Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “IMPLEMENTATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Learning in Neural Networks: VLSI Implementation Strategies

Fully-parallel hardware neural network implementations may be applied to high-speed recognition, classification, and mapping tasks in areas such as vision, or can be used as low-cost self-contained units for tasks such as error detection in mechanical systems (e.g. autos). Learning is required not only to satisfy application requirements, but also to overcome hardware-imposed limitations such as reduced dynamic range of connections.

Neural Networks↗

Optical Implementation of Matching Pursuit for Image Representation

We have developed a technique for image analysis, representation, and decomposition. This technique was motivated by Stephane Mallat's matching-pursuit algorithm. We've altered and simplified the mechanics of his algorithm to enable an extremely fast implementation via optical processing. Initial computer simulations show that our algorithm is capable of decomposing and representing a 2-D image as a linear combination of basis images with both high speed and high fidelity.

matching pursuit adaptive wavelet transform image ↗

Implementation of the dawn ion propulsion system

The Dawn ion propulsion system (IPS) was intended to be simply a larger version of the ion propulsion system that flew on Deep Space 1 (DS1). Implementation of this system to meet the needs of the Dawn mission, however, required modification of some IPS components and completely new developments of others.

ion propulsion↗

Simple broadband implementation of a phase contrast wavefront sensor for adaptive optics

The most critical element of an adaptive optics system is its wavefront sensor, which must measure the closed-loop difference between the corrected wavefront and an ideal template at high speed, in real time, over a dense sampling of the pupil. Most high-order systems have used Shack-Hartmann wavefront sensors, but a novel approach based on Zernike's phase contrast principle appears promising. In this paper we discuss a simple way to achromatize such a phase contrast wavefront sensor, using the pi/2 phase difference between reflected and transmitted rays in a thin, symmetric beam splitter. We further model the response at a range of wavelengths to show that the required transverse dimension of the focal-plane phase-shifting spot, nominally lambda/D, may not be very sensitive to wavelength, and so in practice additional optics to introduce wavelength-dependent transverse magnification achromatizing this spot diameter may not be required. A very simple broadband implementation of the phase contrast wavefront sensor results.

wavefront sensors↗

Factors Influencing the Selection of the Systems Integration Organizational Model Type for Planning and Implementing Government High-Technology Programs

While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.

Thomas, Leann↗

Establishment and Implementation of a Close Approach Evaluation and Avoidance Process for Earth Observing System Missions

In the fall of 2004, the Earth Science Mission Operations Project tasked the Goddard Space Flight Center (GSPC) Flight Dynamics Analysis Branch with establishment of a process to protect the high-value Earth Observing System (EOS) missions (Terra, Aqua, and Aura) from close approaches with space debris and other orbiting objects. An agreement between GSFC and the United States Strategic Command was put in place so that close approach predictions would be routinely generated. This paper describes the ESMO conjunction assessment process for the EOS satellites. Process details, including tools and algorithms developed, are discussed. Particular details for a predicted close approach between Terra and a piece of space debris that resulted in the execution of a debris avoidance maneuver are included. This close approach example is described in detail fiom the first screening identification through execution of the mitigation maneuver to illustrate both the process and lessons learned fiom its implementation.

Newman, Lauri↗

Implementation of the NASA AG-Bed Rest Pilot

To examine the efficacy of artificial gravity (AG) as a countermeasure to spaceflight deconditioning, intermittent AG produced by a horizontal short-radius centrifuge (SRC) was utilized on human test subjects deconditioned by bed rest. This poster will present the subject screening, study design, logistics, and implementation of the 41 day pilot study conducted at the University of Texas Medical Branch, Galveston, TX bed rest facility. An extensive screening process was employed to exclude subjects that were dissimilar to the U.S. astronaut population. Candidates underwent a modified U.S. Air Force Class III physical and tests of bone density, cardiovascular fitness, vestibular system function, psychological fitness and centrifuge tolerance. 15 subjects completed the study; 7 control and 8 AG treatment. All provided written consent to volunteer after the nature of the study and its hazards were clearly explained to them. Standard conditions were strictly regulated; Ta = 72 +/- 2 F, humidity = 70 +/- 5%, light/dark cycle 16h:8h. All fluid intake (minimum 28.5 ml/kg body weight/day) and urine output was monitored. Caloric intake was adjusted as necessary to maintain body weight. Carbohydrate, fat and protein were provided in a ratio of 55:30:15. Phosphorus intake was 1400 mg/d, sodium intake was 2 mmol/kg/d, potassium intake was 1.3 mmol/kg/d, and dietary calcium intake was 1000 mg/d. A physician examined each subject daily. During the first 11 days of the study protocol, subjects were ambulatory, but confined to the facility. Subjects participated in multiple baseline tests of bone, muscle, cardiovascular, sensory-motor, immunological, and psychological function. On the 12th day, subjects entered the bed rest phase of the study, during which they were confined to strict 6? head down tilt bed rest for 21 days. Beginning 24 hrs into this period, treatment subjects received 1 hour daily exposures to artificial gravity which was produced by spinning the subjects on a 3.0 m radius SRC. They were oriented radially in the supine position so that the centrifugal force was aligned with their long body axis, and while spinning, they #stood# on a force plate, supporting the centrifugal loading (2.5 g at the feet, 1.0 g at the heart). The subject station allowed free translation over approximately 10 cm to ensure full loading of the lower extremities and to allow for anti-orthostatic muscle contractions. Control subjects were positioned on the centrifuge but did not spin. Following the bed rest phase, subjects were allowed to ambulate again, but remained within the facility for an additional 9 days and participated in multiple follow-up tests of physiological function.

Warren, L. E.↗

Smart Sensor Node Development, Testing and Implementation for ISHM

A main design criterion for a robust Integrated Systems Health Management (ISHM) system is summed up best by the statement "No data is better than bad data". Traditional data acquisition systems are calibrated in a controlled environment and guaranteed to perform bounded by their tested conditions. To successfully design and implement a real world ISHM system, the data acquisition and signal conditioning needs to function in an uncontrolled environment. Development and testing focuses on a design with the ability to self check in order to extend calibration times, report internal faults and drifts and notify the overall system when the data acquisition is not performing as it should. All of this will be designed in a system that is flexible, requiring little redesign to be deployed on a wide variety of systems. Development progress and testing results will be reported.

Mengers, Timothy↗

Photonic Component Qualification and Implementation Activities at NASA Goddard Space Flight Center

The photonics group in Code 562 at NASA Goddard Space Flight Center supports a variety of space flight programs at NASA including the: International Space Station (ISS), Shuttle Return to Flight Mission, Lunar Reconnaissance Orbiter (LRO), Express Logistics Carrier, and the NASA Electronic Parts and Packaging Program (NEPP). Through research, development, and testing of the photonic systems to support these missions much information has been gathered on practical implementations for space environments. Presented here are the highlights and lessons learned as a result of striving to satisfy the project requirements for high performance and reliable commercial optical fiber components for space flight systems. The approach of how to qualify optical fiber components for harsh environmental conditions, the physics of failure and development lessons learned will be discussed.

Ott, Melanie N.↗

Smart Sensor Node Development, Testing and Implementation for Rocket Propulsion Systems

Successful design and implementation of an Integrated System Health Management (ISHM) approach for rocket propulsion systems requires the capability improve the reliability of complex systems by detecting and diagnosing problems. One of the critical elements in the ISHM is an intelligent sensor node for data acquisition that meets specific requirements for rocket motor testing including accuracy, sample rate and size/weight. Traditional data acquisition systems are calibrated in a controlled environment and guaranteed to perform bounded by their tested conditions. In a real world ISHM system, the data acquisition and signal conditioning needs to function in an uncontrolled environment. Development and testing of this sensor node focuses on a design with the ability to self check in order to extend calibration times, report internal faults and drifts and notify the overall system when the data acquisition is not performing as it should. All of this will be designed within a system that is flexible, requiring little re-design to be deployed on a wide variety of systems. Progress in this design and initial testing of prototype units will be reported.

Mengers, Timothy R.↗

Analytic Formulation and Numerical Implementation of an Acoustic Pressure Gradient Prediction

The scattering of rotor noise is an area that has received little attention over the years, yet the limited work that has been done has shown that both the directivity and intensity of the acoustic field may be significantly modified by the presence of scattering bodies. One of the inputs needed to compute the scattered acoustic field is the acoustic pressure gradient on a scattering surface. Two new analytical formulations of the acoustic pressure gradient have been developed and implemented in the PSU-WOPWOP rotor noise prediction code. These formulations are presented in this paper. The first formulation is derived by taking the gradient of Farassat's retarded-time Formulation 1A. Although this formulation is relatively simple, it requires numerical time differentiation of the acoustic integrals. In the second formulation, the time differentiation is taken inside the integrals analytically. The acoustic pressure gradient predicted by these new formulations is validated through comparison with the acoustic pressure gradient determined by a purely numerical approach for two model rotors. The agreement between analytic formulations and numerical method is excellent for both stationary and moving observers case.

Lee, Seongkyu↗

Implementation of Leak Test Methods for the International Space Station (ISS) Elements, Systems and Components

The International Space Station (ISS has Qualification and Acceptance Environmental Test Requirements document, SSP 41172 that includes many environmental tests such as Thermal vacuum & Cycling, Depress/Repress, Sinusoidal, Random, and Acoustic Vibration, Pyro Shock, Acceleration, Humidity, Pressure, Electromatic Interference (EMI)/Electromagnetic Compatibility (EMCO), etc. This document also includes (13) leak test methods for Pressure Integrity Verification of the ISS Elements, Systems, and Components. These leak test methods are well known, however, the test procedure for specific leak test method shall be written and implemented paying attention to the important procedural steps/details that, if omitted or deviated, could impact the quality of the final product and affect the crew safety. Such procedural steps/details for different methods include, but not limited to: - Sequence of testing, f or example, pressurization and submersion steps for Method I (Immersion); - Stabilization of the mass spectrometer leak detector outputs fo r Method II (vacuum Chamber or Bell jar); - Proper data processing an d taking a conservative approach while making predictions for on-orbit leakage rate for Method III(Pressure Change); - Proper Calibration o f the mass spectrometer leak detector for all the tracer gas (mostly Helium) Methods such as Method V (Detector Probe), Method VI (Hood), Method VII (Tracer Probe), Method VIII(Accumulation); - Usage of visibl ility aides for Method I (Immersion), Method IV (Chemical Indicator), Method XII (Foam/Liquid Application), and Method XIII (Hydrostatic/Visual Inspection); While some methods could be used for the total leaka ge (either internal-to-external or external-to-internal) rate requirement verification (Vacuum Chamber, Pressure Decay, Hood, Accumulation), other methods shall be used only as a pass/fail test for individual joints (e.g., welds, fittings, and plugs) or for troubleshooting purposes (Chemical Indicator, Detector Probe, Tracer Probe, Local Vacuum Chamber, Foam/Liquid Application, and Hydrostatic/Visual Inspection). Any isolation of SSP 41172 requirements have led to either retesting of hardware or accepting a risk associated with the potential system or component pressure integrity problem during flight.

Underwood, Steve↗

Daily Planet Redesign: eZ Publish Web Content Management Implementation

This viewgraph presentation reviews the process of the redesign of the Daily . Planet news letter as a content management implementation project. This is a site that is an internal news site that acts as a communication vehicle for a large volume of content. The Objectives for the site redesign was: (1) Clean visual design, (2) Facilitation of publication processes, (3) More efficient maintenance mode, (4) Automated publishing to internal portal, (5) Better navigation through improved site IA, (6) Archiving and retrieval functionality, (7) Back to basics on fundamental business goals. The CM is a process not a software package

web content management↗

ISRU at a Lunar Outpost: Implementation and Opportunities for Partnerships and Commercial Development

The NASA Lunar Architecture Team (LAT), which was commissioned to help answer the question "how" will humans return to the Moon, and the Synthesis Team and the recently released Global Exploration Strategy, which was commissioned to help answer the question "why" will humans return to the Moon and go on to Mars have identified the ability to extract and use in-situ resources as important to extending human frontiers, reduce dependence on Earth, and further economic and commercial expansion into space. The extraction and processing of space resources into useful products, known as In-Situ Resource Utilization (ISRU), can have a substantial impact on mission and architecture concepts. In particular, the ability to make propellants, life support consumables, and fuel cell reagents can significantly reduce the cost, mass, and risk of sustained human activities beyond Earth. Potential lunar resources include solar wind implanted volatiles, vast quantities of metal and mineral oxides, possible water/ice at the poles, abundant solar energy, regions of permanent light and darkness, the vacuum of space itself, and even scavenging leftover descent propellants and/or trash and waste from human crew activities. Suitable processing can transform these raw resources into useful materials and products. The establishment of a human lunar Outpost, as proposed by NASA at the 2nd Space Exploration Conference in Houston in December 2006, opens up the possibility for the first time of breaking our reliance on Earth supplied consumables and learn to "live off the land". The ISRU phasing and capability incorporation strategy developed during LAT Phase I & II is based on the premise that while ISRU is a critical capability and key to successful implementation of the US Vision for Space Exploration, it is also an unproven capability for human lunar exploration and can not be put in the critical path of architecture success until it has been proven. Therefore, ISRU needs to take incremental steps toward the desired end state. However, at the same time, the lunar architecture needs to be open enough to take advantage of ISRU when proven available.

Sanders, Gerald B.↗

Implementation of a Collision Probability Prediction Technique for Constellation Maneuver Planning

On March 22, 2006, the Space Technology 5 (ST5) constellation spacecraft were successfully delivered to orbit by a Pegasus XI, launch vehicle. An unexpected relative motion experienced by the constellation after orbit insertion brought about a problem. Soon after launch the observed relative position of the inert rocket body was between the leading and the middle spacecraft within the constellation. The successful planning and execution of an orbit maneuver that would create a fly-by of the rocket body was required to establish the.formation. This maneuver would create a close approach that needed to conform to predefined collision probability requirements. On April 21, 2006, the ST5 "155" spacecraft performed a large orbit maneuver and successfully passed the inert Pegasus 3rd Stage Rocket Body on April 30, 2006 15:20 UTC at a distance of 2.55 km with a Probability of Collision of less than 1.0E-06. This paper will outline the technique that was implemented to establish the safe planning and execution of the fly-by maneuver. The method makes use of Gaussian distribution models of state covariance to determine underlying probabilities of collision that arise under low velocity encounters. Specific numerical examples used for this analysis are discussed in detail. The mechanics of this technique are explained to foster deeper understanding of the concepts presented and to improve existing processes for use in future constellation maneuver planning.

Concha, Marco a.↗

Computer-implemented method and apparatus for autonomous position determination using magnetic field data

A computer-implemented method and apparatus for determining position of a vehicle within 100 km autonomously from magnetic field measurements and attitude data without a priori knowledge of position. An inverted dipole solution of two possible position solutions for each measurement of magnetic field data are deterministically calculated by a program controlled processor solving the inverted first order spherical harmonic representation of the geomagnetic field for two unit position vectors 180 degrees apart and a vehicle distance from the center of the earth. Correction schemes such as a successive substitutions and a Newton-Raphson method are applied to each dipole. The two position solutions for each measurement are saved separately. Velocity vectors for the position solutions are calculated so that a total energy difference for each of the two resultant position paths is computed. The position path with the smaller absolute total energy difference is chosen as the true position path of the vehicle.

Ketchum, Eleanor A.↗