Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ESA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

New Direction of NASA Exploration Life Support

NASA's activities in life support Research and Technology Development (R&TD) have changed in both focus and scope following implementation of recommendations from the Exploration System Architecture Study (ESAS). The limited resources available and the compressed schedule to conduct life support R&TD have required that future efforts address the needs of the Crew Exploration Vehicle (CEV), the Lunar Surface Access Module (LSAM) and Lunar Outpost (LO). Advanced Life Support (ALS) efforts related to long duration planetary bases have been deferred or canceled. This paper describes the scope of the new Exploration Life Support (ELS) project; how it differs from ALS, and how it supports critical needs for the CEV, LSAM and LO. In addition, this paper provides rationale for changes in the scope and focus of technical content within ongoing life support R&TD activities.

Chambliss, Joe↗

Water for Two Worlds: Designing Terrestrial Applications for Exploration-class Sanitation Systems

At the United Nations Millennium Summit in September of 2000, the world leaders agreed on an ambitious agenda for reducing poverty and improving lives: the Millennium Development Goals (MDGs), a list of issues they consider highly pernicious, threatening to human welfare and, thereby, to global security and prosperity. Among the eight goals are included fundamental human needs such as the eradication of extreme poverty and hunger, the promotion of gender equality, the reduction of child mortality and improvement of maternal health, and ensuring the sustainability of our shared environment. In order to help focus the efforts to meet these goals, the United Nations (UN) has established a set of eighteen concrete targets, each with an associated schedule. Among these is Target 10: "By 2015, reduce by half the proportion of people without access to safe drinking water." A closely related target of equal dignity was agreed at the World Summit on Sustainable Development (Johannesburg, September 2002): "By 2015, reduce by half the proportion of people without access to basic sanitation." One of the greatest successes in the development of Exploration-class technologies for closed-loop, sustainable support of long-duration human space missions has been the work both ESA and NASA have done in bioregenerative water reclamation (WRS), and secondarily, in solid-waste management. Solid-waste and WRS systems tend to be combined in the commercial world into the field of sanitation, although as we will see, the most essential principles of sustainable terrestrial sanitation actually insist upon the separation of solid and liquid excreta. Seeing the potential synergy between the space program ALS technologies developed for Mars and the urgent needs of hundreds of millions of people for secure access to clean water here on Earth, we set out to organize the adaptation of these technologies to help the United Nations Development Programme (UNDP) meet Target 10. In this paper, we will summarize the issues and results of the first "Water for Two Worlds" summit held in January of this year, describe,the status of the sustainable sanitation systems that are on the table for adaptation to widespread terrestrial use, and present fundamental strategies for forward work.

Adams, Constance↗

Overview of the Solar-B Mission

The Solar-B mission is a collaboration between the Japan Aerospace Exploration Agency, Institute of Space and Astronautical Science, the National Aeronautics and Space Administration (NASA) and the Particle Physics and Astronomy Research Council (PPARC) of the United Kingdom and the European Space Agency. The principal scientific goals of the mission are to understand the processes of magnetic field generation, transport and ultimate dissipation of solar magnetic fields and how the release of magnetic energy is responsible for the heating and structuring of the chromosphere and corona. The scientific payload consists of three instruments: the Solar Optical Telescope that consists of the Optical Telescope Assembly and the Focal Plane Package (FPP), the X-ray Telescope and the EUV Imaging Spectrometer Each instrument is a result of the combined talents of all the members of the international team and their design and performance is described in separate papers in this session. The instruments are designed to work together as an 'observatory' simultaneously studying the target, at which the spacecraft is pointed, at different levels in the atmosphere. The spacecraft is scheduled for launch in September 2006 from the Uchinoura Space Center into a 600 km circular, sun-synchronous, polar orbit with a nominal elevation of 97.9 degrees. The orbit provides at least two morning and two evening contacts in Japan. Morning contacts are used for recovering quick look science data and the evening contacts for uploading commands. In addition ESA will provide 15 contacts per day from the Norwegian high latitude (78deg 14' N) ground station at Svalbard. The data downloads are transmitted to the ISAS Sirius database. They will be reformatted into FITS files and archived as Level 0 data on the ISAS DARTS system and made available to the scientific community. Scientific operations will be conducted from the IS AS facility located in Sagamihara, Japan. They are separated into planning, implementation and archiving. The planning process involves monthly, weekly and daily planning meetings. All scientific data will be made available after the first six month approximately one week after its collection.

Davis, John M.↗

STS-121/Discovery: Launch Readiness Press Conference

Participants in the briefing included: Bruce Buckingham (NASA Public Affairs), John Shannon (Chairman, Mission Management Team), Mike Suffredini (ISS Program Manager), Mike Leinbach (Shuttle Launch Director), Alan Thirkettle (ISS Program Manager, ESA) and 1st Lt. Kaleb Nordgen (USAF 45th Weather Squadron). There are no constraints to launch except for questionable weather. The crew is ready to go. PROGRESS has provided logistics and is ready to be installed. No cryogenics have been loaded because of a Phase 1 lightning advisory. The shuttle crew is in good shape, just waiting for the weather to clear. ISS is making preparations for the Columbus Mission and future plans are to increase the crew from 3 to 6 people. The floor was opened to questions from the press.

Source record↗

LAD-C: A large area debris collector on the ISS

The Large Area Debris Collector (LAD-C) is a 10 sq m aerogel and acoustic sensor system under development by the U.S. Naval Research Laboratory (NRL) with main collaboration from the NASA Orbital Debris Program Office at Johnson Space Center, JAXA Institute of Space and Astronautical Science (ISAS), Chiba University (Japan), ESA Space Debris Office, University of California at Berkeley, and University of Kent at Canterbury (UK). The U.S. Department of Defense (DoD) Space Test Program (STP) has assumed the responsibility for having the system manifested and deployed on the International Space Station (ISS), and then having it retrieved and returned to Earth after one to two years. LAD-C will attempt to utilize the ISS as a scientific platform to characterize the near-Earth meteoroid and orbital debris environment in the size regime where little data exist. In addition to meteoroid and orbital debris sample return, the acoustic sensors will record impact time, location, signal strength, and acoustic waveform data of the largest collected samples. A good time-dependent meteoroid and orbital debris flux estimate can be derived. Analysis of the data will also enable potential source identification of some of the collected samples. This dynamical link can be combined with laboratory composition analysis of impact residuals extracted from aerogel to further our understanding of orbital debris population, and the sources of meteoroids, asteroids and comets.

Liou, J.-C.↗

Low dose failures of hardened DC-DC power converters

Box-level total dose testing of the FOG (Fiber Optic Gyro) by IXSEA at ESA's GammabeamFacility were abruptly terminated at 8krad (Si) due to catastrophic failure (complete shutdown). This was unexpected because all components within the gyro were supposedly radiation tolerant. Further testing showed that the components responsible for the failure were two DC-DC converters, manufactured by Interpoint, that stopped regulating shortly before shutdown. This paper summarizes diagnostic test results for the converters to determine the underlying cause of the unexpected failure at low levels of radiation.

Interpoint Rad-hard DC-DC power converter TC4426 M↗

THz frequency multiplier chains base on planar Schottky diodes

The Herschel Space Observatory (HSO), an ESA cornerstone mission with NASA contribution, will enable a comprehensive study of the galactic as well as the extra galactic universe. At the heart of this exploration are ultra sensitive coherent detectors that can allow for high-resolution spectroscopy. Successful operation of these receivers is predicated on providing a sufficiently powerful local oscillator (LO) source. Historically, a versatile space qualified LO source for frequencies beyond 500 GHz has been difficult if not impossible. This paper will focus on the effort under way to develop, build, characterize and qualify a LO chain to 1200 GHz (Band 5 on HSO) that is based on planar GaAs diodes mounted in waveguide circuits. State-of-the-art performance has been obtained from a three-stage ( x2 x 2 x 3 ) multiplier chain that can provide a peak output power of 120 uW (1178 GHz) at room temperature and a peak output power of 190 uW at 1183 GHz when cooled to 113 K. Implementation of this LO source for the Heterodyne Instrument for Far Infrared (HIFI) on HSO will be discussed in detail.

oscillator spectroscopy↗

Low cost test bed tool development for validation of mission control events

The Cassini Program is one of the last large interplanetary spacecraft missions. It is a joint effort between the European Space Agency, the Italian Space Agency and NASA.The U.S. portion of the mission is managed for NASA by the Jet Propulsion Laboratory (JPL). The primary mission is to survey the complex Saturnian system and release the ESA-Huygens probe at Titan. The success of the Cassini Mission has been largely due its many simulation test beds and its rigorous test program.

Cassini ITL test tools↗

Constrained Profile Retrieval Applied to MIPAS Observation Mode

To investigate the atmosphere of the Earth, and to detect changes in our environment, the Environmental Satellite (ENVISAT) will be launched by the European Space Agency (ESA) in a polar orbit in the mid of the year 2001.

remote sensing retrieval regularization infrared s↗

Performance prediction of the Planck sorption cooler and initial validation

Two continuous operation 18 K/20 K sorption coolers are being developed by JPL for the ESA Planck mission to provide about 200 mW of cooling at 18 K and 1.4 W at 20 K. A detailed performance prediction model has been developed to support the design process and to evaluate the results of a prototype testing.

sorption cryocoolers thermal model analyses metal ↗

Mars Express: exploration of Phobos

The ESA Mars Express Orbiter will be nearly polar and have an initial orbital period of 7.6 hours for the first 440 days and then will reduce its period to 6.7 hours. As periapsis of the elliptical orbit walks around Mars every 2 years, the ascending and descending nodes of the Mars Express orbit on the Mars equatorial plane will have the same radius as the orbit of Phobos and close encounters of Phobos will occur when Phobos is near the node as Mars Express passes.

Mars Express exploration of Phobos↗

Mars Express: exploration of Phobos

The ESA Mars Express Orbiter will be nearly polar and have an initial orbital period of 7.6 hours for the first 440 days and then will reduce its period to 6.7 hours. As periapsis of the elliptical orbit walks around Mars every 2 years, the ascending and descending nodes of the Mars Express orbit on the Mars equatorial plane will have the same radius as the orbit of Phobos and close encounters of Phobos will occur when Phobos is near the node as Mars Express passes.

Mars Express exploration of Phobos↗

Ulysses Education and Outreach

Ulysses is a joint NASA/ESA mission that is exporing a three-dimensional structure of the heliosphere via an orbit over the poles of the Sun. Since its inception, Ulysses, both in NASA and ESA, has had a public and science outreach program; it is only within the last three years that the project has begun to expand its outreach activities to include education.

Ulysses heliosphere↗

(abstract) ARGOS: a System to Monitor Ulysses Nutation and Thruster Firings from Variations of the Spacecraft Radio Signal

Ulysses is a spin-stabilized spacecraft that experienced significant nutation after its launch in October 1990. This was due to the Sun-spacecraft-Earth geometry, and a study of the phenomenon predicted that the nutation would again be a problem during 1994-95. The difficulty of obtaining nutation estimates in real time from the spacecraft telemetry forced the ESA/NASA Ulysses Team to explore alternative information sources. The work performed by the ESA Operations Team provided a model for a system that uses the radio signal strength measurements to monitor the spacecraft dynamics. These measurements (referred to as AGC) are provided once per second by the tracking stations of the DSN. The system was named ARGOS (Attitude Reckoning from Ground Observable Signals) after the ever-vigilant, hundred-eyed giant of Greek Mythology. The ARGOS design also included Doppler processing, because Doppler shifts indicate thruster firings commanded by the active nutation control carried out onboard the spacecraft. While there is some visibility into thruster activity from telemetry, careful processing of the high-sample-rate Doppler data provides an accurate means of detecting the presence and time of thruster firings. DSN Doppler measurements are available at a ten-per-second rate in the same tracking data block as the AGC data.

Ulysses nutation Doppler radio signal strength mea↗

(abstract) The EOS SAR Mission: A New Approach

The goal of the Earth Orbiting System Synthetic Aperture Radar (EOS SAR) program is to help develop the modeling and observational capabilities to predict and monitor terrestrial and oceanic processes that are either causing global change or resulting from global change. Specifically, the EOS SAR will provide important geophysical products to the EOS data set to improve our understanding of the state and functioning of the Earth system. The strategy for the EOS SAR program is to define the instrument requirements based on required input to geophysical algorithms, provide the processing capability and algorithms to generate such products on the required spatial (global) and temporal (3-5 days) scales, and to provide the spaceborne instrumentation with international partnerships. Initially this partnership has been with Germany; currently we are exploring broader international partnerships. A MultiSAR approach to the EOS SAR which includes a number of SARs provided by Japan, ESA, Germany, Canada, and the US in synergistic orbits could be used to attain a truly global monitoring capability using multifrequency polarimetric signatures. These concepts and several options for mission scenarios will be presented.

Earth Observing System radar imaging international↗