Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Characterization of spent nuclear fuel canister surface roughness using surface replicating molds

In this study we present a replication method to determine surface roughness and to identify surface features when a sample cannot be directly analyzed by conventional techniques. As a demonstration, this method was applied to an unused spent nuclear fuel dry storage canister to determine variation across different surface features. In this study, an initial material down-selection was performed to determine the best molding agent and determined that non-modified Polytek PlatSil23-75 provided the most accurate representation of the surface while providing good usability. Other materials that were considered include Polygel Brush-On 35 polyurethane rubber (with and without Pol-ease 2300 release agent), Polytek PlatSil73-25 silicone rubber (with and without PlatThix thickening agent and Pol-ease 2300 release agent), and Express STD vinylpolysiloxane impression putty. The ability of PlatSil73-25 to create an accurate surface replica was evaluated by creating surface molds of several locations on surface roughness standards representing ISO grade surfaces N 3 , N 5 , N 7 , and N 8 . Overall, the molds were able to accurately reproduce the expected roughness average (R a ) values, but systematically over-estimated the peak-valley maximum roughness (R z ) values. Using a 3D printed sample cell, several locations across the stainless steel spent nuclear fuel canister were sampled to determine the surface roughness. These measurements provided information regarding variability in normal surface roughness across the canister as well as a detailed evaluation on specific surface features (e.g., welds, grind marks, etc.). The results of these measurements can support development of dry storage canister ageing management programs, as surface roughness is an important factor for surface dust deposition and accumulation. This method can be applied more broadly to different surfaces beyond stainless steel to provide rapid, accurate surface replications for analytical evaluation by profilometry.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AIR SHIPMENT OF HIGHLY ENRICHED URANIUM SPENT NUCLEAR FUEL FROM ROMANIA AND LIBYA

In June 2009 Romania successfully completed the world’s first air shipment of highly enriched uranium (HEU) spent nuclear fuel transported in Type B(U) casks under existing international laws and without special exceptions for the air transport licenses. Special 20-foot ISO shipping containers and cask tiedown supports were designed to transport Russian TUK 19 shipping casks for the Romanian air shipment and the equipment was certified for all modes of transport, including road, rail, water, and air. In December 2009 Libya successfully used this same equipment for a second air shipment of HEU spent nuclear fuel. Both spent fuel shipments were transported by truck from the originating nuclear facilities to nearby commercial airports, were flown by commercial cargo aircraft to a commercial airport in Yekaterinburg, Russia, and then transported by truck to their final destinations at the Production Association Mayak facility in Chelyabinsk, Russia. Both air shipments were performed under the Russian Research Reactor Fuel Return Program (RRRFR) as part of the U.S. National Nuclear Security Administration (NNSA) Global Threat Reduction Initiative (GTRI). The Romania air shipment of 23.7 kg of HEU spent fuel from the VVR S research reactor was the last of three HEU fresh and spent fuel shipments under RRRFR that resulted in Romania becoming the 3rd RRRFR participating country to remove all HEU. Libya had previously completed two RRRFR shipments of HEU fresh fuel so the 5.2 kg of HEU spent fuel air shipped from the IRT 1 research reactor in December made Libya the 4th RRRFR participating country to remove all HEU. This paper describes the equipment, preparations, and license approvals required to safely and securely complete these two air shipments of spent nuclear fuel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EPA's Suite of Tools for Managing Waste Following a Large-Scale Incident - 19420

Large-scale disasters have the potential to generate a significant amount of waste. For example, Hurricane Katrina and the Joplin Missouri tornado resulted in 100 million and 1.5 million cubic yards of waste respectfully. Man-made chemical, biological, radiological or nuclear (CBRN) incidents either by way of terrorism, war, or accidents have the potential to generate as much or more hazardous waste. Recovery is profoundly impacted by waste management issues. The quantification, segregation, transportation, and storage of waste can be an arduous and costly undertaking. Furthermore, these processes are intricately linked with decisions made throughout the recovery timeline. Therefore, the remediation, including waste management, must be holistically considered. Understanding these complex interactions can be facilitated by using models and tools that adhere to the 'system-of-systems' approach. To better understand and predict waste management issues the Environmental Protection Agency's (EPA's) Homeland Security Research Program (HSRP) is developing a suite of tools and resources for planning and recovery purposes. The waste management suite consists of four tools: - Incident Waste Decision Support Tool (I-WASTE): characterizes and produces order-of-magnitude estimates for the weight and volume of waste materials that may require management and/or disposal, as well as identifies and locates potential treatment and disposal facilities. - Waste Estimation Support Tool (WEST): estimates waste generated from remediation and cleanup activities following a wide-area radiological or biological incident; - Waste Storage and Staging Tool: identifies and prioritizes potential locations for staging and storing waste; - Waste Logistics Tool: estimates optimal routes with consideration to cost, time, and logistical requirements (e.g., resource demand, transportation type, access limitations, etc.) associated with transporting large volumes of waste from disaster-stricken areas to intermediate waste staging/temporary storage/on-site processing sites to off-site waste management facilities; and This paper will present EPA's waste management suite of tools, their purpose and application to large-scale incidents, and a case study demonstrating their use in a hypothetical scenario. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Experimental Approach for Thermal Testing in Bedded Salt - 19431

Safe and permanent isolation of used nuclear fuel (UNF) and high-level nuclear waste (HLW) is an integral component of the cradle-to-grave philosophy of radioactive waste management. Out of the multitude of rock types considered for the permanent deep disposal of nuclear waste (tuff, shale, granite, clay, and salt), salt has received significant interest particularly because of the advantage offered by salt as an impermeable and dry medium with self-sealing properties. The concept of HLW disposal in salt has been investigated through several testing campaigns in the U.S. and in Germany. Serval knowledge gaps still exist in our understanding of how brine is generated and how it transports under heat generating conditions. These knowledge gaps limit our ability to build a robust safety case for the disposal of heat generating waste in salt. The current manuscript reports on efforts performed to develop a field-testing campaign to study brine and water vapor migration in heated salt. The paper summarizes initial work done in a phased thermal testing program in bedded salt at the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico. The testing to date has been focused on existing boreholes and is being used to 'shakedown' the process for implementation of a more refined testing program that will be implemented in freshly drilled boreholes planned for FY2019. We designed and deployed a heater assembly that consisted of a packer, borehole deformation gauge, heater block, a network of thermocouples, and a pressure transducer setup to measure in situ temperature and pressure. The assembly was deployed in an existing borehole and several heating and cooling experiments were performed to test the performance of the different instruments fielded. We report on the results obtained for brine generation as a function of time and heating and cooling cycles and temperature evolution in the rock salt. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Office of Inspector General Strategic Plan Fiscal Years 2009 through 2013

The Department of Energy (Department) Organization Act created the Department in October 1977. That law brought together for the first time, not only most of the government's energy programs, but also science and technology programs and defense responsibilities that included the design, construction, and testing of nuclear weapons. Over its history, the Department has shifted its emphasis and focus as the energy and security needs of the Nation have changed. Today, the Department stands at the forefront of helping the Nation meet our energy, scientific, environmental, and national security goals. The responsibility of the Office of Inspector General (OIG) is to ensure that the Department is: Fulfilling its program and operational goals effectively; Using its resources efficiently in this pursuit; Operating within the scope of its legislative mandates; Meeting the President's Management Agenda; and, Addressing Departmental priorities established by the Secretary. The OIG accomplishes this by performing audits, investigations, and inspections of the Department's programs and operations seeking to uncover existing or potential weaknesses that could result in fraud, waste, and abuse. This strategic plan reflects the vision for how the organization will move forward in the 21st century to ensure the Department continues to serve the American public safely, effectively, and efficiently. Through its strategic planning efforts, the OIG will continue to play a critical role in assisting the Department's leadership and the Congress by identifying opportunities for improving management, program performance, and accountability. The OIG's strategic goal is to perform a robust review program that provides timely, relevant performance information and recommendations to improve the performance of the Department's programs and operations, facilitate positive change, and combat unlawful activities within the Department.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Specification Section 01065S ES&H for Service Contracts

Section Includes: Requirements and guidelines in performance of work concerning protection of environment and property, and the safety and health of Contractors, Sandia National Laboratories (SNL) and Department of Energy (DOE) employees, visitors to SNL, and members of the public. This Section is applicable only to Service Contracts that do not involve construction or construction-like activities. Construction and construction-like activities are covered by Section 01065, Environment, Safety and Health (ES&H) for Construction Contracts. The entire ES&H program shall focus on safe-by-design intent, understanding the technical basis for the work, identifying and controlling energy sources, unacceptable consequences, risk assessments, and positive verification.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Metric for Cementitious Waste Form Inventory Release in the Integrated Disposal Facility

This report describes work supporting Phase 1 of the 2018 Department of Energy (DOE) Office of River Protection’s (ORP) Grand Challenge recipient proposal “Cementitious Immobilization of Treated LAW and Ancillary Benefits to Risk Reduction in Cross Site Transfer”. Phase 1 was to establish a performance metric for grout leachability against which laboratory leach data (as observed diffusivities) can be assed, followed by a comparison of historical test data against this metric. Historically, advancements in the cementitious (grout) waste form performance have been made over the last 40 years, with the majority of progress achieved within the past 8 years as part of the Washington River Protection Solutions, LLC testing program. This report presents a summary of that effort relevant to the Hanford Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of the Sludge Batch 9 (Macrobatch 11) DWPF Pour Stream Glass Sample

A pour stream (PS) sample taken near the end of processing of Sludge Batch 9 (SB9, Macrobatch 11) with the Nitric-Formic Acid Flowsheet was analyzed by the Savannah River National Laboratory to comply with the Defense Waste Processing Facility (DWPF) Glass Product Control Program. The SB9 PS sample was taken on 5/28/2022 during Melter Feed Batch 815 associated with glass canister S04741, and was transferred to SRNL in Primary Container PC0136.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste End Effector Prototype Test Plan

This test plan describes the Phase 1 testing program of the Hanford Waste End Effector (HWEE) at the Washington River Protection Solutions (WRPS) Cold Test Facility (CTF) using a Pacific Northwest National Laboratory (PNNL)-designed testing setup. This task supports Phase 1 development testing of the HWEE to support the informational needs for initial assessment of the HWEE to support Hanford single shell tank A-105 retrieval. This task will install the HWEE on a PNNL-designed robotic gantry system at CTF, install instrumentation to measure reaction forces and process parameters, prepare and characterize simulant materials, and implement the test program. The tests will involve retrieval of water, sludge, and hardpan simulants to determine pumping rate, dilution factors, and screen fouling rate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste End Effector Prototype Test Plan (Rev.1)

This test plan describes the Phase 1 testing program of the Hanford Waste End Effector (HWEE) at the Washington River Protection Solutions (WRPS) Cold Test Facility (CTF) using a Pacific Northwest National Laboratory (PNNL)-designed testing setup. This task supports Phase 1 development testing of the HWEE to support the informational needs for initial assessment of the HWEE to support Hanford single shell tank A-105 retrieval. This task will install the HWEE on a PNNL-designed robotic gantry system at CTF, install instrumentation to measure reaction forces and process parameters, prepare and characterize simulant materials, and implement the test program. The tests will involve retrieval of water, sludge, and hardpan simulants to determine pumping rate, dilution factors, and screen fouling rate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Automated Remedy Performance Evaluation Program - 13622

Performance monitoring is a vital element of groundwater remediation. Unfortunately, the enormous efforts and costs that are expended procuring, managing, processing and storing monitoring data are often not subject to correspondingly rigorous evaluation. This is despite the fact that many steps in the process are predictable and are repeated many times over the remedy life cycle. At the Department of Energy (DOE) Hanford Site, a program is underway to automate many of these steps - processing, formatting any analyzing large volumes of heterogeneous data associated with the operation of several groundwater pump-and-treat (P and T) and in-situ remedies. The Automated Remedy Performance Evaluation Program (ARPEP) was developed from a work-flow process designed to deliver (a) monthly data summaries and preliminary analysis, (b) quarterly performance assessments, and (c) annual roll-up analyses that detect changes in long-term monitoring datasets and support remedy optimization. The intent of the ARPEP is to provide detailed, systematic and traceable data summaries, depictions and analyses that can be used by project scientists to complete their evaluation of remedy performance. The ARPEP work-flow was formalized following extensive review of applicable guidance, regulation and industry standards. The ARPEP incorporates disparate data types collected over different frequencies, such as water levels and pumping rates recorded every minute, and groundwater sample results obtained on quarterly, annual or irregular intervals. The data are processed, reduced to frequencies suitable for assessment, and combined in various ways leading to performance indicators such as (a) pumped well capacities and system downtime that reflect operational performance; (b) hydraulic gradients and areas of hydraulic containment that reflect hydraulic performance; and (c) time-series (longitudinal) and geo-statistical (spatial) trend analyses that reflect progress toward attainment of Remedial Action Objectives (RAOs). The entire sequence of data processing and analysis is undertaken within the R programming environment, an open-source environment for statistical computing and graphics, and is summarized in a comprehensive PDF project report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Feed Low Activity Waste Program Integration - 16638

The mission of Program Integration is to champion and steer the development and implementation of common and consistent programs between the Tank Operating Contract (TOC) contractor and the Waste Treatment Plant (WTP) contractor. TOC is managed by Washington River Protection Solutions LLC (WRPS) and WTP is managed by Bechtel National, Inc. (BNI). The DOE Office of River Protection (DOE ORP) is the Program Owner. WRPS has been actively managing the TOC at the Hanford Site Tank Farms (TF) since 2008. Programs are already developed, verified, and in use for the TOC, whereas WTP is still in the construction phase. WTP Programs are established for construction only, but not developed for commissioning and future operations. An extensive effort is underway at WTP to develop commissioning programs. In order to drive consistency and minimize differences in program requirements between TF, which will feed the tank waste, and WTP, which will receive and treat the tank waste, DOE-ORP requires the two contractors to integrate and collaborate in program development. Advantages of integration are: - Achieves cost and time savings as WTP is able to review existing TOC programs as starting points in development of its programs. - Promotes interfaces with industry counterparts to share experiences, issues, and lessons learned. ? Minimizes difference in program requirements between the companies. - Helps prepare for and ultimately succeed in Operational Readiness Reviews (ORR). Program Integration is a priority for TOC and WTP, and in order to maintain the focus and drive to this effort, a unified One System Program Integration Council (OSPIC) was created in 2012. Membership of the OSPIC consists of senior managers from both companies and the OSPIC chair's report directly to their respective President. Thirty (30) programs are subject to integration, including but not limited to Conduct of Operations, Worker Safety and Health, Quality Assurance, Contractor Assurance, and Environmental Management. Progress of program development and integration efforts are tracked and monitored, and barriers to integration are resolved in a collaborative fashion within both companies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation Residential Properties Contaminated with LLRW as Part of the Port Hope Area Initiative - The Importance of Effective Community Consultation - 18591

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Municipality of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. Within the community of Port Hope, surveys are being conducted at approximately 4800 individual properties to identify the presence of LLRW resulting from fugitive emissions from the refinery and/or the use of refinery residue as construction backfill within the community. Identification of the presence of LLRW is based on multiple lines of evidence including reviews of historical information, gamma radiation surveys and physical sampling of soil for the presence of four signature contaminants. Of the 4800 properties being surveyed, it is expected that approximately 10% will contain some degree of LLRW requiring physical remediation. Many of the residences requiring remediation will require extensive soil removal, removal and restoration of outbuildings, fences and other structures, and the removal of mature trees, hedges and decorative gardens. For the property owners involved this phase represents the final and most intrusive aspect of the program. As such, the remedial designs must be sensitive to the needs of the community and individual property owners taking into consideration factors such as the need to minimize the disturbance to the neighborhood; maintaining geotechnical and structural stability of homes during excavations; removal and restoration of outbuildings affected by LLRW; removal and replacement of landscaping features (decks, fences, pools etc) and mature trees; radiation protection during earthworks; control of dust and noise; and maintaining safe access by residents. As Community satisfaction is a key metric for the success of the project, constant and effective communication at all stages of the project is necessary to ensure the residents understand the nature and extent of work to be undertaken; any and all inconveniences they can expect during the work; contingencies to deal with those inconveniences (e.g. parking, garbage collection etc); measures to protect their health and safety; scheduling; and what their property will look like at the completion of works. This paper provides an overview of the residential remediation program in Port Hope and describes the consultation efforts with property owners that are integral to the development of final designs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 83: Development of the DOE Mercury Management Strategy

This panel discussion addressed the current efforts to develop an integrated strategy for managing the mercury (Hg) challenges across the DOE complex, including challenges in remediation of Hg contamination and related ongoing or planned technology development efforts across the EM complex. Panel members discussed opportunities for collaboration in defining and implementing a mercury management strategy for the various sites, national laboratories, and contractors and for all to provide technical information for DOE to develop an integrated, cost effective Hg management strategy. Emphasis of the panel was placed on challenges at the Oak Ridge Reservation and the Savannah River Site. Opening remarks were made by Ming Zhu. Ming stated that the Academy of Sciences recently released a report on the challenges of addressing Hg in the environment; the report leveraged recent remedial efforts. Presentations proposed include: 1 - Approach to Addressing Mercury at Y-12 (Brian Henry, US DOE OREM (USA)); 2 - Mercury Management Strategy (Renee Echols, FireWater Associates, LLC (USA)); 3 - Integration of Science to Address Mercury Clean-up Challenge (Eric Pierce, Oak Ridge National Laboratory (USA)); 4 - Mercury Related Research and Development by CRESP (Kevin Brown, Vanderbilt University - CRESP (USA)); 5 - Lessons Learned from D and D of West COLEX (Kent Fortenberry, UCOR (USA)); 6 - Mercury in the SRS Liquid Waste System (Richard Edwards, Savannah River Remediation (USA)); 7 - TDD Program on Mercury at Savannah River (Bill Wilmarth, Savannah River National Laboratory (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Grimsel Test Site - A Successful International Underground Research Laboratory for Many Decades - 20429

For more than 35 years, Nagra and its partners from around the world have been conducting underground research projects at the Grimsel Test Site (GTS, www.grimsel.com) to contribute to the development and confirmation of safe geological disposal concepts and for the characterization of suitable host rock formations. Over the years, the results of this internationally recognized research program have been, and continue to be, incorporated directly into exploration programs, modelling, safety, and engineering feasibility studies on options for deep geological repositories. Each project of the GTS program involves field-testing, laboratory studies, design and modelling tasks, and integrates all scientific and technical aspects. Each project phase is planned with a duration of three to five years to facilitate practical and administrative aspects and allow flexibility for updating the overall project plans with the latest findings. Scientific and engineering interaction among the different projects is ensured via an international steering committee meeting. Hosting an IAEA level C radiation- controlled zone, which allows use of radionuclides, including actinides such as thorium, uranium, neptunium, plutonium and americium, in in-situ experiments is one of the reasons why GTS also developed as a center of excellence for work with radioactive tracers under realistic in-situ boundary conditions. Last year, a new five-year program (2019 to 2023) started which includes projects with a planning horizon of decades. The new five-year program includes a new phase of in-situ experiments using radionuclides such as migration experiments in the Colloid Formation and Migration project (CFM), the Long-Term Diffusion experiment (LTD) and the newly established C-14 and I-129 Migration in cement project (CIM). The 'High Temperature effects on Bentonite' (HotBENT) project is starting in the current phase and is studying the effects of elevated temperatures (>175 deg. C) on bentonite materials. As a generic underground research laboratory (URL) it is expected that the GTS will provide in the coming years a platform for international collaboration, knowledge development and knowledge transfer for the next generation of scientists and engineers in the area of radioactive waste disposal and geosciences. A key role regarding knowledge transfer and training is provided by the well-established Grimsel Training Center (GTC), which (beside many URL related issues) also covers many general aspects of radioactive waste management. In this paper we provide an overview of the current program at the GTS, focusing on the experiments that study the migration of radionuclides through engineered barrier materials and the geosphere. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reevaluation of air surveillance station siting

DOE Technical Standard HDBK-1216-2015 (DOE 2015) recommends evaluating air-monitoring station placement using the analytical method developed by Waite. The technique utilizes wind rose and population distribution data in order to determine a weighting factor for each directional sector surrounding a nuclear facility. Based on the available resources (number of stations) and a scaling factor, this weighting factor is used to determine the number of stations recommended to be placed in each sector considered. An assessment utilizing this method was performed in 2003 to evaluate the effectiveness of the existing SRS air-monitoring program. The resulting recommended distribution of air-monitoring stations was then compared to that of the existing site perimeter surveillance program. The assessment demonstrated that the distribution of air-monitoring stations at the time generally agreed with the results obtained using the Waite method; however, at the time new stations were established in Barnwell and in Williston in order to meet requirements of DOE guidance document EH-0173T.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Molten Salt Reactor Experiment (MSRE) Lay-Up - 19187

UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. 2019 is the 50. anniversary of the shutdown of the Molten Salt Reactor Experiment (MSRE). MSRE ran a brief four years in the 1960's but earned an enduring legacy as an innovative reactor technology concept which has enjoyed a renewal of global interest in the past several years. In 2018, it was given elevated status among advanced reactor programs within DoE's Nuclear Energy office. The MSRE was a graphite-moderated, liquid fueled reactor that operated from June 1965 through December 1969. Although it was shut down nearly 50 years ago, certain systems within the reactor have continued to operate to maintain the facility in a safe and stable condition until it can be demolished as part of the comprehensive cleanup of the Oak Ridge Reservation. These systems are composed of a complex network of pipes, valves, gauges and associated equipment that control air filtration and pressure buildup resulting from fluorine gas generated through radiolysis of the fluoride salt which once fueled the reactor. In 2016, an MSRE Engineering Evaluation Team was chartered to assess current facility conditions and develop recommendations to maintain the facility in a safe state until deactivation and demolition commences. Plans are now underway to 'lay up' the MSRE facility until deactivation and demolition can occur. The proposed MSRE Facility Layup will minimize maintenance costs, reduce personnel risk of injury and exposure, provide reliable electric service to the facility and require zero personnel occupancy at MSRE. In the proposed layup approach a new source of electrical power to required loads will be routed through the facility, and new gas processing and ventilation systems will be installed that will be optimized for safe processing of the constituent hazardous gasses that exist in the legacy vessels at MSRE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗