Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Real-Time Prediction of Safety Margins in the National Airspace

Underlying all operations in the National Airspace System (NAS) is the concept of safety. Safety, as defined by acceptable levels of risk, is to be maintained at all times. The real-time safety monitoring (RTSM) framework is under development to provide an automated system to quantify safety in the NAS, estimate the current level of safety, and predict the future evolution of safety and the occurrence of events that pose an increased risk to flights so that these occurrences can be managed strategically rather than mitigated reactively. This paper presents the mathematical framework, the models, and the monitoring and prediction algorithms used to achieve this. RTSM computes safety as expressed through a set of safety margins based on user-defined safety metrics, thresolds, and events. Sources of uncertainty are modeled and propagated through the predictions in order to compute the probabilistic evolution of safety and the probability of events that introduce increased risk to operations. A prototype implementation is discussed and results demonstrating feasibility are presented. The results highlight the kinds of predictions that can be computed and the fidelity that is currently achieved.

national airspace system↗

Prioritization Risk Integration Simulation Model (PRISM) For Environmental Remediation and Waste Management - 12097

The PRISM (Prioritization Risk Integration Simulation Model), a computer model was developed to support the Department of Energy's Office of Environmental Management (DOE-EM) in its mission to clean up the environmental legacy from the Nation's nuclear weapons materials production complex. PRISM provides a comprehensive, fully integrated planning tool that can tie together DOE-EM's projects. It is designed to help DOE managers develop sound, risk-informed business practices and defend program decisions. It provides a better ability to understand and manage programmatic risks. The underlying concept for PRISM is that DOE-EM 'owns' a portfolio of environmental legacy obligations (ELOs), and that its mission is to transform the ELOs from their current conditions to acceptable conditions, in the most effective way possible. There are many types of ELOs - - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. For a given suite of planned activities, PRISM simulates the outcomes as they play out over time, allowing for all key identified uncertainties and risk factors. Each contaminated building, land area and waste stream is tracked from cradle to grave, and all of the linkages affecting different waste streams are captured. The progression of the activities is fully dynamic, reflecting DOE-EM's prioritization approaches, precedence requirements, available funding, and the consequences of risks and uncertainties. The top level of PRISM is the end-user interface that allows rapid evaluation of alternative scenarios and viewing the results in a variety of useful ways. PRISM is a fully probabilistic model, allowing the user to specify uncertainties in input data (such as the magnitude of an existing groundwater plume, or the total cost to complete a planned activity) as well as specific risk events that might occur. PRISM is based on the GoldSim software that is widely used for risk and performance assessment calculations. PRISM can be run in a deterministic mode, which quickly provides an estimate of the most likely results of a given plan. Alternatively, the model can be run probabilistically in a Monte Carlo mode, exploring the risks and uncertainties in the system and producing probability distributions for the different performance measures. The PRISM model demonstrates how EM can evaluate a portfolio of ELOs, and transform the ELOs from their current conditions to acceptable conditions, utilizing different strategic approaches. There are many types of ELOs - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. This scope of work for the PRISM process and the development of a dynamic simulation model are a logical extension of the GoldSim simulation software used by the OCRWM to assess the long-term performance for the Yucca Mountain Project and by NNSA to assess project risk at its sites. Systems integration modeling will promote better understanding of all project risks, technical and nontechnical, and more defensible decision-making for complex projects with significant uncertainties. It can provide effective visual communication and rapid adaptation during interactions with stakeholders (Administration, Congress, State, Local, and NGO). It will also allow rapid assessment of alternative management approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SOSAT: Geohazard Risk Assessment in Carbon Sequestration Operations

Like all operations in which fluids are injected into the subsurface, geologic carbon storage (GCS) presents inherit risks that must be assessed and mitigated to successfully deploy such technology in the field. For example, alterations to pore pressure and the stress state due to fluid injection may trigger certain geohazards, such as potential fault activation and induced seismicity or unintentional hydraulic fracturing. Here we present capabilities for assessing these potential risks using the State of Stress Analysis Tool (SOSAT): a Python library and web-based application capable of probabilistically estimating the subsurface state of stress informed by various field observations. Using posterior distributions of principal stress components, SOSAT can assess the risk of fault activation within the injection formation for either a critically oriented fault or a fault with a user-prescribed orientation. Additionally, SOSAT can estimate the probability of unintentional hydraulic fracturing of the intact reservoir rock. Here, we demonstrate these SOSAT capabilities using a hypothetical GCS site. This type of risk assessment can assist with the effective deployment of GCS technology in the field by informing safe design and management practices.

Haagenson, Ryan J.↗

RAVEN User Manual

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The initial development was aimed to provide dynamic risk analysis capabilities to the Thermo-Hydraulic code RELAP-7, currently under development at the Idaho National Laboratory (INL). Although the initial goal has been fully accomplished, RAVEN is now a multi-purpose probabilistic and uncertainty quantification platform, capable to agnostically communicate with any system code. This agnosticism includes providing Application Programming Interfaces (APIs). These APIs are used to allow RAVEN to interact with any code as long as all the parameters that need to be perturbed are accessible by input files or via python interfaces. RAVEN is capable of investigating the system response, and investigating the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused toward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. The development of RAVEN started in 2012, when, within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the need to provide a modern risk evaluation framework became stronger. RAVEN principal assignment is to provide the necessary software and algorithms in order to employ the concept developed by the Risk Informed Safety Margin Characterization (RISMC) program. RISMC is one of the pathways defined within the Light Water Reactor Sustainability (LWRS) program. In the RISMC approach, the goal is not just the individuation of the frequency of an event potentially leading to a system failure, but the closeness (or not) to key safety-related events. Hence, the approach is interested in identifying and increasing the safety margins related to those events. A safety margin is a numerical value quantifying the probability that a safety metric (e.g. for an important process such as peak pressure in a pipe) is exceeded under certain conditions. The initial development of RAVEN has been focused on providing dynamic risk assessment capability to RELAP-7, currently under development at the INL and, likely, future replacement of the RELAP5-3D code. Most the capabilities that have been implemented having RELAP-7 as principal focus are easily deployable for other system codes. For this reason, several side activates are currently ongoing for coupling RAVEN with software such as RELAP5-3D, etc. The aim of this document is the explanation of the input requirements, focusing on the input structure.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Utilizing Earth Observations to Model Probable Coastal Wetland Extent, Sea-Level Rise Inundation Risk, and Assess Impacts on Historic Hawaiian Lands

Climate induced sea-level rise poses a risk to coastal areas on the Island of Hawai’i, and many of the island’s historic cultural lands are in danger of becoming overtaken by wetlands or inundation. In partnership with the County of Hawai’i, State of Hawai’i Department of Land and Natural Resources, and Arizona State University, NASA DEVELOP mapped wetland extent and short-term sea-level rise inundation risk. We utilized Earth observations over a 10-year span (2013 – 2022) that included the NASA MEaSUREs Gridded Sea Surface Height Anomalies and MEaSUREs Group for High Resolution Sea Surface Temperature datasets, United States Geological Survey (USGS) Hawaii Digital Elevation Models (DEM), and in situ tidal gauge data. Flood risk index values were acquired for 5 known Hawai’i flood events between 2019 – 2021 from the Global Flood Mapper tool on Google Earth Engine. We used a random forest model to predict short-term sea-level rise inundation risk along the entire coast of Hawai’i. Current wetland extents and probabilistic locations of new wetlands were modeled with the most recently available data from PlanetScope Surface Reflectance optical imagery (2022), USGS 3D Elevation Program (3DEP) 10m DEM (2020), temperature and precipitation data from the Hawai’i Climate Atlas, and soils data from the Hawai’i Soil Atlas (2014) using the Wetland Intrinsic Potential tool. Results indicated locations that had the highest probability of wetland creation. The end products aimed to help the partners prioritize efforts to meeting regulation requirements for wetlands protection, evaluate the inundation risk to historical features, and support decision-making for their Shoreline Setback and Climate Adaption plans.

Lisa Tanh↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Rocket engine system reliability analyses using probabilistic and fuzzy logic techniques

The reliability of rocket engine systems was analyzed by using probabilistic and fuzzy logic techniques. Fault trees were developed for integrated modular engine (IME) and discrete engine systems, and then were used with the two techniques to quantify reliability. The IRRAS (Integrated Reliability and Risk Analysis System) computer code, developed for the U.S. Nuclear Regulatory Commission, was used for the probabilistic analyses, and FUZZYFTA (Fuzzy Fault Tree Analysis), a code developed at NASA Lewis Research Center, was used for the fuzzy logic analyses. Although both techniques provided estimates of the reliability of the IME and discrete systems, probabilistic techniques emphasized uncertainty resulting from randomness in the system whereas fuzzy logic techniques emphasized uncertainty resulting from vagueness in the system. Because uncertainty can have both random and vague components, both techniques were found to be useful tools in the analysis of rocket engine system reliability.

Hardy, Terry L.↗

A shared-mobility-based framework for evacuation planning and operations under forecast uncertainty

To meet evacuation needs from carless populations who need personalized assistance to evacuate safely, in this article we propose a ridesharing-based evacuation program that recruits volunteer drivers before a disaster strikes, and then matches volunteer drivers with evacuees once demand is realized. Here we optimize resource planning and evacuation operations under uncertain spatiotemporal demand, and construct a two-stage stochastic mixed-integer program to ensure high demand fulfillment rates. We consider three formulations to improve the number of evacuees served, by minimizing an expected penalty cost, imposing a probabilistic constraint, and enforcing a constraint on the conditional value at risk of the total number of unserved evacuees, respectively. We discuss the benefits and disadvantages of the different risk measures used in the three formulations, given certain carless population sizes and the variety of evacuation modes available. We also develop a heuristic approach to provide quick, dynamic and conservative solutions. We demonstrate the performance of our approaches using five different networks of varying sizes based on regions of Charleston County, South Carolina, an area that experienced a mandatory evacuation order during Hurricane Florence, and utilize real demographic data and hourly traffic count data to estimate the demand distribution.

97 MATHEMATICS AND COMPUTING↗

Preliminary volcanic hazards evaluation for Los Alamos National Laboratory Facilities and Operations : current state of knowledge and proposed path forward

The integration of available information on the volcanic history of the region surrounding Los Alamos National Laboratory indicates that the Laboratory is at risk from volcanic hazards. Volcanism in the vicinity of the Laboratory is unlikely within the lifetime of the facility (ca. 50–100 years) but cannot be ruled out. This evaluation provides a preliminary estimate of recurrence rates for volcanic activity. If further assessment of the hazard is deemed beneficial to reduce risk uncertainty, the next step would be to convene a formal probabilistic volcanic hazards assessment.

58 GEOSCIENCES↗

Reliability, Risk and Cost Trade-Offs for Composite Designs

Risk and cost trade-offs have been simulated using a probabilistic method. The probabilistic method accounts for all naturally-occurring uncertainties including those in constituent material properties, fabrication variables, structure geometry and loading conditions. The probability density function of first buckling load for a set of uncertain variables is computed. The probabilistic sensitivity factors of uncertain variables to the first buckling load is calculated. The reliability-based cost for a composite fuselage panel is defined and minimized with respect to requisite design parameters. The optimization is achieved by solving a system of nonlinear algebraic equations whose coefficients are functions of probabilistic sensitivity factors. With optimum design parameters such as the mean and coefficient of variation (representing range of scatter) of uncertain variables, the most efficient and economical manufacturing procedure can be selected. In this paper, optimum values of the requisite design parameters for a predetermined cost due to failure occurrence are computationally determined. The results for the fuselage panel analysis show that the higher the cost due to failure occurrence, the smaller the optimum coefficient of variation of fiber modulus (design parameter) in longitudinal direction.

Shiao, Michael C.↗

NASA Tech Briefs, May 2010

Topics covered include: Instrument for Analysis of Greenland's Glacier Mills Cryogenic Moisture Apparatus; A Transportable Gravity Gradiometer Based on Atom Interferometry; Three Methods of Detection of Hydrazines; Crossed, Small-Deflection Energy Analyzer for Wind/Temperature Spectrometer; Wavefront Correction for Large, Flexible Antenna Reflector; Novel Micro Strip-to-Waveguide Feed Employing a Double-Y Junction; Thin-Film Ferro Electric-Coupled Microstripline Phase Shifters With Reduced Device Hysteresis; Two-Stage, 90-GHz, Low-Noise Amplifier; A 311-GHz Fundamental Oscillator Using InP HBT Technology; FPGA Coprocessor Design for an Onboard Multi-Angle Spectro-Polarimetric Imager; Serrating Nozzle Surfaces for Complete Transfer of Droplets; Turbomolecular Pumps for Holding Gases in Open Containers; Triaxial Swirl Injector Element for Liquid-Fueled Engines; Integrated Budget Office Toolbox; PLOT3D Export Tool for Tecplot; Math Description Engine Software Development Kit; Astronaut Office Scheduling System Software; ISS Solar Array Management; Probabilistic Structural Analysis Program; SPOT Program; Integrated Hybrid System Architecture for Risk Analysis; System for Packaging Planetary Samples for Return to Earth; Offset Compound Gear Drive; Low-Dead-Volume Inlet for Vacuum Chamber; Simple Check Valves for Microfluidic Devices; A Capillary-Based Static Phase Separator for Highly Variable Wetting Conditions; Gimballing Spacecraft Thruster; Finned Carbon-Carbon Heat Pipe with Potassium Working Fluid; Lightweight Heat Pipes Made from Magnesium; Ceramic Rail-Race Ball Bearings; Improved OTEC System for a Submarine Robot; Reflector Surface Error Compensation in Dual-Reflector Antennas; Enriched Storable Oxidizers for Rocket Engines; Planar Submillimeter-Wave Mixer Technology with Integrated Antenna; Widely Tunable Mode-Hop-Free External-Cavity Quantum Cascade Laser; Non-Geiger-Mode Single-Photon Avalanche Detector with Low Excess Noise; Using Whispering-Gallery-Mode Resonators for Refractometry; RF Device for Acquiring Images of the Human Body; Reactive Collision Avoidance Algorithm; Fast Solution in Sparse LDA for Binary Classification; Modeling Common-Sense Decisions in Artificial Intelligence; Graph-Based Path-Planning for Titan Balloons; Nanolaminate Membranes as Cylindrical Telescope Reflectors; Air-Sea Spray Airborne Radar Profiler Characterizes Energy Fluxes in Hurricanes; Large Telescope Segmented Primary Mirror Alignment; and Simplified Night Sky Display System.

Source record↗

Partial-Breast Irradiation Versus Whole-Breast Irradiation for Early-Stage Breast Cancer: A Cost-Effectiveness Analysis

Purpose: Accelerated partial-breast irradiation (PBI) is a new treatment paradigm for patients with early-stage breast cancer. Although PBI may lead to greater local recurrence rates, it may be cost-effective because of better tolerability and lower cost. We aim to determine the incremental cost-effectiveness of PBI compared with whole-breast radiation therapy (WBRT) for estrogen receptor-positive postmenopausal women treated for early-stage breast cancer. Methods and Materials: We developed a Markov model to describe health states in the 15 years after radiotherapy for early-stage breast cancer. External beam (EB) and MammoSite (MS) PBI were considered and assumed to be equally effective, but carried different costs. Patients received tamoxifen, but not chemotherapy. Utilities, recurrence risks, and costs were adapted from the literature; the baseline utility for no disease after radiotherapy was set at 0.92. Probabilistic sensitivity analyses were performed to model uncertainty in the PBI hazard ratio, recurrence pattern, and patient utilities. Costs (in 2004 US dollars) and quality-adjusted life-years were discounted at 3%/y. Results: The incremental cost-effectiveness ratio for WBRT compared with EB-PBI was $630,000/quality-adjusted life-year; WBRT strongly dominated MS-PBI. One-way sensitivity analysis found that results were sensitive to PBI hazard ratio, recurrence pattern, baseline recurrence risk, and no evidence of disease PBI utility values. Probabilistic sensitivity showed that EB-PBI was the most cost-effective technique over a wide range of assumptions and societal willingness-to-pay values. Conclusions: EB-PBI was the most cost-effective strategy for postmenopausal women with early-stage breast cancer. Unless the quality of life after MS-PBI proves to be superior, it is unlikely to be cost-effective.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

LOFTID Aeroshell Thermal Response Uncertainty Analysis Utilizing the End-to-End Monte Carlo Approach

A probabilistic thermal margin process has been performed to design the flexible thermal protection system (FTPS) and select entry trajectory constraints given an acceptable risk level for the Low-Earth Orbit Flight Test of and Inflatable Decelerator (LOFTID) project. Uncertainties exist in atmospheric entry aeroheating environments and the predicted thermal response of thermal protection system (TPS) material. Entry vehicle TPS is often over-sized to mitigate uncertainty by combining conservative bounding scenarios together. The probabilistic thermal margin process allows engineers to make informed aeroshell design, flight design, and FTPS performance risk trades while preventing excessive FTPS margin from being applied. This paper describes the uncertainty analysis methodology used to carry out a probabilistic thermal margin process used for LOFTID’s aeroshell and explains how the calculated probability of exceeding flight allowable temperatures is used to design the FTPS and establish nominal flight design constraints. This probabilistic thermal margin process had never been applied to entry, decent, and landing design for a flown entry vehicle and it is one of the LOFTID project’s goals to demonstrate its merits.

Steven Andrew Tobin↗

Probabilistic reasoning for intelligent wind shear avoidance

A computerized intelligent cockpit aid can increase flight-crew awareness of wind shear, improving avoidance decisions. The FAA Windshear Training Aid (WTA) provides guidelines for assessing the risk of wind shear encounter from meteorological evidence. Use of these guidelines in the cockpit is complicated by uncertainty surrounding meteorological knowledge of wind shear. Bayesian network representation is discussed as a means of modeling this uncertain knowledge in a computer. A probabilistic model of the WTA guidelines using Bayesian network representation is presented. This model combines evidence from sources of varying reliability and incorporates results from meteorological studies of wind shear. The probabilistic model can provide flight crews with meaningful estimates of risk to aid their decisions, using evidence from a variety of sources and a base of meteorological knowledge.

Stratton, D. Alexander↗

On Expected Value Strong Controllability

The Probabilistic Simple Temporal Network (PSTN) generalizes Simple Temporal Networks with Uncertainty (STNUs) by introducing probability distributions over the timing of uncontrollable timepoints. PSTNs are controllable if there is a strategy to execute the controllable timepoints while bounding the risk of violating any constraint to a small value. If this risk bound can't be satisfied, PSTNs are not considered controllable. We introduce the Expected Value Probabilistic SimpleTemporal Network (EPSTN), which extends PSTNs by including a benefit to the satisfaction of temporal constraints. We study the problem of Expected Value Strong Controllability (EvSC) of EPSTNs, which seeks a schedule maximizing the expected value of satisfied constraints. We solve the EvSC problem by extending a previously developed linear program, combined with search over constraints to violate at execution time. We describe conditions under which the solution to this linear program is the maximum expected value schedule. We then show how to search for constraints to discard, using the linear program at the core of the search. While the general problem is shown to be exponential, we conclude by providing several methods to bound the complexity of search.

Planning↗

The relationship between anatomic noise and volumetric breast density for digital mammography

Purpose: The appearance of parenchymal/stromal patterns in mammography have been characterized as having a Wiener power spectrum with an inverse power-law shape described by the exponential parameter, {beta}. The amount of fibroglandular tissue, which can be quantified in terms of volumetric breast density (VBD), influences the texture and appearance of the patterns formed in a mammogram. Here, a large study is performed to investigate the variations in {beta} in a clinical population and to indicate the relationship between {beta} and breast density. Methods: From a set of 2686 cranio-caudal normal screening mammograms, the parameter {beta} was extracted from log-log fits to the Wiener spectrum over the range 0.15-1 mm{sup -1}. The Wiener spectrum was calculated from regions of interest in the compression paddle contact region of the breast. An in-house computer program, Cumulus V, was used to extract the volumetric breast density and identify the compression paddle contact regions of the breast. The Wiener spectra were calculated with and without modulation transfer function (MTF) correction to determine the impact of VBD on the intrinsic anatomic noise. Results: The mean volumetric breast density was 25.5% ({+-}12.6%) over all images. The mean {beta} following a MTF correction which decreased the {beta} slightly ( Almost-Equal-To -0.08) was found to be 2.87. Varying the maximum of the spatial frequency range of the fits from 0.7 to 1.0, 1.25 or 1.5 mm{sup -1} showing small decreases in the result, although the effect of the quantum noise power component on reducing {beta} was clearly observed at 1.5 mm{sup -1}. Conclusions: The texture parameter, {beta}, was found to increase with VBD at low volumetric breast densities with an apparent leveling off at higher densities. The relationship between {beta} and VBD measured here can be used to create probabilistic models for computer simulations of detectability. As breast density is a known risk predictor for breast cancer, the correlation between {beta} and VBD suggests that {beta} may provide predictive information and this will be investigated in the future.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

RAVEN User Manual, Revision 4

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The initial development was aimed to provide dynamic risk analysis capabilities to the Thermo-Hydraulic code RELAP-7, currently under development at the Idaho National Laboratory (INL). Although the initial goal has been fully accomplished, RAVEN is now a multi-purpose probabilistic and uncertainty quantification platform, capable to agnostically communicate with any system code. This agnosticism includes providing Application Programming Interfaces (APIs). These APIs are used to allow RAVEN to interact with any code as long as all the parameters that need to be perturbed are accessible by inputs files or via python interfaces. RAVEN is capable of investigating the system response, and investigating the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused to- ward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. The development of RAVEN has started in 2012, when, within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the need to provide a modern risk evaluation framework became stronger. RAVEN principal assignment is to provide the necessary software and algorithms in order to employ the concept developed by the Risk Informed Safety Margin Characterization (RISMC) program. RISMC is one of the pathways defined within the Light Water Reactor Sustainability (LWRS) program. In the RISMC approach, the goal is not just the individuation of the frequency of an event potentially leading to a system failure, but the closeness (or not) to key safety-related events. Hence, the approach is interested in identifying and increasing the safety margins related to those events. A safety margin is a numerical value quantifying the probability that a safety metric (e.g. for an important process such as peak pressure in a pipe) is exceeded under certain conditions. The initial development of RAVEN has been focused on providing dynamic risk assess- ment capability to RELAP-7, currently under development at the INL and, likely, future replacement of the RELAP5-3D code. Most the capabilities that have been implemented having RELAP-7 as principal focus are easily deployable for other system codes. For this reason, several side activates are currently ongoing for coupling RAVEN with soft- ware such as RELAP5-3D, etc. The aim of this document is the explanation of the input requirements, focalizing on the input structure.

97 MATHEMATICS AND COMPUTING↗

RAVEN User Manual

RAVEN is a generic software framework to perform parametric and probabilistic analysis based on the response of complex system codes. The initial development was aimed to provide dynamic risk analysis capabilities to the Thermo-Hydraulic code RELAP-7, currently under development at the Idaho National Laboratory (INL). Although the initial goal has been fully accomplished, RAVEN is now a multi-purpose probabilistic and uncertainty quantification platform, capable to agnostically communicate with any system code. This agnosticism includes providing Application Programming Interfaces (APIs). These APIs are used to allow RAVEN to interact with any code as long as all the parameters that need to be perturbed are accessible by inputs files or via python interfaces. RAVEN is capable of investigating the system response, and investigating the input space using Monte Carlo, Grid, or Latin Hyper Cube sampling schemes, but its strength is focused to- ward system feature discovery, such as limit surfaces, separating regions of the input space leading to system failure, using dynamic supervised learning techniques. The development of RAVEN has started in 2012, when, within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, the need to provide a modern risk evaluation framework became stronger. RAVEN principal assignment is to provide the necessary software and algorithms in order to employ the concept developed by the Risk Informed Safety Margin Characterization (RISMC) program. RISMC is one of the pathways defined within the Light Water Reactor Sustainability (LWRS) program. In the RISMC approach, the goal is not just the individuation of the frequency of an event potentially leading to a system failure, but the closeness (or not) to key safety-related events. Hence, the approach is interested in identifying and increasing the safety margins related to those events. A safety margin is a numerical value quantifying the probability that a safety metric (e.g. for an important process such as peak pressure in a pipe) is exceeded under certain conditions. The initial development of RAVEN has been focused on providing dynamic risk assessment capability to RELAP-7, currently under development at the INL and, likely, future replacement of the RELAP5-3D code. Most the capabilities that have been implemented having RELAP-7 as principal focus are easily deployable for other system codes. For this reason, several side activates are currently ongoing for coupling RAVEN with soft- ware such as RELAP5-3D, etc. The aim of this document is the explanation of the input requirements, focalizing on the input structure.

97 MATHEMATICS AND COMPUTING↗