Gandolinium poison solubility testing for the downstream impacts from accelerated basin de-inventory
The Accelerated Basin De-inventory (ABD) Program at the Savannah River Site (SRS) is designed to accelerate the de-inventory of L-Basin and accelerate the Spent Nuclear Fuel (SNF) Disposition mission. Spent fuel will be dissolved in H-Canyon without recovery of uranium. The dissolver solutions will be temporarily stored, pH-adjusted to excess hydroxide (which will facilitate precipitation of metal oxides/hydroxides), transferred to the Concentration, Storage, and Transfer Facility (CSTF), and subsequently immobilized in the Defense Waste Processing Facility (DWPF) during planned sludge batch campaigns. ABD accelerates basin closure, significantly reduces programmatic risk, and greatly reduces the lifecycle budget requirements for the site by eliminating the need for a SNF drying and packaging capability. The ABD approach represents a significant change to the clean-up approach for the SRS. However, the increased fissile loading in sludge batches, due to the dissolver solutions, requires investigation to ensure fissile limits are efficiently and safely managed; higher fissile loadings in the glass are projected to be two to three times higher than the current fissile concentration limit of 897 g/m 3 and will be addressed in a future report.