Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Configuration Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Near isothermal compressed air energy storage system in residential and commercial buildings: Techno-economic analysis

Electrical energy storage systems offer a wide range of options to efficiently manage our power supply infrastructure. Energy and environmental security via renewable resources and energy storage devices will also play a critical role in addressing the supply-demand challenges. A novel energy efficient storage system based on near isothermal compressed air energy storage concept, named as Ground-Level Integrated Diverse Energy Storage (GLIDES) is analyzed for integration with residential and commercial buildings. Additionally, the influence of different configurational aspects on key performance and cost attributes is presented in this study. GLIDES modules in the range of 0.5 kWh–15 kWh configurations were considered for residential buildings whereas 25 kW h–500 kW h modules were considered for commercial buildings. Detailed cost and performance analysis of the GLIDES module proved them to be an effective resource in lowering the peak energy demand and corresponding utility bills.

25 ENERGY STORAGE↗

Autonomous management of a recursive area hierarchy for large scale wireless sensor networks using multiple parents

Large scale wireless sensor networks have been proposed for applications ranging from anomaly detection in an environment to vehicle tracking. Many of these applications require the networks to be distributed across a large geographic area while supporting three to five year network lifetimes. In order to support these requirements large scale wireless sensor networks of duty-cycled devices need a method of efficient and effective autonomous configuration/maintenance. This method should gracefully handle the synchronization tasks duty-cycled networks. Further, an effective configuration solution needs to recognize that in-network data aggregation and analysis presents significant benefits to wireless sensor network and should configure the network in a way such that said higher level functions benefit from the logically imposed structure. NOA, the proposed configuration and maintenance protocol, provides a multi-parent hierarchical logical structure for the network that reduces the synchronization workload. It also provides higher level functions with significant inherent benefits such as but not limited to: removing network divisions that are created by single-parent hierarchies, guarantees for when data will be compared in the hierarchy, and redundancies for communication as well as in-network data aggregation/analysis/storage.

47 OTHER INSTRUMENTATION↗

Performance Assessment for the Waste Management Area C at the Hanford Site in Southeast Washington - 17515

An initial performance assessment (PA) of Single-Shell Tank (SST) Waste Management Area C (WMA C) located at the U.S. Department of Energy's (DOE) Hanford Site in southeastern Washington has been completed to satisfy the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO), as well as other Federal requirements and State-approved closure plans and permits. The WMA C PA assesses the fate, transport, and impacts of radionuclides within residual wastes left in tanks and ancillary equipment and facilities in their assumed closed configuration, and the subsequent risks to humans into the far future. This PA focused on radiological impacts has been developed to meet the requirements for a closure authorization under DOE O 435.1 that includes a waste incidental to reprocessing determination for residual wastes remaining in tanks, ancillary equipment, and facilities. PA results indicate that the performance objectives and measures for the all-pathways dose, the air pathway dose, the radon flux, and groundwater protection are met for both the 1,000-year compliance time period (2020 to 3020) and the post-compliance period (3020 to 12020). The peak dose for the all-pathways analysis in the 1,000-year compliance period is associated with the air pathway, with the peak dose of 4 x 10{sup -5} mSv/yr dominated by tritium resulting from upward gaseous diffusive flux from the residual waste. The peak dose within the sensitivity/uncertainty analysis time period (1,000 to 10,000 years after closure) occurs at about 1,500 years after closure, and results primarily from a peak in {sup 99}Tc groundwater concentration at 100 m down-gradient of the facility. The peak total dose within the sensitivity/uncertainty analysis time period is 0.001 mSv/yr. For all of the sensitivity analyses and uncertainty analyses evaluated, the disposal system also met the performance objectives. In the uncertainty analysis performed with the system level model based on GoldSim{sup C}, the highest calculated groundwater dose in the compliance period was about 7 x 10{sup -4} mSv/yr, and the highest calculated peak dose in the sensitivity/uncertainty analysis period was 0.025 mSv/yr.Doses associated with hypothetical inadvertent human intrusion were calculated for all sources in WMA C and compared to the acute and chronic performance measures in DOE O 435.1. The calculated doses for acute and chronic exposure scenario from potential intrusion into a waste transfer pipeline remain below the DOE O 435.1 performance measure for the time period evaluated beyond 100 years after closure. Acute exposure from drilling into the waste yielded a dose of about 0.36 mSv after the assumed 100-year institutional control period, well below the 5 mSv performance measure for acute exposure. Chronic exposure to waste from drill cuttings in a rural pasture scenario resulted in a dose of about 0.08 mSv/yr after the assumed 100-year institutional control period, well below the 1 mSv/yr performance measure for chronic exposure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal design analysis for SuperTruck II lithium-titanate battery pack

Here, this paper presents a systematic thermal management analysis for a new lithium-titanate-oxide battery pack to be installed in a SuperTruck II, Class 8 hybrid truck. The authors investigate the feasibility of mounting the battery pack inside the vehicle and air-cooling it with fans supplying conditioned air from the cabin. Moreover, the cells within each module are to be immersed in a heat-transfer fluid to improve temperature homogeneity. A multi-stage thermal analysis is performed to ensure adequate thermal regulation of the battery under the proposed design, considering installation and operational constraints. The authors perform thermal and electrical characterization tests on a single cell. Results inform the development of computational fluid dynamics models of the cells, modules, and pack. Module-level analysis shows that the cell temperatures can be maintained below their upper operational limit of 55 °C with module wall-to-air heat transfer coefficients between 10 and 20 Wm -2 K -1 . Pack-level analysis of distinct configurations determines effective airflow paths for adequate heat transfer and delivers a final battery pack design that achieves sufficient cooling and temperature uniformity. A reduced-order electrothermal model is developed to rapidly predict the transient battery performance and to develop a temperature control strategy.

25 ENERGY STORAGE↗

Development of a Conditioned System-Level Groundwater Model to Evaluate Long-Term Groundwater Impacts within a Performance Assessment - 20115

A preliminary performance assessment (PA) of single-shell tank Waste Management Area (WMA) A-AX located at the U.S. Department of Energy (DOE)'s Hanford Site in southeastern Washington is being conducted to satisfy the requirements of DOE Order 435.1 [1] as it relates to closure of the single-shell radioactive waste tanks in the WMA A-AX tank farms. A PA assesses the fate, transport, and impacts of radionuclides within a low-level radioactive waste disposal facility in its assumed closure configuration and the subsequent potential doses to humans over a 1,000-year compliance period and a 10,000-year performance evaluation period. The WMA A-AX preliminary PA evaluation is structured around the complementary use of process-level and system-level models to calculate the facility performance against established DOE Order 435.1 [1] performance objectives. Process-level models are those that represent a detailed phenomenological representation of processes of concern in the PA. Process models typically only represent one or a few of the components of the PA, such as groundwater flow and transport, and must be integrated with other modeling elements to perform PA calculations. System-level models are those that are abstracted from the process models, retaining the essential features of the process model, while allowing integration of all aspects of the PA in a single modeling framework. System-level models are often characterized by coarser numerical discretization, lower dimensionality, or other similar simplifications compared to the process-level model. Traditionally, a three-dimensional (3-D) process-level model is utilized primarily to evaluate the long-term impact on groundwater and the potential doses to individuals who consume contaminated groundwater. System-level models are also utilized to evaluate the groundwater pathway in PAs. These models typically have reduced dimensionality (1-D) and are conditioned utilizing flow fields (Darcy fluxes) and moisture content distributions that are abstracted from the process level models. The abstraction approach assures that the flow field in both models is consistent for a specific set of input parameters for flow, differing only in the discretization and dimensionality of the two models. The preliminary WMA A-AX PA incorporates a detailed representation of the geological system and hydraulic properties within the 3-D model STOMP{sup C} numerical code so that the effects of relevant features and processes on water flow and radionuclide transport in the subsurface can be evaluated. The complementary system-level model is developed utilizing the GoldSim{sup C} code to implement a simplified, 1-D equivalent model to represent the groundwater pathway. Contaminant transport through the vadose zone and unconfined aquifer for Tc-99 and I-129 were evaluated in each of the models. Adjustments to the saturated portion of the GoldSim{sup C} 1-D model were required to mimic the dispersion effect captured with the 3-D STOMP{sup C} model. Once this conditioning was conducted, highly similar results for the transport of Tc-99 and I-129 were achieved at the point of calculation, located 100 m downgradient from the WMA A-AX fenceline. These radionuclides represent elements that are regarded as primary dose drivers in the PA groundwater pathway analysis. The high degree of conformance between the two models suggests that the use of the equivalent 1-D system model is suitable for evaluating the full suite of radionuclides that will be released from the tank sources within WMA A-AX over the 1,000-year compliance period and over the 10,000-year evaluation period. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chapter 6: Luminescence and Thermal Imaging of Thin-Film Photovoltaic Materials, Devices, and Modules

In this chapter, we describe luminescence and thermal imaging in the context of thin-film PV devices. First, we discuss both traditional and developing experimental designs, including dark LIT (DLIT), illuminated LIT, PL using different illumination configurations, traditional EL performed under forward -bias current injection, and contactless EL induced with sub -cell illumination patterns. Next, we provide some brief theoretical background to highlight relationships between fundamental materials properties and the resulting luminescence and thermal images. Finally, we give examples of thin-film PV PL, EL, and LIT images to demonstrate the utility of these imaging methods ranging from understanding the microstructure of active layers to managing the quality and reliability of full PV modules.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Multi-modelling predictions show high uncertainty of required carbon input changes to reach a 4‰ target

Soils store vast amounts of carbon (C) on land, and increasing soil organic carbon (SOC) stocks in already managed soils such as croplands may be one way to remove C from the atmosphere, thereby limiting subsequent warming. The main objective of this study was to estimate the amount of additional C input needed to annually increase SOC stocks by 4‰ at 16 long-term agricultural experiments in Europe, including exogenous organic matter (EOM) additions. We used an ensemble of six SOC models and ran them under two configurations: (1) with default parametrization and (2) with parameters calibrated site-by-site to fit the evolution of SOC stocks in the control treatments (without EOM). We compared model simulations and analysed the factors generating variability across models. The calibrated ensemble was able to reproduce the SOC stock evolution in the unfertilised control treatments. We found that, on average, the experimental sites needed an additional 1.5 ± 1.2 Mg C ha -1 year -1 to increase SOC stocks by 4‰ per year over 30 years, compared to the C input in the control treatments (multi-model median ± median standard deviation across sites). That is, a 119% increase compared to the control. While mean annual temperature, initial SOC stocks and initial C input had a significant effect on the variability of the predicted C input in the default configuration (i.e., the relative standard deviation of the predicted C input from the mean), only water-related variables (i.e., mean annual precipitation and potential evapotranspiration) explained the divergence between models when calibrated. Here, our work highlights the challenge of increasing SOC stocks in agriculture and accentuates the need to increasingly lean on multi-model ensembles when predicting SOC stock trends and related processes. To increase the reliability of SOC models under future climate change, we suggest model developers to better constrain the effect of water-related variables on SOC decomposition.

4 per 1000 initiative↗

Evaluating Thermostats' Deadbands Using HVAC Hardware-In-the-Loop Experiment for Advanced Control Strategies

Smart thermostats have gained significant popularity due to their potential for optimizing energy consumption and enhanced user control while ensuring occupants' comfort. The deadband, also referred to as temperature differential, is defined as the temperature difference between the desired setpoint and upper threshold or lower threshold for the HVAC equipment to turn on. It is a key factor influencing energy efficiency and user satisfaction. This paper presents a comparative analysis of the deadbands of five different smart thermostats, tested with a heat pump, aiming to identify variations in their deadband settings and implications for energy management. The experimental study was conducted using a HVAC hardware-in-theloop (HIL) system that integrates smart thermostats with physical HVAC equipment in a simulated house environment. The study explores the trade-offs between energy efficiency and occupant comfort and highlights how different thermostats participating in demand response event cycle differently based on their deadband settings. The findings offer valuable insights into how selecting the right thermostat or configuring smart thermostat with appropriate deadband settings can be leveraged to enhance demand response capabilities, shift loads effectively and improve operational flexibility in HVAC systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Characterization of Tc-99 Speciation and Chemical Composition of 241-AN-102 Tank Waste Supernatant - 19201

Technetium (Tc) in its isotopic form {sup 99}Tc is generated in high yields from the fission of {sup 235}U and {sup 239}Pu. A significant inventory of {sup 99}Tc remains at the U.S. Department of Energy's Hanford Site, and it is one of the most difficult contaminants to address. In the strongly alkaline solutions that are typical of Hanford tank waste, Tc exists as both pertechnetate (TcO{sub 4}{sup -} in oxidation state VII) and in reduced forms (oxidation state <VII) collectively known as non-pertechnetate species. Pertechnetate is a well-characterized anionic Tc species that can be removed from low-activity waste by anion exchange or other methods. There is no definitive information on the origin or a comprehensive description of the non-pertechnetate species in Hanford tanks. Designing strategies for effective management of Tc, including separation and immobilization, requires an understanding of the molecular structure of the non-pertechnetate species and their identification in actual tank waste samples. Developing this advanced understanding would facilitate development of new technologies for treating dissimilar Tc species. Toward this objective, a spectroscopic library of the Tc(I) [fac-Tc(CO){sub 3}]{sup +} and Tc(IV, VI, VII) compounds was generated using a range of techniques and applied to the characterization of actual 241-AN-102 tank waste supernatant. A sample of the 241-AN-102 tank waste (collected in 2013) was processed to remove {sup 137}Cs by spherical resorcinol-formaldehyde (sRF) ion exchange resin after the sodium concentration was adjusted to 5.6 M. The Cs-loaded sRF column was eluted with 0.45 M HNO{sub 3}. As-received AN-102, Cs-depleted AN-102 effluent, and sRF eluate fractions were comprehensively characterized for chemical composition and speciation of Tc using {sup 99}Tc nuclear magnetic resonance (NMR) spectroscopy and X-ray absorption spectroscopy. The results of these analyses demonstrated for the first time that non-pertechnetate Tc present in the 241-AN-102 tank waste is composed of several low-valent Tc species, including the Tc(I) [fac-Tc(CO){sub 3}L{sub 3}]{sup +}, Tc(IV), and possibly Tc(VI) compounds. This is the second experimental observation of the [fac-Tc(CO){sub 3}L{sub 3}]{sup +} species in the Hanford tank waste that highlights their importance for waste processing. In addition, the chemical composition of the 241-AN-102 tank waste was characterized with the focus on small chelators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Thermostats' Deadbands Using HVAC Hardware-In-the-Loop Experiment for Advanced Control Strategies: Preprint

Smart thermostats have gained significant popularity due to their potential for optimizing energy consumption and enhanced user control while ensuring occupants' comfort. The deadband, also referred to as temperature differential, is defined as the temperature difference between the desired setpoint and upper threshold or lower threshold for the HVAC equipment to turn on. It is a key factor influencing energy efficiency and user satisfaction. This paper presents a comparative analysis of the deadbands of five different smart thermostats, tested with a heat pump, aiming to identify variations in their deadband settings and implications for energy management. The experimental study was conducted using a HVAC hardware-in-theloop (HIL) system that integrates smart thermostats with physical HVAC equipment in a simulated house environment. The study explores the trade-offs between energy efficiency and occupant comfort and highlights how different thermostats participating in demand response event cycle differently based on their deadband settings. The findings offer valuable insights into how selecting the right thermostat or configuring smart thermostat with appropriate deadband settings can be leveraged to enhance demand response capabilities, shift loads effectively and improve operational flexibility in HVAC systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advancing Performance Assessment for Disposal of Depleted Uranium at Clive Utah - 12493

A Performance Assessment (PA) for disposal of depleted uranium (DU) waste has recently been completed for a potential disposal facility at Clive in northwestern Utah. For the purposes of this PA, 'DU waste' includes uranium oxides of all naturally-occurring isotopes, though depleted in U-235, varying quantities of other radionuclides introduced to the uranium enrichment process in the form of used nuclear reactor fuel (reactor returns), and decay products of all of these radionuclides. The PA will be used by the State of Utah to inform an approval decision for disposal of DU waste at the facility, and will be available to federal regulators as they revisit rulemaking for the disposal of DU. The specific performance objectives of the Clive DU PA relate to annual individual radiation dose within a 10,000-year performance period, groundwater concentrations of specific radionuclides within a 500-year compliance period, and site stability in the longer term. Fate and transport processes that underlie the PA model include radioactive decay and ingrowth, diffusion in gaseous and water phases, water advection in unsaturated and saturated zones, transport caused by plant and animal activity, cover naturalization, natural and anthropogenic erosion, and air dispersion. Fate and transport models were used to support the dose assessment and the evaluation of groundwater concentrations. Exposure assessment was based on site-specific scenarios, since the traditional human exposure scenarios suggested by DOE and NRC guidance are unrealistic for this site. Because the U-238 in DU waste reaches peak radioactivity (secular equilibrium) after 2 million years (My) following its separation, the PA must also evaluate the impact of climate change cycles, including the return of pluvial lakes such as Lake Bonneville. The first draft of the PA has been submitted to the State of Utah for review. The results of this preliminary analysis indicate that doses are very low for the site-specific receptors for the 10,000-year compliance period. This is primarily because DU waste is not highly radioactive within this time frame, the DU waste is assumed to be buried beneath zones exposed by erosion, groundwater concentrations of DU waste constituents do not exceed groundwater protection limits with in the 500-year compliance period, and the first deep lake occurrence will disperse DU waste across a large area, and will ultimately be covered by lake-derived sediment. A probabilistic PA model was constructed that considered DU waste and decay product doses to site-specific receptors for a 10,000-yr performance period, as well as deep-time effects. The quantitative results are summarized in Table VII. Doses (as TEDE) are always less than 5 mSv in a year, and doses to the offsite receptors are always much less than 0.25 mSv in a year. Groundwater concentrations of Tc-99 are always less than its GWPL except when the Tc-99 contaminated waste is disposed below grade. Even in this case, the median groundwater concentration is only 4.18 Bq/L (113 pCi/L), which is more than one order of magnitude less than the GWPL for Tc-99. The results overall suggest that there are disposal configurations that can be used to dispose of the proposed quantities of DU waste that are adequately protective of human health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scoping Thermal Response Calculations of RNS Waste During Transport to and Disposal at the WIPP

Sandia National Laboratories (SNL) was contracted by the United States Department of Energy Environmental Management (DOE-EM), Los Alamos Field Office to perform mechanical and thermal scoping calculations as part of a study seeking to understand the ignitability risk of the Remediated Nitrate Salts (RNS) waste drums during transportation from the Waste Control Specialists (WCS) facility to Waste Isolation Pilot Plant (WIPP) and permanent disposal of the waste at WIPP. The scoping thermal simulations described in this report pertain to thermal calculations performed with a packaging system consisting of one Standard Waste Box (SWB) loaded with drums placed inside a Standard Large Box 2 (SLB2). During transportation, the SLB2 is inside Transuranic Package Transporter Model III (TRUPACT-III), which provides the third layer of the packaging. Once at the WIPP, it is assumed the SLB2 is extracted from the TRUPACT-III and maintained above ground, and then subsequently placed underground for permanent disposal. In these proposed configurations, the space between the SLB2 and the SWB is always filled by a layer of insulation consisting of air-filled glass microbubbles except for the bottom which rests directly on the SLB2. The thermal scoping calculations described in this report specifically address whether the introduction of external heat inputs, combined with the contributions from the internally generated radiolytic decay heat and chemical reactions, lead to an unstable thermal state during the time of its movement and placement in the permanent disposal location. The external heat inputs are of two forms: 1) ambient thermal irradiation (e.g., solar and ambient storage/disposal temperatures) and 2) accident-induced fire. Three scoping calculation scenarios were derived as representative, conservative scenarios: 1A) TRUPACT-III transient transportation, 1B) SLB2 48-hour outdoor storage with solar radiation, and 2) fully-engulfing fire during SLB2 handling or emplacement following a steady-state analysis in a 38 °C environment. All the simulated scenarios are conservative relative to the operational conditions expected for handling the waste package during transportation and placement in the WIPP underground disposal unit. The predictions obtained from simulating the three exposure scenarios revealed that adding the SLB2 and the air-filled glass microbubbles to the transport and storage/disposal configurations provides additional thermal protection of the drums beyond what the SWB provides alone, both during long-term above ground insolation and underground during a fire accident. Under the current transportation/storage/disposal concepts, the degree of protection provided by the packaging concept is sufficient to prevent the waste from being ignitable. The simulation results demonstrate that there is adequate margin to safely transport and place the RNS waste from WCS to the WIPP under the current operational concept.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Does one need a 4.5 K screen in cryostats of superconducting accelerator devices operating in superfluid helium? lessons from the LHL

Superfluid helium is increasingly used as a coolant for superconducting devices in particle accelerators: the lower temperature enhances the performance of superconductors in high-field magnets and reduces BCS losses in RF acceleration cavities, while the excellent transport properties of superfluid helium can be put to work in efficient distributed cooling systems. The thermodynamic penalty of operating at lower temperature however requires careful management of the heat loads, achieved inter alia through proper design and construction of the cryostats. A recurrent question appears to be that of the need and practical feasibility of an additional screen cooled by normal helium at around 4.5 K surrounding the cold mass at about 2 K, in such cryostats equipped with a standard 80 K screen. We introduce the issue in terms of first principles applied to the configuration of the cryostats, discuss technical constraints and economical limitations, and illustrate the argumentation with examples taken from large projects confronted with this issue, i.e. CEBAF, SPL, ESS, LHC, TESLA, European X-FEL, ILC.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Well Design, Operation and Maintenance and Proactive Rehabilitation to Optimize Remediation Well Performance - 18605

Optimizing performance of extraction, injection and monitoring wells, which are integral components of groundwater remediation systems, result in lower life cycle costs and a higher probability of meeting project objectives. These wells provide the means to extract contaminated groundwater, inject reagents, treated water and clean water to create groundwater reaction/flushing zones, and to provide groundwater level, contaminant concentration and geochemical data. Initial costs associated with well installation and associated pipelines and treatment systems are significant project expenditures related to site remediation. However, the life cycle costs for wells are dominated by the long-term operation and maintenance (O and M) expenditures. Remediation wells are particularly susceptible to various types of fouling that impact well performance and, therefore, drive up operating costs. Simply defined, fouling is the result of any biological, geochemical or physical process that negatively impacts the intended performance of a remediation well. Fouling decreases well performance by effectively reducing hydraulic communication between the well and the surrounding formation. Oftentimes this occurs via clogging screens and/or gravel pack/formation pore space by bacterial or chemical byproducts and gases, which can lead to corrosion of metal components and spreading fouling deposits to pipelines and surface treatment systems. Ultimately, this results in reduced hydraulic performance in extraction and injection wells and result in erroneous water level and chemical parameter concentration measurements in monitoring wells. Remediation well fouling cannot be eliminated, and natural fouling processes are exacerbated by the installation and operation of remedial systems. Steps required to extend the life of remediation wells and to lower life cycle costs are discussed in this paper in order to establish the required approach to effective system management. These optimization approaches have been developed through years of operation and maintenance of complex large-scale plume remediation systems utilizing a variety of subsurface in-situ and ex-situ technologies. Remediation well performance can be improved by: - careful site characterization, - appropriate well design, - proper well installation and development, - thoughtful and adaptable operation and maintenance, - well performance maintenance tracking and, - proactive well rehabilitation. Clear understanding of the site hydro-stratigraphy and geochemical settings places constraints on the compatibility of well materials and the configurations of well screens. Proper well design, including collection and analysis (sieve/grain-size) of screen zone formation samples, assures that wells can be optimally installed, developed and redeveloped during well rehabilitation. Design considerations should include proper sizing of filter packs and well screens, casing/screen diameter, well material selection/compatibility, expected life/use, and well head configuration to allow for future access. Applying appropriate and effective well installation and development methods are of paramount importance and rely on a good understanding of site characteristics (e.g., geologic setting) as well as local drilling company expertise and experience. Different approaches to operation and maintenance can greatly affect the degree of fouling, these include limiting reagent concentrations, maintaining submerged well screens and filtering injection water to prevent the introduction of fouling enhancing constituents. Tracking well performance by monitoring changes in system operation and metrics such as specific capacity or injectivity for extraction and injection wells, respectively, or turbidity and chemical analyses for monitoring wells is key to identifying well maintenance issues early when well rehabilitation can be most effective. Proactive well rehabilitation can include mechanical brushing, surging and jetting, chemical treatment or other specialized approaches; however, the approach needs to be based on a site-specific understanding of the predominant fouling mechanisms. Collection and analyses of fouling deposits can provide guidance for selection of rehabilitation methods and chemicals that will be most effective. Application of these approaches have led to extended operational life for reagent injection wells, which can foul quickly, from months to years. Additionally, proper maintenance will often lead to increased and extended productivity of the well. For extraction wells, this translates to a higher sustainable yield, which means shorter cleanup times. Similarly, for injection wells, proper maintenance allows for the introduction of a greater volume of reagents over a shorter period, thus, shorter cleanup times that reduce overall project costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Continuing the Validation of CCIM Processability for Glass Ceramic HLLW Forms: Plan for Test AFY14CCIM-GC1

This test plan covers test AFY14CCIM-GC1which is the first of two scheduled FY-2014 test runs involving glass ceramic waste forms in the Idaho National Laboratory’s Cold Crucible Induction Melter Pilot Plant. The test plan is based on the successes and challenges of previous tests performed in FY-2012 and FY-2013. The purpose of this test is to continue to collect data for validating the glass ceramic High Level Liquid Waste form processability advantages using Cold Crucible Induction Melter technology. The major objective of AFYCCIM-GC1 is to complete additional proposed crucible pouring and post tapping controlled cooling experiments not completed during previous tests due to crucible drain failure. This is necessary to qualify that no heat treatments in standard waste disposal canisters are necessary for the operational scale production of glass ceramic waste forms. Other objectives include the production and post-test analysis of surrogate waste forms made from separate pours into the same graphite mold canister, testing the robustness of an upgraded crucible bottom drain and drain heater assembly, testing the effectiveness of inductive melt initiation using a resistive starter ring with a square wave configuration, and observing the tapped molten flow behavior in pans with areas identical to standard High Level Waste disposal canisters. Testing conditions, the surrogate waste composition, key testing steps, testing parameters, and sampling and analysis requirements are defined.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Kansas Consortium Plug-in Hybrid Medium Duty

On September 30, 2008, the US Department of Energy (DoE), issued a cooperative agreement award, DE-FC26-08NT01914, to the Metropolitan Energy Center (MEC), for a project known as “Kansas Consortium Plug-in Hybrid Medium Duty Certification” project. The cooperative agreement was awarded pursuant to H15915 in reference to H. R. 2764 Congressionally Directed Projects. The original agreement provided funding for The Consortium to implement the established project objectives as follows: (1) to understand the current state of the development of a test protocol for PHEV configurations; (2) to work with industry stakeholders to recommend a medium duty vehicle test protocol; (3) to utilize the Phase 1 Eaton PHEV F550 Chassis or other appropriate PHEV configurations to conduct emissions testing; (4) and to make an industry PHEV certification test protocol recommendation for medium duty trucks. Subsequent amendments to the initial agreement were made, the most significant being a revised Scope of Project Objectives (SOPO) that did not address actual field data since it was not available as originally expected. This project was mated by DOE with a parallel project award given to the South Coast Air Quality Management District (SCAQMD) in California. The SCAQMD project involved designing, building and testing of five medium duty plug-in hybrid electric trucks. SCAQMD had contracted with the Electric Power Research Institute (EPRI) to manage the project. EPRI provided the required match to the federal grant funds to both the SCAQMD project and the Kansas Consortium project. The rational for linking the two projects was that the data derived from the SCAQMD project could be used to validate the protocols developed by the Kansas Consortium team. At the same time, the consortium team would be a useful resource to SCAQMD in designating their test procedures for emissions and operating parameters and determining vehicle mileage. The years between award of the cooperative agreements and their completion were problematic for the US and world economies. This resulted in the President and Congress implementing the American Recovery and Reinvestment Act of 2009, abbreviated ARRA (Pub.L. 111-5), commonly referred to as the Stimulus or The Recovery Act. The stimulus money available for transportation projects encouraged the SCAQMD to seek additional funds. In August of 2009, they eventually were awarded an additional $45.5 M, and the scope of their project was expanded to 378 vehicles. However, as a consequence of the stimulus money and the inundation of DOE with applications for new project under the ARRA, the expected time table for producing and testing vehicles was significantly delayed. As a result, these vehicles were not available for validating the protocols developed by the Kansas Consortium. Therefore, in April of 2011, the Scope of Project Objectives (SOPO) for the project was revised, and limited to producing the draft protocol for PHEV certification as its deliverable.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Progress Update on the Waste Treatment and Immobilization Plant Pulse- Jet Mixed Vessel Testing Program - 16286

The Waste Treatment and Immobilization Plant (WTP) is designed to use cylindrical-shaped pulse-jet mixers in the black cell vessels to mix the radioactive waste during process operations. Pulse-jet mixers operate like large turkey basters, using air pressure to suck radioactive waste up into the mixer and eject it back into the vessel at high velocity. Using pulse-jet mixers for keeping waste in process vessels adequately mixed is one of the design features that ensures that there are no mechanical parts inside the black cells that would require maintenance. The WTP Project is conducting a testing program to ensure the pulse-jet mixed vessels can address three design and nuclear safety concerns: 1) pulse jet mixer controls, 2) hydrogen gas generation, and 3) the potential for inadvertent criticality in the vessels. The currently planned pulse-jet mixed vessel testing program is divided into three major test campaigns. The first campaign consists of testing to demonstrate pulse-jet mixed vessel control system design and operating concepts. The second test campaign consisted of informational testing of select prototypic PJM vessel features in a reduced scale facility. This testing informed decision making on selection of different mixing system configurations. This test campaign was completed in March 2015. The third test campaign is planned to test the complete functionality of a pulse-jet mixed vessel at full-scale using a prototype standardized high-solids vessel design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗