Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Living with a Star: New Opportunities in Sun-Climate Research

Living With a Star is a NASA initiative employing the combination of dedicated spacecraft with targeted research and modeling efforts to improve what we know of solar effects of all kinds on the Earth and its surrounding space environment, with particular emphasis on those that have significant practical impacts on life and society. The highest priority among these concerns is the subject of this report: the potential effects of solar variability on regional and global climate, including the extent to which solar variability has contributed to the well-documented warming of the Earth in the last 100 years. Understanding how the climate system reacts to external forcing from the Sun will also greatly improve our knowledge of how climate will respond to other climate drivers, including those of anthropogenic origin. A parallel element of the LWS program addresses solar effects on space weather : the impulsive emissions of charged particles, short-wave electromagnetic radiation and magnetic disturbances in the upper atmosphere and near-Earth environment that also affect life and society. These include a wide variety of solar impacts on aeronautics, astronautics, electric power transmission, and national defense. Specific examples are (1) the impacts of potentially- damaging high energy radiation and atomic particles of solar origin on satellites and satellite operations, spacecraft electronics systems and components, electronic communications, electric power distribution grids, navigational and GPS systems, and high altitude aircraft; and (2) the threat of sporadic, high-energy solar radiation to astronauts and high altitude aircraft passengers and crews. Elements of the LWS program include an array of dedicated spacecraft in near- Earth and near-Sun orbits that will closely study and observe both the Sun itself and the impacts of its variations on the Earth's radiation belts and magnetosphere, the upper atmosphere, and ionosphere. These spacecraft, positioned to study and monitor changing conditions in the Sun-Earth neighborhood, will also serve as sentinels of solar storms and impulsive events.

Source record↗

Value of Improved Wind Power Forecasting in the Western Interconnection (Poster)

Wind power forecasting is a necessary and important technology for incorporating wind power into the unit commitment and dispatch process. It is expected to become increasingly important with higher renewable energy penetration rates and progress toward the smart grid. There is consensus that wind power forecasting can help utility operations with increasing wind power penetration; however, there is far from a consensus about the economic value of improved forecasts. This work explores the value of improved wind power forecasting in the Western Interconnection of the United States.

17 WIND ENERGY↗

Controller Hardware-in-the-Loop Evaluation of a Microgrid Controller for a Microgrid System with Multiple Grid-Forming Inverters: Preprint

This paper presents the laboratory evaluation of a commercial Microgrid Management System (MGMS) implemented in the real-world Bronzeville Microgrid which features a futuristic scenario with high renewable energy integration and the use of multiple Grid-Forming (GFM) inverters. The primary objective of the performance evaluation for the MGMS is to assess the MGMS's capability to dispatch GFM units, including a GFM PV unit and two GFM battery units, to maintain the system stability and ensure economic operation, thus guaranteeing the microgrid's resilience during prolonged outages and dynamic events. The laboratory controller hardware-in-the-loop provides realistic testing environment through detailed electromagnetic transient modeling of the microgrid system, hardware MGMS, and standard communication protocols (DNP3). The CHIL evaluation shows how the MGMS effectively manages the GFM inverters, highlighting its performance in maintaining stability, reliability, and survivability in a microgrid environment with a high penetration of renewable energy sources.

controller hardware-in-the-loop↗

Communication-Constrained Robust Control and Learning of Grid-Connected

The electric grid of things (EGoT) promises great potential for innovative grid services by tapping into vast load flexibility. However, the unique characteristics of EGoT, being a part of the cyber-physical electric power system, present both opportunities and challenges, especially concerning supply-demand balancing, stability, and communication constraints. Traditionally, centralized control was employed to ensure balance and stability in power systems. However, with the massive influx of EGoT devices, new strategies are needed to efficiently coordinate and control these distributed devices for optimal grid operations. While some studies have explored efficiency and economic models, there remains a gap in ensuring reliability under everyday operations and resilience during extreme conditions. Addressing this gap, this project develops the technology for an Energy Service Interface (ESI) that includes novel pricing, control, learning, and distributed optimization algorithms, which will enable utilities to recruit EGoT assets for crucial grid services such as load flexibility, voltage regulation, and situation-awareness. The key novelty of the proposed technology is the careful distribution of learning and control functions across utility and EGoT asset owners such that provably efficient and resilient grid operations are attained while respecting communication and information-exchange constraints. Specifically, the project team develops machine-learning enhanced load modeling methods to allow EGoT asset owners to learn their load capability and flexibility, and develops pricing-based and decentralized learning-based control so that asset owners can coordinate to meet system-wide demand-supply balance and reliability goals. For extreme situations involving high-impact, low-probability catastrophic events (termed the “black-sky” events), the team also develops (1) a “Feeder-Operating Center-on-a-Laptop” (FOCAL) software that can assist utility personnel in leveraging EGoT assets to accelerate the service recovery of damaged feeders, and (2) distributed optimization algorithms that can coordinate the operation points of EGoT devices under severe communication constraints. The proposed technology has been extensively tested and evaluated through simulations and on a testbed. In summary, as we transition into a more interconnected and digital power grid era, our project’s findings and developments offer a pivotal step toward guaranteeing both efficiency and resilience in the face of both everyday operations and rare “black-sky” events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Backup Power Performance of Solar-plus-Storage Systems during Routine Power Interruptions: A Case Study Application of Berkeley Lab’s PRESTO Model

This technical brief estimates the expected performance of a solar photovoltaic and energy storage system (PVESS) for providing backup power during short-duration power interruption events, accounting for the unpredictable nature of those events. The analysis relies on the Power Reliability Event Simulation TOol (PRESTO), a publicly available model developed by Berkeley Lab to simulate the occurrence of short-duration power interruption events at the county-level. A separate storage dispatch model is then used to simulate PVESS operation and backup performance for each of the large number of interruption events produced by PRESTO. In performing this simulation, the analysis accounts for how the customer operates its battery on a day-to-day basis—in this case, we assume the battery is cycled each day in response to time-of-use rates—and how that, in turn, impacts the battery’s state of charge at the beginning of each interruption event. The analysis presented here is intended to demonstrate an application of the PRESTO model as well as to illustrate some of the key determinants of PVESS backup power performance during short-duration power interruption events. The analysis focuses initially on a typical single-family home in Maricopa County, Arizona, and includes a limited set of scenarios related to system sizing, backup power configuration, and whether the customer charges its battery storage system from the grid during normal operating conditions. The analysis also presents comparative results for two other counties, in Massachusetts (Middlesex) and California (Los Angeles), illustrating how regional differences in climate, interruption patterns, and retail rate structures can affect PVESS performance as a backup power source. In the conclusions, we highlight a number of other important considerations for evaluating PVESS backup power capabilities.

14 SOLAR ENERGY↗

Analysis of Wind Ramping Product Formulations in a Ramp-Constrained Power Grid

Flexible ramping products are designed to compensate the variability and uncertainty of load and intermittent generation. Since their market implementation by the California Independent System Operator (CAISO) and Midcontinent System Operator (MISO), flexible ramping products have garnered much attention. However, it is still unclear how to best formulate wind power plants’ participation in the ramping requirement. This paper investigates different wind ramping product formulations and increasing wind power penetration in the context of a security-constrained unit commitment (SCUC) model. We demonstrate that the ramping model that captures both the intra- and inter-temporal output ramp capability of individual wind power plants reflects the true ramp contribution of the wind fleet. With increasing wind penetration, wind generation curtailments can support the grid’s ramping needs. In addition, we found that increased wind penetration has the potential of lowering ramping and production costs. Numerical case studies performed on the TAMU 2000-bus synthetic network support the findings.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

The Evolution of Power System Planning with High Levels of Variable Renewable Generation

Greening the Grid provides technical assistance to energy system planners, regulators, and grid operators to overcome challenges associated with integrating variable renewable energy into the grid. This document, part of the Greening the Grid introduces the evolution of power system planning with high levels of variable renewable generation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hierarchical Control and Stability Analysis for a Nonisolated Grid-Tied DC Energy Router Integrating Energy Storage and Partial Distributed Generation

This article proposes a nonisolated dc converter-based energy router (dc-ER) and its operating strategy. Here, the intent is to integrate energy storage (ES), distributed generation (DG), local load, and dc power grid in an autonomous and more efficient way. The ES/DG power ports are coupled with each other in partial-type connections, which obtains higher voltage supply gain and direct input–output power transmission. High-voltage supply gain allows a wide solar power tracking range and the possibility of optimal battery charging/discharging. Direct input–output power transmission improves the energy conversion efficiency. In this article, the operating modes of dc-ER are first analyzed, followed by the optimal hardware design counting the DG current ripple minimization and the limitation caused by the power flow direction. Second, the mathematical model of dc-ER is deduced. The hierarchical control is then proposed to manage port energy in a flexible manner. The stability is analyzed by using impedance modeling. Finally, experimental and simulation results verify the superiorities of the proposed topology in terms of flexible operating mode transition and high-power conversion efficiency.

25 ENERGY STORAGE↗

More land is needed for solar and wind infrastructure under a high renewables scenario in the Western US by 2050

Expanding United States electricity infrastructure to meet growing demand could require extensive power plant development footprints and land use conversion, depending on the mix of generation types chosen. Understanding where future power plant sitings are likely to take place and identifying potential conflicts and land-use tradeoffs will be key to identifying feasible and affordable investments and evaluating regional planning coordination needs. Here we use an integrated modeling framework that combines capacity expansion planning, hourly grid operations, and geospatial techno-economic analysis to develop projections (2025-2050) of power plant sitings in the Western United States (US) at a 1 km 2 resolution for a business-as-usual scenario and a high renewables penetration scenario. We find that 30% more land will be needed in the high renewables scenario as compared to business-as-usual, and that 75% of that development is projected to be located within 10 km of natural areas.

Mongird, Kendall [Pacific Northwest National Labor↗

Hydrogen Energy Storage System at Borrego Springs Towards an H2 Enabled 100 Renewable Microgrid

San Diego Gas & Electric's Borrego Springs Microgrid is one of the largest microgrids in the USA, serving 2500 residential customers, 300 commercial and industrial customers, and has a peak demand of approximately 14 MW. This microgrid is located at the end of a long transmission line, and is subjected to extreme weather events like storms, wildfires, and flooding, which frequently cause grid outages. The microgrid currently relies on 3.65 MW of diesel-powered generators to provide grid-forming services during these outages, which results in greenhouse gas and criteria pollutant emissions. However, the microgrid has access to approximately 37 MW of installed solar generation and struggles with overgeneration and curtailment. 1.5 MW/4.5 MWh of grid-scale batteries have been installed to capture some the overgeneration and provide resiliency, but a longer-duration low-greenhouse gas emission energy storage solution is needed. In our project, the team will evaluate in the lab and demonstrate in the field a grid-forming fuel cell inverter that can provide grid-forming services while utilizing hydrogen's energy storage scalability. We will first utilize NREL's Renewable Energy Integration and Optimization (REopt) platform to perform analyses on future microgrid scenarios that use hydrogen assets to reduce or eliminate the need for diesel backup generators. We will then evaluate the grid-forming inverter through power hardware-in-the-loop and controller hardware-in-the-loop experiments at ARIES, and de-risk the field deployment and operation of hydrogen assets in the microgrid setting. Finally, this project will demonstrate the operation of the fuel cell inverter and updated microgrid controller by operating in grid-forming mode in the Borrego Springs microgrid.

Borrego Springs↗

Study of Seamless Microgrid Transition Operation Using Grid-Forming Inverters: Preprint

This paper investigates operational techniques to achieve smooth microgrid (MG) transitions by dispatching the grid-forming (GFM) inverter. In traditional approaches, the GFM inverter must switch between grid-following (GFL) and GFM control mode during MG transition operation. Today's inverter technology allows GFM inverters to always operate in GFM control mode, so it is worthy to explore how to use them to achieve smooth MG transition operation. This paper proposes three operational techniques: a traditional scheme of switching between GFL and GFM control; a new scheme of consistent GFM control and shifting the droop intercept up before islanding operation; and a new scheme of consistent GFM control and shifting the droop intercept up before synchronization operation. A full hardware setup is established to compare the three techniques and showcase their implementations in real-world applications. As expected, the third technique outperforms the others and exhibits the best transition performance because the GFM inverter maintains the same operating points during the transition operation. Therefore, we conclude that ensuring smooth MG transition operation requires the GFM inverter(s) to maintain the same operating points (v, f, P, Q, and phase angle) during the transition operation in addition to minimizes the point of common coupling power flow.

grid-following control↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Does practice make perfect? Lessons learned from full-scale power system incident response exercise

While threats to the energy sector occur daily, few utilities get the opportunity to fully test out their detection and response mechanisms to advanced threats in the real world. With the high demand for reliability, few grid operators would allow execution of simulated cyber-attacks on their live systems. The DOE-funded Liberty Eclipse project offers a unique opportunity for small and large utilities and coops to practice their combined IT/OT responses to a live red team executing attacks against an isolated power system on an island in New York. Both cyber teams and power operations teams must work together to detect and respond to attacks, even restoring the power system against extreme impacts. Lessons learned from these exercises reveal key takeaways for understanding what a real attack against the electric sector will look like, gaps in execution of the best-laid plans when the pressure of a real event is bearing down, and how organizations can better prepare for advanced attacks by optimizing participation in exercises. This presentation will discuss successes and opportunities for improvement both in how utilities can prepare for and respond to events, as well as how full-scale IT/OT exercises can be coordinated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nuclear-Renewable Energy Systems Secondary Product Market Analysis Study

In order to properly create a program surrounding the development of any technological concept it is necessary to fully understand the market in which it is being developed. In the case of Integrated Nuclear-Renewable Hybrid Energy Systems (HES), there are two economic markets in which it must be able to participate in: the electricity market and the secondary product market associated with the specific system. The purpose of the present report is to characterize the secondary product market in the U.S. and to provide recommendations for further developing the HES program. While HESs have been discussed in depth in many other reports, it is helpful to discuss them briefly in the present work [REF]. The concept of the HES can be deduced to a system, featuring a combination of a nuclear power plant, a renewable energy source, and an industrial manufacturing plant . The system is designed in a fashion that allows it either to produce electricity or to manufacture a secondary product as needed. The primary benefit of this concept lies in its ability to maximize economic performance of the integrated system and to manufacture products in a carbon-free manner. A secondary benefit is the enhanced supply-side flexibility gained by allowing the HES to economically provide grid services. A key tenant to nuclear power plant economics in today’s electricity market is their ability to operate at a very high capacity factor. Unfortunately, in regions with a high penetration of renewable energy, the carbon free energy produced by nuclear power may not be needed at all times. This forces the nuclear power plant to find a user for its excess capacity. This may include paying the electric grid to find a user, releasing energy to the environment by ‘dumping steam’, or reducing power. If the plant is unable to economically or safely do any of these actions, the plant is at risk of being shutdown. In order to allow for nuclear power plants to continue to contribute carbon free electricity to the grid in a future with high renewable energy penetration, HESs allow for excess capacity to be diverted to a chemical process. If the chemical products sold on the market replace those sold previously – which would be the case if a currently operating manufacturing plant was modified to be a HES component – then the products would now be produced with reduced emission of carbon and other greenhouse gases. There are several key economic barriers that must be surmounted for HESs to be developed. The two primary barriers are the increased capital cost associated with coupling and controlling the HES components and the decreased utilization of the manufacturing plant capital due to intermittent energy delivery . Because of this, manufacturing plants that are less complex and have smaller non-variable operations and capital costs may be more attractive for integration. A secondary economic barrier for the HES is the market availability for its products. The system must operate a region where there is either an intermittent demand for its electricity, an intermittent demand for its secondary product, or both. In a region with an intermittent demand, product prices should shift accordingly, making it less attractive to produce one of the products. The HES then can shift production in order to maximize profit. Without an intermittent demand for at least one of its products, there would be little need for it to expend the extra capital required for integration as an HES.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Tangible Solutions for Grid Operation Upgrade

Many countries worldwide are setting clean energy targets to decarbonize the energy sector and add higher wind and solar capacities. Given their distributed nature, variable renewable energy (VRE) assets can have unique grid integration considerations, and require grid operation practices to be modernized. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage renewable energy resource operation in the system control center. Further, system operation planning is conducted with VRE and load forecasting to enable reliable real-time system operation. NREL has partnered with many system operators in the region to identify appropriate technology and grid modernization solutions. NREL and partners from system operators in the region will present on the challenges and some solutions that have been applied and share best practices such as energy management system upgrades, VRE forecasting framework, grid flexibility improvements, and staff training.

emerging economies↗

Grid Integration of Offshore Wind Power: Standards, Control, Power Quality and Transmission

Offshore wind is expected to be a major player in the global efforts toward decarbonization, leading to exceptional changes in modern power systems. Understanding the impacts and capabilities of the relatively new and uniquely positioned assets in grids with high integration levels of inverter-based resources, however, is lacking, raising concerns about grid reliability, stability, power quality, and resilience, with the absence of updated grid codes to guide the massive deployment of offshore wind. To help fill the gap, this paper presents an overview of the state-of-the-art technologies of offshore wind power grid integration. First, the paper investigates the most current grid requirements for wind power plant integration, based on a harmonized European Network of Transmission System Operators (ENTSO-E) framework and notable international standards, and it illuminates future directions. The paper discusses the wind turbine and wind power plant control strategies, and new control approaches, such as grid-forming control, are presented in detail. The paper reviews recent research on the ancillary services that offshore wind power plants can potentially provide, which, when harmonized, will not only comply with regulations but also improve the value of the asset. The paper explores topics of wind power plant harmonics, reviewing the latest standards in detail and outlining mitigation methods. The paper also presents stability analysis methods for wind power plants, with discussions centered on validity and computational efficiency. Finally, the paper discusses wind power plant transmission solutions, with a focus on high-voltage direct-current topologies and controls.

17 WIND ENERGY↗

Understanding Cognitive and Collaborative Work: Observations in an Electric Transmission Operations Control Center

This paper describes research that is part of an ongoing project to design tools to assist in the integration of renewable energy into the electric grid. These tools will support control room dispatchers in real-time system operations of the electric power transmission system which serves much of the Western United States. Field observations comprise the first phase of this research in which 15 operators have been observed over various shifts and times of day for approximately 90 hours. Findings describing some of the cognitive and environmental challenges of managing the dynamically changing electric grid are presented.