Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Materials Science Research Rack Onboard the International Space Station

The Materials Science Research Rack (MSRR) is a research facility developed under a cooperative research agreement between NASA and ESA for materials science investigations on the International Space Station (ISS). MSRR was launched on STS-128 in August 2009 and currently resides in the U.S. Destiny Laboratory Module. Since that time, MSRR has logged more than 1000 hours of operating time. The MSRR accommodates advanced investigations in the microgravity environment on the ISS for basic materials science research in areas such as solidification of metals and alloys. The purpose is to advance the scientific understanding of materials processing as affected by microgravity and to gain insight into the physical behavior of materials processing. MSRR allows for the study of a variety of materials, including metals, ceramics, semiconductor crystals, and glasses. Materials science research benefits from the microgravity environment of space, where the researcher can better isolate chemical and thermal properties of materials from the effects of gravity. With this knowledge, reliable predictions can be made about the conditions required on Earth to achieve improved materials. MSRR is a highly automated facility with a modular design capable of supporting multiple types of investigations. The NASA-provided Rack Support Subsystem provides services (power, thermal control, vacuum access, and command and data handling) to the ESA-developed Materials Science Laboratory (MSL) that accommodates interchangeable Furnace Inserts (FI). Two ESA-developed FIs are presently available on the ISS: the Low Gradient Furnace (LGF) and the Solidification and Quenching Furnace (SQF). Sample Cartridge Assemblies (SCAs), each containing one or more material samples, are installed in the FI by the crew and can be processed at temperatures up to 1400C. ESA continues to develop samples with 14 planned for launch and processing in the near future. Additionally NASA has begun developing SCAs to support US PIs and their partners. The first of these Flight SCAs are being developed for investigations to support research in the areas of crystal growth and liquid phase sintering. Subsequent investigations are in various stages of development. US investigations will include a ground test program in order to distinguish the particular effects of the absence of gravity.

Reagan, Shawn↗

Materials Science Research Rack Onboard the International Space Station

The Materials Science Research Rack (MSRR) is a research facility developed under a cooperative research agreement between NASA and ESA for materials science investigations on the International Space Station (ISS). MSRR was launched on STS-128 in August 2009 and currently resides in the U.S. Destiny Laboratory Module. Since that time, MSRR has logged more than 1000 hours of operating time. The MSRR accommodates advanced investigations in the microgravity environment on the ISS for basic materials science research in areas such as solidification of metals and alloys. The purpose is to advance the scientific understanding of materials processing as affected by microgravity and to gain insight into the physical behavior of materials processing. MSRR allows for the study of a variety of materials, including metals, ceramics, semiconductor crystals, and glasses. Materials science research benefits from the microgravity environment of space, where the researcher can better isolate chemical and thermal properties of materials from the effects of gravity. With this knowledge, reliable predictions can be made about the conditions required on Earth to achieve improved materials. MSRR is a highly automated facility with a modular design capable of supporting multiple types of investigations. The NASA-provided Rack Support Subsystem provides services (power, thermal control, vacuum access, and command and data handling) to the ESA-developed Materials Science Laboratory (MSL) that accommodates interchangeable Furnace Inserts (FI). Two ESA-developed FIs are presently available on the ISS: the Low Gradient Furnace (LGF) and the Solidification and Quenching Furnace (SQF). Sample Cartridge Assemblies (SCAs), each containing one or more material samples, are installed in the FI by the crew and can be processed at temperatures up to 1400C. ESA continues to develop samples with 14 planned for launch and processing in the near future. Additionally NASA has begun developing SCAs to support US PIs and their partners. The first of these Flight SCAs are being developed for investigations to support research in the areas of crystal growth and liquid phase sintering. Subsequent investigations are in various stages of development. US investigations will include a ground test program in order to distinguish the particular effects of the absence of gravity.

Reagan, Shawn↗

Materials Science Research Rack Onboard the International Space Station

The Materials Science Research Rack (MSRR) is a research facility developed under a cooperative research agreement between NASA and ESA for materials science investigations on the International Space Station (ISS). MSRR was launched on STS-128 in August 2009 and currently resides in the U.S. Destiny Laboratory Module. Since that time, MSRR has logged more than 1400 hours of operating time. The MSRR accommodates advanced investigations in the microgravity environment on the ISS for basic materials science research in areas such as solidification of metals and alloys. The purpose is to advance the scientific understanding of materials processing as affected by microgravity and to gain insight into the physical behavior of materials processing. MSRR allows for the study of a variety of materials, including metals, ceramics, semiconductor crystals, and glasses. Materials science research benefits from the microgravity environment of space, where the researcher can better isolate chemical and thermal properties of materials from the effects of gravity. With this knowledge, reliable predictions can be made about the conditions required on Earth to achieve improved materials. MSRR is a highly automated facility with a modular design capable of supporting multiple types of investigations. The NASA-provided Rack Support Subsystem provides services (power, thermal control, vacuum access, and command and data handling) to the ESA-developed Materials Science Laboratory (MSL) that accommodates interchangeable Furnace Inserts (FI). Two ESA-developed FIs are presently available on the ISS: the Low Gradient Furnace (LGF) and the Solidification and Quenching Furnace (SQF). Sample Cartridge Assemblies (SCAs), each containing one or more material samples, are installed in the FI by the crew and can be processed at temperatures up to 1400degC. ESA continues to develop samples with 14 planned for launch and processing in the near future. Additionally NASA has begun developing SCAs to support US PIs and their partners. The first of these Flight SCAs are being developed for investigations to support research in the areas of crystal growth and liquid phase sintering. Subsequent investigations are in various stages of development. US investigations will include a ground test program in order to distinguish the particular effects of the absence of gravity.

Reagan, S. E.↗

Lessons Learned in Building the Ares Projects

Since being established in 2005, the Ares Projects at Marshall Space Flight Center have been making steady progress designing, building, testing, and flying the next generation of exploration launch vehicles. Ares is committed to rebuilding crucial capabilities from the Apollo era that made the first human flights to the Moon possible, as well as incorporating the latest in computer technology and changes in management philosophy. One example of an Apollo-era practice has been giving NASA overall authority over vehicle integration activities, giving civil service engineers hands-on experience in developing rocket hardware. This knowledge and experience help make the agency a "smart buyer" of products and services. More modern practices have been added to the management tool belt to improve efficiency, cost effectiveness, and institutional knowledge, including knowledge management/capture to gain better insight into design and decision making; earned value management, where Ares won a NASA award for its practice and implementation; designing for operability; and Lean Six Sigma applications to identify and eliminate wasted time and effort. While it is important to learn technical lessons like how to fly and control unique rockets like the Ares I-X flight test vehicle, the Ares management team also has been learning important lessons about how to manage large, long-term projects.

Sumrall, John Phil↗

Materials Science Research Rack Onboard the International Space Station

The Materials Science Research Rack (MSRR) is a research facility developed under a cooperative research agreement between NASA and ESA for materials science investigations on the International Space Station (ISS). MSRR was launched on STS-128 in August 2009 and currently resides in the U.S. Destiny Laboratory Module. Since that time, MSRR has logged more than 1400 hours of operating time. The MSRR accommodates advanced investigations in the microgravity environment on the ISS for basic materials science research in areas such as solidification of metals and alloys. The purpose is to advance the scientific understanding of materials processing as affected by microgravity and to gain insight into the physical behavior of materials processing. MSRR allows for the study of a variety of materials, including metals, ceramics, semiconductor crystals, and glasses. Materials science research benefits from the microgravity environment of space, where the researcher can better isolate chemical and thermal properties of materials from the effects of gravity. With this knowledge, reliable predictions can be made about the conditions required on Earth to achieve improved materials. MSRR is a highly automated facility with a modular design capable of supporting multiple types of investigations. The NASA-provided Rack Support Subsystem provides services (power, thermal control, vacuum access, and command and data handling) to the ESA-developed Materials Science Laboratory (MSL) that accommodates interchangeable Furnace Inserts (FI). Two ESA-developed FIs are presently available on the ISS: the Low Gradient Furnace (LGF) and the Solidification and Quenching Furnace (SQF). Sample Cartridge Assemblies (SCAs), each containing one or more material samples, are installed in the FI by the crew and can be processed at temperatures up to 1400C. ESA continues to develop samples with 14 planned for launch and processing in the near future. Additionally NASA has begun developing SCAs to support US PIs and their partners. The first of these Flight SCAs are being developed for investigations to support research in the areas of crystal growth and liquid phase sintering. Subsequent investigations are in various stages of development. US investigations will include a ground test program in order to distinguish the particular effects of the absence of gravity.

Reagan, Shawn↗

An Overview of the Applied Meteorology Unit (AMU)

The Applied Meteorology Unit (AMU) acts as a bridge between research and operations by transitioning technology to improve weather support to the Shuttle and American space program. It is a NASA entity operated under a tri-agency agreement by NASA, the US Air Force, and the National Weather Service (NWS). The AMU contract is managed by NASA, operated by ENSCO, Inc. personnel, and is collocated with Range Weather Operations at Cape Canaveral Air Force Station. The AMU is tasked by its customers in the 45th Weather Squadron, Spaceflight Meteorology Group, and the NWS in Melbourne, FL with projects whose results help improve the weather forecast for launch, landing, and ground operations. This presentation describes the history behind the formation of the AMU, its working relationships and goals, how it is tasked by its customers, and examples of completed tasks.

Merceret, Francis↗

Failure Investigation of WB-57 Aircraft Engine Cowling

The NASA Johnson Space Center (JSC) in Houston, Texas is the home of the NASA WB-57 High Altitude Research Program. Three fully operational WB-57 aircraft are based near JSC at Ellington Field. The aircraft have been flying research missions since the early 1960's, and continue to be an asset to the scientific community with professional, reliable, customer-oriented service designed to meet all scientific objectives. The NASA WB-57 Program provides unique, high-altitude airborne platforms to US Government agencies, academic institutions, and commercial customers in order to support scientific research and advanced technology development and testing at locations around the world. Mission examples include atmospheric and earth science, ground mapping, cosmic dust collection, rocket launch support, and test bed operations for future airborne or spaceborne systems. During the return from a 6 hour flight, at 30,000 feet, in the clean configuration, traveling at 175 knots indicated airspeed, in un-accelerated flight with the auto pilot engaged, in calm air, the 2-man crew heard a mechanical bang and felt a slight shudder followed by a few seconds of high frequency vibration. The crew did not notice any other abnormalities leading up to, or for the remaining 1 hour of flight and made an uneventful landing. Upon taxi into the chocks, the recovery ground crew noticed the high frequency long wire antenna had become disconnected from the vertical stabilizer and was trailing over the left inboard wing, and that the left engine upper center removable cowling panel was missing, with noticeable damage to the left engine inboard cowling fixed structure. The missing cowling panel was never recovered. Each engine cowling panel is attached to the engine nacelle using six bushings made of 17-4 PH steel. The cylinder portions of four of the six bushings were found still attached to the aircraft (Fig 1). The other two bushings were lost with the panel. The other four bushings exhibited ratchet marks (multiple fatigue origins) which initiated in the sharp radius of the flange/cylinder fillet and were observed 300 degrees around the flange perimeter (Fig 2-3). Low stress, high cycle fatigue (HCF) was observed on the fracture surfaces of all four bushings (Fig 4). To improve the cowling panel joint design and enable return to flight, new cowling bushings with thicker flanges and a larger machined flange/cylinder fillet radius were installed on all cowling panels. In addition, a spacer was added to the joint to achieve the proper stack tolerance. Finally, a time change requirement for all cowling bushings was instituted.

Martinez, J. E.↗

Operations of the Optical Communications Demonstration for the Orion EM-2 Mission

The GSFC implementation of an Optical Communication System to demonstrate an operational optical communication link for Orion EM-2. It will serve as a base for providing an operational optical communications capability for future Orion missions. GSFC plans to maintain a development path for the optical communication flight terminal to allow commercialization and implementation on future Orion missions. The Orion optical module part of the optical communications flight terminal and its control electronics have a common architecture with the ILLUMA-T optical terminal provided by GSFC for use on the ISS. The plan is to flow data from Orion through the Optical Communication Fight Terminal to the Optical Communication Ground Terminal and reverse. NASA's Orion spacecraft is an exploratory vehicle designed for longer-duration flights beyond the Moon. Following Orion's Exploration Mission-1 (EM-1), during which the spacecraft will travel beyond the Moon, enter a distant retrograde orbit around the Moon and return to Earth unmanned, Exploration Mission-2 (EM-2) will see a crewed spacecraft complete a slightly different flight path. First crewed test flight of the Orion spacecraft, currently targeting a June 30, 2022 launch. The mission involves: One revolution in Low Earth Orbit (LEO) parking orbit to verify basic Orion systems functionality and deploy solar arrays. A single 42-hour Highly Elliptical Orbit (HEO) intermediate checkout orbit allows characterization of the Orion vehicle system performance prior to committing to a cis-lunar flight. Trans Lunar Injection (TLI) burn using Orion Service Module (SM) main engine, which sends Orion on a lunar flyby and free return. Skip reentry at lunar return velocities to splashdown off the coast of San Diego. Total mission duration is approximately 10 days. EM-2 is the first crewed mission of the Orion Spacecraft that crew brings more video up/downloads, file transfers, and real-time chats with family back home and high-rate communications enables live HD streaming for Crew conferences, Public Affairs Office (PAO) events, and significant mission events. Also still collecting vehicle data on numerous Orion subsystems via Development Flight Instrumentation (DFI) allows large data volume returns sooner for DFI and future science payloads, as opposed to waiting for end-of-mission. O2O is a demonstration of operational utility system tested as a Developmental Test Objective (DTO) and not required to meet mission requirements/success/ Flight Test Objectives (FTO). EM-2 architecture is as close to future mission operational architecture as possible.Orion subsystems (video, DFI, etc.) expected to generate ~250 GB of data in the first 24 hours of flight. Total data generated over the mission estimated to be more than 400 GBUsing S-Band alone, Orion limited to ~ 6GB of data downlink per day. Because of this limitation, Orion is planning to limit live video downlinks on EM-1 in order to downlink high priority fileswith 1 hour/day of Optical Communication, Orion could downlink ~6x more data per day (~ 36GB/day).The optical communication system is capable of multiple data rates up to at least 80 Mbps downlink for the transfer of Orion data to Earth while Orion is operating in the lunar vicinity.

Optical Communication↗

NARUC grid data sharing playbook

In 2022, the National Association of Regulatory Utility Commissioners (NARUC) launched an initiative to support its members in addressing issues related to grid data sharing. The Grid Data Sharing Collaborative was funded by the DOE’s Office of Electricity and Office of Cybersecurity, Energy Security, and Emergency Response (CESER). NARUC invited programmatic, policy, technical, and cybersecurity subject matter experts from public utility commissions, utilities, non-governmental organizations, energy service companies, and DOE to join the two-year Grid Data Sharing Collaborative to help develop a flexible framework for states to use as a starting point when navigating complex decision-making inherent in grid data sharing. The framework took shape through a series of intensive workshops during which Collaborative participants explored illustrative use cases to identify data needs, articulate the benefits and risks of sharing such data, and assess the trade-offs. Along the way, participants offered suggestions for how the framework could be used in practice. The purpose of this playbook is to describe the elements of the Grid Data Sharing Framework and to begin supporting its implementation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Test Plan. GCPS Task 4, subtask 4.2 thrust structure development

The Single Stage To Orbit (SSTO) vehicle is designed to lift off from a vertical position, go into orbit, return to earth for a horizontal landing, and be reusable for the next mission. (NASA baseline only) In order to meet its performance goals, the SSTO relies on light weight structure and the use of 8 tri-propellant engines. These engines are mounted to the thrust structure. This test plan addresses selection of the material for this structure, and the integrity of the design through testing of elements and a full-scale subcomponent. This test plan supports the development of the design for an advanced composite thrust structure for a Single Stage to Orbit manned, heavy launch vehicle. The thrust structure is designed to transmit very high thrust loads from the engines to the rest of the vehicle (see Figure 1 ). The thrust structure will also be used for primary attachment of the twin vertical tails and possibly act as the aft attach point for the wing. The combination of high loading, high vibration, long service life and high acoustic environments will need to be evaluated by tests. To minimize design risk, a building block approach will be used. We will first screen materials to determine which materials show the most promise for this application. Factors in this screening will be the suitability of these materials for chosen design concepts, particularly concerning specific strength, environmental compatibility and applicability to fabrication processes. Next we will characterize two material systems that will be used in the design; the characterization will allow us to generate preliminary design data that will be used for the analysis. Element testing will be performed to evaluate critical structural locations under load. Final testing on the full scale test article will be performed to verify the design and to demonstrate predictability of the analysis. Additionally, risks associated with fabricating full scale thrust structures will be reduced through testing activities. One of the major concerns that stems from full scale fabrication is the realities of size and the associated complexities of handling, manufacturing, and assembly. The need exists to fabricate, assemble and test_representative joint specimens to achieve_confidence in the design and manufacturing technologies being proposed.

Greenberg, H. S.↗

Space Shuttle mission: STS-67

The Space Shuttle Endeavor, scheduled to launch March 2, 1995 from NASA's Kennedy Space Center, will conduct NASA's longest Shuttle flight prior to date. The mission, designated STS-67, has a number of experiments and payloads, which the crew, commanded by Stephen S. Oswald, will have to oversee. This NASA press kit for the mission contains a general background (general press release, media services information, quick-look facts page, shuttle abort modes, summary timeline, payload and vehicle weights, orbital summary, and crew responsibilities); cargo bay payloads and activities (Astro 2, Get Away Special Experiments); in-cabin payloads (Commercial Minimum Descent Altitude Instrumentation Technology Associates Experiments, protein crystal growth experiments, Middeck Active Control Experiment, and Shuttle Amateur Radio Experiment); and the STS-67 crew biographies. The payloads and experiments are described and summarized to give an overview of the goals, objectives, apparatuses, procedures, sponsoring parties, and the assigned crew members to carry out the tasks.

Source record↗

Design for an 8 Meter Monolithic UV/OIR Space Telescope

ATLAST-8 is an 8-meter monolithic UV/optical/NIR space observatory to be placed in orbit at Sun-Earth L2 by NASA's planned Ares V cargo launch vehicle. The ATLAST-8 will yield fundamental astronomical breakthroughs. The mission concept utilizes two enabling technologies: planned Ares-V launch vehicle (scheduled for 2019) and autonomous rendezvous and docking (AR&D). The unprecedented Ares-V payload and mass capacity enables the use of a massive, monolithic, thin-meniscus primary mirror - similar to a VLT or Subaru. Furthermore, it enables simple robust design rules to mitigate cost, schedule and performance risk. AR&D enables on-orbit servicing, extending mission life and enhancing science return.

Stahl, H. Philip↗

Proposal Drafted for Allocating Space-to-Space Frequencies in the GPS Spectrum Bands

Radionavigation Satellite Service (RNSS) systems such as the U.S. Global Positioning System (GPS) and the Russian Global Navigation Satellite System (GLONASS) are primarily being used today in the space-to-Earth direction (i.e., from GPS satellite to Earth user) for a broad range of applications such as geological surveying; aircraft, automobile, and maritime navigation; hiking and mountain climbing; and precision farming and mining. However, these navigation systems are being used increasingly in space. Beginning with the launch of the TOPEX/Poseidon remote-sensing mission in 1992, over 90 GPS receivers have flown onboard spacecraft for such applications as real-time spacecraft navigation, three-axis attitude control, precise time synchronization, precision orbit determination, and atmospheric profiling. In addition to use onboard many science spacecraft, GPS has been used or is planned to be used onboard the shuttles, the International Space Station, the International Space Station Emergency Crew Return Vehicle, and many commercial satellite systems such as Orbcomm, Globalstar, and Teledesic. From a frequency spectrum standpoint, however, one important difference between the space and terrestrial uses of GPS is that it is being used in space with no interference protection. This is because there is no frequency allocation for the space-to-space use of GPS (i.e., from GPS satellite to user spacecraft) in the International Telecommunications Union (ITU) regulatory table of frequency allocations. If another space-based or groundbased radio system interferes with a spaceborne GPS user, the spaceborne user presently has no recourse other than to accept the interference. Consequently, for the past year and a half, the NASA Glenn Research Center at Lewis Field and other Government agencies have been working within ITU toward obtaining a GPS space-to-space allocation at the next World Radio Conference in the year 2000 (WRC 2000). Numerous interference studies have been conducted in support of a primary space-tospace allocation in the 1215- to 1260-MHz and 1559- to 1610-MHz RNSS bands. Most of these studies and analyses were performed by Glenn and submitted as U.S. input documents to the international Working Party 8D meetings in Geneva, Switzerland. In the structure of the ITU, Working Party 8D is responsible for frequency spectrum issues in the RNSS and the mobile satellite service (MSS). The full texts of the studies are available from the ITU web site under Working Party 8D contributions. Note that because spaceborne RNSS receivers operate in a receive-only mode with navigation signals already being broadcast toward the Earth, the addition of a space-tospace allocation will not result in interference with other systems. A space-based RNSS receiver, however, could experience interference from systems of other services, including intraservice interference from other RNSS systems. The interference scenarios examined in the studies can be inferred from the following frequency allocation charts. In these charts, services labeled in all capital letters (e.g., "ARNS") have primary status, whereas those labeled with sentence-style capitalization (e.g., "Amateur radio") have secondary status (i.e., a service with secondary status cannot claim interference protection from or cause harmful interference to a service with primary status). Charts showing the ITU frequency allocations in the 960 to 1350 MHZ range and the 1525-1660 MHZ range are discussed and presented.

Spence, Rodney L.↗

Performance and data analysis aspects of the new DIII-D monostatic profile reflectometer system

A new frequency-modulated profile reflectometer system, featuring a monostatic antenna geometry (using one microwave antenna for both launch and receive), has been installed on the DIII-D tokamak, providing a first experimental test of this measurement approach for profile reflectometry. Significant features of the new system are briefly described in this paper, including the new monostatic arrangement, use of overmoded, broadband transmission waveguide, and dual-polarization combination/demultiplexing. Updated data processing and analysis, and in-service performance aspects of the new monostatic profile reflectometer system are also presented. By using a raytracing code (GENRAY) to determine the approximate trajectory of the probe beam, the electron density (n{sub e}) profile can be successfully reconstructed with L-mode plasmas vertically shifted by more than 10 cm off the vessel midplane. Specifically, it is demonstrated that the new system has a capability to measure n{sub e} profiles with plasma vertical offsets of up to ±17 cm. Examples are also presented of accurate, high time and spatial resolution density profile measurements made over a wide range of DIII-D conditions, e.g., the measured temporal evolution of the density profile across a L-H transition.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Accelerating Low-Income Financing and Transactions (LIFT) for Solar Access Everywhere (Final Technical Report)

The Accelerating Low-Income Financing and Transactions (LIFT) for Solar Access Everywhere project’s goal was to expand Low-to-Moderate Income (LMI) solar access for homeowners and renters. The LIFT project researched and gathered data on 453 LMI community solar project across the country. Following three years of research, the project delivered three groundbreaking research papers in June 2022, focused on 1) customer experience, 2) the growth of community solar programs, and 3) project-level financial best practices for serving LMI communities. These were followed by a user-friendly web-based Toolkit allowing users to interact with project data and key findings in November 2022. The customer experience research examined community solar subscribers’ primary motivations to join and remain satisfied with projects. Our research identified 453 projects across the country that dedicated some portion of the system capacity to LMI households. Seventeen of these projects participated in the LIFT customer experience research, allowing the project team to survey their customers and gain insight into how LMI subscribers feel about community solar and the programs that serve them. Subscribers in our sample indicated that the most critical issue that motivated them to participate in their program, however, was not savings but helping the environment. This was true for both LMI and non-LMI subscribers. Helping the environment was also the most important issue for LMI subscribers to measure how well their program was working for them. LIFT also explored how rapidly community solar has grown since its inception in 2006, publishing results in the Growth of U.S. Community Solar Serving LMI Households report. The results showed that community solar projects serving LMI households are one of the fastest growing segments of the solar industry. The report identifies and recommends ways developers should overcome real or perceived risks to LMI customer acquisition and subscriber management. Through the analysis of community solar project finance research, LIFT showed that most community solar projects serving LMI households are financed in the same ways mainstream community solar projects are financed. The value stacks and financial returns are no different, although LMI inclusion and participation rate varied across programs in our sample, ranging from between 10% and 100%. Based on the findings from the LIFT research, the team built a web-based user-friendly Toolkit, consisting of case studies, project finance best practices, and several tools built around the national dataset of 453 community solar projects that serve LMI households. These allow users to engage with the dataset in multiple ways; to explore the landscape of LMI community solar in the U.S., and to design community solar projects to optimize LMI inclusion, equity, and savings levels. The Toolkit also includes a library of LIFT-generated and LIFT-curated resources for users to learn more about how to best serve LMI communities through community solar. LIFT officially published the Toolkit on October 31, 2022, followed by a launch event (public webinar) on November 17, 2022. The core LIFT partners continue to engage in outreach and dissemination efforts to promote the LIFT Toolkit and research publications. Our driving motivation is to continue enabling solar developers to leverage the findings of this three-year research effort. By implication, the LIFT Toolkit is designed for use by utilities, energy service providers, and financiers or investors as a learning and decision-making tool to rapidly scale project models that optimize LMI inclusion and maximize real household savings.

14 SOLAR ENERGY↗

Skylab food system

The Skylab food program was a major effort involving a complex spectrum of activities necessary for the preparation of a crew feeding system. Approximately 17,000 individual food packages and support items, weighing more than 1225 kg, were launched into space as a single unit on board the orbital workshop. This unit provided the three (three-man) Skylab crews with nourishing foods and beverages for a total of 156 days, as well as with eating utensils and accessory items. Additionally, provisions for 5 days (15 man-days) were provided in each of the three command and service modules in a manner similar to that of the Apollo flights. The Skylab food system not only provided the crew with a palatable balanced diet in a familiar and acceptable manner but also supported the formidable mineral balance medical experiment series (M070).

Bush, W. H.↗

Orbital transfer vehicle - An overview

A summary is given of the concept definition phase of NASA's Orbital Transfer Vehicle (OTV) program. The mission requirements are threefold: (1) the ability to deliver payloads well beyond the capability of any current system at low acceleration levels, (2) the extension of the cost effectiveness from reusability and operational flexibility provided by the Shuttle at LEO to the geosynchronous altitude, and (3) the provision of the round trip capability needed to service and maintain this expanded and more valuable resource at GEO. The initial Shuttle-matched, reusable OTV is shown to be cost effective with low development cost, relatively short development period and high projected reliability. The performance enhancement provided by aero-assist is discussed, which will enable the difficult round trip to be flown in a single Shuttle launch. Two methods of reducing vehicle velocity are available: (1) aeromaneuvering, which uses vehicle lift to climb or descend and thereby correct for density variations, and (2) aerobraking which varies vehicle drag directly to correct for density.

Caluori, V. A.↗

Development of a reusable, flight-weight cryogenic foam insulation system

Attention is given to a light weight foam insulation system applicable to reusable cryogenic propellant tankage for hypersonic aircraft and space launch vehicles. The insulation system consists of nominally sized blocks of a high temperature-resistant polymethacrylimide foam that is wrapped with a vapor-impermeable membrane of Kapton-aluminum-Kapton laminate, which is adhesively bonded to the outer propellant tank wall. Test results are presented which indicate that this insulation system is capable of enduring a Mach 5 service environment without structural cracking, deterioration, or loss of performance.

Mcauliffe, P. S.↗