Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Twenty-Five Year Site Plan, FY2013 - FY2037

Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Comprehensive Lifecycle Planning and Management System For Addressing Water Issues Associated With Shale Gas Development In New York, Pennsylvania, And West Virginia

The objective of this project is to develop a modeling system to allow operators and regulators to plan all aspects of water management activities associated with shale gas development in the target project area of New York, Pennsylvania, and West Virginia (target area ), including water supply, transport, storage, use, recycling, and disposal and which can be used for planning, managing, forecasting, permit tracking, and compliance monitoring. The proposed project is a breakthrough approach to represent the entire shale gas water lifecycle in one comprehensive system with the capability to analyze impacts and options for operational efficiency and regulatory tracking and compliance, and to plan for future water use and disposition. It will address all of the major water-related issues of concern associated with shale gas development in the target area, including water withdrawal, transport, storage, use, treatment, recycling, and disposal. It will analyze the costs, water use, and wastes associated with the available options, and incorporate constraints presented by permit requirements, agreements, local and state regulations, equipment and material availability, etc. By using the system to examine the water lifecycle from withdrawals through disposal, users will be able to perform scenario analysis to answer "what if" questions for various situations. The system will include regulatory requirements of the appropriate state and regional agencies and facilitate reporting and permit applications and tracking. These features will allow operators to plan for more cost effective resource production. Regulators will be able to analyze impacts of development over an entire area. Regulators can then make informed decisions about the protections and practices that should be required as development proceeds. This modeling system will have myriad benefits for industry, government, and the public. For industry, it will allow planning all water management operations for a project or an area as one entity to optimize water use and minimize costs subject to regulatory and other constraints. It will facilitate analysis of options and tradeoffs, and will also simplify permitting and reporting to regulatory agencies. The system will help regulators study cumulative impacts of development, conserve water resources, and manage disposal options across a region. It will also allow them to track permits and monitor compliance. The public will benefit from water conservation, improved environmental performance as better system wide decisions are made, and greater supply of natural gas, with attendant lower prices, as costs are reduced and development is assisted through better planning and scheduling. Altogether, better economics and fewer barriers will facilitate recovery of the more than 300 trillion cubic feet of estimated recoverable natural gas resource in the Marcellus Shale in a manner that protects the environment.

03 NATURAL GAS↗

Background Information for the Nevada National Security Site Integrated Sampling Plan, Revision 0

This document describes the process followed to develop the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan). It provides the Plan’s purpose and objectives, and briefly describes the Underground Test Area (UGTA) Activity, including the conceptual model and regulatory requirements as they pertain to groundwater sampling. Background information on other NNSS groundwater monitoring programs—the Routine Radiological Environmental Monitoring Plan (RREMP) and Community Environmental Monitoring Program (CEMP)—and their integration with the Plan are presented. Descriptions of the evaluations, comments, and responses of two Sampling Plan topical committees are also included.

54 ENVIRONMENTAL SCIENCES↗

A reload and startup plan for conversion of the NIST research reactor

The National Institute of Standards and Technology operates a 20 MW research reactor for neutron-based research. The heavy-water moderated and cooled reactor is fueled with high-enriched uranium (HEU) but a program to convert the reactor to low-enriched uranium (LEU) fuel is underway. Among other requirements, a reload and startup test plan must be submitted to the U.S. Nuclear Regulatory Commission (NRC) for their approval. The NRC provides guidance for what should be in the plan to ensure that the licensee has sufficient information to operate the reactor safely. Hence, a plan has been generated consisting of two parts. The reload portion of the plan specifies the fuel management whereby initially only two LEU fuel elements are in the core for eight fuel cycles. This is repeated until a point when the optimum approach is to place four fresh LEU elements into the reactor each cycle. This final transition is repeated and after eight cycles the reactor is completely fueled with LEU. By only adding two LEU fuel elements initially, the plan allows for the consumption of HEU fuel elements that are expected to be in storage at the time of conversion and provides additional qualification of production LEU fuel under actual operating conditions. Because the reload is to take place over many fuel cycles, startup tests will be done at different stages of the conversion. The tests, to be compared with calculations to show that the reactor will operate as planned, are the measurement of critical shim arm position and shim arm and regulating rod reactivity worths. An acceptance criterion for each test is specified based on technical specifications that relate to safe operation. Additional tests are being considered that have less safety significance but may be of interest to bolster the validation of analysis tools.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Regional Transmission Planning: A review of practices following FERC Order Nos. 890 and 1000

Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 10001 established requirements that transmission planning regions must follow in regional transmission planning and allocating the costs of new transmission facilities. Order No. 890, issued in 2007, outlined general requirements for local as well as regional transmission planning practices and procedures. Order No. 1000, issued in 2011, laid out specific requirements for: (1) regional transmission planning; (2) consideration of transmission needs driven by public policy requirements; (3) non-incumbent transmission development; (4) interregional transmission coordination; and (5) cost allocation for transmission facilities that have been selected in a regional transmission plan for purposes of cost allocation. This report reviews how these FERC orders are being implemented by the 12 transmission planning regions recognized by FERC.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Asset-Based Approach to Tribal Community Energy Planning

Community energy planning is a vital component of successful energy resource development and project implementation. Planning can help tribes develop a shared vision and strategies to accomplish their energy goals. This paper explores the benefits of an asset-based approach to tribal community energy planning. While a framework for community energy planning and federal funding already exists, some areas of difficulty in the planning cycle have been identified. This paper focuses on developing a planning framework that offsets those challenges. The asset-based framework described here takes inventory of a tribe’s capital assets, such as: land capital, human capital, financial capital, and political capital. Such an analysis evaluates how being rich in a specific type of capital can offer a tribe unique advantages in implementing their energy vision. Finally, a tribal case study demonstrates the practical application of an asset-based framework.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

2019 Site Sustainability Plan (Narrative)

Clean energy and sustainability, long at the core of the United States (U.S.) Department of Energy (DOE) mission and championed at Sandia National Laboratories (SNL), are reinforced in Executive Order (EO) 13834, Efficient Federal Operations. Though no longer in effect as of May 2018, EO 13693, Planning for Federal Sustainability in the Next Decade, is referenced throughout this document. DOE's Strategic Sustainability Performance Plan (SSPP) embodies the Department's sustainability commitment and establishes the foundation for DOE to meet the objectives of the EO. The SNL Site Sustainability Plan (SSP) is prepared annually to support DOE's Strategic Sustainability Performance Plan (SSPP) and the National Nuclear Security Administration's (NNSA) sustainability goals and broader sustainability program. Accordingly, the content of this SSP covers the SNL contributions toward meeting the DOE sustainability goals, including the DOE requirement to comply with EO 13834. This SSP fulfills the contractual requirement for National Technology & Engineering Solutions of Sandia, LLC (NTESS), the management and operating (M&O) contractor for SNL, to deliver an annual sustainability plan to the NNSA and Sandia Field Office (SFO). The SNL Environmental Management System (EMS) implements sustainable practices for enhancing environmental, energy, and transportation management performance. SNL's EMS is a quality-based system modeled on the Plan-Do-Check-Act structure for continuous improvement. The EMS is a part of SNL's Integrated Safety Management System and functions within the overall Laboratory Operating System. The SNL EMS is International Organization for Standardization (ISO) 14001 certified and incorporates all relevant federal, state, local, and DOE requirements. The EMS is coordinated and implemented through 20 environmental programs, five of which are included within the scope of this SSP: Air Quality Compliance (AQC); Materials; Sustainability & Pollution Prevention; Energy and Water; Fleet Services; and, Waste Management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

V&V Integrated Program Planning for Wind Plant Performance

The Department of Energy Atmosphere to Electrons (A2e) initiative has undertaken an experimental planning process for a validation directed program and an experimental planning process directed at improving simulations of wind plant performance. The validation process has been divided into two main sections: Integrated Program Planning, and Integrated Experiment and Model Planning and Execution. This document covers the Integrated Program Planning process in detail as it has been applied to the validation and assessment of models of various fidelity to predict wind plant performance. Three main parts of this process are presented in this document: the Phenomenon Identification and Ranking Table, the Validation Hierarchy, and the Prioritized Phenomenon and Experiment Mapping table. The document concludes with a description of validation program process next steps, which includes the planning and execution of integrated experiment and model campaigns

17 WIND ENERGY↗

State Energy Offices’ Engagement in Electric Distribution Planning to Meet State Policy Goals

NASEO and Berkeley Lab released a new publication on State Energy Offices’ Engagement in Electric Distribution Planning to Meet State Policy Goals. State and Territory Energy Offices develop plans, programs, policies, and projects that have a substantial impact on electric distribution systems. They also can participate in distribution system planning (DSP) processes to help ensure that utilities – consumer- and investor-owned – meet the state’s future energy needs. This paper recognizes the wide spectrum of roles that State Energy Offices can play in DSP processes, including planning for distributed energy resources and grid modernization. It highlights various examples of non-regulatory activities by State Energy Offices including planning, conducting studies, convening stakeholder processes, and implementing programs that inform and contribute to distribution system planning. It also provides examples of State Energy Offices’ engagement in proceedings before their respective public utility commissions. As State Energy Offices face myriad challenges associated with meeting state policy goals, preparing for anticipated rates of distributed energy resource deployment, addressing concerns regarding grid reliability and resilience, and recommending and making long-term investment decisions, the examples provided through this guide can serve as a resource in navigating those challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accelerating Resilience of the Community through Holistic Engagement and use of Renewables (ARCHER) Planning Framework

The primary objective of the Accelerating Resilience of the Community through Holistic Engagement and Use of Renewables (ARCHER) initiative was to identify and incorporate the unique variations in energy burden, social vulnerability, living conditions, and access to essential services that differ across communities. By accounting for these localized factors—down to the neighborhood level—the project supports more targeted and effective investments in community resilience. The framework seeks to establish practical planning guidance, methods, and performance measures for community energy resilience, integrate community-level and electric utility system resilience planning, and assess its effectiveness through comparison with conventional and operational planning approaches. A key component of the project was its data exchange platform, which is used to evaluate and demonstrate the tools, methodologies, and planning approaches developed through ARCHER. This open-source platform enables developers and vendors of distribution and outage management systems to build upon the research by incorporating its concepts into their own tools and workflows. This capability is enabled by the transparent availability of data, functional requirements, and the underlying information model. The project yielded several important insights. First, meaningful engagement with communities is essential to achieving comprehensive resilience outcomes. Second, resilience planning is most effective when electric grid considerations and broader community needs are addressed in a coordinated manner. Third, the use of platforms that allow for real-time input from communities can enhance utility responsiveness during restoration activities. Fourth, a structured and systematic planning approach can successfully translate ARCHER concepts into practice. Fifth, the development of an integrated metric that reflects both grid performance and community impacts provides a more holistic basis for evaluating resilience. Finally, incorporating community engagement and equity considerations into grid operations is critical, particularly during severe weather events that result in extended outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Examples of State and Utility Actions on Proactive Planning and Investments

As states across the U.S. confront rising electricity demand, clean energy deployment, grid modernization imperatives, and the integration of large new loads, some regulators and utilities are shifting away from reactive, “just-in-time” investment approaches toward more proactive planning and investment frameworks. This report compiles examples of jurisdictional and utility actions that reshape planning processes, cost recovery mechanisms, and performance oversight to anticipate—rather than simply respond to—future grid needs. Several themes emerge from state actions examined in this report. First, legislatures and commissions are increasingly directing utilities to proactively upgrade their distribution and transmission systems, reflecting a shift toward a forward-looking system that aligns planning with state policy goals. Second, states are establishing long-term, iterative planning frameworks that often feature multi-year horizons, biannual or annual compliance reporting, structured opportunities for stakeholder engagement, and emphasis on collaboration among utilities, regulators, and stakeholders. Third, states are actively investigating innovative cost recovery mechanisms designed to support accelerated electrification and grid modernization, while balancing consumer advocates’ concerns regarding the ratepayer financial risks of premature investments. Fourth, performance metrics and reporting requirements are being developed to ensure transparency and accountability for proactive investments. Fifth, methodological improvements in planning—such as aligning load forecasting assumptions, incorporating sensitivities, and considering load management potential across building, vehicles, storage, and demand response—are recurring areas of stakeholder focus across jurisdictions. Overall, these developments signify a growing recognition among state regulators, utilities, and stakeholders that proactive planning—supported by clear definitions, consistent and transparent methodologies, robust performance metrics, and innovative cost recovery mechanisms—is a tool that can be used to address the scale and urgency of contemporary grid needs.

electricity market↗

U.S. Climate Change Science Program. Vision for the Program and Highlights of the Scientific Strategic Plan

The vision document provides an overview of the Climate Change Science Program (CCSP) long-term strategic plan to enhance scientific understanding of global climate change.This document is a companion to the comprehensive Strategic Plan for the Climate Change Science Program. The report responds to the Presidents direction that climate change research activities be accelerated to provide the best possible scientific information to support public discussion and decisionmaking on climate-related issues.The plan also responds to Section 104 of the Global Change Research Act of 1990, which mandates the development and periodic updating of a long-term national global change research plan coordinated through the National Science and Technology Council.This is the first comprehensive update of a strategic plan for U.S. global change and climate change research since the origal plan for the U.S. Global Change Research Program was adopted at the inception of the program in 1989.

Climate change↗

Science opportunity analyzer - a multi-mission tool for planning

For many years the diverse scientific community that supports JPL's wide variety ofinterplanetary space missions has needed a tool in order to plan and develop their experiments. The tool needs to be easily adapted to various mission types and portable to the user community. The Science Opportunity Analyzer, SOA, now in its third year of development, is intended to meet this need. SOA is a java-based application that is designed to enable scientists to identify and analyze opportunities for science observations from spacecraft. It differs from other planning tools in that it does not require an in-depth knowledge of the spacecraft command system or operation modes to begin high level planning. Users can, however, develop increasingly detailed levels of design. SOA consists of six major functions: Opportunity Search, Visualization, Observation Design, Constraint Checking, Data Output and Communications. Opportunity Search is a GUI driven interface to existing search engines that can be used to identify times when a spacecraft is in a specific geometrical relationship with other bodies in the solar system. This function can be used for advanced mission planning as well as for making last minute adjustments to mission sequences in response to trajectory modifications. Visualization is a key aspect of SOA. The user can view observation opportunities in either a 3D representation or as a 2D map projection. The user is given extensive flexibility to customize what is displayed in the view. Observation Design allows the user to orient the spacecraft and visualize the projection of the instrument field of view for that orientation using the same views as Opportunity Search. Constraint Checking is provided to validate various geometrical and physical aspects of an observation design. The user has the ability to easily create custom rules or to use official project-generated flight rules. This capability may also allow scientists to easily impact the cost to science if flight rule changes occur. Data Output generates information based on the spacecraft's trajectory, opportunity search results or based on a created observation. The data can be viewed either in tabular format or as a graph. Finally, SOA is unique in that it is designed to be able to communicate with a variety of existing planning and sequencing tools. From the very beginning SOA was designed with the user in mind. Extensive surveys of the potential user community were conducted in order to develop the software requirements. Throughout the development period, close ties have been maintained with the science community to insure that the tool maintains its user focus. Although development is still in its early stages, SOA is already developing a user community on the Cassini project, which is depending on this tool for their science planning. There are other tools at JPL that do various pieces of what SOA can do; however, there is no other tool which combines all these functions and presents them to the user in such a convenient, cohesive, and easy to use fashion.

SOA science planning mission operations sequence s↗

Spatial Coverage Planning and Optimization for Planetary Exploration

We are developing onboard planning and scheduling technology to enable in situ robotic explorers, such as rovers and aerobots, to more effectively assist scientists in planetary exploration. In our current work, we are focusing on situations in which the robot is exploring large geographical features such as craters, channels or regional boundaries. In to develop valid and high quality plans, the robot must take into account a range of scientific and engineering constraints and preferences. We have developed a system that incorporates multiobjective optimization and planning allowing the robot to generate high quality mission operations plans that respect resource limitations and mission constraints while attempting to maximize science and engineering objectives. An important scientific objective for the exploration of geological features is selecting observations that spatially cover an area of interest. We have developed a metric to enable an in situ explorer to reason about and track the spatial coverage quality of a plan. We describe this technique and show how it is combined in the overall multiobjective optimization and planning algorithm.

autonomy↗

Mission Planning for Robotic and Human Exploration

Mission planning for spaceflight is a complex challenge for ground operators managing robotic or human missions. It requires integrating the needs of various disciplines and creating an effective, efficient, and safe plan to execute. NASA uses specialized tools to meet planning requirements and constraints. This talk will provide an overview of spaceflight mission planning as well as the software tools the Human-Computer Interaction Group has built to support scheduling and planning. Also, it identifies the future scheduling and planning challenges for human Mars missions and how we leverage Earth Analogs to learn about Mars operations.

Scheduling and planning↗

Decision Support Tool for Risk Assessment & Maneuver Planning in Collision Avoidance

As the quantity of orbital debris continues to grow, so too does the rate of conjunction messages that suggest possible collisions between high value payloads and debris. The abundance of these conjunction messages, and eventual misses, has led to a culture of ignored alerts, and an increase in satellite operation costs as a result of the frequent need to plan resources for maneuver planning and execution. The loss of “trust” in conjunction alerts is due to the poorly characterized evolution in probability of collision (Pc) as time approaches the time of closest approach (TCA) between two objects, as well as the interpretation of Pc in the context of maneuver planning. To address these problems, and in collaboration with the NASA Conjunction Assessment Risk Analysis (CARA) program, the Industrial Sciences Group has developed a novel Maneuver Decision Support System (MDSS) to assist satellite operations in conjunction assessment and Maneuver planning. It provides a meaningful and intuitive Urgency metric for actionable maneuver decisions, based on the physical dynamics of conjunctions. It is based on a forecast of the evolution of Pc over time and represents an advance over current methods that are in use for satellite conjunction monitoring and planning. The result is to give satellite operators a validated decision support systems to plan for maneuver execution or mitigation or monitoring up to 3 days before TCA.

Decision Support Tool↗

Facilitating Crew-Computer Collaboration During Mixed-Initiative Space Mission Planning

As NASA looks toward longer duration missions, there will inevitably be a stronger emphasis on crew autonomy, particularly in the domains of mission planning. Ensuring that astronauts, while subject to lengthy periods of communication delay with Earth-based mission support personnel, are able to independently adapt their schedules to rapidly changing environments is a critical aspect of deep-space exploration. This task will likely require the assistance of computer support systems, as the task of mission planning is complex and currently requires dedicated console operators. A mixed-initiative approach can help alleviate some of the more workload-heavy aspects of planning by offloading the intricate task of constraint management to a computer, while still allowing the crew member to maintain overall control of the plan. Playbook is a mission planning tool that has been developed specifically to support this type of mixed-initiative scheduling. This paper examines: 1) the operational evidence of the challenges and viability of autonomous crew planning, and 2) the novel scheduling capabilities in Playbook that are meant to address those findings.

human-computer interaction↗