Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2010”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Summary of NGNP Engineering Analysis Progress in Fiscal Year 2010

The Engineering Analysis work package accomplished a number of activities in FY2010 that will help to inform Licensing, R&D, and detailed design activities that will be performed during the preliminary design phase in Phase 2 of the NGNP Project. These activities were in the following areas: • Fission Product Transport • DDN Update and Consolidation • Gas Reactor Lessons Learned Review • Reactor Coolant Chemistry Control • Resilient Control Systems for High Temperature Gas-cooled Reactors • Water-ingress Analysis In total, the efforts associated with the Engineering Analysis work package accomplished four (4) Level 2 milestones and two (2) internal (Level 4) milestones. Details of the activities and milestones are included in the attached report.

42 ENGINEERING↗

ARM Climate Research Facility Quarterly Instrument Report Fourth Quarter: October 1–December 30, 2010

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

54 ENVIRONMENTAL SCIENCES↗

Climate Research Roadmap Workshop: Summary Report, May 13-14, 2010

In recognition of the ongoing advances and challenges of climate change research, DOE's Office of Biological and Environmental Research (BER) organized a workshop asking the scientific community to identify the current state of climate science. The goal of the workshop was to determine the research challenges important for developing a predictive understanding of global climate. Participants were asked to focus on interdisciplinary research that capitalized on BER's scientific strengths in Atmospheric System Research, Terrestrial Ecosystem Science, and Climate and Earth System Modeling. Approximately 50 scientists representing these three areas were asked to identify desired outcomes for the next 10 years. Goals were identified for the near (1--3 years), mid (4--7 years), and long term (8--10 years). Discussions were focused by discipline (atmospheric, terrestrial, and modeling) and by latitude (high, temperate, and tropical). In addition, opportunities and needs for integration across disciplines and latitudes were identified with a specific focus on crosscutting challenges and outcomes. BER will use this workshop output to update its strategic plan for climate research.

54 ENVIRONMENTAL SCIENCES↗

Office of the Chief Financial Officer Annual Report 2010

In March, a review team consisting of CFOs from other national laboratories, industry, and members of the University of California Office of the President (UCOP) convened for three days to conduct a comprehensive peer review of the OCFO. This was the first time in almost a decade that the financial operations of the Laboratory had been reviewed. The Committee relayed their observations on our strengths, and their very thoughtful recommendations for improvement, which we are actively pursuing. These improvements, when implemented, will benefit the entire Laboratory for many years to come. The complete report is available on the OCFO website (www.lbl.gov/Workplace/CFO). In August, the senior management team of the OCFO participated in a strategic planning retreat. The purpose of the two and a half day exercise was, of course, to update our strategic plan, but instead of spending days developing a written document, we enlisted the expertise of a seasoned journalist who also happens to be a very talented graphic artist. He listened carefully to our ideas and committed them to a visual roadmap. All members of the OCFO, Business Managers, and the Laboratory Leadership Team reviewed this draft roadmap. By having a completely visual strategic plan that is posted widely throughout the OCFO, all employees can easily see and identify with the goals that we are all working towards. FY2010 was an extraordinary year. The Laboratory welcomed its seventh Director, Dr. Paul Alivisatos, who wasted no time communicating his vision and priorities for Berkeley Lab. They include five very ambitious initiatives: Carbon Cycle 2.0, The Next Generation Light Source, a Safe and Efficient Lab, Building Community, and Space. In response, the Office of the Chief Financial Officer (OCFO) developed twelve specific initiatives that align completely with these five priorities. We will be very focused on these in the coming fiscal year, but for now, let's review what happened in FY2010. FY2010 was a pivotal year for the Procurement and Property Department. A provision of the management contract that was signed fives years ago required us to achieve cost savings of $30M. I am proud to announce that this last fiscal year we reached that goal, in large part due to the implementation of eBuy, and the negotiation of strategic sourcing contracts. Our last wall-to-wall inventory exceeded all the Department of Energy's (DOE) national targets and DOE approved the LBNL property system unconditionally. Of the total inventory, 92.3% or 25,601 assets were accounted for using barcode scanning that made the inventory process much more efficient. The effective management of the American Recovery and Reinvestment Act (ARRA) funds was strengthened by the continued successful partnership that LBNL shares with our DOE Site Office. They provided authority, support and clarity to this very complex task. The Laboratory's ARRA Stimulus Committee played a critical role in assuring internal controls, compliance with DOE regulations and quality financial management. The LBNL Budget Officer led a DOE complex-wide effort to identify and share how various DOE facilities track and report ARRA-funded projects, share best practices, evaluate issues and discuss solutions. LBNL has been recognized as a leader in this process and will continue to share knowledge and best practices with other DOE laboratories. Continuous education of our staff as well as the greater Laboratory population was still a major focus of the OCFO. With the help of many OCFO senior managers and staff that acted as subject-matter experts, the Core Financial Management Program was completely re-engineered and resulted in a revised classroom and web-based curriculum that will be formally rolled out Lab-wide in early FY2011. The Office of Sponsored Projects and Industry Partnerships (OSPIP) led the effort to select and purchase four Click Commerce software modules for the LBNL electronic Scientific Research Administration (eSRA) project. In early FY2010, the implementation of the Institutional Review Board (IRB) module, responsible for the human subjects review process, began and should be completed in early FY2011. OSPIP also began implementation of the grants and contracts module and we expect an early go-live of 'Grants Express' in mid-FY2011 with a full completion date in FY2012. The peer review's most substantial recommendation for improvement involved the Laboratory's central financial systems. To quote: 'financial reporting system is outdated and inadequate. There is an inability to easily extract data; the field has little confidence in data; people spend more time mining data than analyzing data; requires field users to create & rely upon shadow systems; causes proliferation of program administrators and resource analysts. These issues impact the quality & execution of research; and the data warehouse lacks understanding & ownership.'

99 GENERAL AND MISCELLANEOUS↗

Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Treatment of Passive Component Reliability in Risk-Informed Safety Margin Characterization FY 2010 Report

The Risk-Informed Safety Margin Characterization (RISMC) pathway is a set of activities defined under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability Program. The overarching objective of RISMC is to support plant life-extension decision-making by providing a state-of-knowledge characterization of safety margins in key systems, structures, and components (SSCs). A technical challenge at the core of this effort is to establish the conceptual and technical feasibility of analyzing safety margin in a risk-informed way, which, unlike conventionally defined deterministic margin analysis, is founded on probabilistic characterizations of SSC performance.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SUMMARY OF 2010 DOE EM INTERNATIONAL PROGRAM STUDIES OF WASTE GLASS MELT RATE ENHANCEMENT

A collaborative study has been established under the U.S. Department of Energy (DOE) Office of Environmental Management International Program between the Savannah River National Laboratory (SRNL) and the V. G. Khlopin Radium Institute (KRI) in St. Petersburg, Russia, to investigate potential improvements in melt rate via chemical additions to the glass frit. Researchers at KRI suggested a methodology for selecting frit additives based on empirical coefficients for optimization of glass melting available in the Russian literature. Using these coefficients, KRI identified B{sub 2}O{sub 3}, CuO, and MnO as frit additives that were likely to improve melt rate without having adverse effects on crystallization of the glass or its chemical durability. The results of the melt rate testing in the SMK melter showed that the slurry feed rate (used as a gauge of melt rate) could be significantly increased when MnO or CuO were added to Frit 550 with the SMR-2 sludge. The feed rates increased by about 27% when MnO was added to the frit and by about 26% when CuO was added to the frit, as compared to earlier results for Frit 550 alone. The impact of adding additional B{sub 2}O{sub 3} to the frit was minor when added with CuO. The additional B{sub 2}O{sub 3} showed a more significant, 39% improvement in melt rate when added with MnO. The additional B{sub 2}O{sub 3} also reduced the viscosity of the glasses during pouring. Samples of the glasses from the melt rate testing characterized at SRNL showed that there were no significant impacts on crystallization of the glasses. All of the glasses had very good chemical durability. Chemical composition measurements showed that the frit additives were present in concentrations below the targeted values in some of the glasses. Therefore, it is possible that higher concentrations of these additives may further improve melt rate, although the impacts of higher concentrations of these components on crystallization and durability would need to be determined. Overall, the results show an excellent potential for these additives to significantly improve waste throughput for DOE vitrification facilities. A complete report from KRI is included as an appendix to this document.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

State of the States 2010: The Role of Policy in Clean Energy Market Transformation

This report builds on the emerging body of literature seeking to identify quantitative connections between clean energy policy and renewable energy. The methods presented test the relationships between a broad set of policies and clean energy resources (energy efficiency, biomass, geothermal, solar, and wind). Energy efficiency findings are an initial foray into this type of analysis and indicatesignificant connections between reduced energy use and buildings codes, energy efficiency resource standards (in some cases), and electricity price. Renewable energy findings specify that there is most often a relationship between state policies and solar and wind development, indicating that while policies might apply to a wide variety of renewable resources, further tailoring of policyspecifics to resource needs may lead to increased development of a wider variety of renewable energy resources. Further research is needed to refine the connections between clean energy development and policy, especially in the area of the impact of the length of time that a policy has been in place.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Preliminary Screening Analysis for the Environmental Risk Evaluation System: Task 2.1.1: Evaluating Effects of Stressors – Fiscal Year 2010 Progress Report: Environmental Effects of Marine and Hydrokinetic Energy

Possible environmental effects of marine and hydrokinetic (MHK) energy development are not well understood, and yet regulatory agencies are required to make decisions in spite of substantial uncertainty about environmental impacts and their long-term effects. An understanding of risk associated with likely interactions between MHK installations and aquatic receptors, including animals, habitats, and ecosystems, can help reduce the level of uncertainty and focus regulatory actions and scientific studies on interactions of most concern. As a first step in developing the Pacific Northwest National Laboratory (PNNL) Environmental Risk Evaluation System (ERES), PNNL scientists conducted a preliminary risk screening analysis on three initial MHK cases - a tidal project in Puget Sound using Open Hydro turbines, a wave project off the coast of Oregon using Ocean Power Technologies point attenuator buoys, and a riverine current project in the Mississippi River using Free Flow turbines. Through an iterative process, the screening analysis revealed that top-tier stressors in all three cases were the effects of the dynamic physical presence of the device (e.g., strike), accidents, and effects of the static physical presence of the device (e.g., habitat alteration). Receptor interactions with these stressors at the four highest tiers of risk were dominated by marine mammals (cetaceans and pinnipeds) and birds (diving and non-diving); only the riverine case (Free Flow) included different receptors in the third tier (fish) and the fourth tier (benthic invertebrates). Although this screening analysis provides a preliminary analysis of vulnerability of environmental receptors to stressors associated with MHK installations, probability analysis, especially of risk associated with chemical toxicity and accidents such as oil spills or lost gear, will be necessary to further understand high-priority risks. Subject matter expert review of this process and results is required and is planned for the first quarter of FY11. Once expert review is finalized, the screening analysis phase of ERES will be complete.

02 PETROLEUM↗

Electricity Supply Infrastructure Improvements: Final Technical Status Report, December 2010

This report is about a work effort where the overall objectives were to establish a methodology and approach for selected transmission and distribution (T&D) grid modernization; monitor the results; and report on the findings, recommendations, and lessons learned. The work reported addressed T&D problems and solutions, related reliability issues, equipment and operation upgrades, and respectivefield testing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Remediation of Uranium in the Hanford Vadose Zone Using Ammonia Gas: FY 2010 Laboratory-Scale Experiments

This investigation is focused on refining an in situ technology for vadose zone remediation of uranium by the addition of ammonia (NH3) gas. Objectives are to: a) refine the technique of ammonia gas treatment of low water content sediments to minimize uranium mobility by changing uranium surface phases (or coat surface phases), b) identify the geochemical changes in uranium surface phases during ammonia gas treatment, c) identify broader geochemical changes that occur in sediment during ammonia gas treatment, and d) predict and test injection of ammonia gas for intermediate-scale systems to identify process interactions that occur at a larger scale and could impact field scale implementation.Overall, NH3 gas treatment of low-water content sediments appears quite effective at decreasing aqueous, adsorbed uranium concentrations. The NH3 gas treatment is also fairly effective for decreasing the mobility of U-carbonate coprecipitates, but shows mixed success for U present in Na-boltwoodite. There are some changes in U-carbonate surface phases that were identified by surface phase analysis, but no changes observed for Na-boltwoodite. It is likely that dissolution of sediment minerals (predominantly montmorillonite, muscovite, kaolinite) under the alkaline conditions created and subsequent precipitation as the pH returns to natural conditions coat some of the uranium surface phases, although a greater understanding of these processes is needed to predict the long term impact on uranium mobility. Injection of NH3 gas into sediments at low water content (1% to 16% water content) can effectively treat a large area without water addition, so there is little uranium mobilization (i.e., transport over cm or larger scale) during the injection phase.

99 GENERAL AND MISCELLANEOUS↗

Summary of FY 2010 Iodine Capture Studies at the INL

Three breakthrough runs using silver mordenite sorbents were conducted and a dynamic sorption capacity estimated based on MeI analysis from a 2" bed. However, it is now believed the data for the first 2 runs is incomplete because the contributions from elemental iodine were not included. Although the only source of iodine was MeI, elemental iodine was generated within the sorbent bed, presumably from a recombination reaction likely catalyzed by silver mordenite. On-line effluent analysis with a GC was only capable of analyzing MeI, not I2. Scrub samples drawn during Run #3, which are specific for I2, show significant levels of I2 being emitted from a partially spent Ag-mordenite bed. By combining MeI and I2 analyses, a well defined total iodine breakthrough curve can be generated for Run #3. At the conclusion of Run #3 (IONEX Ag-900 was the sorbent) the effluent level from Bed 2 was approaching 70% of the feed concentration. The leading bed (Bed 1) had an estimated average loading of 66 mg I/g sorbent, Bed 2's was 52 mg I/g. The corresponding silver utilizations (assuming formation of AgI) were about 59% and 46%, respectively. The spent sorbents are being sent to Sandia National Laboratories for confirmatory analysis of iodine and silver utilization as well as source material for waste form development.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Test Reactor Core Modeling Update Project Annual Report for Fiscal Year 2010

Legacy computational reactor physics software tools and protocols currently used for support of Advanced Test Reactor (ATR) core fuel management and safety assurance and, to some extent, experiment management are obsolete, inconsistent with the state of modern nuclear engineering practice, and are becoming increasingly difficult to properly verify and validate (V&V). Furthermore, the legacy staff knowledge required for application of these tools and protocols from the 1960s and 1970s is rapidly being lost due to staff turnover and retirements. In 2009 the Idaho National Laboratory (INL) initiated a focused effort to address this situation through the introduction of modern high-fidelity computational software and protocols, with appropriate V&V, within the next 3-4 years via the ATR Core Modeling and Simulation and V&V Update (or “Core Modeling Update”) Project. This aggressive computational and experimental campaign will have a broad strategic impact on the operation of the ATR, both in terms of improved computational efficiency and accuracy for support of ongoing DOE programs as well as in terms of national and international recognition of the ATR National Scientific User Facility (NSUF).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗