Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OPERATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Evaluation of Oak Ridge National Laboratory Health Physics Research Reactor Operation Data for Critical Benchmark Creation [Abstract]

The Oak Ridge National Laboratory (ORNL) Health Physics Research Reactor (HPRR) was a research reactor designed and built at ORNL in 1961. The critical assembly was using a highly enriched uranium and molybdenum alloy as the fuel, and it could be operated in steady-state or burst modes. The reactor was used for about 25 years to produce a lot of publications related to dosimetry, radiobiology and radiation detectors testing before its decommissioning in 1987. In recent years, the idea of using legacy operation data from the to create a valuable critical accident alarm system shielding benchmark arose. Such a benchmark has been submitted to the International Criticality Safety Benchmark Experiment Project (ICSBEP) Technical Review Group for a potential inclusion in the 2022 version of the handbook. Another way to use the valuable data from the operation of the HPRR is to evaluate the feasibility of the creation of a subcritical or prompt supercritical benchmark for inclusion in the ICSBEP or the International Reactor Physics Experiments Evaluation Project (IRPhEP) handbooks. To initiate a burst, the HPRR had to be operated in a slightly subcritical state for a few minutes. Then, the insertion of the burst control rod would greatly increase the reactivity of the system and start the burst. No critical configuration of the HPRR critical assembly could be located. The only information available concerns stable subcritical and prompt supercritical states, found in a burst experiments’ logbook. In the recovered logbook pages, information about 8 different bursts is available. The information includes the rods positions before and during a burst, the recorded subcritical reactor period and reactivity, and the burst fission yield derived from the temperature elevation sulfur pellet irradiation analysis. By using the HPRR logbook information and the as-built drawings of the critical assembly, a highly detailed model of the HPRR was created with SCALE 6.2.4/KENO-VI. Eight KENO-VI models were created to replicate the sub-critical assembly configurations described in the eight bursts from the recovered logbook pages. KENO-VI calculates k eff and it can be linked to a reactivity value in cents by using the delayed neutron fraction B eff , also calculated by KENO-VI. KENO-VI can also be used to model the prompt super-critical configurations of the HPRR and to assess the similarity with the burst measurements by comparing the calculated k eff and the measured fission yields between each burst. Unfortunately, high uncertainty exist and the obtained discrepancies between experiments and calculation results are high, compromising the creation of a valuable critical benchmark from HPRR operation data. The reasons of the discrepancies and potential ways to solve them are explored.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Power Radiofrequency Operation of the Radiofrequency Quadrupoles in the Spallation Neutron Source

The Spallation Neutron Source (SNS) recently took delivery of a third Radiofrequency Quadrupole (RFQ03) that will ultimately be installed on the front-end (FE) of the SNS Linac. The first RFQ (RFQ01) operated in the SNS FE for more than a decade before being replaced with the second RFQ (RFQ02). RFQ01 was relocated to the Beam Test Facility (BTF) where it operated for five more years. The RFQ02 was initially installed in the BTF for high power testing and used with H- beam for BTF operation. It replaced RFQ01 in the SNS FE in 2017 and has been operating for beam production since then. There are some differences between the three RFQs. RFQ01 has a square cross-section with pi-mode stabilizing loops (PISLs) with the structure being fabricated using two layers of materials, GlidCop outside and OFHC inside. RFQ02 and RFQ03 has an octagonal cross-section with end-wall stabilizer rods and was fabricated using OFHC only. RFQ01 suffered some field flatness distortion incidents that resulted in degradation in beam transmission efficiency and required RF tuning. RFQ02 has performed well but had a melted RF seal in the high energy end wall, that was ultimately mitigated by a redesign of the end flange seals. The SNS decided to order RFQ03 that has a design that followed that of RFQ02 closely, but end-wall contacts were modified to prevent RF seal failure. This report presents the testing, installation, high power RF operation, and design improvements of the RFQ03.

Ren, Haitao↗

Statistical Approaches for Pebble Bed Reactor Operations and Safeguards

The design of pebble bed reactors (PBRs) and their method of operation align more closely with statistical approaches used in manufacturing and process control than traditional safeguards statistical approaches. The reason is PBRs will employ a nondestructive assay (NDA) measurement (burnup measurement system [BUMS]) that is part of the fuel handling system supporting discharge decisions in addition to the reactor code which monitor performance. The integration of these two approaches provides the opportunity to monitor reactor performance statistically for both operations and safeguards in ways not achievable using other reactor designs. For light water reactors (LWRs), knowledge about reactor code performance in predicting irradiated special nuclear material (SNM) content historically was only achieved from special measurement campaigns or from fuel reprocessing. Conversely, through statistical comparison of the BUMS with the reactor code-predicted values, PBRs can achieve this in real time. The resulting SNM distribution is an indicator of reactor performance because factors such as transit time and path of the pebble fuel through the reactor determine the plutonium production and uranium depletion. By analyzing the predicted and measured values, opportunities exist to adjust operating parameters, fuel design, and other characteristics to optimize performance and fuel utilization. From a safeguards perspective, this approach also provides the information necessary to validate declared values and evaluate whether the reactor is being operated as expected. This paper outlines statistical approaches for PBRs that can be used to support both operations and safeguards.

Ball, Cory↗

Operation Optimization Using Reinforcement Learning with Integrated Artificial Reasoning Framework

In large and complex systems, operational decision-making requires a systematic analysis with a vast amount of data from both process parameters and component status monitoring. In this paper, we present an integrated artificial reasoning approach for system state transition models that can help operational decision-making with explainable and traceable reasoning. The integrated artificial reasoning framework is a physics-based approach of defining the system structure in a Bayesian network, so we leveraged it in a Markov decision process (MDP) for finding optimal operational solutions. In our proposed framework, the MDP is implemented on a dynamic Bayesian network (DBN), which represents causalities in a system. The multilevel flow modeling was utilized in order to extract these causalities in a more efficient and objective manner. Since multilevel flow modeling is based on the fundamental energy and mass conservation laws, the target system is decomposed into several mass, energy, and information structures, which serve as the basis for a DBN. The MDP consists of the processes of finding a solution for the Bellman equation, which can be derived from the conditional probability equations of the constructed DBN. System operators can capture stochastic system dynamics as multiple subsystem state transitions based on their physical relations and uncertainties coming from the component degradation process or random failures. We analyzed a simplified example system to illustrate finding an optimal operational policy with this approach.

Kim, Junyung↗

Automated Post-Mold Operations for Wind Blade Manufacturing

Three post-mold operations performed in wind blade manufacturing include: trimming, to remove excess flashing; grinding, to shape the leading edge; and sanding, to prepare the are for bonding of over-lamination or paint. This work focuses on automating these three operations. Each operation scans the blade to build a point cloud, plans a tool path for the operation, and executes the toolpath using an industrial robot arm. The results are analyzed to determine the operational speed and the finish quality.

advanced manufacturing↗

Construction, Startup and Operation of a New LLRW Disposal Facility in Andrews County, Texas - 12151

During this last year, Waste Control Specialists LLC (WCS) completed construction and achieved start of operations of a new low level radioactive waste (LLRW) disposal facility in Andrews County Texas. Disposal operations are underway for commercial LLRW, and start up evolutions are in progress for disposal of Department of Energy (DOE) LLRW. The overall approach to construction and start up are presented as well as some of the more significant challenges and how they were addressed to achieve initial operations of the first new commercial low level radioactive waste disposal facility in more than 30 years. The WCS disposal facility consists of two LLRW disposal cells, one for Texas Compact waste, and a separate disposal cell for DOE waste. Both disposal cells have very robust and unique designs. The cells themselves are constructed entirely in very low permeability red bed clay. The cell liners include a 0.91 meter thick clay liner meeting unprecedented permeability limits, 0.3 meter thick reinforced concrete barriers, as well as the standard geo-synthetic liners. Actions taken to meet performance criteria and install these liners will be discussed. Consistent with this highly protective landfill design, WCS chose to install a zero discharge site water management system. The considerations behind the design and construction of this system will be presented. Other activities essential to successful start of LLRW disposal operations included process and procedure development and refinement, staffing and staff development, and training. Mock ups were built and used for important evolutions and functions. Consistent with the extensive regulation of LLRW operations, engagement with the Texas Commission on Environmental Quality (TCEQ) was continuous and highly interactive. This included daily activity conference calls, weekly coordination calls and numerous topical conference calls and meetings. TCEQ staff and consultants frequently observed specific construction evolutions, such as geological feature mapping of designated excavation faces, disposal cell clay liner installation, disposal cell concrete barrier construction, etc. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering for Operation of a Future Belgian Deep Geological Repository for ILW and HLW - 12379

In Belgium, an advanced conceptual design is being elaborated for deep geologic disposal of high level waste (HLW) and for low and intermediate level waste (LILW) not amenable for surface disposal. The concept is based on a shielded steel and concrete container for disposal of HLW, i.e., the Super-container. LILW will be disposed of in separately designed concrete caissons. The reference host rock is the Boom Clay, a poorly indurated clay formation in northeastern Belgium. Investigations into the potential host rock are conducted at the HADES underground research laboratory in Mol, Belgium. In 2009 the Belgian Agency for Management of Radioactive Waste and Enriched Fissile Materials (ONDRAF/NIRAS) initiated a four year research project aimed at confirming the fundamental feasibility of building and operating a repository. The goal of the program is to demonstrate at a detailed conceptual level that the proposed geologic disposal system can be safely constructed, operated, and progressively closed. Part of the broader research efforts being conducted includes evaluations optimization of the waste transportation shaft, subsurface transportation system, ventilation system, and evaluation of backfilling and sealing concepts for the repository design. The potential for implementation of a waste retrieval strategy encompassing the first 100 years after emplacement is also considered. In the framework of a four year research program aimed at confirming the fundamental feasibility of building and operating a repository in poorly indurated clay design studies have been underway to optimize the waste transportation shaft, subsurface transportation system, and ventilation system. Additionally backfilling and sealing concepts proposed for the potential repository have been reviewed in conjunction with impacts related to the potential future inclusion of a retrievability requirement in governing regulations. The main engineering challenges in the Belgian repository concept are size limitations on the underground facilities imposed by the mechanical behavior of the candidate host rock type (i.e., poorly indurated clay) and the resulting ground support requirements. Underground excavations in the Boom Clay require a significant level of ground support to ensure the openings remain stable. A concrete lining system has been developed to address this engineering requirement. As a result strict size limits are imposed on both the diameter of the tunnels and the dimensions of the shaft stations resulting in unique design challenges requiring maximal optimization of the available space. Ongoing studies indicate that a significant (20%) reduction in shaft diameter can be achieved by diagonally orienting the hoist guide rails with respect to the cage, optimizing the counter weight dimensions, and reconfiguring the auxiliary hoisting system as a single rope system. Reliable subsurface transportation of waste packages can be achieved through a hybrid rail/wheel system powered by a battery operated electric locomotive. Key components of the system, including the battery-powered locomotive and a turntable used for transitioning waste shipments from the access gallery into disposal galleries without the need for constructing turnouts, have been successfully demonstrated at the Gorleben exploratory facility and the Konrad repository in Germany, respectively. By optimizing the available space in the disposal galleries and limiting the introduction of hazardous gases by using electric powered systems combined with the relatively small number of workers envisioned in the Belgian repository concept adequate ventilation can be achieved to ensure safe operational conditions. The proposed sealing and backfill systems in the Belgian repository concept should provide adequate safeguards as currently planned. Should a future retrievability requirement be imposed on the design it appears likely that a partial backfilling strategy could be employed. The key component in ensuring retrievability in the design would be the selection of a backfill that combines the safety functions required in the current design concept with a material strength amenable to removal by hydro-jet excavation techniques. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Proposed Operations Master Plan of Cigeo - 17013

The proposed operations master plan of Cigeo describes the so-called 'reference progression' of the Cigeo project as envisaged by Andra at the end of the preliminary design studies. It aims at clarifying the objectives of the industrial pilot phase and present the choices offered by the reversibility for the management of the Cigeo project. The reference progression includes the inventory of the waste to be disposed of in Cigeo used for the dimensioning (73 600 m{sup 3} of ILW-LL and 10 100 m{sup 3} of HLW). Cigeo is designed to store the waste already produced and those that will be produced in the future by the existing nuclear installations and those whose creation was authorized, until the predictable end of their operation and their dismantling. All spent fuel is assumed to be reprocessed. The reference progression also includes the duration and the projected milestones of the construction and operation phases of Cigeo until termination. Across the operating life of Cigeo, the extensions of the Cigeo repository areas proceed by successive incremental phases, from the start of the industrial pilot phase (2025) to the final closure operations planned by 2150. Reversibility is defined as the ability to offer to the next generations different choices in terms of radioactive waste long-term management. The implementation of the reversibility principle is based on both governance and technical project management tools. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improvements to the operational efficiency of the Portsmouth 'Blue Box' Assay system - 15162

The 'Blue Box' in Building 326 at Portsmouth comprises a dual cargo container lined with high density polyethylene with 5% (elemental) boron that acts as a neutron shield. This construction provides a low environmental neutron background to support the capability to attain low values of minimal detectable activity (MDA). A Non-destructive Assay (NDA) measurement platform known as the Fluor B and W Portsmouth Slab Counter (FBPSC) is housed inside the Blue Box. This comprises four neutron slab detectors supported with an electronic system supplying power and associated signal processing. The system is operated by a laptop computer which has data acquisition and analysis capabilities. Each slab contains five {sup 3}He proportional counters embedded in polyethylene. The system is designed to measure the mass of U-235 in coolers from the Portsmouth site using passive neutron counting. The system was calibrated by taking measurements with {sup 252}Cf sources attached to various positions on the outside surfaces of a surrogate cooler. In addition, Monte-Carlo N-Particle (MCNP) simulations were performed to extend the baseline calibration for coolers of various sizes used in the gaseous-diffusion process. The basic principle of operation is to measure the total neutron emission from the item and determine the mass of {sup 235}U using the system efficiency (determined from MCNP calculations combined with the calibration measurements) combined with known isotopic information ({sup 235}U enrichment and U-235/U-234 ratio), assumed chemical composition, and gross cooler mass. The FBPSC analysis program calculates the mass of U-235 within the cooler being assayed, together with the associated Total Measurement Uncertainty (TMU). A background correction is performed that accounts for the measured environmental background with a cosmic-ray spallation correction (based on the cooler's gross weight). The software suite developed for the system also includes the capability to track and trend measurement control data in order to quickly identify conditions where the system has drifted outside of its quality control envelope. The MDA of the system has been determined to be less the 15 g of U-235 for count times that are typically less than 5 minutes (depending on the uranium isotopics). This is primarily the result of the low neutron background rate inside the Blue Box (approximately 3 times lower than at nearby locations outside the box). Additionally, various software features have been designed to yield optimum counting performance for the system including count time adjustment and interval filtering to reject statistical outliers that are usually associated with cosmic spallation events. The operation of the system has proven to be very efficient, with the short measurement time providing a high throughput rate of coolers through the Blue Box NDA system. Significant operational benefits and improved data traceability have been yielded compared to the previous measurement process, which involved operators taking measurement with counter/scalers and manually entering data into spreadsheets. As of August 2014, this system successfully measured all coolers required to support completion of a contractually-required Performance Milestone. There are approximately 1900 coolers available for measurement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing the interfaces for successful waste treatment operations at the river protection project - 15347

The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize(vitrify) approximately 432 million liters (114 million gallons) of high level radioactive waste (after all single-shell retrievals are accomplished). The tank operating contractor (TOC) is charged with delivering feed, with preconditioning if required. Other Hanford contractors are charged with providing utilities and other services and waste disposal facilities. In all, four DOE contractors, two DOE offices along with DOE headquarters, and two Washington state regulators play essential roles in enabling successful treatment operations eliminate the radioactive and hazardous waste threats to the public and the environment. DOE has decided that the appropriate approach is to proceed with operations at the WTP's Low-Activity Waste (LAW) vitrification facility ahead of completing the WTP Pretreatment and High Level Waste (HLW) waste vitrification facilities, This paper outlines the approach that is being taken to ensure that all the functions, reviews, and approvals needed for radioactive operations are achieved to allow successful feed delivery, startup, and operations of the WTP in a direct feed to LAW mode. A massive effort is needed to be successful and a One System organization, jointly managed and staffed by WTP and TOC personnel is tasked with achieving the integration, coordination, tracking, and reporting necessary for the endeavor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational plant lifetime assessment - UK national nuclear laboratory experience - 15366

Inspection and monitoring of the condition of key plant assets at the Sellafield Site is an important task in helping to enable the continued operation of the reprocessing and waste management facilities. This takes place within a range of environments, from non-active areas to highly active black cells where no man-access is possible. NNL staff work closely with the plant operators and other contractors in carrying out inspection and monitoring tasks, and have a particular expertise in the black cell environments where increased challenges exist. As plants age more work is required in order to underpin ongoing operations and understand the operational lifetime of key assets in order to achieve maximum throughput and utilisation. This paper discusses how expertise in a variety of different technical disciplines is combined in order to both understand and extend the operational life of the Highly Active (HA) evaporators at Sellafield, and a small number of further similar examples are also discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operations research modeling in support of the Hanford direct feed low activity waste program - 15538

Operations Research (OR) modeling is a supplemental system planning tool for the Hanford Tank Farm Contractor. OR models are designed to quantify the impact of equipment failures and other constraints on mission duration; to determine overall system performance; and to identify any potential bottleneck areas and identify any potential improvement areas. OR models are being developed to provide critical insights into the expected operational performance of current and planned facilities and to help identify any operational risks which impact performance of plant and equipment. This information is used to aid decision making on facility design and operations. A new OR model is being developed in support of the Direct Feed Low Activity Waste (DFLAW) Program and will be a valuable tool in the development of overall operational and management strategies as well as providing input to facility design. The OR model will identify predicted system availability, process bottlenecks, and key equipment influencing system performance. The OR model will also test proposed solutions to improve system availability by resolving process bottlenecks and provide this information to the design agent for incorporation into the DFLAW process design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Model from the Mind to the Operating Facility - 16448

The reprocessing of Spent Magnox fuel has been undertaken at the Sellafield site in the United Kingdom (UK) for more than 50 years and is now entering the final few years of its operating programme. The age of this facility has resulted in additional operational challenges which have led to the need for a sustained programme of continuous improvement. It has therefore been necessary to assess what potential plant improvements are key to delivering a successful end to the operating programme. In 2003 the UK National Nuclear Laboratory (NNL) (then Nexia Solutions) worked with Sellafield Ltd to produce a visual discrete event simulation (DES) model. The DES approach models plant equipment (such as a storage pond crane or fuel element processing equipment), and the key processes that these items undertake. Process times, availability and process logic are all combined to provide a prediction of the plant performance. Through the use of 'what-if' scenarios, changes to any model parameter can be undertaken. The benefits of such an approach have been in the ability for Sellafield Ltd to understand which changes to make and which do not add value. This then allows the operating facility to focus the improvement programme on quantitatively underpinned benefits, thus increasing the potential to complete the reprocessing programme ahead of schedule, which is a key aim for Sellafield Ltd. Maximising the benefit of this model has required a close working relationship between NNL, Sellafield Ltd Technical and the Sellafield Ltd Operations teams to ensure that the model is using the correct information and is addressing the real issues at hand. Over the past 12 years many ideas have been assessed and three examples have been selected to demonstrate the range of use of the model, and the different approaches used to identify issues and opportunities, agree an approach and provide solutions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative Canister Processing Operations at an Interim Storage Facility - 16617

The US Department of Energy (DOE) is laying the groundwork for implementing interim storage of spent nuclear fuel (SNF) in response to recommendations by the Blue Ribbon Commission on America's Nuclear Future in their report to the Secretary of Energy published January 2012. These efforts include planning for a Pilot Interim Storage Facility (ISF) and a Larger ISF. In March 2014, the DOE employed the CB and I team to evaluate design alternatives for cask handling operations and storing SNF at an ISF. The report, 'Generic Design Alternatives for Dry Storage of Used Nuclear Fuel', (Alternatives Report) evaluates different aspects of an ISF, including a study on alternative approaches for processing SNF canisters such as different cask handling methods and configurations which might be used to transfer canisters from shipping casks into storage locations at an ISF. The purpose of this paper is to report on the development of alternative cask handling operations that have been evaluated for the receipt and storage of the SNF at an initial Pilot ISF and a Larger ISF. This design study is relevant for host communities considering near-term development of a Pilot ISF. DOE-sponsored system analyses indicate that a processing rate of up to 3,000 MTU/yr (approximately 230 to 300 canisters) would be needed for a single Larger ISF (less if more than one ISF were developed) to remove SNF from commercial nuclear plants in a reasonable amount of time. The study evaluated different canister processing operation methodologies in order to reduce the complexity, cost, and personnel exposure associated with processing operations at an ISF. The conclusions from this design study could help to inform the selection of future canister processing operations for an ISF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of an AREVA Mobile Evaporator Design Used Successfully at NRC Licensed U.S. Commercial Nuclear Sites to Support Hanford Site Operations - 18134

The U.S. Department of Energy (DOE), Office of River Protection (ORP), manages the River Protection Project at the Hanford site in the South Eastern corner of Washington State in the Pacific Northwest of the United States. The mission of the River Protection Project is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. The Site Tank Operations Contractor (Washington River Protection Solutions (WRPS)) via its site operations teams creates additional space in the Double Shell Tanks (DSTs) using the site's only remaining operational evaporator - 242-A. The current 242-A Evaporator has long been identified as a potential single point of failure that in the event of a major breakdown, could significantly impact retrieval operations at the Hanford Site. Areva has experience both on the Hanford site as an integrated subcontractor to the mission and in the design, procurement and construction of a mobile forced circulation evaporator unit designed to be used on Nuclear Regulatory Commission commercial nuclear utility sites. The mobile unit has been used at the following nuclear power plants: SONGS, Salem, Davis Besse, Waterford and Palo Verde. It was designed to take spent Water-EDTA based chemical cleaning solvent and evaporate water off to reduce the volume of waste required to go through downstream processes. It was further designed to fit inside ISO shipping containers. A multi-step approach will be used to: 1. review lessons learned from the previous DOE study for deploying a mobile evaporator on the Hanford sit, 2. evaluate the proposed waste streams and the required throughput and waste arising, sizing the evaporator appropriately, 3. develop a concept design requirements document for the use of a customized evaporator to meet the Hanford need 4. Design, and build a mobile evaporator and 5. Test, install and commission at a site to be agreed with WRPS/DOE. With an overall budget for the approach described of around $35 m, an operational evaporator could be delivered to site in 18-24 months from the approval of a detailed design package. Potential befits include the elimination of the 242-A evaporator as a single point failure, the creation of additional DST tank space and the elimination of the need to stage waste at the 242-A evaporator by moving the mobile unit to a location where is could be deployed at or close to the tank such as in 200W. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Highly Active Cells in Preparation for Post Operational Clean Out at Sellafield - 18139

The Highly Active Liquor Evaporation and Storage (HALES) Plant at Sellafield receives highly active (HA) raffinate liquors from the Magnox and Thermal Oxide (THoRP) Reprocessing Plants. These liquors are concentrated through evaporation into Highly Active Liquor (HAL), conditioned and stored in HALES before immobilisation in glass in the Waste Vitrification Plant (WVP). Reprocessing operations at Sellafield are nearing completion and hence these liquor feeds will soon cease. Therefore, HALES is starting its planning and preparation phases for Post Operational Clean Out (POCO) and decommissioning. POCO is a transitional phase between operations and decommissioning and encompasses activities undertaken to remove residual inventory and activity from the facility. Key drivers for POCO include risk and hazard reduction and facilitating subsequent decommissioning activities (including potential surveillance and maintenance or care and maintenance regimes). Characterization is a critical enabler for development and implementation of effective POCO. In addition to the key drivers above characterization within HALES will be used to: - Define the start and end points of POCO (radiological condition, inventory sources and location, configuration, etc.); - Develop and technically underpin the wash out strategy (volumes, rates, reagent types, etc.; - Monitor the effectiveness of POCO activities (reduction in inventory/activity, points of diminishing return, confirmation of end points for POCO). There are a number of significant challenges that present to characterization of the HALES facilities. Perhaps the most significant of these is the radiological status of the facility. HALES is an HA facility meaning that the high dose rates limit not only the technology selection for characterization (i.e. those with a very high radiation tolerance) but also place constraints on the access and deployment for the selected technology. Additionally, parts of the facility are circa 60 years old which brings its own challenges such as poor quality construction drawings and limited operational knowledge. Finally, limited sampling capability and minimal data regarding historic operations has resulted in uncertainties that will need to be addressed in order to undertake POCO as efficiently and effectively as possible. The solution to this challenge requires a novel and innovative approach and an example of this is the technique which is described in this paper. This is a radiometric characterization technique which utilizes remotely deployed dosimetry to determine the activity distribution within the vessels of interest to POCO. The results to date have been extremely promising, and the ability to produce concise visual representation of these results has already begun to facilitate better informed discussions around the POCO of the facility. It is expected that in the future this technique will be applicable to other areas of Sellafield which face similar characterization challenges. This paper presents a summary of the development and implementation of the solution along with the results obtained so far. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Telerobotic Control of Dexterous Dual-Arm Robots for D and D Operations - 18622

Robotic systems hold the potential to significantly reduce exposure of workers to hazardous environments such as in the deactivation and decommissioning (D and D) of nuclear facilities. Our goal is to enable an operator with minimal training to easily control a remote dual-arm robot to perform demolition tasks with hand tools. We propose a system that combines semi-autonomous coordination of the robot's arms with an intuitive operator interface based on virtual reality (VR) technology. A limb coordination system enables independent control of the robot arms, as well as coupled motion required to hold and manipulate rigid bodies such as reciprocating saws, angle grinders and crow bars. Using a VR head mounted display and stereo video from the robot for situational awareness and tracked VR hand controllers to command robot arm movement, an operator will be able to walk up to the control console, pick up the controllers, engage the manipulators, fly the grippers, grasp a tool with one or both robot arms and easily move them in unison to perform tasks. We present preliminary results using simulation and a physical dual-arm platform based on the Johns Hopkins University Applied Physics Laboratory's Modular Prosthetic Limb, an anthropomorphic device that provides hyper-dexterous human-like manipulation capabilities. Anticipated benefits of the robotic system for D and D operations include improved situational awareness, increased mission complexity, and reduced operator training time, workload, and task execution times. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Can Melter for Vitrification of Waste Coming from Decommissioning and Dismantling Operations - 19020

Some waste streams from decommissioning and dismantling operations are identified as an issue in terms of handling, transportation, adapted conditioning matrix or evacuation outlet within the existing regulations. In this context, the consortium of the DEM and MELT project which gathers Orano, the CEA and ECM technologies are currently developing and qualifying a specific vitrification tool designed to match the requirements and constraints of D and D projects. The main characteristics of this In-Can vitrification process are presented hereafter: - Suitable for high or medium level waste; - Flexible enough to accommodate uncertainties on waste composition; - Adequately dimensioned and compact to be implemented and operated inside an existing cell or close to the waste to be treated; - Designed for a short duration of use, as a decommissioning tool, aimed to be dismantled just after the treatment operation; - Designed in order to produce a small amount of secondary waste; - Requiring low investment and operation costs. The In-Can melting process has already been developed by the CEA for an internal application (defense waste vitrification) and can be rated TRL 7. That means it has been tested at full scale at a prototypical demonstration level with a range of simulants in an operational environment. This paper presents the In-Can vitrification process and its performances for a typical D and D waste highly loaded with Cs. The vitrification tests results will be in particular discussed in terms of process parameters, glass properties and cesium volatility. This paper also highlights the methodology and the organization (material, process, technological and long term behavior teams) deployed in order to adapt and qualify the In-Can process for all kind of wastes (liquid, solid, highly loaded with Tc and Cs, waste with no route, ...) from the matrix design definition to the full qualification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗