Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “criteria”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

User Selection Criteria of Airspace Designs in Flexible Airspace Management

A method for identifying global aerodynamic models from flight data in an efficient manner is explained and demonstrated. A novel experiment design technique was used to obtain dynamic flight data over a range of flight conditions with a single flight maneuver. Multivariate polynomials and polynomial splines were used with orthogonalization techniques and statistical modeling metrics to synthesize global nonlinear aerodynamic models directly and completely from flight data alone. Simulation data and flight data from a subscale twin-engine jet transport aircraft were used to demonstrate the techniques. Results showed that global multivariate nonlinear aerodynamic dependencies could be accurately identified using flight data from a single maneuver. Flight-derived global aerodynamic model structures, model parameter estimates, and associated uncertainties were provided for all six nondimensional force and moment coefficients for the test aircraft. These models were combined with a propulsion model identified from engine ground test data to produce a high-fidelity nonlinear flight simulation very efficiently. Prediction testing using a multi-axis maneuver showed that the identified global model accurately predicted aircraft responses.

Lee, Hwasoo E.↗

Adaptive Sampling of Spatiotemporal Phenomena with Optimization Criteria

This work was designed to find a way to optimally (or near optimally) sample spatiotemporal phenomena based on limited sensing capability, and to create a model that can be run to estimate uncertainties, as well as to estimate covariances. The goal was to maximize (or minimize) some function of the overall uncertainty. The uncertainties and covariances were modeled presuming a parametric distribution, and then the model was used to approximate the overall information gain, and consequently, the objective function from each potential sense. These candidate sensings were then crosschecked against operation costs and feasibility. Consequently, an operations plan was derived that combined both operational constraints/costs and sensing gain. Probabilistic modeling was used to perform an approximate inversion of the model, which enabled calculation of sensing gains, and subsequent combination with operational costs. This incorporation of operations models to assess cost and feasibility for specific classes of vehicles is unique.

Chien, Steve A.↗

The Ice, Cloud, and land Elevation Satellite (ICESat) Summary Mission Timeline and Performance Relative to Pre-Launch Mission Success Criteria

The Ice, Cloud and land Elevation Satellite (ICESat) mission was conceived, primarily, to quantify the spatial and temporal variations in the topography of the Greenland and Antarctic ice sheets. It carried on board the Geoscience Laser Altimeter System (GLAS), which measured the round-trip travel time of a laser pulse emitted from the satellite to the surface of the Earth and back. Each range derived from these measurements was combined with precise, concurrent orbit and pointing information to determine the location of the laser spot centroid on the Earth. By developing a time series of precise topographic maps for each ice sheet, changes in their surface elevations can be used to infer their mass balances.

Webb, Charles E.↗

Biases in Long-term NO2 Averages Inferred from Satellite Observations Due to Cloud Selection Criteria

Retrievals of atmospheric trace gas column densities from space are compromised by the presence of clouds, requiring most studies to exclude observations with significant cloud fractions in the instrument's field of view. Using NO2 observations at three ground stations representing urban, suburban, and rural environments, and tropospheric vertical column densities measured by the Ozone Monitoring Instrument (OMI) over each site, we show that the observations from space represent monthly averaged ground-level pollutant conditions well (R=0.86) under relatively cloud-free conditions. However, by analyzing the ground-level data and applying the OMI cloud fraction as a filter, we show there is a significant bias in long-term averaged NO2 as a result of removing the data during cloudy conditions. For the ground-based sites considered in this study, excluding observations on days when OMI-derived cloud fractions were greater than 0.2 causes 12:00-14:00 mean summer mixing ratios to be underestimated by 12%+/-6%, 20%+/-7%, and 40%+/-10% on average (+/-1 standard deviation) at the urban, suburban, and rural sites respectively. This bias was investigated in particular at the rural site, a region where pollutant transport is the main source of NO2, and where longterm observations of NOy were also available. Evidence of changing photochemical conditions and a correlation between clear skies and the transport of cleaner air masses play key roles in explaining the bias. The magnitude of a bias is expected to vary from site to site depending on meteorology and proximity to NOx sources, and decreases when longer averaging times of ground station data (e.g. 24-h) are used for the comparison.

SEASONAL-VARIATIONS↗

Chemical Evidence for Smectites and Zeolites on Mars: Criteria and Limitations

Aqueous alteration on Mars can produce a range of tell-tale secondary minerals [1]. Surface missions typically obtain detailed and highly localized element compositional information, but not always mineralogical information, whereas orbital missions deduce mineralogy from relatively high spatial resolution IR spectral mapping (decameters scale, for CRISM), but obtain element data only over much larger areas of martian terrain (~200 km). Surface missions have also discovered several occurrences of major geochemical alteration of igneous precursors, for many of which elemental compositional is the only diagnostic information available. Many types of clays and zeolites have quasi-unique element profiles which may be used to implicate their presence. In some cases, one or more candidate minerals are sufficiently close in their component elements and their stoichiometry that ambiguity must remain, unless other constraints can be brought to bear. Geochemical characteristics of alteration products most likely on Mars can be compared to results from MER and MSL rover missions (e.g. Independence [4] and Esperance samples). These considerations are needed for MER Opportunity rover now that Mini-TES is no longer operational. It also has importance for exploration by the MSL Curiosity rover because inferences and deductions available from ChemCam (CCAM) remote LIBS and/or in situ x-ray fluorescence (APXS) can be used as indicators for triage to select materials to sample for limited-resource instruments, SAM and Chemin.

Clark, B. C.↗

Feasibility Criteria for Interval Management Operations as Part of Arrival Management Operations

Interval Management (IM) is a future airborne spacing concept that aims to provide more precise inter-aircraft spacing to yield throughput improvements and greater use of fuel efficient trajectories for arrival and approach operations. To participate in an IM operation, an aircraft must be equipped with avionics that provide speeds to achieve and maintain an assigned spacing interval relative to another aircraft. It is not expected that all aircraft will be equipped with the necessary avionics, but rather that IM fits into a larger arrival management concept developed to support the broader mixed-equipage environment. Arrival management concepts are comprised of three parts: a ground-based sequencing and scheduling function to develop an overall arrival strategy, ground-based tools to support the management of aircraft to that schedule, and the IM tools necessary for the IM operation (i.e., ground-based set-up, initiation, and monitoring, and the flight-deck tools to conduct the IM operation). The Federal Aviation Administration is deploying a near-term ground-automation system to support metering operations in the National Airspace System, which falls within the first two components of the arrival management concept. This paper develops a methodology for determining the required delivery precision at controlled meter points for aircraft that are being managed to a schedule and aircraft being managed to a relative spacing interval in order to achieve desired flow rates and adequate separation at the meter points.

Levitt, Ian M.↗

Evolving Design Criteria for Very Large Aperture Space-Based Telescopes and Their Influence on the Need for Integrated Tools in the Optimization Process

NASA's Advanced Mirror Technology Development (AMTD) program has been developing the means to design and build the future generations of space based telescopes. With the nearing completion of the James Webb Space Telescope (JWST), the astrophysics community is already starting to define the requirements for follow on observatories. The restrictions of available launch vehicles and the possibilities of planned future vehicles have fueled the competition between monolithic primaries (with better optical quality) and segmented primaries (with larger apertures, but with diffraction, costs and figure control issues). Regardless of the current shroud sizes and lift capacities, these competing architectures share the need for rapid design tools. As part of the AMTD program a number of tools have been developed and tested to speed up the design process. Starting with the Arnold Mirror Modeler (which creates Finite Element Models (FEM) for structural analysis) and now also feeds these models into thermal stability analyses. They share common file formats and interchangeable results. During the development of the program, numerous trade studies were created for 4 meter and 8 meter monolithic primaries, complete with support systems. Evaluation of these results has led to a better understanding of how the specification drives the results. This paper will show some of the early trade studies for typical specification requirements such as lowest mirror bending frequency and suspension system lowest frequency. The results use representative allowable stress values for each mirror substrate material and construction method and generic material properties. These studies lead to some interesting relationships between feasible designs and the realities of actually trying to build these mirrors. Much of the traditional specifications were developed for much smaller systems, where the mass and volume of the primary where a small portion of the overall satellite. JWST shows us that as the aperture grows, the primary takes up the majority of the mass and volume and the established rules need to be adjusted. For example, a small change in lowest frequency requirement can change the cost by millions of dollars.

Space-based telescopes↗

Evolving Design Criteria for Very Large Aperture Space Based Telescopes and Their Influence on the Need for Integrated Tools in the Optimization Process

NASA's Advanced Mirror Technology Development (AMTD) program has been developing the means to design and build the future generations of space based telescopes. With the nearing completion of the James Webb Space Telescope (JWST), the astrophysics community is already starting to define the requirements for follow-on observatories. The restrictions of available launch vehicles and the possibilities of planned future vehicles have fueled the competition between monolithic primaries (with better optical quality) and segmented primaries (with larger apertures, but with diffraction, costs and figure control issues). Regardless of the current shroud sizes and lift capacities, these competing architectures share the need for rapid design tools. As part of the AMTD program a number of tools have been developed and tested to speed up the design process. Starting with the Arnold Mirror Modeler (which creates Finite Element Models (FEM) for structural analysis) and now also feeds these models into thermal stability analyses. They share common file formats and interchangeable results. During the development of the program, numerous trade studies were created for 4-meter and 8-meter monolithic primaries, complete with support systems. Evaluation of these results has led to a better understanding of how the specification drives the results. This paper will show some of the early trade studies for typical specification requirements such as lowest mirror bending frequency and suspension system lowest frequency. The results use representative allowable stress values for each mirror substrate material and construction method and generic material properties. These studies lead to some interesting relationships between feasible designs and the realities of actually trying to build these mirrors. Much of the traditional specifications were developed for much smaller systems, where the mass and volume of the primary where a small portion of the overall satellite. JWST shows us that as the aperture grows, the primary takes up the majority of the mass and volume and the established rules need to be adjusted. For example, a small change in lowest frequency requirement can change the cost by millions of dollars. The paper uses numerous trade studies created during the software development phase of the Arnold Mirror Modeler to illustrate the influences of system specifications on the design space. The future telescopes will require better performance, stability and documented feasibility to meet the hurdles of today's budget and schedules realities. AMTD is developing the tools, but the basic system planning mentality also has to adopt to the requirements of these very large and complex physical structures.

Arnold, William R., Sr.↗

Scheduler Design Criteria: Requirements and Considerations

This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

NASA-KAIA/KARI research collaboration↗

Assessment of the Orion-SLS Interface Management Process in Achieving the EIA 731.1 Systems Engineering Capability Model Generic Practices Level 3 Criteria

NASA is currently developing the next generation crewed spacecraft and launch vehicle for exploration beyond earth orbit including returning to the Moon and making the transit to Mars. Managing the design integration of major hardware elements of a space transportation system is critical for overcoming both the technical and programmatic challenges in taking a complex system from concept to space operations. An established method of accomplishing this is formal interface management. In this paper we set forth an argument that the interface management process implemented by NASA between the Orion Multi-Purpose Crew Vehicle (MPCV) and the Space Launch System (SLS) achieves the Level 3 tier of the EIA 731.1 System Engineering Capability Model (SECM) for Generic Practices. We describe the relevant NASA systems and associated organizations, and define the EIA SECM Level 3 Generic Practices. We then provide evidence for our compliance with those practices. This evidence includes discussions of: NASA Systems Engineering Interface (SE) Management standard process and best practices; the tailoring of that process for implementation on the Orion to SLS interface; changes made over time to improve the tailored process, and; the opportunities to take the resulting lessons learned and propose improvements to our institutional processes and best practices. We compare this evidence against the practices to form the rationale for the declared SECM maturity level.

Jellicorse, John J.↗

Entry, Descent, and Landing Guidance and Control Approaches to Satisfy Mars Human Mission Landing Criteria

Precision landing on Mars is a challenge. All Mars lander missions prior to the 2012 Mars Science Laboratory (MSL) had landing location uncertainty ellipses on the order of hundreds of kilometers. Sending humans to the surface of Mars will likely require multiple landers delivered in close proximity, which will in turn require orders of magnitude improvement in landing accuracy. MSL was the first Mars mission to use an Apollo-derived bank angle guidance to reduce the size of the landing ellipse. It utilized commanded bank angle magnitude to control total range and bank angle reversals to control cross range. A shortcoming of this bank angle guidance is that the open loop phase of flight created by use of bank reversals increases targeting errors. This paper presents a comparison of entry, descent and landing performance for a vehicle with a low lift-to-drag ratio using both bank angle control and an alternative guidance called Direct Force Control (DFC). DFC eliminates the open loop flight errors by directly controlling two forces independently, lift and side force. This permits independent control of down range and cross range. Performance results, evaluated using the Program to Optimize Simulated Trajectories (POST2), including propellant use and landing accuracy, are presented.

Dwyer Cianciolo, Alicia↗