Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

In this paper, a preliminary evaluation of removing used nuclear fuel (UNF) from 12 shutdown sites was conducted. Shutdown sites are defined as those commercial nuclear power reactor sites where the nuclear power reactors have been shut down and the site has been decommissioned or is undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. The evaluation was divided into four components: • characterization of the UNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory • a description of the on-site infrastructure and conditions relevant to transportation activities • an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing UNF from the shutdown sites, including gaps in information • an evaluation of the actions necessary to prepare for and remove UNF and GTCC waste from the shutdown sites. The primary sources for the inventory of UNF and GTCC waste are the DOE RW-859 used nuclear fuel inventory database, industry sources such as StoreFUEL and SpentFUEL, and government sources such as the NRC. The primary sources for the information on the site conditions and near-site transportation infrastructure and experience include site visits to the Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion sites; information provided by managers at the shutdown sites; Facility Interface Data Sheets compiled for DOE in 2005; Services Planning Documents prepared for DOE in 1993 and 1994; industry publications such as Radwaste Solutions; and Google Earth. State and Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative participated in six of the shutdown site visits. All sites were found to have at least one off-site transportation mode option for removing their UNF and GTCC waste, and some sites have two options. Large component removals during reactor decommissioning provided an important source of information in determining transportation mode options. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: • Although there are common aspects, each site has some unique features and/or conditions. • The 12 sites use designs from 4 different suppliers, including 9 different (horizontal and vertical) storage systems that would require 8 different transportation cask designs. • Although some regulatory actions will be required, all UNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in licensed systems that can be transported, including a small amount of high-burnup fuel. • Each site indicated that 2-3 years of advanced time is required for preparations prior to pick-up. • Most sites have multiple transportation options, e.g., rail, barge, or heavy haul truck, as well as constraints and preferences. It is expected that additional site visits will be conducted to update the information used in the evaluation. Additional sites may be added to the evaluation if further site closures are announced.

shutdown sites, used nuclear fuel, NFST, Nuclear F↗

PRELIMINARY EVALUATION OF REMOVING SNF FROM SHUTDOWN SITES – 2016 UPDATE

An updated evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power reactor sites was conducted during 2016. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites included in the evaluation were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. This paper provides summary information on the 13 shutdown sites as well detailed information gathered from site visits to San Onofre and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure, (3) an evaluation of the near-site transportation infrastructure and transportation experience, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Updates to the evaluation since 2015 include incorporating SNF data from the GC-859 database; updating of Google Earth imagery; incorporating revisions to transportation certificates of compliance; adding information obtained from site visits to the Pacific Sun Railroad and Camp Pendleton, California; adding rail assessments for Kewaunee, Crystal River, and San Onofre to the evaluation; and adding information obtained from the site visit to Vermont Yankee. As additional sites such as Fort Calhoun, Palisades, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

gtcc waste, unf, used nuclear fuel, transportation↗

Experimental Validation of a Spectral-Based Structural Analysis Model Implemented in the Design of the VolturnUS 6MW Floating Offshore Wind Turbine

The following work presents a spectral-based structural analysis method implemented in the design of the VolturnUS 6MW Floating Offshore Wind Turbine hull developed to increase system optimization. To begin, a description of the methodology is provided which details how transfer functions relate the hull's structural response to first order wave kinematics and wind turbine aerodynamics. Following the model definition, focus is placed on model validation using results from an experimental 1:52 scale model test of the VolturnUS system (shown in Fig. 1) conducted at the University of Maine's Alfond W2 Ocean Engineering Laboratory. Using data acquired from load cells installed at various locations in the hull the accuracy of the model is assessed through the use of power spectra and statistics. The performance of the structural model is considered over a range of environmental conditions representing design load cases prescribed by the American Bureau of Shipping for class certification of floating offshore wind turbines.

artificial intelligence, offshore projects plannin↗

High CO2 Capture Rate Cost and Performance for F- and H-Class Natural Gas Combined Cycles (NGCC)

The National Energy Technology Laboratory (NETL) is updating its study titled “Cost and Performance Baselines for Fossil Energy Plants, Volume 1: Bituminous Coal and Natural Gas to Electricity.” Revision 4 was published in 2019. Pulverized coal (PC) and natural gas combined cycle (NGCC) cases with carbon capture in that study capture carbon dioxide (CO2) at 90% efficiency. Field-testing of post-combustion CO2 capture technology as well as vendor and industry feedback on projects currently in the planning stages (including FEED projects sponsored by DOE) indicate that capture rates as high as 95% are feasible for both coal- and natural gas-fueled electricity generating units. Technology suppliers (as reflected in vendor-supplied information provided to DOE for this study that included cost and performance estimates for both NGCC (97%) and PC (99%) study cases) as well as subject matter experts acknowledge and support that solvent-based post-combustion CO2 capture technologies are capable of achieving CO2 removal rates beyond 95% on low-purity streams representative of fossil-fueled combustion; however, the relatively limited experience with design and operation of capture systems that can routinely, reliably, and economically achieve very high removal rates (e.g., 97% for NGCC flue gas) requires further study. This presentation will address performance and cost estimates for 90%, 95%, and 97% capture for F- and H-class NGCC plants. This presentation was given at the 2022 Pittsburgh Coal Conference.

Fout, Timothy↗

Modernization efforts for the R -Matrix code SAMMY [Abstract]

The R-Matrix code SAMMY is a widely used nuclear data evaluation code focused on the resolved range, which includes corrections for experimental effects. The code is still mostly written in Fortran 77, and uses a memory management system suitable for the time of its initial writing (1984). A modernization effort is under way to bring the code in-line with modern software development practices. A continuous-integration testing framework was added, automating the large existing set of test cases. It is run on every commit. The memory management was updated to current standard practices suitable for modern software analysis tools. The code can be obtained from https://code.ornl.gov/RNSD/SAMMY. The resonance parameters and covariance information are now stored in C++ objects shared by SAMMY and AMPX, the processing code that generates nuclear data libraries for SCALE. This allows for easier maintenance and access to the resonance parameters inside and outside of SAMMY. This feature is already used by accessing and changing parameters in memory in the Bayesian Monte Carlo Evaluation Framework for Cross Sections Nuclear Data and Integral Benchmark Experiments project, Further plans include the switch to the ENDF reading and writing routines in AMPX, as these routines are more robust, easier to maintain, and support more features. Of note here is support for the new GNDS format. Previously it wasn’t easy to share the full covariance matrix for evaluations containing more than one isotope due to limitations on the ENDF format; this is now supported in GNDS. The data are currently available in a binary SAMMY format and can be exported to GNDS to make them more widely available and sharable. The next step will be to use the same resonance processing code at 0K in AMPX and SAMMY as one of the available Reich-Moore R-Matrix formalism. The first step toward this goal is to isolate the reconstruction into a module that takes resonance parameters as its input and does not depend on SAMMY global parameters. This goal has been achieved and it should now be possible to more easily change the resonance formalism and add enhancements as the Phenomenological R-Matrix parameterization of direct, doorway, and compound nuclear reactions discussed elsewhere on this conference. This concerted modernization and enhancement effort provides multiple advantages to the nuclear data community. It will allow parameter optimization using enhanced formalisms, including experimental effects, that better match complex experimental data. Then those evaluated parameters can immediately be passed off to AMPX to be reconstructed with the exact same cross section model and be put into a data library for subsequent testing using SCALE and the Valid Benchmark suite or other suitable benchmark suites.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Latest experience from Jose Cabrera reactor vessel dismantling project - 15214

Westinghouse is performing a decommissioning project at the Jose Cabrera NPP in Spain. The project was awarded in June 2013 and the main scope is to cut and package the reactor vessel and the reactor vessel head. The project is performed in the necessary sequential steps needed to prepare, segment, separate, and package the individual component segments using under water mechanical techniques. The first activities to be performed on site included e.g. cutting of all pipe penetrations on the reactor, sealing of some of the pipe penetrations, lifting and transportation of the reactor and sealing of the reactor pit. The results of these activities were very good and gave a perfect foundation for the cutting and packaging of the reactor vessel. Cutting of the reactor vessel head and the reactor vessel is made with different types of Westinghouse designed cutting equipment. The flexible nature of the cutting equipment has proved to be very valuable for the execution of the cutting work. The project is planned to be finalized in April 2014. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cold Commissioning Simulant Selection for the Hanford Tank Waste Treatment Plant LAW Facility - 18465

Commissioning the Low-Activity Waste (LAW) Facility of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) will require large volumes (∼2,000,000 liters) of a non-radioactive, chemically analogous waste simulant. Cold commissioning will provide for operator training in an integrated facility, demonstration of mechanical process equipment capacity, environmental performance demonstration of emissions control systems, and process control systems shakedown and tuning. Selection of the cold commissioning simulant is following a structured four-phase process to arrive at the preferred composition and recipe. Phases I, II and III are complete. Phase I laid the framework for decision making with preparation of a Project Management Plan, an update to the Simulant Development, Approval, Validation, and Documentation procedure, and a kickoff meeting to gather stakeholder input into the simulant definition and selection criteria. Phase II consisted of a comprehensive literature search and compilation of LAW simulant recipes, followed by initial screening against the selection criteria identified in Phase I. This process identified 72 candidate simulant recipes and down-selected 9 for further study. Phase III studies involved a) statistical comparisons of the similarity of candidate simulant compositions to the tank waste feed vector, b) process modelling of the commissioning sequence with each simulant to estimate glass former and simulant material consumption, offgas and effluent volumes and compositions, and product glass volumes and compositions, and c) evaluation of simulants against the immobilized LAW glass composition algorithm to determine allo able waste loading to ensure compliance with product specifications and process constraints. The results of these studies identified two of the candidate recipes to be carried forward to full-scale testing. Phase IV consists of testing these two recipes at vendor facilities to determine scalability, fabricability, and stability of the simulants when produced at industrial scale. Scalability is the ability to take a recipe from bench scale (1 to 40 liters) batch size to full scale (>35,000 liters) batch size. Fabricability is the ability of a recipe to be prepared in large batches without the need for complex or expensive mechanical equipment, heating, or cooling systems. Stability is the ability of a simulant to withstand long term storage and variations in environmental conditions without unacceptable changes in key characteristics (the set of chemical, physical, and rheological parameters that the simulant is intended to exhibit during cold commissioning tests). Simulants will also be tested for compatibility with other startup material (i.e., frit), tuning simulants, and environmental performance demonstration test spiking solutions to ensure against unexpected situations. Using a structured process is essential when making high impact decisions such as waste simulant selection. Proper planning and a clear explanation of how the decision process will unfold is key to obtaining stakeholder buy-in as more information is gathered. The documentation resulting from this structured selection process will be compiled and summarized in a Cold Commissioning Simulant Definition deliverable due to the Department of Energy 24 months before the start of Cold Commissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Retrieval and Disposition Techniques for Remote Handled Mixed Low-Level Waste - 20319

Legacy waste generated by the sodium-cooled fast reactor, EBR-II, program at the Idaho National Laboratory (INL) (owned by the U.S. Department of Energy and managed and operated by Battelle Energy Alliance, LLC) is challenging to treat and disposition using conventional methods. As a result, Veolia Nuclear Solutions is under contract with the Idaho National Laboratory to demonstrate an integrated retrieval and disposition solution for Remote-Handled Mixed Low-Level Waste currently stored in underground liners at INL. Delivery of the integrated solution builds on the expertise and successes of Veolia Nuclear Solutions under its Problematic Waste Treatment Initiative with INL. This initiative focuses solely on the treatment of problematic (reactive metal containing) waste streams using the Veolia Nuclear Solutions GeoMelt{sup R} In-Container Vitrification (ICV{sup TM}) technology. Under the contract, Veolia Nuclear Solutions will provide a fully commissioned prototype remote retrieval system to semi-remotely retrieve and size-reduce problematic waste liners into a safe and consolidated package for transport. The consolidated package will be shipped to Richland, Washington for demonstration treatment using the robust GeoMelt Richland system at Perma-Fix Northwest. The treated waste will ultimately be disposed of as a vitrified Low-Level Waste glass monolith. Veolia Nuclear Solutions has delivered countless remotely operated systems globally to solve some of the industry's most challenging problems. To ensure risk is mitigated in the best possible manner, a methodical phased approach is being utilized to validate the integrated solution. This contract focuses on the delivery and deployment of the prototype retrieval system onsite and the treatment of a single liner. Following successful demonstration treatment using GeoMelt ICV, the project is planning to make prototype enhancements before retrieving and treating another liner. Establishing a new integrated approach for retrieval and disposition of waste offers many benefits to INL and the U.S. Department of Energy. It is anticipated that the integrated solution will provide significant cost and schedule savings by increasing the number of liners dispositioned per year. In addition, the complexity of the overall waste disposition process will be reduced. Remotely retrieving and size-reducing waste in the field will provide additional safety to operational personnel and allow critical resources, such as hot cells, to focus on the primary missions at hand. Vitrification (using the GeoMelt ICV technology) allows for the direct processing of metal clad waste thereby significantly reducing pretreatment steps while providing a robust waste form for long-term disposal. The results from this ongoing contract are presented in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

7. Space-Filling Toolpath Generation

Space-filling toolpaths are used to fill whatever space remains on a layer after closed-loop contours have been planned. They provide structure to the object, both supporting the geometry and creating solid surfaces. As such, there are two main types of space-filling toolpaths: infill and skin. Infill paths are sparse and meant to cover a large area quickly. Infill is typically not visible once a print is complete, because infill is covered by skins. Skins are the solid space-filling toolpaths meant to solidify the top and bottom of the object, which, unlike the sides of the object, are not completely covered by layering contours. Space-filling paths are typically planned by projecting a pattern over the layer, clipping the pattern at the boundary of the object, and then linking the remaining portions of the pattern. A subcategory of skin paths, called gradual infill, can be employed to densify the infill when approaching a top skin layer so that the print path of the top skin is sufficiently supported. Space-filling paths come in a variety of patterns to optimize how the space is filled. This chapter will discuss space-filling path categories, how to find the space for each path type, and how to apply the path type to generate toolpaths.

Roschli, Alex↗

NIF Projects Controls and Information Systems Software Quality Assurance Plan

Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

42 ENGINEERING↗

Supplemental Environmental Project, Supplemental Sampling and Monitoring Work Plan Regarding Settlement Agreement and Stipulated Final Order HWB-14-20, Addendum 3: Certification Package: Sampling and Monitoring

In accordance with the Supplemental Environmental Project (SEP), Settlement Agreement and Stipulated Final Order HWB-14-20 (signed January 22, 2016), Addendum 3: Supplemental Sampling and Monitoring Work Plan (sent December 12, 2016), this correspondence certifies that the Sampling and Monitoring subproject has been completed. When all Supplemental Sampling and Monitoring SEP subprojects are completed, Department of Energy (DOE) and TRIAD, LLC shall submit a signed and sworn Certification of Completion in accordance with the approved SEP Addendum 3.

54 ENVIRONMENTAL SCIENCES↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 8 Deliverable 8.0 - Commercialization Plan

The “Optimizing Alabama’s CO 2 Storage in Shelby County: Project OASIS” CarbonSAFE Phase II Project seeks to build on regional data sets that demonstrate that the subsurface within Shelby County, Alabama has the potential to store commercial volumes of CO 2 safely, permanently, and economically. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis from industrial facilities that are not collocated with prospective storage geology (i.e., the Coastal Plain of the Southeastern U.S. in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns are required to identify CO 2 storage opportunities in under-developed areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province of the Appalachian Fold and Thrust Belt occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale.

20 FOSSIL-FUELED POWER PLANTS↗

1995 OMPO Model Development Project

The 1995 Oahu Metropolitan Planning Organization (OMPO) Model Development Project for Oahu Island was intended to document how Oahu residents use the streets, highways, and transit services in the region. These data were used to develop the Travel Demand Forecasting Model, which is used to forecast the traffic impacts of various land use changes. The survey collected complete travel information of 4,060 Oahu households for a 24-hour period, including demographic and socioeconomic data.

1Hz data↗

Fossil Energy Planning for Navajo Nation

This project includes fossil energy transition planning to find optimal solutions that benefit the Navajo Nation and stakeholders. The majority of the tribe’s budget currently comes from fossil energy-revenue. The purpose of this work is to assess potential alternative energy resources including solar photovoltaics and biomass (microalgae for either biofuel or food consumption). This includes evaluating carbon-based reserves related to the tribe’s resources including CO 2 emissions for the Four Corners generating station. The methodology for this analysis will consist of data collection from publicly available data, utilizing expertise from national laboratories and academics, and evaluating economic, health, and environmental impacts. Finally, this report will highlight areas of opportunities to implement renewable energy in the Navajo Nation by presenting the technology requirements, cost, and considerations to energy, water, and environment in an educational structure.

20 FOSSIL-FUELED POWER PLANTS↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Design, implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Design implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗