Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “In Space Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

NASA Exploration Launch Projects Overview: The Crew Launch Vehicle and the Cargo Launch Vehicle Systems

The U.S. Vision for Space Exploration (January 2004) serves as the foundation for the National Aeronautics and Space Administration's (NASA) strategic goals and objectives. As the NASA Administrator outlined during his confirmation hearing in April 2005, these include: 1) Flying the Space Shuttle as safely as possible until its retirement, not later than 2010. 2) Bringing a new Crew Exploration Vehicle (CEV) into service as soon as possible after Shuttle retirement. 3) Developing a balanced overall program of science, exploration, and aeronautics at NASA, consistent with the redirection of the human space flight program to focus on exploration. 4) Completing the International Space Station (ISS) in a manner consistent with international partner commitments and the needs of human exploration. 5) Encouraging the pursuit of appropriate partnerships with the emerging commercial space sector. 6) Establishing a lunar return program having the maximum possible utility for later missions to Mars and other destinations. In spring 2005, the Agency commissioned a team of aerospace subject matter experts to perform the Exploration Systems Architecture Study (ESAS). The ESAS team performed in-depth evaluations of a number of space transportation architectures and provided recommendations based on their findings? The ESAS analysis focused on a human-rated Crew Launch Vehicle (CLV) for astronaut transport and a heavy lift Cargo Launch Vehicle (CaLV) to carry equipment, materials, and supplies for lunar missions and, later, the first human journeys to Mars. After several months of intense study utilizing safety and reliability, technical performance, budget, and schedule figures of merit in relation to design reference missions, the ESAS design options were unveiled in summer 2005. As part of NASA's systems engineering approach, these point of departure architectures have been refined through trade studies during the ongoing design phase leading to the development phase that begins in 2008. Comprehensive reviews of engineering data and business assessments by both internal and independent reviewers serve as decision gates to ensure that systems can fully meet customer and stakeholder requirements. This paper provides the current CLV and CaLV configuration designs and gives examples of the progress being made during the first year of this significant effort. Safe, reliable, cost-effective space transportation systems are a foundational piece of America s future in space and the next step in realizing the plan for revitalizing lunar capabilities on the passageway to the human exploration of Mars. While building on legacy knowledge and heritage hardware for risk reduction, NASA will apply lessons learned from developing these new launch vehicles to the growth path for future missions. The elements for mission success and continued U.S. leadership in space have been assembled over the past year. As NASA designs and develops these two new systems over the next dozen years, visible progress, such as that reported in this paper, may sustain the national will to stay the course across political administrations and weather the inevitable trials that will be experienced during this challenging endeavor.

Snoddy, Jimmy R.↗

Pixelized Device Control Actuators for Large Adaptive Optics

A fully integrated, compact, adaptive space optic mirror assembly has been developed, incorporating new advances in ultralight, high-performance composite mirrors. The composite mirrors use Q-switch matrix architecture-based pixelized control (PMN-PT) actuators, which achieve high-performance, large adaptive optic capability, while reducing the weight of present adaptive optic systems. The self-contained, fully assembled, 11x11x4-in. (approx.= 28x28x10-cm) unit integrates a very-high-performance 8-in. (approx.=20-cm) optic, and has 8-kHz true bandwidth. The assembled unit weighs less than 15 pounds (=6.8 kg), including all mechanical assemblies, power electronics, control electronics, drive electronics, face sheet, wiring, and cabling. It requires just three wires to be attached (power, ground, and signal) for full-function systems integration, and uses a steel-frame and epoxied electronics. The three main innovations are: 1. Ultralightweight composite optics: A new replication method for fabrication of very thin composite 20-cm-diameter laminate face sheets with good as-fabricated optical figure was developed. The approach is a new mandrel resin surface deposition onto previously fabricated thin composite laminates. 2. Matrix (regenerative) power topology: Waveform correction can be achieved across an entire face sheet at 6 kHz, even for large actuator counts. In practice, it was found to be better to develop a quadrant drive, that is, four quadrants of 169 actuators behind the face sheet. Each quadrant has a single, small, regenerative power supply driving all 169 actuators at 8 kHz in effective parallel. 3. Q-switch drive architecture: The Q-switch innovation is at the heart of the matrix architecture, and allows for a very fast current draw into a desired actuator element in 120 counts of a MHz clock without any actuator coupling.

Knowles, Gareth J.↗

Utilization of ISS to Develop and Test Operational Concepts and Hardware for Low-Gravity Terrestrial EVA

NASA has considerable experience in two areas of Extravehicular Activities (EVA). The first can be defined as microgravity, orbital EVAs. This consists of everything done in low Earth orbit (LEO), from the early, proof of concept EVAs conducted during the Gemini program of the 1960s, to the complex International Space Station (ISS) assembly tasks of the first decade of the 21st century. The second area of expertise is comprised of those EVAs conducted on the lunar surface, under a gravitational force one-sixth that of Earth. This EVA expertise encapsulates two extremes - microgravity and Earthlike gravitation - but is insufficient as humans expand their exploration purview, most notably with respect to spacewalks conducted on very low-gravity bodies, such as near- Earth objects (NEO) and the moons of Mars. The operational and technical challenges of this category of EVA have yet to be significantly examined, and as such, only a small number of operational concepts have been proposed thus far. To ensure mission success, however, EVA techniques must be developed and vetted to allow the selection of operational concepts that can be utilized across an assortment of destinations whose physical characteristics vary. This paper examines the utilization of ISS-based EVAs to test operational concepts and hardware in preparation for a low-gravity terrestrial EVA. While the ISS cannot mimic some of the fundamental challenges of a low-gravity terrestrial EVA - such as rotation rate and surface composition - it may be the most effective test bed available.

Gast, Matthew A.↗

Team Expo: A State-of-the-Art JSC Advanced Design Team

In concert with the NASA-wide Intelligent Synthesis Environment Program, the Exploration Office at the Johnson Space Center has assembled an Advanced Design Team. The purpose of this team is two-fold. The first is to identify, use, and develop software applications, tools, and design processes that streamline and enhance a collaborative engineering environment. The second is to use this collaborative engineering environment to produce conceptual, system-level-of-detail designs in a relatively short turnaround time, using a standing team of systems and integration experts. This includes running rapid trade studies on varying mission architectures, as well as producing vehicle and/or subsystem designs. The standing core team is made up of experts from all of the relevant engineering divisions (e.g. Power, Thermal, Structures, etc.) as well as representatives from Risk and Safety, Mission Operations, and Crew Life Sciences among others. The Team works together during 2- hour sessions in the same specially enhanced room to ensure real-time integration/identification of cross-disciplinary issues and solutions. All subsystem designs are collectively reviewed and approved during these same sessions. In addition there is an Information sub-team that captures and formats all data and makes it accessible for use by the following day. The result is Team Expo: an Advanced Design Team that is leading the change from a philosophy of "over the fence" design to one of collaborative engineering that pushes the envelope to achieve the next-generation analysis and design environment.

Tripathi, Abhishek↗

Migrating to 9.1 -- Why Not...How Hard Could It Be?

With 19+ Million documents in the 8.0 Vault. the decision was to migrate only selected top-level Documents, Drawings, Models and Assemblies to Kennedy Space Center's Brand-Spankin-New 9.1 Windchill system. Come with us as we detail our journey. We'll share our triumphs. tools, and approaches, as well as our challenges (and a surprise or two) discovered on the trip.

Little, Keith↗

Improving Project Management with Simulation and Completion Distribution Functions

Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.

Cates, Grant R.↗

Spacecraft Power Source Installation at Launch Complex

For certain space missions, an assembly must be integrated onto the spacecraft as late as possible in the launch vehicle processing flow. 12This late integration can be driven for a variety of reasons including thermal or hazardous materials constraints. This paper discusses the process of integrating an assembly onto a spacecraft as late as one week prior to the opening of the launch window. Consideration is given to achieving sufficient access for hardware integration, methods of remotely securing hardware to the spacecraft, maintaining spacecraft cleanliness throughout the integration process, and electrically integrating the component to the spacecraft. Specific examples are taken from the remote mechanical, electrical, and fluid cooling system integration of the power source onto the Mars Science Laboratory (MSL) Rover at the Atlas V Vertical Integration Facility (VIF) at Cape Canaveral Air Force Station, Florida.

Lytal, Paul↗

Evidence for Reduced Species Star Formation Rates in the Centers of Massive Galaxies at zeta = 4

We perform the first spatially-resolved stellar population study of galaxies in the early universe z equals 3.5 -6.5, utilizing the Hubble Space Telescope Cosmic Assembly Near-infrared Deep Extragalactic Legacy Survey (CANDELS) imaging dataset over the GOODS-S field. We select a sample of 418 bright and extended galaxies at z less than or approximately equal to 3.5-6.5 from a parent sample of approximately 8000 photometric-redshift selected galaxies from Finkelstein et al. We first examine galaxies at 3.5 less than or equal to z less than or approximately equal to 4.0 using additional deep K-band survey data from the HAWK-I UDS and GOODS Survey (HUGS) which covers the 4000 Angstrom break at these redshifts. We measure the stellar mass, star formation rate, and dust extinction for galaxy inner and outer regions via spatially-resolved spectral energy distribution fitting based on a Markov Chain Monte Carlo algorithm. By comparing specific star formation rates (sSFRs) between inner and outer parts of the galaxies we find that the majority of galaxies with the high central mass densities show evidence for a preferentially lower sSFR in their centers than in their outer regions, indicative of reduced sSFRs in their central regions. We also study galaxies at z approximately equal to 5 and 6 (here limited to high spatial resolution in the rest-frame ultraviolet only), finding that they show sSFRs which are generally independent of radial distance from the center of the galaxies. This indicates that stars are formed uniformly at all radii in massive galaxies at z approximately equal to 5-6, contrary tomassive galaxies at z. less than approximately equal to 4.

early universe – galaxies: bulges – galaxies: ↗

Overview of Additive Manufacturing Initiatives at NASA Marshall Space Flight Center

NASA's In Space Manufacturing Initiative (ISM) includes: The case for ISM - why; ISM path to exploration - results from the 3D Printing In Zero-G Technology Demonstration - ISM challenges; In space Robotic Manufacturing and Assembly (IRMA); Additive construction. Additively Manufacturing (AM) development for liquid rocket engine space flight hardware. MSFC standard and specification for additively manufactured space flight hardware. Summary.

Clinton, R. G., Jr.↗

Evidence Report: Risk of Injury and Compromised Performance due to EVA Operations

During future missions to the Moon and Mars, each crewmember will most likely perform up to 24 hours a week of extravehicular activity (EVA) in support of exploration, science, construction, and maintenance tasks. Achieving mission objectives will require EVA systems and operations concepts that maximize human performance and efficiency while minimizing health and safety risks for crewmembers. Currently, over 450 EVAs have been performed in microgravity using the Extravehicular Mobility Unit (EMU). The EMU space suit has enabled the successful assembly and maintenance of the International Space Station (ISS) for over 20 years, as well as deployment of payload experiments, solar arrays, satellite launches and repairs. This EVA work was accomplished at a slower cadence than is expected for Moon and Mars, with ISS crewmembers performing no more than 7 EVAs during a single mission and without any back-to-back EVAs. Despite their success, ISS EVAs have resulted in more injury to EVA crewmembers than may be acceptable for long-duration exploration missions. The Apollo astronauts completed EVA tasks in suits that were designed for their short-duration lunar missions, although suit mobility problems were evident. The more frequent EVAs and more varied EVA tasks that are anticipated during the future longer-duration exploration missions will require EVA suits and systems that are better oriented to human health and performance than those used during the Apollo Program. Many of the problems that were encountered with the Apollo EVA suits (e.g., limited mobility and dexterity, high and aft center of gravity, and other features requiring significant crew compensation) will need to be corrected or mitigated to optimize EVA objectives of exploration missions. It is critical that we understand how EVA system design variables such as suit pressure, weight/mass, center-of-gravity location, joint ranges of motion, and biomedical monitoring, affects the ability of astronauts to perform safe, efficient, and effective EVAs. To achieve this understanding, EVA researchers will need to develop and execute an integrated human testing program across multiple environments. The research will provide objective data that will enable informed design decisions and crewmember standards, thereby ensuring EVA systems that optimize crewmember health, safety, efficiency, and performance. This report describes the risks to crew health, safety, performance, and efficiency caused by EVA operations, and it provides the evidence base to substantiate the importance of the risk.

EVA↗

Thermal Modeling of a Compressor for CO2 Removal in the International Space Station

Contaminant removal technology, such as the Carbon Dioxide Removal Assembly (CDRA) on the International Space Station (ISS), is critical to Environmental Control and Life Support Systems (ECLSS), which enable humans to live and work in outer space. The CDRA includes an adsorbent bed, which absorbs CO2 from the cabin air and releases it to a Sabatier reactor for water production when thermally cycled. An effective system would heat and cool the adsorbent quickly and uniformly to maximize the amount of CO2 removed from the cabin and delivered to the Sabatier reactor. Air-Cooled Temperature Swing Adsorption Compressors (AC-TSAC) are promising for use downstream of the CDRA because they are a simple alternative to more mechanically-complex compressors, which are currently in use on the ISS. A thermal model of the AC-TSAC was created in COMSOL and validated by comparing the model outputs to experimental data for the heating phase of the cycle. Subsequently, several design trades and performance sensitivities were conducted, including bed geometry (rectangular vs. cylindrical), bed structural material (i.e., the material that makes up the walls and shelves), thermal conductivity of the adsorbent material and bed structural materials, and the input power for heating. The results from these studies will inform the design of the next generation of the AC-TSAC, and the thermal modeling results will be further validated through testing.

Hannah Alpert↗

Thermal Modeling of a Compressor for CO2 Removal in the International Space Station

Contaminant removal technology, such as the Carbon Dioxide Removal Assembly (CDRA) on the International Space Station (ISS), is critical to Environmental Control and Life Support Systems (ECLSS), which enable humans to live and work in outer space. The CDRA includes an adsorbent bed, which absorbs CO2 from the cabin air and releases it to a Sabatier reactor for water production when thermally cycled. An effective system would heat and cool the adsorbent quickly and uniformly to maximize the amount of CO2 removed from the cabin and delivered to the Sabatier reactor. Air-Cooled Temperature Swing Adsorption Compressors (AC-TSAC) are promising for use downstream of the CDRA because they are a simple alternative to more mechanically-complex compressors, which are currently in use on the ISS. A thermal model of the AC-TSAC was created in COMSOL and validated by comparing the model outputs to experimental data for the heating phase of the cycle. Subsequently, several design trades and performance sensitivities were conducted, including bed geometry (rectangular vs. cylindrical), bed structural material (i.e., the material that makes up the walls and shelves), thermal conductivity of the adsorbent material and bed structural materials, and the input power for heating. The results from these studies will inform the design of the next generation of the AC-TSAC, and the thermal modeling results will be further validated through testing.

Hannah Alpert↗

Thermal modeling of a cryogenic turbopump for space shuttle applications.

Thermal modeling of a cryogenic pump and a hot-gas turbine in a turbopump assembly proposed for the Space Shuttle is described in this paper. A model, developed by identifying the heat-transfer regimes and incorporating their dependencies into a turbopump system model, included heat transfer for two-phase cryogen, hot-gas (200 R) impingement on turbine blades, gas impingement on rotating disks and parallel plate fluid flow. The ?thermal analyzer' program employed to develop this model was the TRW Systems Improved Numerical Differencing Analyzer (SINDA). This program uses finite differencing with lumped parameter representation for each node. Also discussed are model development, simulations of turbopump startup/shutdown operations, and the effects of varying turbopump parameters on the thermal performance.

Knowles, P. J.↗

Design of a compliant passive magnetic bearing for use in SIRTF's Tertiary Mirror Assembly

A proposed baseline design for the Space Infrared Telescope Facility includes a Tertiary Mirror Assembly (TMA) which selectively redirects the telescope's converging science beam to each of several instruments. The TMA's mirror rotates on an axis coincident with the beam's axis, and is held steady during observation by a kinematic mount. A bearing has been designed whose compliance causes minimal interference with the precision of the kinematic mount, and which is well suited to the particular requirements of a cryogenic satellite such as SIRTF. The bearing suspends its rotor by taking advantage of the repulsion between a superconductor and a magnet. It potentially eliminates problems associated with mechanical bearings that arise in similar applications, such as lubricant loss or failure, bearing wear, and sensitivity to particulates, and does so without imposing the thermal load of a bearing heater or active magnetic bearing. The bearing shows promise of offering an alternative to ball bearings in cryogenic applications where some compliance is acceptable or advantageous.

Cannon, David M.↗

Astronaut/EVA construction of Space Station

Four early space construction tests performed in neutral buoyancy and/or on-orbit to evaluate EVA for assembly of truss structures are reviewed and astronaut observations are presented. In addition, two ongoing ground test programs that address EVA assembly of full scale Space Station truss structure using a mobile transporter equipped with astronaut positioning arms are described. A truss joint design that enables EVA assembly while meeting structural design goals is also discussed.

Heard, Walter L., Jr.↗

Development of the elevation drive assembly for orbiting solar observatory I (EYE)

The requirements for pointing accuracy, friction, and power for the elevation drive assembly of an orbiting space observatory are discussed briefly. A description of the components making up the assembly is presented. Special features requiring development testing prior to unit fabrication are more fully described together with a review of the test programs conducted and results obtained.

Sharpe, W. F.↗

Life Science on the International Space Station Using the Next Generation of Cargo Vehicles

With the retirement of the Space Shuttle and the transition of the International Space Station (ISS) from assembly to full laboratory capabilities, the opportunity to perform life science research in space has increased dramatically, while the operational considerations associated with transportation of the experiments has changed dramatically. US researchers have allocations on the European Automated Transfer Vehicle (ATV) and Japanese H-II Transfer Vehicle (HTV). In addition, the International Space Station (ISS) Cargo Resupply Services (CRS) contract will provide consumables and payloads to and from the ISS via the unmanned SpaceX (offers launch and return capabilities) and Orbital (offers only launch capabilities) resupply vehicles. Early requirements drove the capabilities of the vehicle providers; however, many other engineering considerations affect the actual design and operations plans. To better enable the use of the International Space Station as a National Laboratory, ground and on-orbit facility development can augment the vehicle capabilities to better support needs for cell biology, animal research, and conditioned sample return. NASA Life scientists with experience launching research on the space shuttle can find the trades between the capabilities of the many different vehicles to be confusing. In this presentation we will summarize vehicle and associated ground processing capabilities as well as key concepts of operations for different types of life sciences research being launched in the cargo vehicles. We will provide the latest status of vehicle capabilities and support hardware and facilities development being made to enable the broadest implementation of life sciences research on the ISS.

Robinson, J. A.↗

Effect of Film Thickness and Domain Spacing on Defect Densities in Directed Self-Assembly of Cylindrical Morphology Block Copolymers

Directed assembly of block copolymer thin films is recognized as a high-throughput, low-cost complement to optical lithography with the ability to overcome the 32 nm natural resolution limit of conventional lithographic techniques. For bulk block copolymer systems, desired feature sizes ranging from 5 to 100 nm can be obtained by controlling the molecular weight and composition of a block copolymer, as long as the bulk order-disorder temperature (ODT) is such that the copolymer is well-segregated at the processing conditions. However, our studies on graphoepitaxially aligned cylindrical morphology block copolymer monolayer and bilayer films demonstrate that, as domain sizes are reduced, the block copolymer becomes increasingly susceptible to an unacceptably high density of thermally generated defects, resulting in a significant reduction of the ODT. Thus, in thin films, the minimum feature spacing accessible is limited by thermal defect generation and not by the bulk ODT. Our experimental studies on monolayer films of cylindrical morphology polystyrene-b-poly(2-vinyl pyridine) with microdomain spacings approaching 20 nm reveal that defect densities and the ODT are surprisingly sensitive to variations as small as 2 nm in the microdomain spacing. Additionally, the monolayer and bilayer ODT differ by nearly 100 C when the monolayer domain spacing is 20 nm, while the difference is only 20 C when the monolayer domain spacing is 22 nm. We explain this behavior using a quantitative estimation of the energetic cost of defect production in terms of the domain spacing, {chi}N, and block copolymer composition. These studies reveal unexpected consequences on the equilibrium defect densities of thin film block copolymers which must be accounted for when designing a block-copolymer-based directed-assembly process.

36 MATERIALS SCIENCE↗