Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “energy system analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop

Geothermal cost and performance evaluation implemented via techno-economic assessment (TEA) modeling is critical for the U.S. Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for NREL's Annual Technology Baseline (ATB), which provides inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL's reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the U.S. generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on techno-economic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next-generation technologies such as closed-loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

annual technology baseline↗

MW-Class SOFC Pilot System Development

The overall objective of this project is to develop a low-cost, efficient, and reliable MWe-class Solid Oxide Fuel Cell (SOFC) power system towards commercial deployment in natural-gas fueled distributed generation applications. This report details the successful completion of all project objectives. The main goals of the project were to develop the conceptual design of a MWe-class SOFC power system, and to complete a techno-economic analysis (TEA) to determine system costs at low-volume production levels of >100MW per year. The combination of the BoP equipment cost and SOFC stack module factory cost provided the net fabrication cost of the selected 1MW SOFC system configuration. The results of the study showed that the cost target of less than $6000/kW is achievable for a FOAK 1MW SOFC system, exclusive of the first-time engineering cost. Also, the project included an exploratory analysis of the factory cost of next generation stack technology based on the Compact Solid-oxide Architecture (CSA) design at a high annual manufacturing rate of one-GW produced in a giga-factory. The BoP capital cost for one giga-watt power production was estimated using learning-curve analysis based on the historical manufacturing cost data related to similar high temperature Molten Carbonate fuel cell systems built by FuelCell Energy (FCE). The giga-factory manufactured SOFC cost estimate combined with the BoP cost at high production rates led to the estimation of entire system capital cost. Ultimately, a Cost of Electricity (COE) analysis was performed including natural gas fuel prices, installation and O&M costs, and stack replacement cost. The results of the techno-economic analysis were summarized by parametric estimation of COE for 1MW SOFC NOAK (Nth-of-a-Kind) system with natural gas prices as a variable parameter.

08 HYDROGEN↗

- Analysis of a suspended cylinder in a wave basin

The Offshore Code Comparison, Collaboration, Continued, with Correlation (OC5) is an international research project run under the International Energy Agency (IEA) Wind Task 30. The project is focused on validating the tools used design offshore wind systems. OC5 consists of four phases. Phase 1a: Analysis of a suspended cylinder in a wave basin This website provides the data used for validation in these four phases, as well as simulation results from multiple participants.

17 WIND ENERGY↗

BEEAM (Building Electrical Efficiency Analysis Model) [SWR-20-107]

Modern high-performance buildings exhibit an increasing number of building loads that use direct current (DC) electricity internally, rather than alternating current (AC), due to the advent of low-cost computing and advanced power electronics. Powering DC devices from the AC grid requires AC/DC power conversion, which introduces energy losses and reduces efficiency. As DC loads proliferate, the cumulative wasted energy associated with hundreds of millions of AC/DC converters has become one of the broadest energy savings opportunities in buildings. DC power distribution systems have been proposed as an elegant and transformative solution to the problem of DC devices. In a DC distribution system, the building's wires carry DC electricity, rather than AC; and a few centralized, highly efficient AC/DC converters replace the many smaller, less efficient converters that serve individual DC loads. Unfortunately, the trade-offs associated with DC distribution systems are not well understood. Reported energy savings associated with DC power distribution differ widely and have not been well validated. The Building Electrical Efficiency Analysis Model (BEEAM) is a Modelica library that simulates the efficiency of building electrical distribution systems using harmonic power flow. BEEAM can model a wide variety of building distribution topologies, including three-phase AC, single-phase AC, unipolar DC, bipolar DC, and hybrid networks under both balanced and unbalanced load conditions. BEEAM accurately models power electronic converter losses, provides granular estimates of losses throughout the distribution system, and properly models efficiency at part load conditions. Users can package BEEAM within a functional mockup unit (FMU), enabling co-simulation with other modeling platform, such as EnergyPlus. In summary, BEEAM provides a tool suite for fair and accurate comparison of the efficiency of building electrical distribution systems, including AC, DC, and hybrid systems.

Frank, Stephen↗

Evaluating Utility-Scale PV-Battery Hybrids in an Operational Model for the Bulk Power System

Systems that combine solar photovoltaic and battery energy storage technologies (PV-BES) are increasingly being proposed and deployed on the bulk power system. The operations and value of PV-BES systems have been extensively studied from the project developer's perspective through analyses that maximize plant-level revenue. However, PV-BES hybrids' operational characteristics are seldom studied from the perspective of bulk power system operators, who seek to optimize the performance of a suite of generation and storage assets that are connected via the transmission network. This work presents modeling approaches for representing and evaluating PV-BES hybrids in a model that optimizes operations across the bulk power system. Its novel contributions include demonstrating a technique to modify a unit commitment and dispatch model to represent the operational synergies of PV-BES hybrids. In particular, we describe the challenges and an approach for representing so-called DC-coupled PV-BES - which utilize a single bi-directional inverter - as a dispatchable resource in a commercial, production cost model (PCM), PLEXOS. We demonstrate this technique in a PCM study of the Los Angeles Department of Water and Power (LADWP) test system, by replacing existing PV and battery generators on the test system with our PV-BES hybrids. We then pursue scenario analysis that is designed to isolate the various drivers of operational strategies for DC-coupled PV-BES hybrids, including the nature of coupling, PV penetration on the system, and varying inverter loading ratios (or degrees of over-sizing of the PV field). Results from the analysis include utilization profiles for the PV DC energy across available pathways, dispatch profiles for the battery component, and the hybrid technologies' impacts on system-wide production costs. The approach presented in this paper can be used in any PCM that is looking to study PV-BES hybrids as a resource in different power system configurations and services.

14 SOLAR ENERGY↗

Review of Life Cycle Cost Analysis Tools

Life cycle costing (LCC) is a vital aspect of decision-making in building retrofitting. It allows stakeholders to thoroughly assess all expenses involved throughout the lifespan of these retrofits, covering initial costs; ongoing operation, maintenance, and repair costs; and disposal costs of the system. The Federal Energy Management Program of the US Department of Energy has established clear guidelines for conducting LCC analysis, particularly for investments aimed at energy and water conservation, as well as renewable energy projects. These guidelines are detailed in the Code of Federal Regulations, 10 CFR 436, Subpart A, which outlines the methodology and procedure for LCC analysis (Department of Energy 1990). The National Institute of Standards and Technology (NIST) has developed the NIST Handbook 135 (Joshua Kneifel 2022) to standardize the process of LCC analysis within the building industry. Whereas the handbook is tailored to the needs of federal agencies, its principles and methodologies can be valuable for other organizations and industries interested in conducting life cycle costing analyses for their building projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Effects of water recirculation on microalgae assemblage and corresponding sustainability of the photobioreactor cultivation system

An algae photobioreactor (APB) was used to determine the effect of water recirculation on the growth of algal assemblage. CO 2 in the flue gas from a power plant was the carbon source. Boiler water was used as the source water. The results showed that microalgae cultivation under recirculation conditions was stable over a period of four months. Biomass productivities during the 1st through 4th months of recirculation (0.26, 0.23, 0.20, and 0.18 g L –1 d –1 , respectively) were not significantly different than freshwater (0.22 g L –1 d –1 ). Furthermore, the relationship between eukaryotic and bacterial domains in the assemblage remained consistent throughout the four months of recirculation (80.7, 87.1, 83.1, and 82.1%, respectively, and 19.2, 12.8, 16.9, and 17.8%, respectively). This was not significantly different than the abundance of each domain in the control freshwater cultivation (83.7% eukaryotic and 16.2% bacterial). A 1 m 3 photobioreactor was then envisioned for a mass, energy, and exergy analysis to evaluate the water recirculation on sustainability of the culture system. The mass balance analysis concluded that 98% reduction in water usage, 25% reduction in nitrogen, and 12.5% reduction in phosphorus could be achieved during cultivation operating under recirculation for one year, while maintaining biomass productivity of 1.2 kg wet algal biomass and sequestration of 0.4 kg CO 2 per day. Furthermore, the exergy balance analysis concluded that without considering solar irradiation, the culture with water recirculation greatly enhanced the rational exergy efficiency, which represents a more sustainable cultivation system for CO 2 capture and utilization.

59 BASIC BIOLOGICAL SCIENCES↗

Updates to the Instant Online PV LCOE Calculator Tool

Levelized cost of energy (LCOE) is an important metric for techno-economic analysis of PV modules, systems, and performance. An NREL team within DuraMAT has developed a simplified PV-specific LCOE calculator as an alternative to the NREL System Advisor Model (SAM) for applications that do not have the degree of detail required by SAM. This webinar will review recent data and new features that have been added to the simplified calculator this year, including breakeven buttons, commercial system options, and inverter loading ratios. It will also review the structure of the source code on GitHub, how to edit a local version of the calculator, and walk through some example use cases for the calculator.

calculator↗

The 1000 GeV gamma ray emission from radio pulsars

Radio pulsars have concentrated on long observations of the Crab pulsar and showed that it emits short intense bursts and a persistent weak periodic flux at gamma-ray energies 1000 GeV. It was shown that the light curve of the persistent emission was dominated by a single peak, coincident with the position of the radio and low energy gamma-ray main pulse. The results of a more detailed analysis of the structure of this main pulse are reported following an appraisal of the timing system. It is shown that at energies 1000 GeV the duration of the main pulse is not greater than 0.4 ms, which is less than that seen at all frequencies other than radio. Flux limits for the emission of 1000 GeV gamma-rays by seven other radio pulsars are reported

Chadwick, P. M.↗

Impact analysis of DERs on bulk power system stability through the parameterization of aggregated DER_a model for real feeders

With an ever increasing percentage of distributed energy resources (DERs) connected behind the meter in the distribution system, it is becoming increasingly important to equip transmission planners with the visibility of DER dynamic performance in distribution system. Not having visibility of the disconnection of DERs with the occurrence of transmission events, could result in an erroneous view of the stability of bulk power system. Here, in this paper, a parameterized aggregated model (DER_a) serves as a representation of the distribution-level dynamics of real residential feeders, which is used for analysis of bulk power system stability. The parameters are obtained by executing dynamic Monte Carlo simulations. Faults are then induced at the substation level causing the DERs to trip which subsequently enables the parameterization of the low and high voltage breakpoints (v l0 , v l1 , v h0 , and v h1 ) of the DER_a model’s partial voltage trip block. These parameters are then utilized to study the effectiveness of the DER_a model to represent the behavior of the aggregated DERs’ response and their impact on the bulk power system. The case study shows the ability of the positive-sequence DER_a model to provide an accurate estimation of DERs that are susceptible to trip due to 3-$\phi$ and 1-$\phi$ faults of transmission.

14 SOLAR ENERGY↗

Aging Effect Analysis of PV Inverter Semiconductors for Ancillary Services Support

PV inverters can provide reactive power while generating active power. An ongoing microgrid implementation at Duke Energy actively engages non-utility PVs to generate/absorb reactive power in support of ancillary services to increase microgrid resiliency during extreme events. PV systems are requested to provide reactive power support: 1) in response to grid voltage variation to better regulate the local voltage; or 2) in response to utility incentives, such as following Transactive Energy System (TES) incentives. However, providing ancillary services might shorten the lifetime expectation of PV inverter semiconductors. This paper summarizes the potential impacts on a PV inverter semiconductor's lifetime when providing ancillary services. The analysis presented in this research work shows that providing reactive power support will increase the mean junction temperature and the junction temperature variation of the inverter diodes. This increased junction temperature will eventually lead to shorter diode lifetime. The lifetime estimation of semiconductors is briefly reviewed. The power losses of PV inverter semiconductors are derived as a support analysis to the junction temperature calculation. In addition, the impact of the filtering inductor on the semiconductor current distribution is discussed. The theoretical analysis presented in this research work is supported by simulation results.

14 SOLAR ENERGY↗

Multi-technology building system retrofits for utility incentive programs: Savings, costs and baseline considerations

Utility incentive programs are an important channel to support the deployment of energy efficiency in buildings. To date, these programs have largely been limited to single-component strategies. However, many utilities are now motivated to identify and develop multi-component system retrofits to achieve deeper energy savings, which are essential to achieving broader energy and greenhouse gas reduction goals in the buildings sector. In this paper we present the energy savings, demand reductions, and cost-effectiveness of 16 systems retrofit packages in six utility regions in the United States. These results are being used by these utilities to inform and develop incentive programs for systems retrofits. Our analysis shows that packages with proven lighting and HVAC measures can provide 5–22% whole building annual energy savings, and 13–22% annual energy costs savings, using utility incentive program baselines (code and existing building). The packages are reasonably cost effective for replace-on-burnout but generally not for a retrofit scenario prior to end of equipment life. Demand response can increase both the energy savings and energy cost savings, further improving the cost effectiveness of these packages. We analyzed the impact of using existing building vs. code baselines for calculating savings, showing that the choice of baseline in developing utility incentive programs has a substantial impact on the attributable energy savings to a program, with significant implications for the overall viability of a program (generally savings against existing building condition are higher and improve project and program cost-effectiveness).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

How Should Life Support Be Modeled and Simulated?

Why do most space life support research groups build and investigate large models for systems simulation? The need for them seems accepted, but are we asking the right questions and solving the real problems? The modeling results leave many questions unanswered. How then should space life support be modeled and simulated? Life support system research and development uses modeling and simulation to study dynamic behavior as part of systems engineering and analysis. It is used to size material flows and buffers and plan contingent operations. A DoD sponsored study used the systems engineering approach to define a set of best practices for modeling and simulation. These best practices describe a systems engineering process of developing and validating requirements, defining and analyzing the model concept, and designing and testing the model. Other general principles for modeling and simulation are presented. Some specific additional advice includes performing a static analysis before developing a dynamic simulation, applying the mass and energy conservation laws, modeling on the appropriate system level, using simplified subsystem representations, designing the model to solve a specific problem, and testing the model on several different problems. Modeling and simulation is necessary in life support design but many problems are outside its scope.

Jones, Harry W.↗

Distribution Grid Impact Study in Highland Park, Michigan: Understanding Rooftop Solar, Behind-the-Meter Energy Storage, Electric Vehicle Charging, and Building Electrification [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "B" related to policy analysis, due diligence, and case studies for removing barriers and providing best practices for local clean energy development. Highland Park community members face frequent, long-duration power interruptions due largely to the aging distribution system serving the area and the legacy design standards used in its construction. While degrading physical infrastructure such as poles, crossarms, and transformers can result in this substandard reliability, another notable characteristic of this legacy system is the lower, 4.8 kV, voltage class. This is a legacy construction standard which many utilities, DTE included, are phasing out in favor of higher, 15 or 25 kV, voltage classes instead. The existing 4.8 kV distribution system serving Highland Park may limit significant adoptions of clean-energy technologies like high percentages of building electrification or electric vehicle adoption. The following analysis seeks to quantify these limitations under a variety of clean-energy technology adoption scenarios. It compares the overall system risks of the present system to those of a hypothetical, upgraded 13.2 kV system, using NREL-developed risk metrics and offers upgrade cost considerations. The legacy 4.8 kV voltage class serving Highland park is not, as we have modeled it, a major limitation to the widespread adoption of cost-optimal rooftop solar and/or behind-the-meter energy storage. Within our modeling framework, these technologies namely impact secondary, low-voltage assets, which may be remedied without the need for a system-wide upgrade to a 13.2 kV voltage class. Our model of the current 4.8kV system indicates it is not capable of supporting community-wide electrification efforts. Widespread building electrification, and the resulting large increase in wintertime load, dramatically increases the prevalence of voltage violations and thermal overloading on the current 4.8 kV distribution system. These impacts illustrate the need for system-wide upgrades to a 13.2 kV voltage class to accommodate these technologies. Low to Moderate DER adoption does not adversely impact the grid but does improve undervoltage and asset overloading issues. However, these benefits are insufficient to defer grid upgrades. Higher DER penetration is shown to increase overvoltage and asset overloading in future electrification scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modular Space Station Phase B Extension Preliminary Systems Design Report. Volume VI: Trades and Analyses

This document contains trades and analyses conducted during the Modular Space Station Phase B System Definition. Requirements and concepts considered and the tradeoff analysis leading to the preferred concept are presented. Integrated analyses are presented for subsystems and thermal control. Specific trades and analyses are presented for water management, atmosphere control, energy storage, radiators, navigation, control moment gyros, and system maintenance. The analyses of manipulator concepts and requirements, and supplemental analyses of information management issues are summarized. Subsystem reliability analyses include a detailed discussion of the critical failure analysis.

Jones, A. L.↗

Wind Energy Technologies Office Multi-Year Program Plan Fiscal Years 2021—2025

WETO's Multi-Year Program Plan outlines the Office’s research priorities and plans through the year 2025. With the objectives of reducing the cost of wind energy, enabling the integration of substantial amounts of wind energy into the evolving national energy system, and creating siting and environmental solutions to reduce environmental impacts, the Plan provides insight into DOE’s wind energy research priorities, and will guide planning and execution of future R&D activities. It is organized in six sections: offshore wind, land-based wind, distributed wind, systems integration, modeling and analysis, and crosscutting initiatives.

17 WIND ENERGY↗