Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Damage Control Plan for International Space Station Recharge Tank Assembly Composite Overwrapped Pressure Vessel

As NASA has retired the Space Shuttle Program, a new method of transporting compressed gaseous nitrogen and oxygen needed to be created for delivery of these crucial life support resources to the International Space Station (ISS). One of the methods selected by NASA includes the use of highly pressurized, unprotected Recharge Tank Assemblies (RTAs) utilizing Composite Overwrapped Pressure Vessels (COPVs). A COPV consists of a thin liner wrapped with a fiber composite and resin or epoxy. It is typically lighter weight than an all metal pressure vessel of similar volume and therefore provides a higher-efficiency means for gas storage. However COPVs are known to be susceptible to damage resulting from handling, tool drop impacts, or impacts from other objects. As a result, a comprehensive Damage Control Plan has been established to mitigate damage to the RTA COPV throughout its life cycle. The DCP is intended to evaluate and mitigate defined threats during manufacturing, shipping and handling, test, assembly level integration, shipment while pressurized, launch vehicle integration and mission operations by defining credible threats and methods for preventing potential damage while still maintaining the primary goal of resupplying ISS gas resources. A comprehensive threat assessment is performed to identify all threats posed to the COPV during the different phases of its lifecycle. The threat assessment is then used as the basis for creating a series of general inspection, surveillance and reporting requirements which apply across all phases of the COPV's life, targeted requirements only applicable to specific work phases and a series of training courses for both ground personnel and crew aboard the ISS. A particularly important area of emphasis deals with creating DCP requirements for a highly pressurized, large and unprotected RTA COPV for use during Inter Vehicular Activities (IVA) operations in the micro gravity environment while supplying pressurized gas to the ISS for crew life support.

Cook, Anthony J.↗

Software for Displaying Data from Planetary Rovers

Science Activity Planner (SAP) DownlinkBrowser is a computer program that assists in the visualization of processed telemetric data [principally images, image cubes (that is, multispectral images), and spectra] that have been transmitted to Earth from exploratory robotic vehicles (rovers) on remote planets. It is undergoing adaptation to (1) the Field Integrated Design and Operations (FIDO) rover (a prototype Mars-exploration rover operated on Earth as a test bed) and (2) the Mars Exploration Rover (MER) mission. This program has evolved from its predecessor - the Web Interface for Telescience (WITS) software - and surpasses WITS in the processing, organization, and plotting of data. SAP DownlinkBrowser creates Extensible Markup Language (XML) files that organize data files, on the basis of content, into a sortable, searchable product database, without the overhead of a relational database. The data-display components of SAP DownlinkBrowser (descriptively named ImageView, 3DView, OrbitalView, PanoramaView, ImageCubeView, and SpectrumView) are designed to run in a memory footprint of at least 256MB on computers that utilize the Windows, Linux, and Solaris operating systems.

Powell, Mark↗

Automated Monitoring with a BSP Fault-Detection Test

The figure schematically illustrates a method and procedure for automated monitoring of an asset, as well as a hardware- and-software system that implements the method and procedure. As used here, asset could signify an industrial process, power plant, medical instrument, aircraft, or any of a variety of other systems that generate electronic signals (e.g., sensor outputs). In automated monitoring, the signals are digitized and then processed in order to detect faults and otherwise monitor operational status and integrity of the monitored asset. The major distinguishing feature of the present method is that the fault-detection function is implemented by use of a Bayesian sequential probability (BSP) technique. This technique is superior to other techniques for automated monitoring because it affords sensitivity, not only to disturbances in the mean values, but also to very subtle changes in the statistical characteristics (variance, skewness, and bias) of the monitored signals.

Bickford, Randall L.↗

Iridium Interfacial Stack - IrIS

Iridium Interfacial Stack (IrIS) is the sputter deposition of high-purity tantalum silicide (TaSi2-400 nm)/platinum (Pt-200 nm)/iridium (Ir-200 nm)/platinum (Pt-200 nm) in an ultra-high vacuum system followed by a 600 C anneal in nitrogen for 30 minutes. IrIS simultaneously acts as both a bond metal and a diffusion barrier. This bondable metallization that also acts as a diffusion barrier can prevent oxygen from air and gold from the wire-bond from infiltrating silicon carbide (SiC) monolithically integrated circuits (ICs) operating above 500 C in air for over 1,000 hours. This TaSi2/Pt/Ir/Pt metallization is easily bonded for electrical connection to off-chip circuitry and does not require extra anneals or masking steps. There are two ways that IrIS can be used in SiC ICs for applications above 500 C: it can be put directly on a SiC ohmic contact metal, such as Ti, or be used as a bond metal residing on top of an interconnect metal. For simplicity, only the use as a bond metal is discussed. The layer thickness ratio of TaSi2 to the first Pt layer deposited thereon should be 2:1. This will allow Si from the TaSi2 to react with the Pt to form Pt2Si during the 600 C anneal carried out after all layers have been deposited. The Ir layer does not readily form a silicide at 600 C, and thereby prevents the Si from migrating into the top-most Pt layer during future anneals and high-temperature IC operation. The second (i.e., top-most) deposited Pt layer needs to be about 200 nm to enable easy wire bonding. The thickness of 200 nm for Ir was chosen for initial experiments; further optimization of the Ir layer thickness may be possible via further experimentation. Ir itself is not easily wire-bonded because of its hardness and much higher melting point than Pt. Below the iridium layer, the TaSi2 and Pt react and form desired Pt2Si during the post-deposition anneal while above the iridium layer remains pure Pt as desired to facilitate easy and strong wire-bonding to the SiC chip circuitry.

Spry, David↗

Mars Science Laboratory Launch Pad Thermal Control

This paper will describe the challenges faced in accommodating the warm Multi Mission Radioisotope Thermoelectric Generator (MMRTG) during the pre-launch phases of integration, launch pad operations as well as during launch. Predictions of temperatures during these phases will be presented when all the cooling systems (HRS and A/C) are operational. In-air tests conducted on the spacecraft in December 2008 to simulate the launch conditions were very successful and showed that all components would be within their allowable limits during these phases. Results of these tests will be shared in this paper.

Radioisotope Thermoelectric Generator (RTG)↗

Small Payload Launch Integrated Testing Services (SPLITS) - SPSDL

My experience working on the Small Payload Launch Integrated Testing Services project has been both educational and rewarding. I have been given the opportunity to work on and experiment with a number of exciting projects and initiatives, each offering different challenges and opportunities for teamwork and collaboration. One of my assignments is to aid in the design and construction of a small-scale two stage rocket as part of a Rocket University initiative. My duties include programming a microcontroller to control the various sensors on the rocket as well as process and transmit data. Additionally, I am writing a graphical user interface application for the ground station that will receive the transmitted data from the rocket and display the information on screen along with a 3D rendering displaying the rocket orientation. Another project I am working on is to design and develop the avionics that will be used to control a high altitude balloon flight that will test a sensor called a Micro Dosimeter that will measure the total ionizing dose absorbed by electrical components during a flight. This includes assembling and soldering the various sensors and components, programming a microcontroller to input and process data from the Micro Dosimeter, and transmitting the data down to a ground station as well as save the data to an on-board SD card. Additionally, I am aiding in the setup and development of ITOS (Integrated Test and Operations System) capability in the SPSDL (Spaceport Processing System Development Lab).

Intern↗

Towards a State Based Control Architecture for Large Telescopes: Laying a Foundation at the VLT

Large telescopes are characterized by a high level of distribution of control-related tasks and will feature diverse data flow patterns and large ranges of sampling frequencies; there will often be no single, fixed server-client relationship between the control tasks. the architecture is also challenged by the task of integrating heterogeneous subsystems which will be delivered by multiple different contractors. Due to the high number of distributed components, the control system needs to effectively detect errors and faults, impede their propagation, and accurately mitigate them in the shortest time possible, enabling the service to be restored. The presented Data-Driven Architecture is based on a decentralized approach with an end-to-end integration of disparate, independently developed software components. These components employ a high-performance standards-based communication middle-ware infrastructure, based on the Data Distribution Service. A set of rules and principles, based on JPL's State Analysis method and architecture, are use to constrain component-to component interactions, where the Control System and System Under Control are clearly separated. State Analysis provide a model-based process for capturing system and software requirements and design, greatly reducing the gap between the requirements on software specified by systems engineers and the implementation by software engineers. The method and architecture has been field tested at the Very Large Telescope, where it has been integrated into an operational system.

European Extremely Large Telescope (E-ELT)↗

Advantages of a Modular Mars Surface Habitat Approach

Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment, including the habitat, -would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Mission 5.0 (NASA-SP-2009-566). The Evolvable Mars Campaign (EMC) explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat, the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of the modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

Rucker, Michelle A.↗

Imaging X-Ray Polarimetry Explorer (IXPE) Risk Management

The Imaging X-ray Polarimetry Explorer (IXPE) project is an international collaboration to build and fly a polarization sensitive X-ray observatory. The IXPE Observatory consists of the spacecraft and payload. The payload is composed of three X-ray telescopes, each consisting of a mirror module optical assembly and a polarization-sensitive X-ray detector assembly; a deployable boom maintains the focal length between the optical assemblies and the detectors. The goal of the IXPE Mission is to provide new information about the origins of cosmic X-rays and their interactions with matter and gravity as they travel through space. IXPE will do this by exploiting its unique capability to measure the polarization of X-rays emitted by cosmic sources. The collaboration for IXPE involves national and international partners during design, fabrication, assembly, integration, test, and operations. The full collaboration includes NASA Marshall Space Flight Center (MSFC), Ball Aerospace, the Italian Space Agency (ASI), the Italian Institute of Astrophysics and Space Planetology (IAPS)/Italian National Institute of Astrophysics (INAF), the Italian National Institute for Nuclear Physics (INFN), the University of Colorado (CU) Laboratory for Atmospheric and Space Physics (LASP), Stanford University, McGill University, and the Massachusetts Institute of Technology. The goal of this paper is to discuss risk management as it applies to the IXPE project. The full IXPE Team participates in risk management providing both unique challenges and advantages for project risk management. Risk management is being employed in all phases of the IXPE Project, but is particularly important during planning and initial execution-the current phase of the IXPE Project. The discussion will address IXPE risk strategies and responsibilities, along with the IXPE management process which includes risk identification, risk assessment, risk response, and risk monitoring, control, and reporting.

IXPE↗

Simulation Evaluations of an Autonomous Urban Air Mobility Network Management and Separation Service

This paper presents an initial implementation of an autonomous Urban Air Mobility network management and aircraft separation service for urban airspace that does 1) departure and arrival scheduling across the network, 2) continuous trajectory management to ensure safe separation between aircraft, and 3) seamless integration with traditional operations. The highly-autonomous AutoResolver algorithm developed for traditional aviation was extended to provide these capabilities. An evaluation of this initial implementation was conducted in fast-time simulations using a dense, two-hour traffic scenario with Urban Air Mobility aircraft flying between a network of 20 vertiports in the Dallas-Fort Worth metroplex. When the spatial separation was reduced from 0:3nmi to 0:1nmi, the total de- lay decreased by 7:3%; when the temporal separation was reduced from 60s to 45s, the total delay decreased by 28:4%. The total number of conflict resolutions decreased by 26% and 17%, respectively. Furthermore, when a scheduling horizon greater than the duration of UAM flights was used (50min), most conflicts were resolved pre-departure producing ground delay. By comparison, when a shorter scheduling horizon was used (8min), most conflicts were resolved post-departure generating airborne delay. For all scheduling and separation constraints tested, AutoResolver prevented loss of separation from occurring. Urban Air Mobility operations have the ability to revolutionize how people and goods are transported and this paper presents initial research focusing on the high levels of autonomy required for an airspace system capable of scaling to handle significantly higher densities of aircraft.

Bosson, Christabelle S.↗

Unmanned Aircraft System Traffic Management (UTM) Project

This presentation is intended to explain the background and status of the UAS Traffic Management (UTM) project and the efforts underway in integrating public safety operations into the ecosystem. The core priniciples of the concept are explained and the architectural framework is presented as a means of providing the intended audience with an overall understanding of UTM and how the future management of low altitude airspace is envisioned for small UAS use. Within the overall UTM context, the work done in developing the concept to account for public safety UAS applications is presented with examples of work done in the area to date.

UAS↗

Advantages of a Modular Mars Surface Habitat Approach

Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment-including the habitat-would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Architecture 5.0. More recent work, dubbed the Evolvable Mars Campaign (EMC), explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat-the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of a modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

Rucker, Michelle A.↗

Advantages of a Modular Mars Surface Habitat Approach

Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment?including the habitat--would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Mission 5.0 (NASA-SP-2009-566). The Evolvable Mars Campaign (EMC) explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat?the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of the modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

Rucker, Michelle↗

Simulation Evaluations of an Autonomous Urban Air Mobility Network Management and Separation Service

This presents an initial implementation of an autonomous Urban Air Mobility network management and aircraft separation service for urban airspace that does 1) departure and arrival scheduling across the network, 2) continuous trajectory management to ensure safe separation between aircraft, and 3) seamless integration with traditional operations. The highly-autonomous AutoResolver algorithm developed for traditional aviation was extended to provide these capabilities. An evaluation of this initial implementation was conducted in fast-time simulations using a dense, two-hour traffic scenario with Urban Air Mobility aircraft flying between a network of 20 vertiports in the Dallas-Fort Worth metroplex. When the spatial separation was reduced from 0:3 nmi (nautical miles) to 0:1nmi, the total delay decreased by 7:3 percent...

Bosson, Christabelle S.↗

PACE Technical Report Series, Volume 5: Mission Formulation Studies

This chapter summarizes the mission architecture for the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission, ranging from its scientific rationale to the history of its realized conception to itspresent-day organization and management. This volume in the PACE Technical Report series focuses ontrade studies that informed the formulation of the mission in its pre-Phase A (2014-2016; pre-formulation:define a viable and affordable concept) and Phase A (2016-2017; concept and technology development).With that in mind, this chapter serves to introduce the mission by providing: a brief summary of thescience drivers for the mission; a history of the direction of the mission to NASA's Goddard Space Flight Center (GSFC); a synopsis of the mission's and instruments' management and development structures; and a brief description of the primary components and elements that form the foundation ofthe mission, encompassing the major mission segments (space, ground, and science data processing) and their roles in integration, testing, and operations.

Cetinic, Ivona↗

Indoor Ground Testing of a Small UAS Sense and Avoid Airborne Doppler Radar

The National Aeronautics and Space Administration’s Unmanned Aircraft System (UAS) Traffic Management (UTM) project is researching prototype technologies needed to ensure safe integration of UAS operations into the National Airspace System (NAS). Within the UTM Concept of Operations, UAS would be equipped with on-board Sense and Avoid (SAA) technology to continually monitor for manned and unmanned aircraft in its vicinity while operating beyond visual line of sight in uncontrolled airspace. To support this effort, a candidate commercially available 24.5 GHz Doppler radar was selected and evaluated to determine if the technology could reliably support minimum requirements for SAA applications of small UAS (sUAS). Indoor ground tests were conducted inside the NASA Langley Research Center’s Experimental Test Range (ETR) from a stationary platform to evaluate the Doppler radar performance characteristics and gain operational proficiency before the radar was authorized to transmit outdoors. A high speed linear rail system was developed for the radar evaluation and was shown to be an effective method to generate Doppler radar targets of known radar cross section. The accuracy of the range and velocity reported by the radar was shown to be dependent on the Kalman filter state variance parameter settings. Antenna measurements were collected with the radar installed both on and off a sUAS to quantify the relative antenna gain, beam width and side lobe levels of the radar’s Metamaterial Electronically Scanning Array (MESA) antennas at boresight and extreme field of view pointing vectors. The relative antenna gain measured 2.6 dB lower at extreme field view angles compared to the boresight radiation pattern.

Szatkowski, George N.↗

Workload Considerations in Urban Air Mobility

Urban air mobility (UAM) is receiving increased attention in aviation as a system for passenger and cargo-carrying new entrants in urban airspace. In order to develop a safe and efficient system, numerous possible concepts of operation for UAM are being explored throughout industry and research domains, the features and assumptions of which may differ according to near, medium and far term operations. Much of the current research into the development of UAM has dominantly focused on technological and engineering capabilities, such as vehicle development. Although these areas of research are essential to furthering UAM, research into the role of the human operator in UAM is limited. The research described in this paper aims to begin to address this gap by investigating the capabilities and implications of human operators as traffic managers in the UAM system, focusing on near-term UAM operations. A human in the loop air traffic control simulation was used to investigate the effect of UAM traffic density, airspace routes and communication procedures on subjective workload and efficiency-related task performance. Findings indicate that medium and high-density operations were associated with high workload. A reduction in verbal communications through a letter of agreement, and optimized routes, were associated with reduced workload and increased performance efficiency. However, even with these adjustments, reported workload remained high, particularly during the high-density scenario. Future research should focus on the human operator roles and responsibilities, and the amount of involvement, in UAM system management. Particular focus should be directed on the impact of reduced human operator involvement and increased automation, on the safety and efficiency of UAM operations and the integration of UAM with traditional air traffic management.

Edwards, Tamsyn↗

NASA’s Space Launch System: High C3 Launch Capability for Science Missions

As NASA’s initial Space Launch System (SLS) Block 1 vehicle enters integration and stacking operations at Kennedy Space Center (KSC) this year in preparation for a 2021 launch, work is in progress on future more powerful variants of the vehicle. Available in the mid 2020s and 2030s, Block 1B and Block 2 will feature increased performance and unparalleled volume for payloads, providing an enabling launch option for science mission planners. The baseline SLS architecture consists of two five-segment solid rocket boosters and four RS-25 LH2/LOX engines. The evolved Block 1B and Block 2 vehicles use a four-engine LH2/LOX upper stage and can be outfitted with an 8.4 m-diameter pay-load fairing. Additional upper stages can be packaged in the 8.4 m fairing to enable high C3 (in the range of 300 km2/sec2) missions to Mercury, the Jovian system, the ice giants, the Kuiper Belt and beyond.

Stephen D Creech↗