Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WIND POWER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Compounding climate change impacts during high stress periods for a high wind and solar power system in Texas

Power system planning aims at ensuring that sufficient supply- and demand-side assets exist to meet electricity demand at all times. For a Texas electric power system with high wind and solar penetrations, we quantify how climate change will affect supply and demand during three types of high stress periods for the power grid: high demand hours, high net demand hours, and high system ramp hours. We specifically quantify effects on demand, reductions in available thermal capacity (i.e. thermal deratings), wind and solar generation, and net demand. We estimate each using meteorological variables from five climate change projections (2041-2050) assuming Representative Concentration Pathway 8.5 and from a reference period (1996-2005). All five projections indicate that climate change will increase demand by up to 2 GWh during high demand hours (4% of demand in the reference period) and increase net demand by up to 3 GWh during high net demand periods (6% of net demand in the reference period). All five projections also indicate thermal deratings will increase during high demand and net demand periods by up to 2 GWh and high net demand ramps will increase by up to 2 GW. Overall, our results indicate compounding effects of climate change in Texas will necessitate greater investment in peak and flexible capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2.6: Limiting Climate Change to 450 ppm CO2 Equivalent in the 21st Century

The EMF 22 subgroup on Transition Scenarios explores a rich suite of potential future worlds in which climate change is limited to a variety of alternative radiative forcing levels. This paper focuses primarily on the requirements to limit radiative forcing from Kyoto gases to 2.6 W/m2. Given that we estimate year 2005 radiative forcing to be 2.4 W/m2, the 2.6 W/m2 limit creates a non-trivial constraint. Allowing radiative forcing to exceed the long-term target level provides greater latitude in achieving the goal, but implies major changes to both global energy and land-use systems in the near term as well as the long term. In addition, delay on the part of major emitting parties creates potential leakage in both energy and land-use. We estimate the challenging near-term and long-term deployment of new wind power, nuclear power and CO2 capture and storage associated with the 2.6 W/m2 limit.

17 WIND ENERGY↗

Artificial Intelligence-Aided Wind Plant Optimization for Nationwide Evaluation of Land Use and Economic Benefits of Wake Steering

If clean energy pathways are to harness massive increases in wind power, innovations with broad geographic viability will be needed to support buildout in diverse locations. However, geodiversity in impact potential is seldom captured in technology assessment. Here we propose a scalable approach to plant-level optimization using artificial intelligence to evaluate land sparing and economic benefits of wake steering at more than 6,800 plausible onshore wind locations in the USA. This emerging controls strategy optimizes plant energy production by directing turbine wakes. On the basis of estimates from our artificial intelligence model trained on engineering wind flow simulations, co-optimizing plant layouts with wake steering can reduce land requirements by an average of 18% per plant (site-specific benefits range from 2% to 34%), subject to errors and uncertainties in the flow model, wind resource estimates, buildout scenario and geographic factors. According to model estimates, wake steering is predicted to increase power production during high-value (relatively low wind) periods, boosting the annual revenue of individual plants by up to US$3.7 million (equivalent to US$13,000 MW-1 yr-1) but producing negligible gains in some settings. Consideration of wake steering’s geographic potential reveals divergent nationwide prospects for improved economics and siting flexibility.

deployment↗

Evolution of Scenario Generation Capabilities in the ExaSGD Project

High-fidelity renewable energy scenarios and rare-event high-impact contingencies are essential for modeling operations and infrastructure expansion of the next generation power grids using exascale computing resources. As the ExaSGD project progressed, our capabilities for generating scenarios for modeling wind power output at multiple wind farms significantly improved, evolving from the use of independent random perturbations to importance sampling-based techniques capturing representative spatial-temporal relations. Contingency generation also improved, evolving from standard N-1 techniques to probabilistic models of infrastructure damage resulting from extreme weather events. We review the developments in the realistic intermittent-energy scenario forecasting and extreme-event contingency creation as the ExaSGD project progressed and discuss the future work in these areas.

economic dispatch↗

A Data-Driven Multi-Period Importance Sampling Strategy for Stochastic Economic Dispatch

Power systems with high penetrations of renewable energy (e.g., wind power) require sophisticated approaches to optimize system performance due to uncertainty in short-term system generation capacity. In this paper, we combine a data-driven analog scenario selection method with importance sampling to create a novel scenario construction approach for two-stage stochastic economic dispatch problems with a large number of wind farms on a network. The proposed method produces scenarios with realistic physics by finding high-fidelity analogs that can describe future states of the system. We show how to extend this method to multi-period operations and demonstrate the effectiveness of this technique by simulating economic dispatch operations on a synthetic test system over the course of a week.

data-driven forecasting↗

Simulated meteorological impacts of offshore wind turbines and sensitivity to the amount of added turbulence kinetic energy

Offshore wind energy projects are currently in development off the east coast of the United States and may influence the local meteorology of the region. Wind power production and other commercial uses in this area are related to atmospheric conditions, and so it is important to understand how future wind plants may change the local meteorology. In the absence of measurements of potential wind plant impacts on meteorology, simulations offer the next-best possible insight into wake effects on boundary layer height, temperature, fluxes, and wind speeds. However, simulation tools that capture these effects offer multiple options for representing the amount of turbine-added turbulence that may impact assessments of micrometeorological effects. To explore this sensitivity, we compare 1 year of simulations from the Weather Research and Forecasting (WRF) model with and without wind plants incorporated, focusing on the lease area south of Massachusetts and Rhode Island. The simulations with wind plants are repeated to include both the maximum and minimum amounts of added turbulence to provide bounds on the potential impacts. We assess changes in wind speeds, 2 m temperature, surface heat flux, turbulence kinetic energy (TKE), and boundary layer height during different stability classifications and ambient wind speeds over the entire year and compare results for the degree of added turbulence in the wind plant simulations. Because the wake behavior may be a function of boundary layer stability, in this paper, we also present a machine learning algorithm to quantify the area and distance of the wake generated by the wind plant. This analysis enables us to identify the relationship between wake extent and boundary layer height. We find that hub-height wind speed is reduced within and downwind of the wind plant, with the strongest impacts occurring during stable conditions and faster wind speeds in region 3 of the turbine power curve, although impacts lessen as wind speeds increase past 15 m s−1. In contrast, wind speeds near the surface decrease when no turbine-added turbulence is included but can increase for stably stratified conditions when 100 % of possible TKE is included in the simulations. TKE increases at hub height in the simulations with added TKE for all stability classes, suggesting that atmospheric stability does not immediately modify the TKE generated by turbines. Negligible changes in hub-height TKE manifest in the simulations without the added TKE. At the surface, TKE increases in the simulations with maximum added turbulence only for unstable conditions. In the no-added-turbulence simulations, surface TKE decreases slightly in neutral and unstable simulations. Differences in 2 m temperatures and surface heat fluxes are small but vary considerably with atmospheric stability and the amount of added TKE. Boundary layer heights increase within the wind plant when turbine-added turbulence is included and decrease slightly downwind during stable conditions. In contrast, with no added turbulence, the boundary layer height is in general reduced in stable conditions with wind speeds less than 15 m s −1 and slightly increased in neutral conditions. Finally, shallower upwind boundary layer heights tend to correlate with larger wake areas and distances, though other factors likely also play a role in determining the extent of the wind plant wake. These simulation-based results provide a bound for micrometeorological impacts of wind plant wakes: simulations that couple the atmosphere to the ocean may reduce these impacts, and we await observational verification.

17 WIND ENERGY↗

Improved Superconducting Wire for Wind Generators: Superconducting Wires for Direct-Drive Wind Generators

REACT Project: Brookhaven National Laboratory will develop a low-cost superconducting wire that could be used in high-power wind generators. Superconducting wire currently transports 600 times more electric current than a similarly sized copper wire, but is significantly more expensive. Brookhaven National Laboratory will develop a high-performance superconducting wire that can handle significantly more electrical current, and will demonstrate an advanced manufacturing process that has the potential to yield a several-fold reduction in wire costs while using a using negligible amount of rare earth material. This design has the potential to make a wind turbine generator lighter, more powerful, and more efficient, particularly for offshore applications.

ARPA-E↗

Surface wind characteristics of some Aleutian Islands

The wind power potential of Alaska is assessed in order to determine promising windpower sites for construction of wind machines and for shipment of wind derived energy. Analyses of near surface wind data from promising Aleutian sites accessible by ocean transport indicate probable velocity regimes and also present deficiencies in available data. It is shown that winds for some degree of power generation are available 77 percent of the time in the Aleutians with peak velocities depending on location.

Wentink, T., Jr.↗

Holistic scan optimization of nacelle-mounted lidars for inflow and wake characterization at the RAAW and AWAKEN field campaigns

In this article, we provide a methodological framework for designing the scanning strategies of nacelle-mounted scanning lidars for wind energy field experiments, and apply it at two major experimental field campaigns. For the Rotor Aerodynamics, Aeroelastics, and Wake project (RAAW), we leverage two scanning lidars on one turbine to characterize the incoming turbulence and the turbine wake. For the American WAKE experimeNt (AWAKEN), we use four scanning lidars on top of four turbines in a large wind power plant to investigate both individual wakes and wind-plant-scale flow features.

17 WIND ENERGY↗

Scenario Creation and Power-Conditioning Strategies for Operating Power Grids with Two-Stage Stochastic Economic Dispatch

A significant difficulty associated with the use of stochastic programming to solve optimal power flow problems on a 5-minute timescale is the quality of renewable energy scenarios input by the user. This is especially true when considering power systems with high penetrations of renewable energy, e.g. wind power. This paper introduces the use of stochastic programming to solve the DC optimal power flow problem with scenarios drawn directly from high-fidelity data sets. Hence, the proposed method avoids the problem of lost physics by finding high-fidelity analogs that can describe future states of the system. Furthermore, this method can be simply extended to output multi-period scenarios to the stochastic program. We demonstrate the effectiveness of this technique by simulating dispatch operations on a synthetic test system over the course of a week.

94 GMLC - Grid Modernization Laboratory Consortium↗

Incorporation of the Rotor-Equivalent Wind Speed into the Weather Research and Forecasting Model’s Wind Farm Parameterization

Wind power installations have been increasing in recent years. Because wind turbines can influence local wind speeds, temperatures, and surface fluxes, weather forecasting models should consider their effects. Wind farm parameterizations do currently exist for numerical weather prediction models. They generally consider two turbine impacts: elevated drag in the region of the wind turbine rotor disk and increased turbulent kinetic energy production. The wind farm parameterization available in the Weather Research and Forecasting (WRF) Model calculates this drag and TKE as a function of hub-height wind speed. However, recent work has suggested that integrating momentum over the entire rotor disk [via a rotor-equivalent wind speed (REWS)] is more appropriate, especially for cases with high wind shear. In this study, we implement the REWS in the WRF wind farm parameterization and evaluate its impacts in an idealized environment, with varying amounts of wind speed shear and wind directional veer. Specifically, we evaluate three separate cases: neutral stability with low wind shear, high stability with high wind shear, and high stability with nonlinear wind shear. For most situations, use of the REWS with the wind farm parameterization has marginal impacts on model forecasts. However, for scenarios with highly nonlinear wind shear, the REWS can significantly affect results.

17 WIND ENERGY↗

Empirical Analysis of the Variability of Wind Generation in India: Implications for Grid Integration

We analyze variability in load and wind generation in India to assess its implications for grid integration of large scale wind projects using actual wind generation and load data from two states in India, Karnataka and Tamil Nadu. We compare the largest variations in load and net load (load -wind, i.e., load after integrating wind) that the generation fleet has to meet. In Tamil Nadu, where wind capacity is about 53% of the peak demand, we find that the additional variation added due to wind over the current variation in load is modest; if wind penetration reaches 15% and 30% by energy, the additional hourly variation is less than 0.5% and 4.5% of the peak demand respectively for 99percent of the time. For wind penetration of 15% by energy, Tamil Nadu system is found to be capable of meeting the additional ramping requirement for 98.8percent of the time. Potential higher uncertainty in net load compared to load is found to have limited impact on ramping capability requirements of the system if coal plants can me ramped down to 50percent of their capacity. Load and wind aggregation in Tamil Nadu and Karnataka is found to lower the variation by at least 20% indicating the benefits geographic diversification. These findings suggest modest additional flexible capacity requirements and costs for absorbing variation in wind power and indicate that the potential capacity support (if wind does not generate enough during peak periods) may be the issue that has more bearing on the economics of integrating wind

17 WIND ENERGY↗

Assessing boundary condition and parametric uncertainty in numerical-weather-prediction-modeled, long-term offshore wind speed through machine learning and analog ensemble

To accurately plan and manage wind power plants, not only does the time-varying wind resource at the site of interest need to be assessed but also the uncertainty connected to this estimate. Numerical weather prediction (NWP) models at the mesoscale represent a valuable way to characterize the wind resource offshore, given the challenges connected with measuring hub-height wind speed. The boundary condition and parametric uncertainty associated with modeled wind speed is often estimated by running a model ensemble. However, creating an NWP ensemble of long-term wind resource data over a large region represents a computational challenge. Here, we propose two approaches to temporally extrapolate wind speed boundary condition and parametric uncertainty using a more convenient setup in which a mesoscale ensemble is run over a short-term period (1 year), and only a single model covers the desired long-term period (20 year). We quantify hub-height wind speed boundary condition and parametric uncertainty from the short-term model ensemble as its normalized across-ensemble standard deviation. Then, we develop and apply a gradient-boosting model and an analog ensemble approach to temporally extrapolate such uncertainty to the full 20-year period, for which only a single model run is available. As a test case, we consider offshore wind resource characterization in the California Outer Continental Shelf. Both of the proposed approaches provide accurate estimates of the long-term wind speed boundary condition and parametric uncertainty across the region (R 2 >0.75), with the gradient-boosting model slightly outperforming the analog ensemble in terms of bias and centered root-mean-square error. At the three offshore wind energy lease areas in the region, we find a long-term median hourly uncertainty between 10 % and 14 % of the mean hub-height wind speed values. Finally, we assess the physical variability in the uncertainty estimates. In general, we find that the wind speed uncertainty increases closer to land. Also, neutral conditions have smaller uncertainty than the stable and unstable cases, and the modeled wind speed in winter has less boundary condition and parametric sensitivity than summer.

17 WIND ENERGY↗

NASA presentation

The development of a wind energy system is outlined that supplies reliable energy at a cost competitive with other energy systems. A government directed industry program with strong university support is recommended that includes meteorological studies to estimate wind energy potentials and determines favorable regions and sites for wind power installations. Key phases of the overall program are wind energy conversion systems, meteorological wind studies, energy storage systems, and environmental impact studies. Performance testing with a prototype wind energy conversion and storage system is projected for Fiscal 1977.

Thomas, R. L.↗

Deciphering the X-ray Emission of the Nearest Herbig Ae Star

In this research program, we obtained and analyzed an X-ray observation of the young nearby intermediate mass pre-main sequence star HD 104237 using the XMM-Newton space-based observatory. The observation was obtained on 17 Feb. 2002. This observation yielded high-quality X-ray images, spectra, and timing data which provided valuable information on the physical processes responsible for the X-ray emission. This star is a member of the group of so-called Herbig Ae/Be stars, which are young intermediate mass (approx. 2 - 4 solar masses) pre-main sequence (PMS) stars a few million years old that have not yet begun core hydrogen burning. The objective of the XMM-Newton observation was to obtain higher quality data than previously available in order to constrain possible X-ray emission mechanisms. The origin of the X-ray emission from Herbig Ae/Be stars is not yet known. These intermediate mass PMS stars lie on radiative tracks and are not expected to emit X-rays via solar-like magnetic processes, nor are their winds powerful enough to produce X-rays by radiative wind shocks as in more massive O-type stars. The emission could originate in unseen low-mass companions, or it may be intrinsic to the Herbig stars themselves if they still have primordial magnetic fields or can sustain magnetic activity via a nonsolar dynamo.

Skinner, Stephen L.↗

Scenario Creation and Power-Conditioning Strategies for Operating Power Grids with Two-Stage Stochastic Economic Dispatch: Preprint

A significant difficultly associated with the use of stochastic programming to solve optimal power flow problems on a 5-minute timescale is the quality of renewable energy scenarios input by the user. This is especially true when considering power systems with high penetrations of renewable energy, e.g. wind power. This paper introduces the use of stochastic programming to solve the DCOPF problem with scenarios drawn directly from high-fidelity data sets. Hence, the proposed method avoids the problem of lost physics by finding high-fidelity analogs that can describe future states of the system. Furthermore, this method can be simply extended to output multi-period scenarios to the stochastic program. We demonstrate the effectiveness of this technique on simulated dispatch operations of the RTS-GMLC over a week.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Scenario Creation and Power-Conditioning Strategies for Operating Power Grids with Two-Stage Stochastic Economic Dispatch

A significant difficulty associated with the use of stochastic programming to solve optimal power flow problems on a 5-minute timescale is the quality of renewable energy scenarios input by the user. This is especially true when considering power systems with high penetrations of renewable energy, e.g. wind power. This paper introduces the use of stochastic programming to solve the DC optimal power flow problem with scenarios drawn directly from high-fidelity data sets. Hence, the proposed method avoids the problem of lost physics by finding high-fidelity analogs that can describe future states of the system. Furthermore, this method can be simply extended to output multi-period scenarios to the stochastic program. We demonstrate the effectiveness of this technique by simulating dispatch operations on a synthetic test system over the course of a week.

analog forecast↗