Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ground System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

LST data management and mission operations concept

A candidate design concept for an LST ground facility is described. The design objectives were to use NASA institutional hardware, software and facilities wherever practical, and to maximize efficiency of telescope use. The pointing control performance requirements of LST are summarized, and the major data interfaces of the candidate ground system are diagrammed.

Walker, R.↗

Deep Space Network to Viking Orbiter telecommunications performance during the Viking extended mission, November 1976 - February 1978

The telecommunications performance during the Viking extended mission, starting with the completion of the first superior conjunction in November 1976 and ending with the jettison of the VO-2 aft bioshield early in March 1978 is discussed. Viking Orbiter activities and problems, the ground system activities and problems, radio science activities, and communication link performance are included. The substantial involvement of the Deep Space Network and the coordination of their telecommunication planners with Viking Project telecommunications analysts in the planning and execution of complex Viking Orbiter sequences are discussed.

Taylor, F. H. J.↗

Work management plan for data systems and analysis directorate

A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.

Nichols, L. R.↗

Lightning Technology: Proceedings of a Technical Symposium

Several facets of lightning technology are considered including phenomenology, measurement, detection, protection, interaction, and testing. Lightning electromagnetics, protection of ground systems, and simulated lightning testing are emphasized. The lightning-instrumented F-106 aircraft is described.

Source record↗

Geodynamics from satellites

The NASA Geodynamics Program is developing a variety of techniques in support of national programs in geodynamics, geomagnetics and earthquake hazard reduction. Global tectonics are to be observed by satellite laser tracking and radio interferometry, which will be used to measure the movements of extended (greater than 200 km) regions to an accuracy of 3 cm, while for shorter distances, lasers enable a more rapid measuring of regional strain accumulation patterns than ground systems. The techniques of Doppler tracking between two satellites to measure the gravity field over the ocean is also under NASA study

Kaula, W. M.↗

Review of biased solar arraay. Plasma interaction studies

The Solar Electric Propulsion System (SEPS) is proposed for a variety of space missions. Power for operating SEPS is obtained from large solar array wings capable of generating tens of kilowatts of power. To minimize resistive losses in the solar array bus lines, the array is designed to operate at voltages up to 400 volts. This use of high voltage can increase interactions between the biased solar cell interconnects and plasma environments. With thrusters operating, the system ground is maintained at space plasma potential which exposes large areas of the arrays at the operating voltages. This can increase interactions with both the natural and enhanced charged particle environments. Available data on interactions between biased solar array surfaces and plasma environments are summarized. The apparent relationship between collection phenomena and solar cell size and effects of array size on interactions are discussed. The impact of these interactions on SEPS performance is presented.

Stevens, N. J.↗

Mission control

This paper addresses the aspects of providing mission control to near-earth unmanned scientific missions at the Goddard Space Flight Center (GSFC). Major areas covered include a background of the development of the mission control function, a description of the GSFC ground system elements necessary to provide that mission control, and the developments which are planned to meet the 1980 decade requirements. Particular attention is given to the Payload Operations Control Center and the Command Management function for performing mission control operations.

Costa, S. R.↗

Low Noise Amplifiers

One of the great technical challenges facing the Deep Space Network is receiving signals from a severely weight limited spacecraft hundreds of thousands to billions of kilometers from Earth. This weight limitation has always imposed strict limitations on the size of the spacecraft antenna and the amount of transmitter power radiated. The communication burden is placed upon the ground systems of the Deep Space Network which must recover an extremely weak signal in the presence of nearly overwhelming amounts of noise. Two key parameters that determine the signal to noise ratio of a received signal using a deep space station are the collecting area and efficiency of the antenna, and the amount of noise which is generated in, as well as allowed to enter in, the antenna-mounted receiver. These parameters are used to describe the relative ability of a deep space station to receive weak signals. As spacecraft to Earth communication distances have increased, the Deep Space Network engages in a relentless effort to increase the figure of merit through larger and more efficient antennas, higher frequencies, and lower system noise temperature.

Petty, S. M.↗

Space Shuttle contamination measurements from flights STS-1 through STS-4

Results of contamination measurements performed on the initial four flights of the Space Shuttle Orbiter are summarized and compared with requirements contained in the Space Shuttle Flight and Ground System Specifications and those formulated by the Contamination Requirements Definition Group. In general, the results of measurements carried out with the induced environment contamination monitor indicate that molecular fluxes, deposition rates, and average counts of particulates are within the requirements and close to predicted values. Among the exceptions, were such special circumstances as water dumps, payload bay door closures, and RCS engine, APU, and flash evaporator operations which led to molecular and particulate contamination levels exceeding the limits. In cases where these circumstances would interfere with sensitive payload operations, careful mission planning to preclude a contamination source by operational limitation should be done to avoid losses.

Ehlers, H. K. F.↗

Development of a VOR/DME model for an advanced concepts simulator

The report presents a definition of a VOR/DME, airborne and ground systems simulation model. This description was drafted in response to a need in the creation of an advanced concepts simulation in which flight station design for the 1980 era can be postulated and examined. The simulation model described herein provides a reasonable representation of VOR/DME station in the continental United States including area coverage by type and noise errors. The detail in which the model has been cast provides the interested researcher with a moderate fidelity level simulator tool for conducting research and evaluation of navigator algorithms. Assumptions made within the development are listed and place certain responsibilities (data bases, communication with other simulation modules, uniform round earth, etc.) upon the researcher.

Steinmetz, G. G.↗

Space Shuttle progress report

The Shuttle flight test plan is detailed, together with the results of tests of the flight control system (FCS). The initial Columbia flights carried 13,000 lb of instrumentation, and will be replaced with a 97 lb package during subsequent flights when further data are desired. The flight test program, besides gathering aerodynamic data, was heavily concerned with the perormance of the SSME (near-nominal), the thermal protection system (the performance and reusability have been demonstrated), and the data processing system (ground verification tests vindicated). Ascent has been nominal, as have orbital maneuvers, and descent roll/yaw has proven smoother than other high performance aircraft. Accelerometers and crewmembers have not been able to sense the smoothness of reentry RCS-controlled maneuvers. The manual controls are noted to serve only in off-nominal situations. The STS is concluded to be a basically sound vehicle, assuring a routine American presence in space.

Mattingly, T. K.↗

Overview od STS ground operations/orbiter turnaround STS-1 through STS-7

A review of STS-1 processing is presented as a reference for Shuttle processing time and the magnitude of the associated modifications, discrepancies, technical requirements, and ground systems activities. STS-1 processing provided the basis from which a plan to perform operational turnaround was established. Turnaround processing for Launch and Landing are treated separately to depict more clearly the progress made to reduce turnaround time and manhours expended. Turnaround time was reduced from 187 days for STS-2 to 60 days for STS-7 and landing turnaround was reduced from 14 days to 5 days. Modifications were reduced from 114 to 51. Requirements changes for launch readiness verification were reduced from 536 to 107. Special tests or inspections were reduced from 292 to 52. Anomalies resolved concurrent with processing were reduced from 13,000 to 4,000. Integration in the Vehicle Assembly Building (VAB) is about 10 percent of the flow, and Launch Pad operations comprise 40 percent of the turnaround. The work force has matured and has demonstrated the capability to perform planned and contingency operations. The turnaround program is fast approaching the goal of becoming operational.

Schwartz, R.↗

Study of application of space telescope science operations software for SIRTF use

The design and development of the Space Telescope Science Operations Ground System (ST SOGS) was evaluated to compile a history of lessons learned that would benefit NASA's Space Infrared Telescope Facility (SIRTF). Forty-nine specific recommendations resulted and were categorized as follows: (1) requirements: a discussion of the content, timeliness and proper allocation of the system and segment requirements and the resulting impact on SOGS development; (2) science instruments: a consideration of the impact of the Science Instrument design and data streams on SOGS software; and (3) contract phasing: an analysis of the impact of beginning the various ST program segments at different times. Approximately half of the software design and source code might be useable for SIRTF. Transportability of this software requires, at minimum, a compatible DEC VAX-based architecture and VMS operating system, system support software similar to that developed for SOGS, and continued evolution of the SIRTF operations concept and requirements such that they remain compatible with ST SOGS operation.

Dignam, F.↗

The role of scientists in developing Hubble Space Telescope

The objective of the Hubble Space Telescope Program is to build and operate a high-performance, fully-instrumented and long-lived optical observatory in earth orbit. Key Program elements are (1) a logistic strategy of Shuttle launch/maintenance and TDRSS communications, (2) overall responsibility at the MSFC Project for developing both the flight and ground systems, and (3) scientific participation in ST development and responsibility after launch for conducting the observing program. The ST Project is a management structure with a budget and schedule for delivering an ST system capable of achieving its established scientific objectives. The Project distributes through contracts the responsibility for supplying particular components, but retains the responsibility for system-level integrity. Scientists have set the performance objectives and now support the Project during the development stage by providing (1) PI management of the five Science Instruments, (2) continuing translations of scientific requirements into engineering specifications, (3) oversight of designs and performance tests, and (4) specific expertise on technical concerns.

Brown, R. A.↗

Operational efficiency in STS cargo processing

A multifaceted program is presented that addresses both the operational aspects of Shuttle-cargo integration and the needs of the STS Cargo Community. The program consists of the following key elements: (1) processing team awareness of cargo needs and requirements; (2) standardization of Orbiter preparation and cargo integration procedures and methods; (3) maximum application of state-of-the-art ADP techniques in all relevant areas; (4) continual review of cargo integration facility and ground system capabilities versus requirements and enhancement; (5) continual assessment of proposed cargo processing changes for safety and other needs; and (6) review of cargo processing philosophies, policies, and concepts for potential improvements.

Wilson, R. E.↗

Verification of post permanently manned configuration Space Station elements

An account is given of the techniques and ground systems designed to fulfill post permanently manned configuration (PMC) Space Station verification tasks. Consideration is given to analysis using computer math models and computer-aided interface verification systems, testing using simulators and interface mixtures, and special inspection. It is noted that an initial Space Station design that accommodates and facilitates verification is crucial to an effective verification program as well as proper instrumentation, built-in test capability, and a precise configuration management, control and record system. It is concluded that post PMC verification should be accounted for both in the initial Space Station design and in the subsequent development of initial assembly flight verification techniques and capabilities.

Scully, E. J.↗

Quantitative Schlieren analysis applied to holograms of crystals grown on Spacelab 3

In order to extract additional information about crystals grown in the microgravity environment of Spacelab, a quantitative schlieren analysis technique was developed for use in a Holography Ground System of the Fluid Experiment System. Utilizing the Unidex position controller, it was possible to measure deviation angles produced by refractive index gradients of 0.5 milliradians. Additionally, refractive index gradient maps for any recorded time during the crystal growth were drawn and used to create solute concentration maps for the environment around the crystal. The technique was applied to flight holograms of Cell 204 of the Fluid Experiment System that were recorded during the Spacelab 3 mission on STS 51B. A triglycine sulfate crystal was grown under isothermal conditions in the cell and the data gathered with the quantitative schlieren analysis technique is consistent with a diffusion limited growth process.

Brooks, Howard L.↗

Operating the Hubble Space Telescope

The Hubble Space Telescope and its capabilities are described, and techniques of operating the observatory are discussed. The operational ground system functions are described. Some projections of what might be learned with this new instrument are presented.

Fuechsel, C. F.↗