Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIOACTIVE WASTES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

NEAMS Nuclear Waste Management IPSC : evaluation and selection of tools for the quality environment.

The objective of the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simulation Nuclear Waste Management Integrated Performance and Safety Codes (NEAMS Nuclear Waste Management IPSC) is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to quantitatively assess the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. These M&S capabilities are to be managed, verified, and validated within the NEAMS Nuclear Waste Management IPSC quality environment. M&S capabilities and the supporting analysis workflow and simulation data management tools will be distributed to end-users from this same quality environment. The same analysis workflow and simulation data management tools that are to be distributed to end-users will be used for verification and validation (V&V) activities within the quality environment. This strategic decision reduces the number of tools to be supported, and increases the quality of tools distributed to end users due to rigorous use by V&V activities. This report documents an evaluation of the needs, options, and tools selected for the NEAMS Nuclear Waste Management IPSC quality environment. The objective of the U.S. Department of Energy (DOE) Office of Nuclear Energy Advanced Modeling and Simulation Nuclear Waste Management Integrated Performance and Safety Codes (NEAMS Nuclear Waste Management IPSC) program element is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to assess quantitatively the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. This objective will be fulfilled by acquiring and developing M&S capabilities, and establishing a defensible level of confidence in these M&S capabilities. The foundation for assessing the level of confidence is based upon the rigor and results from verification, validation, and uncertainty quantification (V&V and UQ) activities. M&S capabilities are to be managed, verified, and validated within the NEAMS Nuclear Waste Management IPSC quality environment. M&S capabilities and the supporting analysis workflow and simulation data management tools will be distributed to end-users from this same quality environment. The same analysis workflow and simulation data management tools that are to be distributed to end-users will be used for verification and validation (V&V) activities within the quality environment. This strategic decision reduces the number of tools to be supported, and increases the quality of tools distributed to end users due to rigorous use by V&V activities. NEAMS Nuclear Waste Management IPSC V&V and UQ practices and evidence management goals are documented in the V&V Plan. This V&V plan includes a description of the quality environment into which M&S capabilities are imported and V&V and UQ activities are managed. The first phase of implementing the V&V plan is to deploy an initial quality environment through the acquisition and integration of a set of software tools. An evaluation of the needs, options, and tools selected for the quality environment is given in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leaning the tank closure process at the Savannah River Site - 15515

The Savannah River Site liquid waste system consists of multiple facilities that safely receive and store legacy radioactive waste prior to treatment and disposition. The liquid radioactive waste is stored in large underground tanks. The waste inventory currently stored in these tanks is a complex mixture of insoluble metal hydroxide solids and soluble salt supernate. The high-level (radioactive) portion of the waste is vitrified into a glass waste form, while the low-level waste is immobilized into a cementitious grout waste form called salt-stone. Once the waste is retrieved and processed, the tanks are closed. The closure process includes; waste removal, characterizing residuals, isolating the tank systems, and stabilizing the tank with tailored grout formulations. The core of Lean is to eliminate waste or non-value added steps from processes to maximize customer value. From the perspective of the customer, 'value' is defined as any action or process for which a customer would willingly pay. In this case our product is to safely and efficiently remove waste from the underground storage tanks and demonstrate operational closure to the State of South Carolina. Savannah River Remediation (SRR) initiated the use of the Lean process in late 2013 and identified the Tank Closure process as one of the targeted areas to improve. The first step in the Lean process is to 'map' out the value stream and identify areas where non-value added steps are present and then prioritize Rapid Improvement Events (RIE). Based on this mapping process, there were a number of areas that SRR determined warranted further evaluation for improvements, including; standard equipment design, characterization, standard work packages, regulatory documentation, tank characterization, structural evaluations, engineering documentation and equipment re-use. This paper focuses on the application of the Lean process at SRR and more specifically, effective application to the Tank Closure Process. This paper discusses the value stream mapping process for Tank Closures, as well as, summarizes the RIEs and demonstrate the realized benefits. Benefits can come in a variety of forms, from schedule compression to decreased costs. Through the Lean process we have been able to identify close to $10 M in savings over the life cycle of the tank closure process and a 4 year schedule compression. Cost and schedule savings are used to accomplish further risk reduction efforts. In addition to hard benefits, there are also soft benefits. These soft benefits are a result of the process itself and help drive improved efficiencies through better communication with key stakeholders, such as regulators and customers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Backyards and Bedrooms: Challenges and Successes in Gaining Access to Homes for Radiological Testing - 18204

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from various locations within the community. The Port Hope Project includes a unique and important component - the Property Radiological Survey. This survey involves the interior and exterior investigation of approximately 4,800 small-scale properties - primarily residential - in the Municipality of Port Hope for the presence or absence of historic low-level radioactive waste. The Property Radiological Survey began in 2012 and is being conducted in five campaigns with between 450 and 1,250 properties in each campaign. The survey begins with radon monitoring, followed by interior and exterior gamma radiation tests, and concludes with exterior borehole drilling/soil sampling. The full suite of tests take approximately 18 - 24 months to complete at each property. This paper will describe the communications strategy implemented to obtain consent from thousands of property owners for CNL's contractor to conduct radiological testing in private living spaces such as bathrooms, bedrooms and closets, as well as front yards, backyards and outbuildings. This strategy incorporates tactics used to secure consent from residents who are reluctant to participate in the survey for reasons including privacy issues, family situations, life events and misapprehensions about the survey and/or the PHAI in general. The paper will include information about how residents' concerns are addressed, the stepped approach to securing access from owners who do not respond to repeated attempts at contact, and the importance of close coordination with the contractor to ensure that all components of the investigations are aligned so that work is conducted in a safe, timely and systematic manner. The authors will also describe the process for keeping the regulator and the municipality informed of survey outreach efforts, challenges and successes, and will outline the process for notifying the approximately 800 owners of properties on which historic low-level radioactive waste is expected to be identified and transitioning those owners from the survey to the remediation phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a multi-purpose container system for the storage, transport and disposal of PWR spent fuel in the UK - 15466

Radioactive Waste Management Limited (RWM) is a wholly owned subsidiary of UK's Nuclear Decommissioning Authority, and is responsible for implementing UK Government policy on geological disposal of higher activity radioactive waste. An aspect of the generic work programme that underpins the current generic disposal concepts includes the development of the associated disposal containers. To date RWM has focused on the development of a range of disposal container designs that fulfil the requirements for transport and disposal in a Geological Disposal Facility (GDF) for legacy high heat generating wastes, one of which includes legacy Pressurised Water Reactor (PWR) spent nuclear fuel (SF). In line with a number of European countries exploring deep geological disposal, the conceptual disposal container solution developed for this waste type has a capacity of 4 PWR fuel assemblies. Since 2013, the feasibility of developing an alternative higher capacity disposal container design based around the Multi-Purpose Container (MPC) concept has been explored. In general terms, MPCs are containers that are designed to meet requirements for safe containment of radioactive waste during storage, transport and disposal. The fundamental design philosophy of the MPC is that once the waste is packaged in an MPC, it would not need to be handled again. That is, after a period of initial cooling in a fuel pond, the SF could be packaged for long term dry storage and would not require direct handling for its eventual transport to, and disposal in, a GDF. The novel feature of the MPC system design considered is the inclusion of an additional overpack specifically for the final deep geological disposal phase. The conceptual MPC and its associated storage, transfer, transport and thick walled carbon steel disposal overpack have been developed to a conceptual level of design detail to demonstrate concept feasibility, with the final design solution confirming a MPC system with a capacity of 12 PWR SF assembles. This represents the highest capacity PWR MPC system that complies with the mass and rail gauge limits of the UK W6a rail gauge. Such a capacity realises a contents loading three times that of the standard PWR disposal container and presented technical challenges from both a structural performance and thermal perspective; necessitating the need for the inclusion of features to enhance heat transfer from the central fuel assemblies within the MPC and novel lid features on the transport container overpack to maintain structural integrity and containment during the hypothetical accident conditions of transport tests. In developing the MPC system conceptual design it is recognised that, depending upon the safety functions of the MPC disposal overpack, the choice of carbon steel material may not be suitable for all geological environments. Consequently, the MPC system design and its materials of construction will require further evaluation once detailed knowledge of the disposal concept to be implemented, its safety functions and geological environment are known. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advances in Thermal-Hydrologic Modeling of Nuclear Waste Disposal in Deep Boreholes - 16303

Deep borehole disposal is one of the potential options for safely isolating high-level radioactive waste. It is expected that existing drilling technology can provide reliable and cost-effective construction of suitable deep boreholes. In addition, favorable disposal conditions such as low permeability host rock, high salinity, and geochemically reducing conditions, exist at depth in many locations. Coupled thermal-hydrologic processes induced by heat from the radioactive waste may impact fluid flow and the associated migration of radionuclides. This work looks at those processes as was also done with recent studies. Simulations of thermal-hydrology for the emplacement of cesium and strontium capsules in a deep borehole are presented. The simulations looked at disposal options such as different disposal configurations and aging of waste to reduce thermal effects. The simulations studied temperature and fluid flux in the vicinity of the borehole. Simulation results include temperature and vertical flux profiles around the borehole at selected depths. Of particular importance are peak temperatures, and fluxes above the disposal zone. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Belgian regulatory framework for decontamination and decommissioning - lessons learned and new initiatives

Belgium can rely on significant experience in the field of decontamination and decommissioning of nuclear facilities. Several projects are ongoing and include research reactors (BR3, Thetis), uranium and MOX fuel fabrication plants (FBFC International, Belgonucleaire), fuel reprocessing facilities (Eurochemic) and radwaste processing facilities (Belgoprocess). Additional projects are expected in the coming years with the planned final shutdown of the oldest nuclear power reactor units. Two national authorities are involved in the decontamination and decommissioning process of nuclear facilities. The FANC (together with its subsidiary Bel V) is concerned for all matters related to nuclear safety and radiation protection, while NIRAS/ONDRAF is concerned for all matters related to radioactive waste and fuel management and financial provisions. These attributions ensure that all safety and material concerns are addressed and that both the licensees and the national authorities bear their own responsibilities. They rely on an existing regulatory framework covering both the procedural and the technical aspects of the decontamination and decommissioning activities. However, opportunities for regulatory improvement were raised after some recent events in Belgium, among which the bankruptcy of a nuclear company producing radioisotopes, involving numerous additional interested parties in a complex judiciary context. Amendments in the current regulations are considered to increase the prerogatives of the authorities regarding the management of radioactive waste by a licensee, the transfer of an operating license from an operator to another, and the general decommissioning strategy of a facility. Furthermore, a dedicated 'waste and decommissioning' working group within WENRA defined new reference levels applying to the decontamination and decommissioning of nuclear facilities. Belgium committed to include these requirements explicitly in its national legislation, even though most of them were already included in the existing decommissioning authorizations. Amendments will cover the safety provisions inherent to the decontamination and decommissioning phase, such as the decommissioning strategy, the qualification of techniques, the experience feedback valorization, the periodic safety reviews, the radioactive waste management, or the final characterization of the sites. Additionally, requirements regarding the authorization process will be detailed, such as the content of the licensee's application file or the structure of the safety report covering the decontamination and decommissioning phase. These changes will contribute to a more secure regulatory framework for all interested parties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CSM, 50 Years Anniversary: Retrospective - 20118

The Centre de Stockage de la Manche (CSM), in La Hague (France) was in 1969 the first radioactive waste disposal facility built and operated in France for Low and Intermediate level waste (LILW). Each chapter of the paper exposes the main achievements of a decade of the CSM history, from the decision to dispose radioactive waste on surface to the preservation of the memory of the site. Through the history of the CSM, it is the evolution of waste management that unfolds over 50 years, shedding light on the choices we make today and the issues of tomorrow. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Status Report (FY2016) Performance Assessment for the Environmental Restoration Disposal Facility

DOE O 435.1, Radioactive Waste Management, and DOE M 435.1-1, Radioactive Waste Management Manual, require that a determination of continued adequacy of the performance assessment (PA), composite analysis (CA), and disposal authorization statement (DAS) be made on an annual basis, and it must consider the results of data collection and analysis from research, field studies, and monitoring. Annual summaries of low-level waste (LLW) disposal operations must be prepared with respect to the conclusions and recommendations of the PA and CA, and a determination of the need to revise the PA or CA must be made. The annual summary requirement provides a structured approach for demonstrating the continued adequacy of the PA and CA in demonstrating a reasonable expectation that the performance objectives will be met. This annual summary addresses only the status of the Environmental Restoration Disposal Facility (ERDF) PA (CP-60089, Performance Assessment for the Environmental Restoration Disposal Facility, Hanford Site, Washington, formerly WCH-520 Rev. 1)1. The CA for ERDF is supported by DOE/RL-2016-62, Annual Status Report (FY 2016): Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site. The ERDF PA portion of the CA document is found in Section 3.1.4, and the ERDF operations portion is found in Section 3.3.3.2 of that document.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 561: Waste Disposal Areas, Nevada National Security Site, Nevada, Revision 0 with ROTC 1

CAU 561 comprises 10 CASs: (1) 01-19-01, Waste Dump; (2) 02-08-02, Waste Dump and Burn Area; (3) 03-19-02, Debris Pile; (4) 05-62-01, Radioactive Gravel Pile; (5) 12-23-09, Radioactive Waste Dump; (6) 22-19-06, Buried Waste Disposal Site; (7) 23-21-04, Waste Disposal Trenches ; (8) 25-08-02, Waste Dump; (9) 25-23-21, Radioactive Waste Dump; and (10) 25-25-19, Hydrocarbon Stains and Trench. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 561 with no further corrective action. The purpose of the CAI was to fulfill the following data needs as defined during the DQO process: (1) Determine whether COCs are present; (2) If COCs are present, determine their nature and extent; and (3) Provide sufficient information and data to complete appropriate corrective actions. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) No contamination exceeding FALs was identified at CASs 01-19-01, 03-19-02, 05-62-01, 12-23-09, and 22-19-06. (2) The surface and subsurface soil within the burn area at CAS 02-08-02 contains arsenic and lead above the FALs of 23 milligrams per kilogram (mg/kg) and 800 mg/kg, respectively. The surface and subsurface soil within the burn area also contains melted lead slag (potential source material [PSM]). The soil within the waste piles contains polyaromatic hydrocarbons (PAHs) above the FALs. The contamination within the burn area is spread throughout the area, as it was not feasible to remove all the PSM (melted lead), while at the waste piles, the contamination is confined to the piles. (3) The surface and subsurface soils within Trenches 3 and 5 at CAS 23-21-04 contain arsenic and polychlorinated biphenyls (PCBs) above the FALs of 23 mg/kg and 0.74 mg/kg, respectively. The soil was removed from both trenches, and the soil that remains at this CAS does not contain contamination exceeding the FALs. Lead bricks and counterweights were also removed, and the soil below these items does not contain contamination that exceeds the FAL for lead. (4) The concrete-like material at CAS 25-08-02 contains arsenic above the FAL of 23 mg/kg. This concrete-like material was removed, and the soil that remains at this CAS does not contain contamination exceeding the FALs. Lead-acid batteries were also removed, and the soil below the batteries does not contain contamination that exceeds the FAL for lead. (5) The surface soils within the main waste dump at the posted southern radioactive material area (RMA) at CAS 25-23-21 contain cesium (Cs)-137 and PCBs above the FALs of 72.9 picocuries per gram (pCi/g) and 0.74 mg/kg, respectively. The soil was removed from the RMA, and the soil that remains at this CAS does not contain contamination exceeding the FALs. (6) The surface and subsurface soils at CAS 25-25-19 do not contain contamination exceeding the FALs. In addition, lead bricks were removed, and the soil below these items does not contain contamination that exceeds the FAL for lead. The following best management practices were implemented: (1) Housekeeping debris at CASs 02-08-02, 23-21-04, 25-08-02, 25-23-21, and 25-25-19 was removed and disposed of; (2) The open trenches at CAS 23-21-04 were backfilled; (3) The waste piles at CAS 25-08-02 were removed and the area leveled to ground surface; and (4) The remaining waste piles at the main waste dump at CAS 25-23-21 were leveled to ground surface. Therefore, NNSA/NSO provides the following recommendations: (1) No further action for CASs 01-19-01, 03-19-02, 05-62-01, 12-23-09, and 22-19-06; (2) Closure in place with an FFACO use restriction (UR) at CAS 02-08-02 for the remaining PAH-, arsenic-, and lead-contaminated soil, and the melted lead PSM. The UR form and map have been filed in the NNSA/NSO Facility Information Management System, the FFACO database, and the NNSA/NSO CAU/CAS files; (3) No further corrective action at CAS 23-21-04, as the lead bricks and counterweights (PSM) have been removed, and the COCs of arsenic and PCBs in soil have been removed; (4) No further corrective action at CAS 25-08-02, as the COC of arsenic in soil has been removed, and the lead-acid batteries have been removed; (5) No further corrective action at CAS 25-23-21, as the COCs of Cs-137 and PCBs in soil have been removed, and the cast-iron pipes have been removed and disposed of; (6) No further corrective action at CAS 25-25-19, as the lead bricks (PSM) been removed; (7) A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 561; and (8) Corrective Action Unit 561 should be moved from Appendix III to Appendix IV of the FFACO.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current Status of Decommissioning Plans and Chemical Decontamination of Metal Scraps in Chinshan NPP - 19304

The decommissioning of nuclear facilities has become a significantly attractive and worldwide topic due to the end of lifetime of many nuclear power plants within next coming years. In Taiwan, Chinshan nuclear power plant owned by the Taiwan Power Company will be the first candidate to be decommissioned according to the Nuclear Reactor Facilities Regulation Act. The Chinshan nuclear power plant located in New Taipei City has two units of 636 MWe boiling water reactors (BWRs) for the generation of 9 billion kWh of electricity per year. The date of cessation of operation of Unit No. 1 and Unit No. 2 will be December in 2018 and July in 2019, respectively. Based on the Regulations for the Review and Approval of Applications for a Decommissioning Permit of Nuclear Reactor Facilities, Taiwan Power Company have submitted a decommissioning plan of Chinshan nuclear power plant to the authority, Atomic Energy Council (AEC). After the review process, the decommissioning plan of Chinshan nuclear power plant has been permitted by AEC in 2017. Decontamination is generally utilized during the period of decommissioning of nuclear facility in order to minimize the radiation exposure of personnel and the cost of management of radioactive wastes. The successful decontamination also probably provides the benefits of lowering the level of radioactive wastes, facilitating potential releases, permitting the reuse of metals and facilitating the radiation principle of As Low As Reasonably Achievable (ALARA) management. Decontamination aims at the removal of radioactive materials from the contaminated surfaces by several technologies such as washing, heating, chemical reaction and mechanical process. The selection of proper decontamination technologies are depended on the requirement of the target materials and the purpose of the decontamination. Chemical decontamination has been proven to be an effective in reducing the radioactivity for metallic materials by using chemical reagents in contact with the contaminated surfaces. During the operation of Chinshan nuclear power plant, chemical decontamination was performed for Unit No.1 and No.2 in 2000 to decontaminate the Reactor Recirculation System (RRS) and Reactor Water Clean-up Systems (RWCU) by using LOMI-NP-LOMI process. Based on the previous experience of chemical decontamination, the dismantled metallic piping is provided as sample by Chinshan nuclear power plant for the evaluation of the feasibility of chemical decontamination. The provided metallic sample is composed of carbon steel with dose rate around 0.2 mSv/hr. In this report, a multistep decontamination process using strongly oxidizing solution and organic acid solution is performed to remove the contaminated oxide layer from the metal surface, and the resulting contact dose rate and decontamination factor (DF) are also shown to discuss the performance in relation to the process control factors. In this paper, the recent progress in decommissioning programs and preliminary results of the decontamination experiment are described to provide usable information regarding the future decommissioning for Chinshan nuclear power plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Texas authorizes disposal of large quantities of depleted uranium at wcs - 15626

The U.S. Nuclear Regulatory Commission (NRC) has been actively engaged in a rulemaking process that would revise Title 10 of the Code of Federal Regulations (CFR), Part 61, Licensing Requirements for Land Disposal of Radioactive Waste, to govern the disposal of large quantities of Depleted Uranium (DU) and Blended Waste (referred to as Unique Waste Streams). While the NRC plans to propose a Site Specific Analysis (SSA) rulemaking in early 2015, they have already issued guidance to Agreement States which identified general disposal criteria that could be used should a licensee propose to dispose of Unique Waste Streams before their rulemaking was completed. On August 5, 2013, Waste Control Specialists LLC (WCS) submitted a major license amendment application for review and approval to the Texas Commission on Environmental Quality (TCEQ). This major license amendment request proposed, among other things, authorization to dispose of large quantities of DU at its Federal Facility Waste Disposal Facility (FWF). Pursuant to Title 30 of the Texas Administrative Code (TAC), Rule 336.709, Technical and Environmental Analyses, disposal of waste must be sufficient to meet the radiological dose criteria for a minimum period of performance of 1,000 years after closure or the period where peak dose occurs, whichever is longer. These regulations are more stringent than those of any other state that hosts a facility authorized to dispose of Low-Level Radioactive Waste (LLW) in the U.S. On August 28, 2014, the TCEQ approved the major amendment request authorizing disposal of large quantities of DU. During the licensing review process, significant technical issues were successfully resolved ensuring that large quantities of DU could be safely isolated from the biosphere for long time periods after site closure. Many important lessons were learned during the licensing proceedings that have potential significant impacts to the licensed community. Namely that a modern, well designed disposal facility that is properly sited geologically and in an arid environment is ideal for ensuring that long-lived alpha emitting radionuclides are sufficiently isolated to protect public health for long into the future. The DOE is currently finalizing plans to complete a Supplemental Environmental Analysis (EA) to support shipments of DU for disposal at WCS' FWF as required under the National Environmental Policy Act of 1970. The DOE may begin shipments of DU for disposal to WCS FWF that was licensed and constructed to support disposal of waste that is the responsibility of the federal government as stipulated in the Low-Level Radioactive Waste Policy Amendments Act of 1985. This paper will present the regulatory history of events that initiated the NRC's rulemaking for Unique Waste Streams and the technical analysis that were conducted in support of WCS' major amendment that has been approved by the TCEQ. A description of the geological characteristics and engineering designs used to support the Performance Assessment will be included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geochemical data package for performance assessment calculations related to the Savannah River Site

The Savannah River Site (SRS) disposes of low-level radioactive waste (LLW) and stabilizes high-level radioactive waste (HLW) tanks in the subsurface environment. Calculations used to establish the radiological limits of these facilities are referred to as Performance Assessments (PAs), Special Analyses (SAs), and Composite Analyses (CAs). The purpose of this document is to revise the existing geochemical data package used for these calculations (Kaplan, 2016). This work builds on earlier compilations of geochemical data, referred to a geochemical data packages (Kaplan, 2007; Kaplan, 2010; Kaplan, 2016; McDowell-Boyer et al., 2000). This work is being conducted as part of the on-going maintenance program of the SRS PA programs that periodically updates calculations and data packages when new information becomes available.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the Chernobyl NPP: Problems, Progress, Prospects - 18485

Decommissioning of the Chernobyl NPP provides a special case due to a number of peculiarities: it is prescheduled decommissioning, the facilities undergone a major accident with off-site contamination, no previous experience of decommissioning of RBMK-type nuclear power units, unavailability of proper spent fuel and radioactive waste management infrastructure, special types of waste. The most challenging issue is the final decommissioning of the Unit 4 destroyed by the major accident on 26 April 1986. Neither of four RBMK-1000 nuclear power units was in operation till the end of the design-based lifetime, Units 1 and 3 being in operation for 19 years each, Units 2 and 4 even less. The last operating unit, Unit 3, was permanently shutdown on December 15 2000, however the main obstacle to complete a complex technological and radiological survey was spent fuel left in reactor pools and in the core due to lack of capacity in the existing interim spent fuel storage of wet type (ISF-1). So removal of spent fuel from the core and reactor pools was considered as one of the priority tasks. While construction of ISF-2 (of dry type) was delayed due to different reasons, safety reassessment and modernization of ISF-1 enabled capacity increase and transfer of all non-damaged fuel assemblies into ISF-1. Thus Chernobyl NPP Units were fully vacated from spent fuel. Since that Chernobyl NPP Units are considered as the radioactive waste facility. Dismantlement of Units 1,2 turbine hall equipment is on the way and some progress is achieved in technical solution for fragmentation of long-size equipment. All dismantled equipment after decontamination and characterization is either released from regulatory control or disposed as solid radioactive waste. The details are discussed in the paper. Eventually the comprehensive technological and radiological survey of Chernobyl NPP Units had been completed and detailed decommissioning programme had been endorsed. The decommissioning strategy chosen for the Chernobyl NPP is based on the deferred dismantlement approach, so final dismantlement of all equipment and constructions is supposed after some period of decay storage. However, the issue of the final state of the site and its further use is still open. The main reason for it is the lack of clear picture as for the destroyed Unit 4, as technical solutions concerning its highly damaged and contaminated constructions and so called fuel containing masses (FCM) are not available yet. It could be reasonably predicted also that the internal part of the so called exclusion zone will not be released into non-restricted use in near future due to characteristics of its contamination. Possible implications of these and other factors on further decommissioning activities and some approaches to find solutions are discussed in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LIQUID AIR INTERFACE CORROSION TESTING FOR FY2010

An experimental study was undertaken to investigate the corrosivity to carbon steel of the liquid-air interface of dilute simulated radioactive waste solutions. Open-circuit potentials were measured on ASTM A537 carbon steel specimens located slightly above, at, and below the liquid-air interface of simulated waste solutions. The 0.12-inch-diameter specimens used in the study were sized to respond to the assumed distinctive chemical environment of the liquid-air interface, where localized corrosion in poorly inhibited solutions may frequently be observed. The practical inhibition of such localized corrosion in liquid radioactive waste storage tanks is based on empirical testing and a model of a liquid-air interface environment that is made more corrosive than the underlying bulk liquid due to chemical changes brought about by absorbed atmospheric carbon dioxide. The chemical changes were assumed to create a more corrosive open-circuit potential in carbon in contact with the liquid-air interface. Arrays of 4 small specimens spaced about 0.3 in. apart were partially immersed so that one specimen contacted the top of the meniscus of the test solution. Two specimens contacted the bulk liquid below the meniscus and one specimen was positioned in the vapor space above the meniscus. Measurements were carried out for up to 16 hours to ensure steady-state had been obtained. The results showed that there was no significant difference in open-circuit potentials between the meniscus-contact specimens and the bulk-liquid-contact specimens. With the measurement technique employed, no difference was detected between the electrochemical conditions of the meniscus versus the bulk liquid. Stable open-circuit potentials were measured on the specimen located in the vapor space above the meniscus, showing that there existed an electrochemical connection through a thin film of solution extending up from the meniscus. This observation supports the Hobbs-Wallace model of the development of the pitting susceptibility of carbon steel in alkaline solutions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Westinghouse Waste Simulation and Optimization Software Tool - 13493

Radioactive waste is produced during NPP operation and NPP D and D. Different kinds of waste with different volumes and properties have to be treated. Finding a technically and commercially optimized waste treatment concept is a difficult and time consuming process. The Westinghouse waste simulation and optimization software tool is an approach to study the total life cycle cost of any waste management facility. The tool enables the user of the simulation and optimization software to plan processes and storage buildings and to identify bottlenecks in the overall waste management design before starting detailed planning activities. Furthermore, application of the software enables the user to optimize the number of treatment systems, to determine the minimum design capacity for onsite storage facilities, to identify bottlenecks in the overall design and to identify the most cost-effective treatment paths by maintaining optimal waste treatment technologies. In combination with proven waste treatment equipment and integrated waste management solutions, the waste simulation and optimization software provides reliable qualitative results that lead to an effective planning and minimization of the total project planning risk of any waste management activity. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges in the UK Generic Design Assessment Process - 17062

In the UK, Generic Design Assessment (GDA) is a voluntary step-wise joint assessment process undertaken by the Office for Nuclear Regulation (ONR) and the Environment Agency (EA) of a generic reactor design. The process focuses purely on the reactor design and does not consider any site specific issues. The key objective of GDA is for the regulators to consider the adequacy of claims, arguments and evidence (CAE) put forward by a requesting party (RP) to demonstrate the safety of its design in the UK context. This includes all CAE relating to management of spent fuel and radioactive waste. The CAE are generally applied to a reference design put forward by the RP that is substantially complete in terms of the overall concepts and functions of the major systems, having already been deployed elsewhere. GDA assessment encompasses a broad range of topic areas which include fuel and core design, management of spent fuel, radioactive waste management and decommissioning. Other technical disciplines also have valid interests in particular aspects of the management of spent fuel. This paper summarises the UK GDA process and the types of issues raised; in particular aspects of the proposed operation of liquid waste management systems and Spent Fuel Interim Storage are presented and the instructive resolution of the RP's original limited design scope to allow the regulators to carry out a meaningful assessment. Some examples are presented and useful lessons learned for future GDAs are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Future German R and D on HLW Disposal - 16519

In 2009, after the General elections, the new German Government showed a relatively positive attitude towards a prolonged use of nuclear power. Power plant shutdown was planned for the year 2032. Nuclear power was considered as a sort of transition energy technology until the energy supply would take place by the use of renewable energy sources. This was in line with the legal framework and the political strategy of the energy turnaround. Then, 17 nuclear power plants (NPP) were operational. The Fukushima incident heralded the sound of drastic changes in the German energy policy: Besides an intermediate stop of operation of reactors until a so-called stress test was accomplished, the general political decision was to phase-out nuclear earlier than planned and to implement faster the decisions regarding the energy transition policy. The shut-down of the last German nuclear power plant will occur in 2022. Accordingly, all the necessary legal changes were made. A consensus about the appropriate waste management strategy for heat generating waste (spent nuclear fuel (SNF) and vitrified waste (HLW)) was still pending at this time. Public and political discussions on this subject continued as in the years before. In July 2013, after intensive discussions, most of the parties represented in the German parliament agreed to eventually tackle the challenge of finding a repository by a consensual, transparent and science-based approach. This was to be codified in a law. In July 2013, the Site Selection Act passed the parliament. This law should pave the way for a new holistic process that addresses social, political, and scientific aspects of siting and the site selection process. The basics for this process should be provided by the 'Commission Storage of Radioactive Waste Materials' which was established according this law. Against this background discussions showed that scientific-technical R and D activities should be mirrored accordingly and R and D has to deal both with the future challenges of radioactive waste HLW disposal and related aspects. Considering this the Federal Ministry for Economic Affairs and Energy (BMWi), which is responsible for non-site specific R and D, created the new Research Concept 'Research for the management of radioactive waste', being fundamental and the frame for non-site specific R and D projects funded by BMWi. Key changes - mirroring the new requirements and different aspects - touch the issues: host rock research, i.e. all potential host rocks available in Germany are equally addressed and there is no prioritization, consideration of consequences of prolonged storage at NPP sites, alternative waste management strategies compared to direct disposal in a mined repository, and involvement of socio-technical aspects.This paper intends to highlight the key changes, its consequences, and will give a brief overview on first initiated R and D activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Packaging for Transport of the ILW-LL of EDF First Generation Power Plant Dismantling - 16517

EDF has a first generation decommissioning plan involving different types of reactors: Heavy Water Reactor, Natural Uranium and Gas Cooled Reactor, Fast Neutron Reactor and Chooz-A the first Pressurized Water Reactor (PWR) of the French decommissioning plan. The dismantling of these first generation reactors produces various types of radioactive waste, the most radioactive of them being the intermediate-level long-lived waste (ILW LL). After cutting and/or extraction from the reactors, these ILW LLs have to be transported to the EDF Conditioning and Storage Facility for Activated Waste ICEDA where they will be temporarily stored until a final depository solution is built. To transport these irradiated and contaminated metallic wastes, EDF decided to give ROBATEL Industries the responsibility of designing a new B- type package and obtaining the associated approval from the French Nuclear Safety Authority (ASN). A lot of issues had to be overcome to comply with the nuclear transport regulations and answer the ASN and its technical support IRSN's questions. Among them, was the difficulty to have a single type of package to transport unblocked waste coming from reactors of different technologies, sites in different stages of decommissioning and using different methods of waste production, conditioning and control. In the end, EDF had to apply for a specific approval for each dismantling site. These difficulties, some other technical issues encountered, and the decision to get first an approval for the transport of Chooz A's ILW LLs, are described here. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗