Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACE MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Gravitational loading of a simulated launch alters mRNA expression in osteoblasts

Serum-deprived mouse osteoblastic cells (MC3T3-E1a) were centrifuged under a regime designed to simulate a space shuttle launch (maximum of 3g). Messenger RNA levels for eight genes involved in bone growth and maintenance were determined using RT-PCR. Following 30 min of centrifugation, mRNA level for early response gene c-fos was significantly increased 89% (P < 0.05). The c-fos induction was transient and returned to control levels after 3 h. The mRNA level for the mineralization marker gene osteocalcin was significantly decreased to 44% of control level (P < 0.005) 3 h after centrifugation. No changes in mRNA levels were detected for c-myc, TGFbeta1, TGFbeta2, cyclophilin A, or actin. No basal mRNA level for TGFbeta3 was detected. In addition, no change in the steady-state synthesis of prostaglandin E2 was detected, possibly due to lack of lipid substrates in serum-deprived cells, suggesting that the increase in c-fos mRNA in response to gravitational loading is a result of mechanical stimulation. These results indicate that a small magnitude mechanical loading, such as that experienced during a shuttle launch, can alter mRNA levels in quiescent osteoblastic cells.

Non-NASA Center↗

Supportability Concepts for Crewed Deep Space Exploration

Supportability—defined as the set of system characteristics that influence the logistics and support required to enable safe and effective operations—will be a much larger driver of mass, risk, and crew time for future human space exploration due to the more challenging mission context. For Mars, systems must operate in a logistically isolated environment for much longer durations than previous missions, which results in a higher probability of system failure and therefore an increased need for maintenance or contingency options. Mars missions also lack access to quick aborts, which increases the consequences of an unrecoverable system failure. Together, this higher likelihood and consequence of failure results in an increase in supportability-related risk. Supportability analysis is an important part of systems development that helps designers better understand the impacts of system and mission decisions on risk, mass, and crew time. The real-world processes that drive maintenance requirements and other supportability-related characteristics are probabilistic, and therefore they require different conceptual approaches and models than are used for more deterministic aspects of space systems. This paper provides an overview of supportability analysis, addresses key concepts, and provides examples of how supportability analysis can be incorporated into system development. Specifically, system supportability involves stochastic processes, and therefore must be evaluated using probabilistic models. These models can be used to perform sensitivity analysis even if system characteristics are not yet fully defined. Failure rates cannot be measured directly, but tests provide valuable data that can help refine those estimates. Human spaceflight architectures are complex, and exhibit coupled behavior that should be examined with integrated systems analysis that includes an assessment of supportability.

Supportability↗

Supportability Concepts for Crewed Deep Space Exploration

Supportability—defined as the set of system characteristics that influence the logistics and support required to enable safe and effective operations—will be a much larger driver of mass, risk, and crew time for future human space exploration due to the more challenging mission context. For Mars, systems must operate in a logistically isolated environment for much longer durations than previous missions, which results in a higher probability of system failure and therefore an increased need for maintenance or contingency options. Mars missions also lack access to quick aborts, which increases the consequences of an unrecoverable system failure. Together, this higher likelihood and consequence of failure results in an increase in supportability-related risk. Supportability analysis is an important part of systems development that helps designers better understand the impacts of system and mission decisions on risk, mass, and crew time. The real-world processes that drive maintenance requirements and other supportability-related characteristics are probabilistic, and therefore they require different conceptual approaches and models than are used for more deterministic aspects of space systems. This paper provides an overview of supportability analysis, addresses key concepts, and provides examples of how supportability analysis can be incorporated into system development. Specifically, system supportability involves stochastic processes, and therefore must be evaluated using probabilistic models. These models can be used to perform sensitivity analysis even if system characteristics are not yet fully defined. Failure rates cannot be measured directly, but tests provide valuable data that can help refine those estimates. Human spaceflight architectures are complex, and exhibit coupled behavior that should be examined with integrated systems analysis that includes an assessment of supportability.

Supportability↗

Paint and Oil Locker, SWMU 067 Southern Treatment Area Air Sparge System Construction Completion and Performance Monitoring and Paint and Oil Locker, Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion, Performance Monitoring, and Long-Term Monitoring (LTM) Report presents activities conducted at the Paint and Oil Locker (POL) (Solid Waste Management Unit [SWMU] 067) and Supply Warehouse #3 (SW3) (SWMU 088) sites located at the Kennedy Space Center (KSC), Florida. Activities include implementation and Year 1 (Quarters [Q] 1 through 4) and Q5 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) in the POL Southern Treatment Area, LTM results for the POL Northern Area and SW3, and supplemental direct push technology (DPT) sampling at both sites to support the LTM and performance monitoring programs. The timeframe for activities included in this report extends from August 2019 to August 2022. The scope for these sites currently includes two main components, which are documented within this report: (1) LTM at SW3 and POL Northern Area where an AS system began operation at these sites in May 2009 and June 2013, respectively, and subsequently turned off for both sites in March 2018 (during the previous reporting period); and (2) Active AS operations and performance monitoring in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The AS IM in the POL Southern Treatment Area was implemented between 2019 and 2021 to treat a chlorinated solvent groundwater plume that resulted from historic operations supporting the National Aeronautics and Space Administration’s (NASA) Space Program. The objective of the AS IM is to remediate groundwater within the treatment zone to support transition to monitored natural attenuation (MNA). The overall Corrective Action objective is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2- dichloroethene (tDCE), and vinyl chloride (VC) present in groundwater to levels below their respective State of Florida Groundwater Cleanup Target Levels (GCTLs). The AS IM was installed in the POL Southern Treatment Area to target the high concentration plume (HCP), which includes a source zone (SZ) area where TCE was found to exceed 11,000 micrograms per liter (µg/L), and extend to a depth of 30 feet below land surface (bls).

TCE↗

The Threat of Uncertainty: Why Using Traditional Approaches for Evaluating Spacecraft Reliability are Insufficient for Future Human Mars Missions

Through the Evolvable Mars Campaign (EMC) study, the National Aeronautics and Space Administration (NASA) continues to evaluate potential approaches for sending humans beyond low Earth orbit (LEO). A key aspect of these missions is the strategy that is employed to maintain and repair the spacecraft systems, ensuring that they continue to function and support the crew. Long duration missions beyond LEO present unique and severe maintainability challenges due to a variety of factors, including: limited to no opportunities for resupply, the distance from Earth, mass and volume constraints of spacecraft, high sensitivity of transportation element designs to variation in mass, the lack of abort opportunities to Earth, limited hardware heritage information, and the operation of human-rated systems in a radiation environment with little to no experience. The current approach to maintainability, as implemented on ISS, which includes a large number of spares pre-positioned on ISS, a larger supply sitting on Earth waiting to be flown to ISS, and an on demand delivery of logistics from Earth, is not feasible for future deep space human missions. For missions beyond LEO, significant modifications to the maintainability approach will be required.Through the EMC evaluations, several key findings related to the reliability and safety of the Mars spacecraft have been made. The nature of random and induced failures presents significant issues for deep space missions. Because spare parts cannot be flown as needed for Mars missions, all required spares must be flown with the mission or pre-positioned. These spares must cover all anticipated failure modes and provide a level of overall reliability and safety that is satisfactory for human missions. This will require a large amount of mass and volume be dedicated to storage and transport of spares for the mission. Further, there is, and will continue to be, a significant amount of uncertainty regarding failure rates for spacecraft components. This uncertainty makes it much more difficult to anticipate failures and will potentially require an even larger amount of spares to provide an acceptable level of safety. Ultimately, the approach to maintenance and repair applied to ISS, focusing on the supply of spare parts, may not be tenable for deep space missions. Other approaches, such as commonality of components, simplification of systems, and in-situ manufacturing will be required.

Stromgren, Chel↗

Reusable Rocket Engine Operability Modeling and Analysis

This paper describes the methodology, model, input data, and analysis results of a reusable launch vehicle engine operability study conducted with the goal of supporting design from an operations perspective. Paralleling performance analyses in schedule and method, this requires the use of metrics in a validated operations model useful for design, sensitivity, and trade studies. Operations analysis in this view is one of several design functions. An operations concept was developed given an engine concept and the predicted operations and maintenance processes incorporated into simulation models. Historical operations data at a level of detail suitable to model objectives were collected, analyzed, and formatted for use with the models, the simulations were run, and results collected and presented. The input data used included scheduled and unscheduled timeline and resource information collected into a Space Transportation System (STS) Space Shuttle Main Engine (SSME) historical launch operations database. Results reflect upon the importance not only of reliable hardware but upon operations and corrective maintenance process improvements.

Christenson, R. L.↗

The space station assembly phase: Flight telerobotic servicer feasibility, volume 1

The question is addressed which was raised by the Critical Evaluation Task Force (CETF) analysis of the space station: if a Flight Telerobotic Servicer (FTS) of a given technical risk could be built for use during space station assembly, could it save significant extravehicular (EVA) resources. Key issues and trade-offs associated with using an FTS to aid in space station assembly phase tasks such as construction and servicing are identified. A methodology is presented that incorporates assessment of candidate assembly phase tasks, telerobotics performance capabilities, development costs, operational constraints (STS and proximity operations), maintenance, attached payloads, and polar platforms. A discussion of the issues is presented with focus on potential FTS roles: (1) as a research-oriented test bed to learn more about space usage of telerobotics; (2) as a research-based test bed with an experimental demonstration orientation and limited assembly and servicing applications; or (3) as an operational system to augment EVA, to aid the construction of the space station, and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations. During the course of the study, the baseline configuration was modified into Phase 1 (a station assembled in 12 flights), and Phase 2 (a station assembled over a 30 flight period) configuration.

Smith, Jeffrey H.↗

The principle of commonality and its application to the Space Station Freedom Program

The principle of commonality has achieved wide application in the communication, automotive, and aircraft industries. By the use of commonality, component development costs are minimized, logistics are simplified, and the investment costs of spares inventory are reduced. With space systems, which must be maintained and repaired in orbit, the advantages of commonality are compounded. Transportation of spares is expensive, on-board storage volume for spares is limited, and crew training and special tools needed for maintenance and repair are significant considerations. This paper addresses the techniques being formulated to realize the benefits of commonality in the design of the systems and elements of the Space Station Freedom Program, and include the criteria for determining the extent of commonality to be implemented.

Hopson, George D.↗

Crew Health Care System (CHeCS) Design Research, Documentations, and Evaluations

The Crew Health Care System (CHeCS) is a group within the Space Life Science Directorate (SLSD) that focuses on the overall health of astronauts by reinforcing the three divisions - the Environmental Maintenance System (EMS), the Countermeasures System (CMS), and the Health Maintenance System (HMS). This internship provided opportunity to gain knowledge, experience, and skills in CHeCS engineering and operations tasks. Various and differing tasks allowed for occasions to work independently, network to get things done, and show leadership abilities. Specific exercises included reviewing hardware certification, operations, and documentation within the ongoing Med Kit Redesign (MKR) project, and learning, writing, and working various common pieces of paperwork used in the engineering and design process. Another project focused on the distribution of various pieces of hardware to off-site research facilities with an interest in space flight health care. The main focus of this internship, though, was on a broad and encompassing understanding of the engineering process as time was spent looking at each individual step in a variety of settings and tasks.

CLement, Bethany M.↗

A study of the durability of beryllium rocket engines

An experimental test program was performed to demonstrate the durability of a beryllium INTEREGEN rocket engine when operating under conditions simulating the space shuttle reaction control system. A vibration simulator was exposed to the equivalent of 100 missions of X, Y, and Z axes random vibration to demonstrate the integrity of the recently developed injector-to-chamber braze joint. An off-limits engine was hot fired under extreme conditions of mixture ratio, chamber pressure, and orifice plugging. A durability engine was exposed to six environmental cycles interspersed with hot-fire tests without intermediate cleaning, service, or maintenance. Results from this program indicate the ability of the beryllium INTEREGEN engine concept to meet the operational requirements of the space shuttle reaction control system.

Paster, R. D.↗

Robonaut: a robot designed to work with humans in space

The Robotics Technology Branch at the NASA Johnson Space Center is developing robotic systems to assist astronauts in space. One such system, Robonaut, is a humanoid robot with the dexterity approaching that of a suited astronaut. Robonaut currently has two dexterous arms and hands, a three degree-of-freedom articulating waist, and a two degree-of-freedom neck used as a camera and sensor platform. In contrast to other space manipulator systems, Robonaut is designed to work within existing corridors and use the same tools as space walking astronauts. Robonaut is envisioned as working with astronauts, both autonomously and by teleoperation, performing a variety of tasks including, routine maintenance, setting up and breaking down worksites, assisting crew members while outside of spacecraft, and serving in a rapid response capacity.

Man-Machine Systems↗

Sensors Enable Plants to Text Message Farmers

Long-term human spaceflight means long-term menu planning. Since every pound of cargo comes with a steep price tag, NASA has long researched technologies and techniques to allow astronauts to grow their own food, both on the journey and in some cases at their destination. Sustainable food technologies designed for space have resulted in spinoffs that improve the nutrition, safety, and durability of food on Earth. There are of course tradeoffs involved in making astronauts part-time farmers. Any time spent tending plants is time that can t be spent elsewhere: collecting data, exploring, performing routine maintenance, or sleeping. And as scarce as time is for astronauts, resources are even more limited. It is highly practical, therefore, to ensure that farming in space is as automated and precise as possible.

Source record↗

Revolutionary implications of the space shuttle.

The space shuttle concept, generated to meet the stringent requirement for a low-cost transportation system for further exploration and utilization of space, is discussed. By virtue of being a recoverable and reusable delivery vehicle, the space shuttle will provide a substantial reduction in recurring expenses associated with expendable launch vehicles. With its generous volume capacity and weight capability, the shuttle will have a drastic impact on all payloads, regardless of their destination, and will be able to recover spacecraft on a cyclic basis in order to permit their updating and refurbishing for later reuse. The shuttle's maintenance responsibilities may also involve performing scheduled or unscheduled repairs of malfunctioning satellites, either in orbit or after landing. The impact of the space shuttle, as a research laboratory, on the method of space experimentation has even more far-reaching implications.

Von Braun, W.↗

Future NSMO plans for maintenance of NASTRAN

The objectives of the NASTRAN computer program system are discussed. Specific reference is made to the use of NASTRAN in the space shuttle program. The use of NASTRAN by agencies other than NASA is reported. The subjects presented are: (1) planned developments, (2) capability improvements, (3) efficiency improvements, and (4) new error correction procedure.

Weidman, D. J.↗

Experimental progress and future plans on spherical tokamak, QUEST

QUEST (Q-shu university experiment with steady state spherical tokamak) aims at effective plasma current start-up and stable maintenance of plasma discharge. To solve the inherent problems in a spherical tokamak (ST) arising from insufficient space for placing the inductive center solenoid, electron cyclotron current drive (ECCD) and transient coaxial helicity injection (T-CHI) are implemented as a non-inductive plasma start-up method in QUEST. Efficient ECCD assisted by energetic electrons could be achieved. By combining control of the wave injection angle and application of a negative toroidal electric field, the bulk electron temperature could be raised up to 1 keV due to selective wave power absorption in the bulk electrons. The plasma current of over 50 kA contained within the closed flux surface could be obtained with a floating single biased electrode placed on lower divertor plates for T-CHI. Long-pulse operations on QUEST are impeded frequently due to wall saturation and subsequent density runaway caused by fuel particle imbalance. Since 2014, a unique tool called the ‘hot wall’ has been implemented to overcome the imbalance. The hot wall has a capability to regulate its surface temperature using a heater and two water cooling channels. With the help of the hot wall, 6 h discharges were obtained in 2020. Cooling down of the surface of the hot wall was significantly effective in recovering the wall pumping and was useful to extend the pulse duration. Augmentation of the toroidal magnetic field, B T up to 0.5 T from 0.25 T and a continuous wave (CW) gyrotron of 28 GHz are planned for QUEST in the near future. As raising B T provides a fundamental resonance of electron cyclotron waves (ECWs) with 28 GHz, more effective plasma current start-up and heating will be performed. Long-pulse operations with higher plasma parameters are expected.

QUEST↗

Development of an Activation Analysis Methodology to Support the Disposal of the High Flux Isotope Reactor Metal Pool Waste

During operation and maintenance of the High Flux Isotope Reactor (HFIR), metal waste from reactor components is generated. Due to space limitations in the pool fuel storage, it is necessary to remove the waste and send it to off-site disposal. Most of this waste was in the reactor and is radioactive through neutron activation. Prior to shipping and disposal at a waste disposal facility, the radiological activity of the waste must be determined. Therefore, a conservative methodology to characterize the radiological activity of the waste must be performed. The methodology used was based on being able to determine a conservative overall activity and radionuclide inventory based on radiological survey data and neutron activation products for the materials present.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Proposed space shuttle cargo handling criteria at the operational site (preliminary)

The criteria for cargo handling at the operational site of space shuttles are presented, based on assumed program requirements. The concepts for the following functions are described: maintenance and checkout facility, transfer to launch pad, and launch pad. The requirements for the ground equipment are given along with the general sequences for cargo loading.

Beck, P. E.↗

Payloads.

Approaches to payload definition, design, and planning adopted in the Space Shuttle Program are described. The Space Shuttle offers many new modes of operation featuring reuse of spacecraft, on-orbit checkout and maintenance, sortie experiment missions, and opportunities to trade launch weight and volume for cost savings. In order to take advantage of these new approaches and to accommodate the varying missions, new payload elements have been identified, and new low-cost design approaches are being developed to utilize standardized components and modularized subassemblies that reduce spacecraft buildup and maintenance costs. A new payload planning technique makes use of the computer to provide large-scale planning, scheduling, and costing required for various program options.

Marshall, W. R.↗