of the ROMPS robot control system. This report provides a summary of the results obtained in Phase 1 and Phase 2.

Nguyen, Charles C.↗

Environmental Trade-Offs for a Process Utilizing Aerobic Respiration for Biological Conversion of Cellulosic Biomass-Derived Sugars to Hydrocarbons (Renewable Diesel Blendstock): Cooperative Research and Development Final Report, CRADA Number CRD-18-00765, Project 1

Phase II work is meant to develop an advanced understanding of how production of a renewable diesel blendstock from lignocellulosic biomass feedstocks via aerobic respiration at different production scales affects emissions of criteria pollutants and greenhouse gases (GHGs), local and regional air quality. The results could inform decisions by stakeholders (e.g., industry, community, air quality planners, investors) regarding relationships and tradeoffs between multiple environmental impacts and the challenges and opportunities for the design and deployment of a sustainable biofuel supply chain.

09 BIOMASS FUELS↗

Unmanned Aerial Systems (UAS) Integration into the National Airspace System (NAS)

NASA's Unmanned Aerial Systems (UAS) integration into the National Air Space (NAS) project has been working closely with the FAA and RTCA Special Committee 228 to identify and break down barriers to UAS integration. A focus of this work is on detect and avoid (DAA) technologies. A pilot has responsibility to see and avoid other aircraft and to remain "well clear," using their best judgment (Federal Aviation Regulations (FAR) Sec. 91.113). For UAS to perform this function, the see function is replaced by sensors to detect the other aircraft. Secondly, the pilot judgment of well clear has to be replaced by a mathematical expression. For Phase 1 of this effort, a well clear violation was defined if all three of these conditions are true: a) the horizontal clearance is less than 4000 ft., and b) the vertical clearance is less than 450 ft., and c) the time to loss of well clear is less than 35 seconds. This definition was developed with a great deal of community input and testing to ensure interoperability with Air Traffic Control (ATC) and pilots of manned aircraft. Appropriate guidance, alerting and displays were developed to allow UAS, with the appropriate sensors, to effectively maintain well clear. This work contributed to FAA Technical Standard Orders: TSO-C211, Detect and Avoid and TSO-C212, ATAR for Traffic Surveillance. Phase 2 of this work extends the operational environment to include the terminal area and lesser capable aircraft that might not have the payload capability to carry the RADAR defined in Phase 1. This session reports on work from Phase 1 and initial work in Phase 2.

UAS↗

Detect and Avoid: Efforts from NASA's UAS Integration into the NAS Project

NASA's Unmanned Aerial Systems (UAS) integration into the National Air Space (NAS) project has been working closely with the FAA and RTCA Special Committee 228 to identify and break down barriers to UAS integration. A focus of this work is on detect and avoid (DAA) technologies. A pilot has responsibility to see and avoid other aircraft and to remain "well clear," using their best judgment (Federal Aviation Regulations (FAR) Sec. 91.113). For UAS to perform this function, the see function is replaced by sensors to detect the other aircraft. Secondly, the pilot judgment of well clear has to be replaced by a mathematical expression. For Phase 1 of this effort, a well clear violation was defined if all three of these conditions are true: a) the horizontal clearance is less than 4000 ft., and b) the vertical clearance is less than 450 ft., and c) the time to loss of well clear is less than 35 seconds. This definition was developed with a great deal of community input and testing to ensure interoperability with Air Traffic Control (ATC) and pilots of manned aircraft. Appropriate guidance, alerting and displays were developed to allow UAS, with the appropriate sensors, to effectively maintain well clear. This work contributed to FAA Technical Standard Orders: TSO-C211, Detect and Avoid and TSO-C212, ATAR for Traffic Surveillance. Phase 2 of this work extends the operational environment to include the terminal area and lesser capable aircraft that might not have the payload capability to carry the RADAR defined in Phase 1. This session reports on work from Phase 1 and initial work in Phase 2.

Detect and Avoid (DAA)↗

A Two-Phase Intergrowth in Genthelvite from Mont Saint-Hilaire, Quebec

Synchrotron high-resolution powder X-ray-diffraction (HRPXRD) data and Rietveld structure refinement were used to examine a two-phase intergrowth of genthelvite, ideally Zn{sub 8}[Be{sub 6}Si{sub 6}O{sub 24}]S{sub 2}, from the alkaline intrusive complex at Mont Saint-Hilaire, Quebec, where genthelvite occurs in nepheline syenite pegmatites. The structural parameters obtained for the two phases are slightly different from each other. The unit-cell parameters are 8.119190(7) {angstrom} (51% phase 1) and 8.128914(9) {angstrom} (49% phase 2). The refinement gives the chemical formulae and interstitial M cation in terms of Zn and Mn (the Fe content is practically zero) for the Mn-poor genthelvite phase 1 as (Zn{sub 7.8}Mn{sub 0.2}){Sigma}{sub 8}[Be{sub 6}Si{sub 6}O{sub 24}]S{sub 2}, and the Mn-rich genthelvite phase 2 as (Zn{sub 7.0}Mn{sub 1.0}){Sigma}{sub 8}[Be{sub 6}Si{sub 6}O{sub 24}]S{sub 2}. These formulae are comparable to the Mn-poor and Mn-rich phases obtained by electron-microprobe analysis. The intergrowth indicates that diffusion is absent among the interstitial M cations of similar size (Zn{sup 2+}, Fe{sup 2+} and Mn{sup 2+}). Such intergrowths may form under distinct f(O{sub 2}) conditions and probably low temperature of crystallization that inhibits diffusion of M cations.

58 GEOSCIENCES↗

Hot gas ingestion characteristics and flow visualization of a vectored thrust STOVL concept

A 9.2 percent scale short takeoff and vertical landing (STOVL) hot gas ingestion model was designed and built by McDonnell Douglas Corporation (MCAIR) and tested in the NASA Lewis Research Center 9- by 15-Foot Low Speed Wind Tunnel (LSWT). Hot gas ingestion, the entrainment of heated engine exhaust into the inlet flow field, is a key development issue for advanced short takeoff and vertical landing aircraft. The Phase 1 test program, conducted by NASA Lewis and McDonnell Douglas Corporation, evaluated the hot ingestion phenomena and control techniques and Phase 2 test program which was conducted by NASA Lewis are both reported. The Phase 2 program was conducted at exhaust nozzles temperatures up to 1460 R and utilized a sheet laser system for flow visualization of the model flow field in and out of ground effects. Hot gas ingestion levels were measured for the several forward nozzle splay configurations and with flow control/lift improvement devices which reduced the hot gas ingestion. The model support system had four degrees of freedom, heated high pressure air for nozzle flow, and a suction system exhaust for inlet flow. The headwind (freestream) velocity for Phase 1 was varied from 8 to 90 kn, with primary data taken in the 8 to 23 kn headwind velocity range. Phase 2 headwind velocity varied from 10 to 23 kn. Results of both Phase 1 and 2 are presented. A description of the model, facility, a new model support system, and a sheet laser illumination system are also provided. Results are presented over a range of main landing gear height (model height) above the ground plane at a 10 kn headwind velocity. The results contain the compressor face pressure and temperature distortions, total pressure recovery, compressor face temperature rise, and the environmental effects of the hot gas. The environmental effects include the ground plane temperature and pressure distributions, model airframe heating, and the location of the ground flow separation. Results from the sheet laser flow visualization test are also shown.

Johns, Albert L.↗

TRANSENSOR: Transformer Real-time Assessment INtelligent System with Embedded Network of Sensors and Optical Readout. Final Report

Utilities across the world are wrestling with evolving market dynamics, population growth and climate change. Distributed Energy Resources (DERs) such as solar photovoltaics, distributed generators and energy storage systems are becoming important parts of the U.S. energy mix. These factors are driving an increasing need for low-cost grid asset monitoring. Aside from being costly, traditional utility monitoring systems are not sufficiently robust and do not provide real-time visibility into the condition of grid assets such as transformers. Lack of accurate real-time measurements on performance has resulted in the use of lagging indicators, such as oil sample analysis. To address this need, an innovative embedded optical sensing technology, Transformer Real-time Assessment Intelligent System (TRANSENSOR) was developed, validated and demonstrated in this project. To date, TRANSENSOR has focused on transformers but is extendable to other grid assets. In addition to the technology being embedded into new transformers during manufacturing, a retrofit configuration that can be installed on existing transformers in the field was also developed. It is anticipated that the ability to retrofit existing transformers will help accelerate adoption of the underlying TRANSENSOR technology. Phase 1 of the project focused on laboratory development and qualification of the technology. Following iterations and exploration of relevant optical sensing modalities and multiplexed configurations of interest for the transformer environment, an effective candidate configuration was agreed upon, down-selected and custom-designed for embedding into General Electric (GE) network transformers. Two new GE 500 kilovolt ampere (kVA), 27 kilovolt (kV) distribution network transformers were built with embedded fiber-optic (FO) sensors and successfully qualified per industry standards at GE’s Shreveport, Louisiana facility during Phase 1 of the project. Following the successful completion of Phase 1, the team proceeded to Phase 2, which focused on a field demonstration of the technology. Over Phase 2, the first new GE transformer built with embedded fiber-optic sensors was installed in an above-ground cage and connected to the grid at Con Edison’s Astoria facility. A second transformer equipped with TRANSENSOR was installed in an underground vault. Additionally, an older (1982 year model) GE transformer in an above-ground cage was retrofitted with fiber- optic sensors and reconnected to the grid at ConEd’s facility. Analysis of data acquired from the sensors showed interesting correlations with transformer loading. Additionally, key events such as transformer low-voltage network connection, primary-side energizing, and a pressure loss event from an oil sampling were detected by the TRANSENSOR system. Online data processing/feature extraction algorithms for the second transformer in the underground vault detected key features and event alerts that were transmitted through a wireless 4G connection. The remote deployment concept showed promising results with data collection running for a total of 8 months across the three (3) GE transformers instrumented for the Phase 2 field demonstration. This sets the stage well for further development and commercialization.

24 POWER TRANSMISSION AND DISTRIBUTION↗