Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Unit Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Wind-tunnel tests on a 3-dimensional fixed-geometry scramjet inlet at M = 2.30 to 4.60

Wind-tunnel tests were conducted on a baseline scramjet inlet model having fixed geometry and swept leading edges at M = 2.30, 2.96, 3.95, and 4.60 in the Langley unitary plan wind tunnel. The unit Reynolds number of the tests was held constant at 6.56 million per meter (2 million per foot). The objectives of the tests were to establish inlet performance and starting characteristics in the lower Mach number range of operation (less than M = 5). Surface pressures obtained on the inlet components are presented, along with the results of the internal flow surveys made at the throat and capture stations of the inlet. Contour plots of the inlet-flow-field parameters such as Mach numbers, pressure recovery, flow capture, local static and total pressure ratios at the survey stations are shown for the test Mach numbers.

Mueller, J. N.↗

Design, fabrication and testing of an optical temperature sensor

The laboratory breadboard optical temperature sensor based on the temperature dependent absorptive characteristics of a rare earth (europium) doped optical fiber. The principles of operation, materials characterization, fiber and optical component design, design and fabrication of an electrooptic interface unit, signal processing, and initial test results are discussed. Initial tests indicated that, after a brief warmup period, the output of the sensor was stable to approximately 1 C at room temperature or approximately + or - 0.3 percent of point (K). This exceeds the goal of 1 percent of point. Recommendations are presented for further performance improvement.

Morey, W. W.↗

Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

Mason, Lee↗

Mapping soils, crops, and rangelands by machine analysis of multitemporal ERTS-1 data

ERTS-1 data, obtained during the period 25 August 1972 to 5 September 1973 over a range of test sites in the Central United States, have been used for identifying and mapping differences in soil patterns, species and conditions of cultivated crops, and conditions of rangelands. Multispectral scanner data from multiple ERTS passes over certain test sites have provided the opportunity to study temporal changes in the scene. Multispectral classifications delineating soils boundaries in different test sites compared well with existing soil association maps prepared by conventional means. Spectral analysis of ERTS data was used to identify, maps, and make areal measurements of wheat in western Kansas. Multispectral analysis of ERTS-1 data provided patterns in rangelands which can be related to soils differences, range management practices, and the extent of infestation of grasslands by mesquite (prosopis fuliflora) and juniper (juniperus spp.).

Baumgardner, M. F.↗

A real-time simulator of a turbofan engine

A real-time digital simulator of a Pratt and Whitney F100 engine has been developed for real-time code verification and for actuator diagnosis during full-scale engine testing. This self-contained unit can operate in an open-loop stand-alone mode or as part of closed-loop control system. It can also be used for control system design and development. Tests conducted in conjunction with the NASA Advanced Detection, Isolation, and Accommodation program show that the simulator is a valuable tool for real-time code verification and as a real-time actuator simulator for actuator fault diagnosis. Although currently a small perturbation model, advances in microprocessor hardware should allow the simulator to evolve into a real-time, full-envelope, full engine simulation.

Litt, Jonathan S.↗

Test and evaluation of load converter topologies used in the Space Station Freedom Power Management and distribution DC test bed

Power components hardware in support of the Space Station Freedom dc Electrical Power System were tested. One type of breadboard hardware tested is the dc Load Converter Unit, which constitutes the power interface between the electric power system and the actual load. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. Three load converters were tested: a series resonant converter, a series inductor switchmode converter, and a switching full-bridge forward converter. The topology, operation principles, and tests results are described, in general. A comparative analysis of the three units is given with respect to efficiency, regulation, short circuit behavior (protection), and transient characteristics.

Lebron, Ramon C.↗

Test and evaluation of load converter topologies used in the Space Station Freedom power management and distribution dc test bed

Power components hardware in support of the Space Station freedom dc Electric Power System were tested. One type of breadboard hardware tested is the dc Load Converter Unit, which constitutes the power interface between the electric power system and the actual load. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. Three load converters were tested: a series resonant converter, a series inductor switch-mode converter, and a switching full-bridge forward converter. The topology, operation principles, and test results are described, in general. A comparative analysis of the three units is given with respect to efficiency, regulation, short circuit behavior (protection), and transient characteristics.

Lebron, Ramon C.↗

Diagnostic for Verifying the Thrust Vector Requirement of the AEPS Hall-Effect Thruster and Comparison to the NEXT-C Thrust Vector Diagnostic

A diagnostic has been designed and fabricated to verify the thrust vector requirement for the Advanced Electric Propulsion System (AEPS) Hall Effect Rocket with Magnetic Shielding (HERMeS) thruster. This diagnostic will be used to verify that the propulsion system thrust vector offset from the mounting surface normal vector does not exceed 1.5 degrees over the entire throttling range and over the course of 23,000 hours of thruster testing. The diagnostic will also not violate the thruster's required voltage standoff capability in the presence of carbon backsputter by being minimally intrusive and not significantly adding to the facility backsputtered rate. Based on these requirements, an appropriate diagnostic design was determined to comprise of an array of 23 Faraday probes swept through the plume in an arc 1m from the thruster to map the beam current density. The beam current density centroid of the plume is assumed to track the thrust vector within an acceptable level of uncertainty. Additionally, a reference system, including optical alignment to the mounting surface normal vector and tilt sensors, was devised to periodically calibrate the probe position and motion throughout the long duration wear test campaign. Initial measurements of the thruster plume have been acquired to demonstrate the diagnostics functionality, verify procedures, and assess any necessary improvements prior to implementation of the diagnostic during the AEPS Engineering Development Unit (EDU) long duration wear test. To illustrate the merits of differing approaches to thrust vector determination for different classes of electric propulsion thrusters, NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) thrust vector diagnostic design details and recent data are also discussed (Appendix A).

Benavides, Gabriel F.↗

Diagnostic for Verifying the Thrust Vector Requirement of the AEPS Hall-Effect Thruster and Comparison to the NEXT-C Thrust Vector Diagnostic

A diagnostic has been designed and fabricated to verify the thrust vector requirement for the Advanced Electric Propulsion System (AEPS) Hall Effect Rocket with Magnetic Shielding (HERMeS) thruster. This diagnostic will be used to verify that the propulsion system thrust vector offset from the mounting surface normal vector does not exceed 1.5 degrees over the entire throttling range and over the course of 23,000 hours of thruster testing. The diagnostic will also not violate the thruster's required voltage standoff capability in the presence of carbon backsputter by being minimally intrusive and not significantly adding to the facility backsputtered rate. Based on these requirements, an appropriate diagnostic design was determined to comprise of an array of 23 Faraday probes swept through the plume in an arc 1m from the thruster to map the beam current density. The beam current density centroid of the plume is assumed to track the thrust vector within an acceptable level of uncertainty. Additionally, a reference system, including optical alignment to the mounting surface normal vector and tilt sensors, was devised to periodically calibrate the probe position and motion throughout the long duration wear test campaign. Initial measurements of the thruster plume have been acquired to demonstrate the diagnostics functionality, verify procedures, and assess any necessary improvements prior to implementation of the diagnostic during the AEPS Engineering Development Unit (EDU) long duration wear test. To illustrate the merits of differing approaches to thrust vector determination for different classes of electric propulsion thrusters, NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) thrust vector diagnostic design details and recent data are also discussed (Appendix A).

Benavides, Gabriel F.↗

Diagnostic for Verifying the Thrust Vector Requirement of the AEPS Hall-Effect Thruster and Comparison to the NEXT-C Thrust Vector Diagnostic

A diagnostic has been designed and fabricated to verify the thrust vector requirement for the Advanced Electric Propulsion System (AEPS) Hall Effect Rocket with Magnetic Shielding (HERMeS) thruster. This diagnostic will be used to verify that the propulsion system thrust vector offset from the mounting surface normal vector does not exceed 1.5 degrees over the entire throttling range and over the course of 23,000 hours of thruster testing. The diagnostic will also not violate the thruster's required voltage standoff capability in the presence of carbon backsputter by being minimally intrusive and not significantly adding to the facility backsputtered rate. Based on these requirements, an appropriate diagnostic design was determined to comprise of an array of 23 Faraday probes swept through the plume in an arc 1m from the thruster to map the beam current density. The beam current density centroid of the plume is assumed to track the thrust vector within an acceptable level of uncertainty. Additionally, a reference system, including optical alignment to the mounting surface normal vector and tilt sensors, was devised to periodically calibrate the probe position and motion throughout the long duration wear test campaign. Initial measurements of the thruster plume have been acquired to demonstrate the diagnostics functionality, verify procedures, and assess any necessary improvements prior to implementation of the diagnostic during the AEPS Engineering Development Unit (EDU) long duration wear test. To illustrate the merits of differing approaches to thrust vector determination for different classes of electric propulsion thrusters, NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) thrust vector diagnostic design details and recent data are also discussed (Appendix A).

Advanced Electric Propulsion System (AEPS)↗

The Arctic data buoy. A system for environmental monitoring in the Arctic

An automated data buoy system for environmental monitoring in the Arctic was developed. The buoy is designed to operate for a minimum of 1 year providing position and environmental data through polar-orbiting satellite telecommunications. It can be deployed by a two or three man crew using a small aircraft. It is capable of operating in both free-floating and frozen-in situations. An experimental unit successfully completed a 5-month test at Fletcher's Ice Island (T-3) during the winter of 1971-72 and six units were deployed in the Arctic during the spring of 1972. Results to data have demonstrated the utility of the basic design, the effectiveness of the satellite communications, and the feasibility of deploying and operating a large array of such buoy systems in the Arctic Ocean.

Haugen, D. P.↗

Evaluation of a high performance, fixed-ratio, traction drive

A test program was initiated to evaluate the key operational and performance factors associated with the Nasvytis multiroller concept. Two sets of Nasvytis drives, each of slightly geometry, were parametrically tested on a back to back test stand. Initial results from these tests are reported. One of these units was later retrofitted to the power turbine of an automotive gas turbine engine and dynamometer tested.

Loewenthal, S. H.↗

Qualification testing of solar photovoltaic powered refrigerator freezers for medical use in remote geographic locations

One of the primary obstacles to the application of vaccination in developing countries is the lack of refrigerated storage. Vaccines exposed to elevated temperatures suffer a permanent loss of potency. Photovoltaic (PV) powered refrigerator/freezer (R/F) units could surmount the problem of refrigeration in remote areas where no reliable commercial power supply is available. The performance measurements of two different models of PV powered R/F units for medical use are presented. Qualification testing consisted of four major procedures: no-load pull down, ice making, steady-state (maintenance), and holdover. Both R/F units met the major World Health Organization (WHO) requirements. However, the testing performed does not provide complete characterization of the two units; such information could be derived only from further extensive test procedures.

Kaszeta, W. J.↗

Preparation for Hollow Cathode Testing for the Advanced Electric Propulsion System at NASA Glenn Research Center

NASA Glenn Research Center is performing activities to support the unique needs of hollow cathode development and testing for the Advanced Electric Propulsion System (AEPS). Three existing vacuum facilities have been outfitted as cathode test facilities, and each will serve a different role in upcoming testing. Vacuum Facility 67 is being developed to serve as a long-duration test facility for the Engineering Development Unit cathode, which is to be delivered by the AEPS contractor. It will feature a thruster-like magnetic field simulator and cold-cycle capability via a liquid nitrogen-cooled cold plate. Vacuum Facility 17 is being developed as a test facility for short- to medium-duration experiments in order to provide auxiliary support for the long-duration testing. It will feature a magnetic field simulator but not cold-cycling. Finally, Vacuum Facility 1 will be a high-pumping speed cathode development environment, and will feature an array of plasma and temperature diagnostics. In addition to the facility preparation work, a new cathode, referred to as the Mark II, has been designed. The Mark II is an evolution of the Technology Demonstration Unit cathodes that better evokes the geometry, fabrication, and construction of the forthcoming Engineering Development Unit. This cathode serves as a transition between the Technology Demonstration Unit cathodes used during early thruster development and the forthcoming Engineering Development Unit cathodes. It will be used as a means of verifying the new test facilities prior to arrival of Engineering Development Unit hardware. Details of the Mark II design and key features are presented, as well as details of future work to be performed.

Hall, Scott J.↗

Preparation for Hollow Cathode Testing for the Advanced Electric Propulsion System at NASA Glenn Research Center

NASA Glenn Research Center is performing activities to support the unique needs of hollow cathode development and testing for the Advanced Electric Propulsion System (AEPS). Three existing vacuum facilities have been outfitted as cathode test facilities, and each will serve a different role in upcoming testing. Vacuum Facility 67 is being developed to serve as a long-duration test facility for the Engineering Development Unit cathode, which is to be delivered by the AEPS contractor. It will feature a thruster-like magnetic field simulator and cold-cycle capability via a liquid nitrogen-cooled cold plate. Vacuum Facility 17 is being developed as a test facility for short- to medium-duration experiments in order to provide auxiliary support for the long-duration testing. It will feature a magnetic field simulator but not cold-cycling. Finally, Vacuum Facility 1 will be a high-pumping speed cathode development environment, and will feature an array of plasma and temperature diagnostics. In addition to the facility preparation work, a new cathode, referred to as the Mark II, has been designed. The Mark II is an evolution of the Technology Demonstration Unit cathodes that better evokes the geometry, fabrication, and construction of the forthcoming Engineering Development Unit. This cathode serves as a transition between the Technology Demonstration Unit cathodes used during early thruster development and the forthcoming Engineering Development Unit cathodes. It will be used as a means of verifying the new test facilities prior to arrival of Engineering Development Unit hardware. Details of the Mark II design and key features are presented, as well as details of future work to be performed.

Advanced Electric Propulsion System (AEPS)↗

Preparation for Hollow Cathode Testing for the Advanced Electric Propulsion System at NASA Glenn Research Center

NASA Glenn Research Center is performing activities to support the unique needs of hollow cathode development and testing for the Advanced Electric Propulsion System (AEPS). Three existing vacuum facilities have been outfitted as cathode test facilities, and each will serve a different role in upcoming testing. Vacuum Facility 67 is being developed to serve as a long-duration test facility for the Engineering Development Unit cathode, which is to be delivered by the AEPS contractor. It will feature a thruster-like magnetic field simulator and cold-cycle capability via a liquid nitrogen-cooled cold plate. Vacuum Facility 17 is being developed as a test facility for short- to medium-duration experiments in order to provide auxiliary support for the long-duration testing. It will feature a magnetic field simulator but not cold-cycling. Finally, Vacuum Facility 1 will be a high-pumping speed cathode development environment, and will feature an array of plasma and temperature diagnostics. In addition to the facility preparation work, a new cathode, referred to as the Mark II, has been designed. The Mark II is an evolution of the Technology Demonstration Unit cathodes that better evokes the geometry, fabrication, and construction of the forthcoming Engineering Development Unit. This cathode serves as a transition between the Technology Demonstration Unit cathodes used during early thruster development and the forthcoming Engineering Development Unit cathodes. It will be used as a means of verifying the new test facilities prior to arrival of Engineering Development Unit hardware. Details of the Mark II design and key features are presented, as well as details of future work to be performed.

Hall, Scott J.↗

Mariner Jupiter/Saturn LCSSE thruster/valve assembly and injection propulsion unit rocket engine assemblies: 0.2-lbf T/VA development and margin limit test report

Thruster valve assemblies (T/VA's) were subjected to the development test program for the combined JPL Low-Cost Standardized Spacecraft Equipment (LCSSE) and Mariner Jupiter/Saturn '77 spacecraft (MJS) programs. The development test program was designed to achieve the following program goals: (1) demonstrate T/VA design compliance with JPL Specifications, (2) to conduct a complete performance Cf map of the T/VA over the full operating range of environment, (3) demonstrate T/VA life capability and characteristics of life margin for steady-state limit cycle and momentum wheel desaturation duty cycles, (4) verification of structural design capability, and (5) generate a computerized performance model capable of predicting T/VA operation over pressures ranging from 420 to 70 psia, propellant temperatures ranging from 140 F to 40 F, pulse widths of 0.008 to steady-state operation with unlimited duty cycle capability, and finally predict the transient performance associated with reactor heatup during any given duty cycle, start temperature, feed pressure, and propellant temperature conditions.

Clark, E. C.↗

Mariner Jupiter/Saturn LCSSE thruster/valve assembly and injection propulsion unit rocket engine assemblies: 0.2-lbf T/VA development and margin limit test report, addendum

Capillary tube plugging phenomena on the 0.2-lbf thruster/valve assembly was examined. Vibration tests were conducted in the nozzle up attitude. Failure to fire caused by blockage of the capillary tube by catalyst fines was observed after vibration. Water flushing and previbration hot firing were used to remove the fines.

Wilson, W. W.↗