Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Assessing Government and Industry Roles to Accelerate Commercialization of Advanced Reactors and Supporting Fuel Cycles

Recent growth in private sector interest and investment in advanced reactor designs signals a new period in the greater than six decade pursuit of commercial nuclear technology. This nuclear entrepreneurship is primarily centered in the North America; meanwhile, national programs in China, France, India, Russia, and South Korea also feature active efforts to design, construct, operate and export advanced reactors .The business case for most private ventures calls for an aggressive commercialization timeline-tied to expectations for returns on investment. Finally, strategic energy portfolio projections and utility resource planning point to the 2030 - 2050 window as the period of greatest need for dispatchable, energy intensive, low-carbon generation options to address retirement of baseload capacity, increased penetration of renewables and economy-scale decarbonization. However, lead times for commercialization range from 30 to 50 years based on more traditional government-centric timelines. Fuel development and fuel cycle infrastructure deployment represent parallel timelines that directly influence the timeline for commercialization of many advanced reactor concepts. While multi-decade development periods appear to be commonplace for new nuclear projects, such timelines were not always the norm-three separate countries set out to develop civilian commercial power from fundamental nuclear principles, in just over a decade, on average. The US led light-water reactor (LWR) development in the 1950's, the UK pioneered a gas-cooled reactor (GCR) concept in the same time period, and Canada forged the path to commercializing the heavy-water reactor (HWR) starting in the mid-1950's and into the mid-1960's. The necessary fuel cycle facilities to support the commercial reactor design also did not appear suddenly, but were a collaborative effort between government and private partners. In this paper, the efforts of these three governments and their private industry partnerships in reactor and fuel cycle development are explored, and a select sample of representative milestones for each is presented, with the roles that each group played. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Internal Climate Variability Obscures Future Freezing Rain Changes Despite Global Warming Trend

Abstract Although numerous studies have projected changes in freezing rain under future climate conditions, the internal variability of freezing rain remains poorly quantified. Here, we introduce a framework utilizing a novel machine‐learning algorithm to diagnose freezing rain in reanalysis and climate model simulations. By employing multivariate quantile mapping, we decompose the projected freezing rain trend into contributions from changes in temperature, relative humidity, and precipitation, which helps separate the forced response from internal climate variability. Our finding reveals a notable decrease in freezing rain occurrence in most areas. Despite a substantial temperature increase, internal variability overshadows climate forcing across a large portion of the eastern United States until about 2050. This insight has implications for practitioners, suggesting that the observed freezing rain frequency climatology continues to provide a relevant baseline for decision‐making in the near term. However, longer‐term design and adaptation plans should consider the projected changes in these regions.

Zhuang, Haoyu (Richard) [Department of Atmospheric↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Parallel tools GUI framework-DOE SBIR phase I final technical report

Many parallel performance, profiling, and debugging tools require a graphical way of displaying the very large datasets typically gathered from high performance computing (HPC) applications. Most tool projects create their graphical user interfaces (GUI) from scratch, many times spending their project resources on simply redeveloping commonly used infrastructure. Our goal was to create a multiplatform GUI framework, based on Nokia/Digia’s popular Qt libraries, which will specifically address the needs of these parallel tools. The Parallel Tools GUI Framework (PTGF) uses a plugin architecture facilitating rapid GUI development and reduced development costs for new and existing tool projects by allowing the reuse of many common GUI elements, called “widgets.” Widgets created include, 2D data visualizations, a source code viewer with syntax highlighting, and integrated help and welcome screens. Application programming interface (API) design was focused on minimizing the time to getting a functional tool working. Having a standard, unified, and userfriendly interface which operates on multiple platforms will benefit HPC application developers by reducing training time and allowing users to move between tools rapidly during a single session. However, Argo Navis Technologies LLC will not be submitting a DOE SBIR Phase II proposal and commercialization plan for the PTGF project. Our preliminary estimates for gross income over the next several years was based upon initial customer interest and income generated by similar projects. Unfortunately, as we further assessed the market during Phase I, we grew to realize that there was not enough demand to warrant such a large investment. While we do find that the project is worth our continued investment of time and money, we do not think it worthy of the DOE's investment at this time. We are grateful that the DOE has afforded us the opportunity to make this assessment, and come to this conclusion.

97 MATHEMATICS AND COMPUTING↗

Localization of a Portion of an Endorectal Balloon for Prostate Image-Guided Radiation Therapy Using Cone-Beam Tomosynthesis: A Feasibility Study

Purpose: To assess the feasibility of using cone-beam tomosynthesis (CBTS) to localize the air-tissue interface for the application of prostate image-guided radiation therapy using an endorectal balloon for immobilization and localization. Methods and Materials: A Feldkamp-David-Kress-based CBTS reconstruction was applied to selected sets of cone-beam computed tomography (CBCT) projection data to simulate volumetric imaging achievable from tomosynthesis for a limited range of scan angles. Projection data were calculated from planning CT images of 10 prostate cancer patients treated with an endorectal balloon, as were experimental CBCT projections for a pelvic phantom in two patients. More than 50 points at the air-tissue interface were objectively identified by an intensity-based interface-finding algorithm. Using three-dimensional point sets extracted from CBTS images compared with points extracted from corresponding CBCT images, the relative shift resulting from a reduced scan angle was determined. Because the CBCT and CBTS images were generated from the same projection data set, shift identified was presumed to be due to distortions introduced by the tomosynthesis technique. Results: Scans of {>=}60 Degree-Sign were shown to be able to localize an air-tissue interface near the isocenter with accuracy on the order of a millimeter. The accuracy was quantified in terms of the mean discrepancy as a function of reconstruction angle. Conclusion: This work provides an understanding of the effect of scan angle used in localization of a portion of an endorectal balloon by means of CBTS. CBTS with relatively small scan angles is capable of accurately localizing an extended interface near the isocenter and may provide clinically relevant measurements to guide IGRT treatments while reducing imaging radiation to the patient.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Energy Resilience for Mission Assurance: Case Study Scoping Document

The Energy Resilience for Mission Assurance (ERMA) project—a Department of Energy Grid Modernization Lab Consortium effort carried out via a partnership among five national laboratories— seeks to develop metrics to quantify how improvements to energy system resilience translate to improved Department of Defense (DoD) mission assurance (MA) during wide-scale, long-duration outages of the bulk power system. DoD missions are integral to national security and highly dependent on electric power. However, energy system planners—both civilian and military—lack a clear and quantifiable mapping between electric power system resilience and MA, leaving a gap in their ability to understand and consider national security outcomes within their planning efforts. The ERMA project seeks to fill this gap, providing stakeholders with new capabilities to understand the impact of electric power system resilience on MA during hazard scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Strategic Energy Plan, Town of Cranberry Isles

This report details the strategic energy plan for the Town of Cranberry Isles, Maine. This project was spearheaded by the Cranberry Isles Community Solar Association (CICSA), and supported by Island Institute and Sandia National Laboratories, in partnership with the National Laboratory of the Rockies and Versant Power. The plan details the energy vision, goals, and focus areas for the community, provides technical analysis of the current energy system, and outlines potential projects to support community energy. Throughout the energy planning process, the project team engaged with members of the community to gather input and ideas to shape the plan. The project team and Versant also completed an extensive data collection to better inform the project. Sandia National Laboratories completed baseline technical assessments and feasibility studies to better understand potential feasible options for future projects. These potential projects, high-level costs, and next steps are a key output of this report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wind-energy Science, Technology and Research (WindSTAR) Consortium: Curriculum, Workforce Development, and Education Plan Final Report

The purpose of the project is to modify and expand the current wind energy curriculum at the University of Massachusetts Amherst and to develop plans to expand the graduate program to a national scale. The expansion plans include the foundational steps to establish the American Academy of Wind Energy (AAWE). The AAWE is intended to be a cooperative organization of wind energy research, development, and deployment institutes and universities across North America, whose mission will be to develop and execute joint RD&D projects and to organize high-level science and education in wind energy

17 WIND ENERGY↗

A new paradigm for Environmental Assessment (EA) in Korea

Over the last 30 years, Environmental Impact Assessment (EIA) in Korea has played an important role in decision-making processes particularly for environmentally sensitive projects. However, the EIA system alone has sometimes not been effective enough to ensure the successful resolution of environmental concerns. In order to compensate for the limitations of the EIA system, a new assessment system called Prior Environmental Review System (PERS), which is relevant to Strategic Environmental Assessment (SEA) in some aspects, was introduced in 1993. PERS aims to balance development and preservation by identifying possible environmental impacts of some administrative plans mainly related to development projects in the early stages of planning. However, PERS still appeared to have some weak points such as a limited range of subjects to be assessed, and weakness of tiering (or vertical integration) from PERS to EIA. Therefore, the necessity for reform of the Korean Environmental Assessment (EA) system, including PERS, was raised. In response, the Korean government sought to establish its policy direction for implementing SEA by enhancing the objectivity and expertise of PERS. The policy was approved by the National Assembly in May 2005, and went into effect in June 2006. The introduction of SEA, by enhancing PERS, provides a framework for a system of EA from the strategic level, including PPPs, to the project level. Yet, despite such improvements, some managerial and technical problems associated with subsequent EA implementation remain. This paper critically reviews the evolution of the EA system in Korea and suggests essential improvements for the current EA system based on experiences of implementation of both EIA and SEA since June 2006, in the context of international good practice.

54 ENVIRONMENTAL SCIENCES↗

Shipping Remote Handled Transuranic Waste to the Waste Isolation Pilot Plant - An Operational Experience

On January 18, 2007, the first ever shipment of Remote Handled Transuranic (RH TRU) waste left the gate at the Idaho National Laboratory (INL), headed toward the Waste Isolation Pilot Plant (WIPP) for disposal, thus concluding one of the most stressful, yet rewarding, periods the authors have ever experienced. The race began in earnest on October 16, 2006, with signature of the New Mexico Environment Department Secretary's Final Order, ruling that the '..draft permit as changed is hereby approved in its entirety.' This established the effective date of the approved permit as November 16, 2006. The permit modification was a consolidation of several Class 3 modification requests, one of which included incorporation of RH TRU requirements and another of which incorporated the requirements of Section 311 of Public Law 108-137. The obvious goal was to complete the first shipment by November 17. While many had anticipated its approval, the time had finally come to actually implement, and time seemed to be the main item lacking. At that point, even the most aggressive schedule that could be seriously documented showed a first ship date in March 2007. Even though planning for this eventuality had started in May 2005 with the arrival of the current Idaho Cleanup Project (ICP) contractor (and even before that), there were many facility and system modifications to complete, startup authorizations to fulfill, and many regulatory audits and approvals to obtain before the first drum could be loaded. Through the dedicated efforts of the ICP workers, the partnership with Department of Energy (DOE) - Idaho, the coordinated integration with the Central Characterization Project (CCP), the flexibility and understanding of the regulatory community, and the added encouragement of DOE - Carlsbad Field Office and at Headquarters, the first RH TRU canister was loaded on December 22, 2006. Following final regulatory approval on January 17, 2007, the historic event finally occurred the following day. While some of the success of this endeavor can be attributed to the sheer will and determination of the individuals involved, the fact that it was established and managed as a separate sub-project under the ICP, accounts for a majority of the success. Utilizing a structured project management approach, including development of, and management to, a performance baseline, allowed for timely decision making and the flexibility to adapt to changing conditions as the various aspects of the project matured. This paper provides some insight into how this was achieved, in a relatively short time, and provides an overview of the experience of start-up of a new retrieval, characterization, loading, and transportation operation in the midst of an aggressive cleanup project. Additionally, as one might expect, everything within the project did not go as planned, which provides a great opportunity to discuss some lessons learned. Finally, the first shipment was just the beginning. There are 224 additional shipments scheduled. In keeping with the theme of WM 2008, Phoenix Rising: Moving Forward in Waste Management, this paper will address the future opportunities and challenges of RH TRU waste management at the INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of the ORIGEN Fallout Analysis Tool and the DELFIC Fallout Planning Tool to National Technical Nuclear Forensics

The objective of this project was to provide a robust fallout analysis and planning tool for the National Technical Nuclear Forensics interagency ground sample collection team. Their application called for a fast-running, portable mission-planning tool for use in response to emerging improvised nuclear device (IND) post-detonation situations. The project met those goals by research and development of models to predict the physical, chemical, and radiological properties of fallout debris. ORNL has developed new graphical user interfaces for two existing codes, the Oak Ridge Isotope Generation (ORIGEN) code and the Defense Land Fallout Interpretive Code (DELFIC). ORIGEN is a validated, radionuclide production and decay code that has been implemented into the Fallout Analysis Tool to predict the fallout source term nuclide inventory after the detonation of an IND. DELFIC is a validated, physics-based, research reference fallout prediction software package. It has been implemented into the Fallout Planning Tool and is used to predict the fractionated isotope concentrations in fallout, particle sizes, fractionation ratios, dose rate, and integrated dose over the planned collection routes - information vital to ensure quality samples for nuclear forensic analysis while predicting dose to the sample collectors. DELFIC contains a particle activity module, which models the radiochemical fractionation of the elements in a cooling fireball as they condense into and onto particles to predict the fractionated activity size distribution for a given scenario. This provides the most detailed physics-based characterization of the fallout source term phenomenology available in an operational fallout model.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Characterization Results for the April 2022 Tank Farm 2H Evaporator Overhead Sample

On an annual basis, Savannah River Mission Completion (SRMC) provides 2H and 3H evaporator overhead samples to Savannah River National Lab (SRNL) to be analyzed per Section 5.2 of the Effluent Treatment Project (ETP) Waste Compliance Plan (WCP) and the Waste Acceptance Criteria (WAC). This report presents characterization results for the April 2022 2H evaporator overhead sample. The sample was clear and colorless with no visible solids. The results provide measurements for cesium-137 ( 137 Cs), strontium-90 ( 90 Sr), and iodine-129 ( 129 I) with the radionuclide concentration limits specified by the WAC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement and correction of leaf open times in helical tomotherapy

Purpose: The binary multileaf collimator (MLC) is one of the most important components in helical tomotherapy (HT), as it modulates the dose delivered to the patient. However, methods to ensure MLC quality in HT treatments are lacking. The authors obtained data on the performance of the MLC in treatments administered in their department in order to assess possible delivery errors due to the MLC. Correction methods based on their data are proposed. Methods: Twenty sinograms from treatments delivered using both of the authors HT systems were measured and analyzed by recording the fluence collected by the imaging detector. Planned and actual sinograms were compared using distributions of leaf open time (LOT) errors, as well as differences in fluence reconstructed at each of the 51 projections into which the treatment planning system divides each rotation for optimization purposes. They proposed and applied a method based on individual leaf error correction and the increase in projection time to prevent latency effects when LOT is close to projection time. In order to analyze the dosimetric impact of the corrections, inphantom measurements were made for four corrected treatments. Results: The LOTs measured were consistent with those planned. Most of the mean errors in LOT distributions were within 1 ms with standard deviations of over 4 ms. Reconstructed fluences showed good results, with over 90% of points passing the 3% criterion, except in treatments with a short mean LOT, where the percentage of passing points was as low as 66%. Individual leaf errors were as long as 4 ms in some cases. Corrected sinograms improved error distribution, with standard deviations of over 3 ms and increased percentages of points passing 3% in the fluence per angle analysis, especially in treatments with a short mean LOT and those that were more subject to latency effects. The minimum percentage of points within 3% increased to 86%. In-phantom measurements of the corrected treatments showed that, while treatments affected by latency effects were improved, those affected by individual leaf errors were not. Conclusions: Measurement of MLC performance in real treatments provides the authors with a valuable tool for ensuring the quality of HT delivery. The LOTs of MLC are very accurate in most cases. Sources of error were found and correction methods proposed and applied. The corrections decreased the amount of LOT errors. The dosimetric impact of these corrections should be evaluated more thoroughly using 3D dose distribution analysis.

07 ISOTOPE AND RADIATION SOURCES↗

FY21 Status report on the CMVB and CNWG International Collaborations

The ART-GCR Methods area includes an international collaboration work package that covers the tasks defined for the Computational Methods Validation and Benchmark (CMVB)and Civil Nuclear Energy Research and Development Working Group (CNWG) projects. This report summarizes the status of the FY21 tasks and planned FY22 DOE contributions. The CMVB Project Arrangement (PA) is not yet formally approved by all signatories, and no work has therefore been performed in FY21 at INL related to this activity. The CNWG activities inFY21 consisted of the simulation of the High Temperature Test Reactor (HTTR) Loss Of Forced Cooling (LOFC) experimental with the Idaho National Laboratory (INL) codes Griffin, BISON and RELAP-7 based on the Multiphysics Object-Oriented Simulation Environment (MOOSE).It was found that the multiphysics coupled suite is capable of simulating all the important phenomena occurring during the Depressurized Loss of Forced Cooling (DLOFC) experiments showing promising agreement with the measurements given the number of uncertainties and approximations introduced into the model.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

LAMP Project Facility and Space Requirements

The project will require significant space over the lifetime of the project to successfully execute design, technology maturation, component testing and verification, and final removal and installation. The types of space required falls into three general categories: office, storage, and laboratory. Figure 1 below summarizes the project space requirements by project lifecycle. The specific color coding indicates the availability (and potential risk to the project) of the particular type of space: green indicates space that is already allocated and in use by the LAMP project; yellow indicates space that is expected to be easily transitioned from its current use to the project; red indicates a space that is use by multiple users or other projects, and will most likely require high-level negotiations and planning to become available to the project. Figure 2 summarizes the LAMP Space Requirements by calendar year and type throughout the duration of the project. As can be seen in Fig. 2, the maximum space needed by the project exceeds 40,000 square feet, with an average space requirement over the lifetime of the project equal to approximately 25,000 square feet.

43 PARTICLE ACCELERATORS↗

Sacramento Deep Energy Retrofit (DER) Home Study

This project was part of the Sacramento Municipal Utility District (SMUD) Deep Energy Retrofit (DER) Project which included several other homes in addition to the the subject of this study. Some of the reports and presentations included in this dataset cover the whole DER project. The retrofit home was one of several homes in the DER project. The goal of this monitoring plan is to develop a protocol for monitoring the SMUD DER project and answer the following major questions: 1. Is heat pump water heater performing as expected? 2. Is the whole house energy as expected? 3. Based on monitored results, how can performance be improved in future retrofit projects?

Array↗

Technology Demands of a Muon Collider and its Relation to other HEP Projects

The decadal US Particle Physics Community Planning Exercise known as “Snowmass” has released a final report. Snowmass is a scientific study to define the most important questions for the field of particle physics and identify promising opportunities to address them. The Snowmass report will serve as input for the Particle Physics Project Prioritization Panel (P5) to develop a strategic plan for U.S. particle physics that will guide the field for the next decade and R&D priorities beyond that. A broad range of proposals for future facilities have been put forward. Among them, a Muon Collider has generated considerable interest from the particle physics community. Enabling such a facility will involve solving a variety of challenges that will be briefly described in this talk.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Prototype Data Models and Data Dictionaries for Hanford Sediment Physical and Hydraulic Properties

The Remediation Decision Support (RDS) project, managed by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE) and the CH2M HILL Plateau Remediation Company (CHPRC), has been compiling physical and hydraulic property data and parameters to support risk analyses and waste management decisions at Hanford. In FY09 the RDS project developed a strategic plan for a physical and hydraulic property database. This report documents prototype data models and dictionaries for these properties and associated parameters. Physical properties and hydraulic parameters and their distributions are required for any type of quantitative assessment of risk and uncertainty associated with predictions of contaminant transport and fate in the subsurface. The central plateau of the Hanford Site in southeastern Washington State contains most of the contamination at the Site and has up to {approx}100 m of unsaturated and unconsolidated or semi-consolidated sediments overlying the unconfined aquifer. These sediments contain a wide variety of contaminants ranging from organic compounds, such as carbon tetrachloride, to numerous radionuclides including technetium, plutonium, and uranium. Knowledge of the physical and hydraulic properties of the sediments and their distributions is critical for quantitative assessment of the transport of these contaminants in the subsurface, for evaluation of long-term risks and uncertainty associated with model predictions of contaminant transport and fate, and for evaluating, designing, and operating remediation alternatives. One of the goals of PNNL's RDS project is to work with the Hanford Environmental Data Manager (currently with CHPRC) to develop a protocol and schedule for incorporation of physical property and hydraulic parameter datasets currently maintained by PNNL into HEIS. This requires that the data first be reviewed to ensure quality and consistency. New data models must then be developed for HEIS that are approved by the HTAG that oversees HEIS development. After approval, these new data models then need to be implemented in HEIS by the EDM before there is an actual repository for the data. This document summarizes modifications to previously developed data models, and new data models and data dictionaries for physical and hydraulic property data and parameters to be transferred to HEIS. A prototype dataset that conforms to the specifications of these recommended data models has been identified and processed, and is ready for transfer to CHPRC for inclusion in HEIS. Additional datasets are planned for transfer from PNNL to CHPRC in FY11.

99 GENERAL AND MISCELLANEOUS↗