Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Earth Return Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,053 records · Page 59

NASA’s Space Launch System: Enabling a New Generation of Lunar Exploration

Following two decades of operational experience in low-Earth orbit (LEO), NASA has turned its focus once again to deep space exploration. The Agency is building the Space Launch System (SLS) to take astronauts and cargo to the Moon and send robotic spacecraft deep into the solar system. Offering unmatched performance, departure energy and payload capacity, SLS is designed to evolve into progressively more powerful configurations, enabling a new generation of human exploration of the Moon in preparation for future missions to Mars. The first build of the Block 1 vehicle is nearly complete for Exploration Mission-1 (EM-1), the first integrated flight of SLS and the Orion crew vehicle. EM-1 will send an uncrewed Orion to a distant retrograde lunar orbit in order to test and verify new systems, and along the way will deploy 13 6U-class CubeSats in deep space along the upper stage disposal trajectory after separation from Orion. The Agency’s current plans call for the first three missions on the SLS manifest to utilize the Block 1 vehicle in crew and cargo configurations. A more powerful evolved vehicle, Block 1B, will provide additional mass and volume performance using a new Exploration Upper Stage (EUS). Block 1B will lift 34 to 40 metric tons (t) to trans-lunar injection (TLI), depending on crew or cargo configuration. The Block 1B crew configuration will offer as much payload volume as industry-standard 5 m-diameter fairings to co-manifested payloads in a Universal Stage Adapter (USA). The Block 1B cargo variant will accommodate 8.4 meter-diameter fairings in 62.7-foot (19.1 meter) or 90-foot (27.4 meter) lengths. Adding smallsat secondary payloads to ride along with primary and co-manifested payloads on future flights may be possible, depending on mass margins. Leveraging a flight-proven, well-understood propulsion system, SLS’s flexible architecture, unmatched performance and expansive payload accommodations will open exciting new mission possibilities in deep space. Launches of habitat modules for NASA’s new Gateway lunar outpost, the next generation of robotic spacecraft to the far reaches of the solar system, large-aperture deep space telescopes, probes to interstellar space and the return of astronauts to the Moon are all possible with SLS.

Creech, Stephen D.↗

Autonomous Assembly of Modular Structures in Space and on Extraterrestrial Locations

The fulfillment of the new US. National Vision for Space Exploration requires many new enabling technologies to accomplish the goal of utilizing space for commercial activities and for returning humans to the moon and extraterrestrial environments. Traditionally, flight structures are manufactured as complete systems and require humans to complete the integration and assembly in orbit. These structures are bulky and require the use of heavy launch vehicles to send the units to the desired location, e.g. International Space Station (ISS). This method requires a high degree of safety, numerous space walks and significant cost for the humans to perform the assembly in orbit. For example, for assembly and maintenance of the ISS, 52 Extravehicular Activities (EVA's) have been performed so far with a total EVA time of approximately 322 hours. Sixteen (16) shuttle flights haw been to the ISS to perform these activities with an approximate cost of $450M per mission. For future space missions, costs have to be reduced to reasonably achieve the exploration goals. One concept that has been proposed is the autonomous assembly of space structures. This concept is an affordable, reliable solution to in-space and extraterrestrial assembly operations. Assembly is autonomously performed when two components containing onboard electronics join after recognizing that the joint is appropriate and in the precise position and orientation required for assembly. The mechanism only activates when the specifications are correct and m a nominal range. After assembly, local sensors and electronics monitor the integrity of the joint for feedback to a master controller. To achieve this concept will require a shift in the methods for designing space structures. In addition, innovative techniques will be required to perform the assembly autonomously. Monitoring of the assembled joint will be necessary for safety and structural integrity. If a very large structure is to be assembled in orbit, then the number of integrity sensors will be significant. Thus simple, low cost sensors are integral to the success of this concept. This paper will address these issues and will propose a novel concept for assembling space structures autonomously. The paper will present Several autonomous assembly methods. Core technologies required to achieve in space assembly will be discussed and novel techniques for communicating, sensing, docking and assembly will be detailed. These core technologies are critical to the goal of utilizing space in a cost efficient and safe manner. Finally, these technologies can also be applied to other systems both on earth and extraterrestrial environments.

Alhorn, Dean C.↗

Advances in Rodent Research Missions on the International Space Station

A research platform for rodent experiment on the ISS is a valuable tool for advancing biomedical research in space. Capabilities offered by the Rodent Research project developed at NASA Ames Research Center can support experiments of much longer duration on the ISS than previous experiments performed on the Space Shuttle. NASAs Rodent Research (RR)-1 mission was completed successfully and achieved a number of objectives, including validation of flight hardware, on-orbit operations, and science capabilities as well as support of a CASIS-sponsored experiment (Novartis) on muscle atrophy. Twenty C57BL6J adult female mice were launched on the Space-X (SpX) 4 Dragon vehicle, and thrived for up to 37 days in microgravity. Daily health checks of the mice were performed during the mission via downlinked video; all flight animals were healthy and displayed normal behavior, and higher levels of physical activity compared to ground controls. Behavioral analysis demonstrated that Flight and Ground Control mice exhibited the same range of behaviors, including eating, drinking, exploratory behavior, self- and allo-grooming, and social interactions indicative of healthy animals. The animals were euthanized on-orbit and select tissues were collected from some of the mice on orbit to assess the long-term sample storage capabilities of the ISS. In general, the data obtained from the flight mice were comparable to those from the three groups of control mice (baseline, vivarium and ground controls, which were housed in flight hardware), showing that the ISS has adequate capability to support long-duration rodent experiments. The team recovered 35 tissues from 40 RR-1 frozen carcasses, yielding 3300 aliquots of tissues to distribute to the scientific community in the U.S., including NASAs GeneLab project and scientists via Space Biology's Biospecimen Sharing Program Ames Life Science Data Archive. Tissues also were distributed to Russian research colleagues at the Institute for Biomedical Problems. The expression levels of select genes including albumin, catalase, GAPDH, HMGCoA Reductase, and IGF1 were determined using RNA isolated from the livers by qPCR and no significant differences by one factor ANOVA were found between flight and ground control groups. In addition, some of the liver samples were analyzed for transcriptomic, epigenomic and proteomic profiles; some of the data sets are now available to the scientific community through GeneLabs open science data website. A second long duration mission, Rodent Research-2 (RR-2) was completed on the ISS in 2015; 20 female C57BL6J mice were successfully maintained on the ISS for various durations, with the last group of 5 animals living on-orbit for 54 days. Furthermore, we continue to expand the ISSs capabilities by introducing new on-orbit technologies including blood collection and separation, bone densitometry scanning, muscle grip strength and anesthesia with recovery. In addition, series of ground-based verification testing to fly male mice and increase the total number of mice on-orbit from 20 to 40. Subsequent missions will provide the capability to return live mice from the ISS animals to evaluate recovery on Earth, further expanding operational and science capabilities of the RR project on the ISS.

Choi, S. Y.↗

Simulation of Mission Phases

This position with the Simulation and Graphics Branch (ER7) at Johnson Space Center (JSC) provided an introduction to vehicle hardware, mission planning, and simulation design. ER7 supports engineering analysis and flight crew training by providing high-fidelity, real-time graphical simulations in the Systems Engineering Simulator (SES) lab. The primary project assigned by NASA mentor and SES lab manager, Meghan Daley, was to develop a graphical simulation of the rendezvous, proximity operations, and docking (RPOD) phases of flight. The simulation is to include a generic crew/cargo transportation vehicle and a target object in low-Earth orbit (LEO). Various capsule, winged, and lifting body vehicles as well as historical RPOD methods were evaluated during the project analysis phase. JSC core mission to support the International Space Station (ISS), Commercial Crew Program (CCP), and Human Space Flight (HSF) influenced the project specifications. The simulation is characterized as a 30 meter +V Bar and/or -R Bar approach to the target object's docking station. The ISS was selected as the target object and the international Low Impact Docking System (iLIDS) was selected as the docking mechanism. The location of the target object's docking station corresponds with the RPOD methods identified. The simulation design focuses on Guidance, Navigation, and Control (GNC) system architecture models with station keeping and telemetry data processing capabilities. The optical and inertial sensors, reaction control system thrusters, and the docking mechanism selected were based on CCP vehicle manufacturer's current and proposed technologies. A significant amount of independent study and tutorial completion was required for this project. Multiple primary source materials were accessed using the NASA Technical Report Server (NTRS) and reference textbooks were borrowed from the JSC Main Library and International Space Station Library. The Trick Simulation Environment and User Training Materials version 2013.0 release was used to complete the Trick tutorial. Multiple network privilege and repository permission requests were required in order to access previous simulation models. The project was also an introduction to computer programming and the Linux operating system. Basic C++ and Python syntax was used during the completion of the Trick tutorial. Trick's engineering analysis and Monte Carlo simulation capabilities were observed and basic space mission planning procedures were applied in the conceptual design phase. Multiple professional development opportunities were completed in addition to project duties during this internship through the System for Administration, Training, and Education Resources for NASA (SATERN). Topics include: JSC Risk Management Workshop, CCP Risk Management, Basic Radiation Safety Training, X-Ray Radiation Safety, Basic Laser Safety, JSC Export Control, ISS RISE Ambassador, Basic SharePoint 2013, Space Nutrition and Biochemistry, and JSC Personal Protective Equipment. Additionally, this internship afforded the opportunity for formal project presentation and public speaking practice. This was my first experience at a NASA center. After completing this internship I have a much clearer understanding of certain aspects of the agency's processes and procedures, as well as a deeper appreciation from spaceflight simulation design and testing. I will continue to improve my technical skills so that I may have another opportunity to return to NASA and Johnson Space Center.

Carlstrom, Nicholas Mercury↗

Advances in Rodent Research Missions on the International Space Station

A Research platform for rodent experiment on the ISS is an essential tool for advancing biomedical research in space. The Rodent Research allows for experiments of much longer duration that experiments on the Shuttle. NASA’s Rodent Research (RR)-1 mission was successfully completed, including post-flight analysis and achieved a number of objectives including validation of flight hardware, on-orbit operations, and science capabilities that were developed at the NASA Ames Research Center. Briefly, twenty C57BL/6J adult female mice were launched on the SpX4 Dragon vehicle, which thrived for up to 37 days in microgravity. Daily health checks of the mice were performed during the mission via downlinked video; all animals were healthy and displayed normal behavior without any significant signs of stress. Behavioral analysis demonstrated that Flight and Ground Control mice exhibited the same range of behaviors, including eating, drinking, exploratory behavior, self- and allo-grooming, and social interactions indicative of healthy animals. The animals were euthanized and select tissues were collected from some of the mice on orbit to assess the long-term sample storage capabilities of the ISS. The data obtained from the flight mice were comparable to those from the 3 groups of control mice (baseline, vivarium and ground controls), suggesting that the ISS has adequate capability to support long-duration rodent experimentations. We recovered over 35 tissues from 40 RR1 frozen carcasses, yielded over 3200 aliquots of tissues, and distributed to the scientific community, including NASA’s GeneLab and scientists in the U.S. through Biospecimen Sharing Program via Ames Life Science Data Archive. Tissues were also distributed to Russian research colleagues at the Institute for Biomedical Problems. The expression levels of select genes including albumin, catalase, GAPDH, HMGCoA Reductase, and IGF1 were determined using RNA isolated from the livers by qPCR and no significant differences by one factor ANOVA were found between flight and ground control groups. In addition, some of the liver samples were subject to transcriptomics, epigenomics and proteomics. The data are now available to the scientific community through GeneLab’s open science data website. Since the RR1 mission, another long duration mission (Rodent Research-2) was completed on the ISS in 2015 in which 20 female C57 BL/6J mice were successfully maintained on the ISS for varying time points, with the last group of 5 animals being on-orbit for 54 days. This second Rodent Research flight expanded the program’s capabilities with the introduction of new technologies including blood collection and separation and bone densitometry scanning. Furthermore, we have continued to expand the ISS’s capabilities by running a series of ground-based verification testing using male mice. Our next step is to fly male mice for Rodent Research-4 on SpaceX-10 to study the effects of microgravity on bone healing and regeneration. It will be the first long-duration mission using male mice using Rodent Hardware. In addition, the number of mice will increase from 20 mice (on RR-1 and RR-2) to 40 for RR-4. When samples return to Earth, a number of tissues will be dissected from the frozen carcasses and select tissue samples will become available to the scientific community via BSP. Altogether, we have continued to expand our capabilities for performing long-duration missions on the ISS as emphasized in the National Research Council’s Decadal Survey released in 2011 and to maximize science return from each mission.

Choi, S.↗

Converting the ISS to an Earth-Moon Transport System Using Nuclear Thermal Propulsion

Using Nuclear Thermal Propulsion (NTP), the International Space Station (ISS) can be placed into a cyclic orbit between the Earth and the Moon for 2-way transport of personnel and supplies to a permanent Moon Base. The ISS cycler orbit apogees 470,000 km from Earth, with a period of 13.66 days. Once a month, the ISS would pass close to the Moon, enabling 2-way transport between it and the surface using a lunar shuttle craft. The lunar shuttle craft would land at a desired location on the surface during a flyby and return to the ISS during a later flyby. At Earth perigee 7 days later at 500 km altitude, there would be 2-way transport between it and Earth's surface using an Earth shuttle craft. The docking Earth shuttle would remain attached to the ISS as it traveled towards the Moon, while personnel and supplies transferred to a lunar shuttle spacecraft that would detach and land at the lunar base when the ISS swung around the Moon. The reverse process would be carried out to return personnel and materials from the Moon to the Earth. The orbital mechanics for the ISS cycle are described in detail. Based on the full-up mass of 400 metric tons for the ISS, an ISP of 900 seconds, and a delta V burn of 3.3 km/sec to establish the orbit, 200 metric tons of liquid H-2 propellant would be required. The 200 metric tons could be stored in 3 tanks, each 8 meters in diameter and 20 meters in length. An assembly of 3 MITEE NTP engines would be used, providing redundancy if an engine were to fail. Two different MITEE design options are described. Option 1 is an 18,000 Newton, 100 MW engine with a thrust to weight ratio of 6.6/1; Option 2 is a 180,000 Newton, 1000 MW engine with a thrust to weight ratio of 23/1. Burn times to establish the orbit are {approx}1 hour for the large 3 engine assembly, and 10 hours for the small 3 engine assembly. Both engines would use W-UO2 cermet fuel at {approx}2750 K which has demonstrated the capability to operate for at least 50 hours in 2750 K hydrogen with only a minor loss of fuel material. The small engine is favored because of its lower weight. The total system weight of the small 3 engine assembly is {approx}12 metric tons, including engine, controls, pumps, and neutron and gamma shields. After their main thrust operation, the NTP engines would shut down, with periodic successive smaller delta V burns as required to fine-tune the cycler orbit. Radiation dosages to personnel, both during operation and after shutdown, are much smaller than those from the cosmic ray background.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Interstellar flow and temperature determination with IBEX: Robustness and sensitivity to systematic effects

The Interstellar Boundary Explorer (IBEX) samples the interstellar neutral (ISN) gas flow of several species every year from December through late March when the Earth moves into the incoming flow. The first quantitative analyses of these data resulted in a narrow tube in four-dimensional interstellar parameter space, which couples speed, flow latitude, flow longitude, and temperature, and center values with approximately 3° larger longitude and 3 km s{sup −1} lower speed, but with temperatures similar to those obtained from observations by the Ulysses spacecraft. IBEX has now recorded six years of ISN flow observations, providing a large database over increasing solar activity and using varying viewing strategies. In this paper, we evaluate systematic effects that are important for the ISN flow vector and temperature determination. We find that all models in use return ISN parameters well within the observational uncertainties and that the derived ISN flow direction is resilient against uncertainties in the ionization rate. We establish observationally an effective IBEX-Lo pointing uncertainty of ±0.°18 in spin angle and confirm an uncertainty of ±0.°1 in longitude. We also show that the IBEX viewing strategy with different spin-axis orientations minimizes the impact of several systematic uncertainties, and thus improves the robustness of the measurement. The Helium Warm Breeze has likely contributed substantially to the somewhat different center values of the ISN flow vector. By separating the flow vector and temperature determination, we can mitigate these effects on the analysis, which returns an ISN flow vector very close to the Ulysses results, but with a substantially higher temperature. Due to coupling with the ISN flow speed along the ISN parameter tube, we provide the temperature T{sub VISN∞}=8710+440/−680 K for V{sub ISN∞}=26 km s{sup −1} for comparison, where most of the uncertainty is systematic and likely due to the presence of the Warm Breeze.

79 ASTRONOMY AND ASTROPHYSICS↗

Stroboscopic Goggles as a Countermeasure for Dynamic Visual Acuity and Landing Sickness in Crewmembers Returning from Long-Duration Spaceflight

Long-term exposure to microgravity causes sensorimotor adaptations that result in functional deficits upon returning to a gravitational environment. At landing, the vestibular system and the central nervous system, responsible for coordinating head and eye movements via the vestibulo-occular reflex (VOR), are adapted to microgravity and must re-adapt to the Earth's gravitational environment. This re-adaptation causes decrements in gaze control and dynamic visual acuity, with astronauts reporting oscillopsia and blurred vision. These effects are caused by retinal slip, or the inability to keep an image focused on their retina, which is thought to drive motion sickness symptoms experienced upon landing. Retinal slip can be estimated by dynamic visual acuity (DVA); visual acuity while in motion. Peters et al. (2011) find that DVA is worsened in astronauts by an average of 0.75 eye-chart lines one day after landing. Previously, the use of stroboscopic goggles has shown to be effective in minimizing motion sickness symptoms due to retinal slip (Reschke et al. 2007). In this study, we simulated the decrement in DVA caused by sensorimotor re-adaptation by using minifying lenses and then testing the efficacy of stroboscopic goggles in preventing retinal slip and improving DVA. Dynamic visual acuity is assessed using an oscillating chair developed in the Neuroscience Laboratory at JSC. This chair is motor-driven and oscillates vertically at 2 Hz with a vertical displacement of +/- 2 cm to simulate the vertical translations that occur while walking. As the subject is being oscillated, they are asked to discern the direction of Landolt-C optotypes of varying sizes and record their direction using a gamepad. The visual acuity thresholds are determined using an algorithm that alters the size of the optotype based on the previous responses of the subject using a forced-choice best parameter estimation that is able to rapidly converge on the threshold value. Visual acuity thresholds were determined both for static (seated) and dynamic (oscillating) conditions. Dynamic visual acuity is defined as the difference between the dynamic and static conditions. We found that healthy subjects (n=20) have a significantly impaired DVA while wearing the minifying lenses, demonstrating that the VOR is in an adaptive state and retinal slip is occurring. When subjects' acuity was tested wearing the stroboscopic goggles with the minifying lenses, there was no significant difference in their DVA compared to their baseline DVA. This suggests that stroboscopic goggles are preventing retinal slip and would function as an efficient countermeasure for VOR adaptations and thus help mitigate landing sickness symptoms experienced by long-duration crewmembers. These goggles might also be used to counter blurred vision (caused by retinal slip) experienced by crewmembers during launch where the vehicle vibrations are greatest. The stroboscopic effect could be built into a section of their head mounted displays on the visor of their helmets to be used in these high vibration situation if a mission critical task is necessary.

Rosenberg, M. J. F.↗

Integrated Simulation Design Challenges to Support TPS Repair Operations

During the Orbiter Repair Maneuver (ORM) operations planned for Return to Flight (RTF), the Shuttle Remote Manipulator System (SRMS) must grapple the International Space Station (ISS), undock the Orbiter, maneuver it through a long duration trajectory, and orient it to an EVA crewman poised at the end of the Space Station Remote Manipulator System (SSRMS) to facilitate the repair of the Thermal Protection System (TPS). Once repair has been completed and confirmed, then the SRMS proceeds back through the trajectory to dock the Orbiter to the Orbiter Docking System. In order to support analysis of the complex dynamic interactions of the integrated system formed by the Orbiter, ISS, SRMS, and SSMS during the ORM, simulation tools used for previous ‘nominal’ mission support required substantial enhancements. These upgrades were necessary to provide analysts with the capabilities needed to study integrated system performance. Prevalent throughout this ORM operation is a dynamically varying topology. In other words, the ORM starts with the SRMS grappled to the mated Shuttle/ISS stack (closed loop topology), moves to an open loop chain topology consisting of the Shuttle, SRMS, and ISS, and then, at the repair configuration, extends the chain topology to one consisting of the Shuttle, SMS, ISS, and SSRMS/EVA crewman. The resulting long dynamic chain of vehicles and manipulators may exhibit significant motion between the Shuttle worksite and the EVA crewman due to the system flexibility throughout the topology (particularly within the SRMS/SSRMS joints and links). Since the attachment points of both manipulators span the flexible structure of the ISS, simulation analysis may also need to take that into consideration. Moreover, due to the lengthy time duration associated with the maneuver and repair, orbital effects become a factor and require the ISS vehicle control system to maintain active attitude control. Several facets of the ORM operation make the associated analytical efforts different from previous mission support, including: (1) the magnitude of the SRMS handled payload (Le., Orbiter class), (2) the orbital effects induced on the integrated system consisting of the large Shuttle and ISS masses connected by a light flexible SRMS, (3) long duration environmental consequences due to the lengthy operational times associated with the maneuver and repair of the TPS, (4) active attitude control (as opposed to free drift) interacting with the SRMS and SSRMS manipulators (also due to the length of the maneuver and repair), (5) relative dynamics between the EVA crewman and thc worksite influenced by the extended flexible topology. In order to meet these analysis challenges, an ORM simulation architecture was developed leveraging upon numerous pre-existing simulation elements to analyze the various subsystems individually. For example, core manipulator subsystem simulations for both the SRMS and SSRMS were originally combined to provide the dual-arm dynamics topology simulation (in the absence of orbital dynamics and vehicle control). This capability was later merged with the simulation used to analyze SRMS loading with a heavy payload in the orbital environment with an active payload control system (in this case, the ISS Attitude Control System (ACS)), configured for the ORM. The resulting worksite dynamics simulation, based off of the modified ORM simulation, provided the extended topological chain of vehicles and manipulators, while taking into account the orbital effects of both the Shuttle and ISS (as well as its ACS). Verification and validation (V&V) of these integrated simulations became a challenge in itself. A systematic approach needed to be developed such that integration simulation results could be tested against previous constituent simulations upon which these simulations were built. General V&V categories included: (1) core orbital state propagation, (2), stand-alone SRMS, (3) stand-alone SSRMS, (4) stand-alone ISS ACS, (5) integrated Shuttle, SRMS, ISS (with active ACS) in the orbital environment, and (5) dual-arm SRMS/SSRMS dynamics topology. Integrated simulation V&V run suites were created and correlated to verification runs from subsystem simulations, in order to establish the validity of the results. This paper discusses the simulation design challenges encountered while developing simulation capabilities to mirror the ORM operations. The paper also describes the incremental build approach that was utilized, starting with the subsystem simulation elements and integration into increasing more complex simulations until the resulting ORM worksite dynamics simulation had been assembled. Furthermore, the paper presents an overall integrated simulation V&V methodology based upon a subsystem level testing, integrated comparisons, and phased checkout.

Thermal Protection System↗