Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “verifications”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Selected Examples of LDRD Projects Supporting Test Ban Treaty Verification and Nonproliferation

The Laboratory Directed Research and Development (LDRD) Program at the DOE National Laboratories was established to ensure the scientific and technical vitality of these institutions and to enhance the their ability to respond to evolving missions and anticipate national needs. LDRD allows the Laboratory directors to invest a percentage of their total annual budget in cutting-edge research and development projects within their mission areas. We highlight a selected set of LDRD-funded projects, in chronological order, that have helped provide capabilities, people and infrastructure that contributed greatly to our ability to respond to technical challenges in support of test ban treaty verification and nonproliferation.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Verification test of the SURF and SURFplus models in xRage

As a verification test of the SURF and SURFplus models in the xRage code we use a propagating underdriven detonation wave in 1-D. This is about the only test cases for which an accurate solution can be determined based on the theoretical structure of the solution. The solution consists of a steady ZND reaction zone profile joined with a scale invariant rarefaction or Taylor wave and followed by a constant state. The end of the reaction profile and the head of the rarefaction coincide with the sonic CJ state of the detonation wave. The constant state is required to match a rigid wall boundary condition. For a test case, we use PBX 9502 with the same EOS and burn rate as previously used to test the shock detector algorithm utilized by the SURF model. The detonation wave is propagated for 10 μs (slightly under 80mm). As expected, the pointwise errors are largest in the neighborhood of discontinuities; pressure discontinuity at the lead shock front and pressure derivative discontinuities at the head and tail of the rarefaction. As a quantitative measure of the overall accuracy, the L2 norm of the difference of the numerical pressure and the exact solution is used. Results are presented for simulations using both a uniform grid and an adaptive grid that refines the reaction zone.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Some New Verification Test Problems for Multimaterial Diffusion on Meshes that are Non-Aligned with Material Boundaries

In this report a number of new verification test problems for multimaterial diffusion will be shown. Using them we will show that homogenization of multimaterial cells in either Arbitrary Lagrangian Eulerian (ALE) or Eulerian simulations can lead to errors in the energy flow at the interfaces. Results will be presented that show that significant improvements and predictive capability can be gained by using either a surrogate supermesh, such as Thin Mesh in FLAG, or the emerging method based on Static Condensation.

36 MATERIALS SCIENCE↗

Verification Test of the SURF and SURFplus Models in xRage: Part III Affect of Mesh Alignment

The previous studies used an underdriven detonation wave in 1-dimension (steady ZND reaction zone profile followed by a scale-invariant rarefaction wave) for PBX 9502 as a verification test of the implementation of the SURF and SURFplus models in the xRage code. Since the SURF rate is a function of the lead shock pressure, the question arises as to the effect on accuracy of variations in the detected shock pressure due to the alignment of the shock front with the mesh. To study the effect of mesh alignment we simulate a cylindrically diverging detonation wave using a planar 2-D mesh. The leading issue is the magnitude of azimuthal asymmetries in the numerical solution. The 2-D test case does not have an exact analytic solution. To quantify the accuracy, the 2-D solution along rays through the origin are compared to a highly resolved 1-D simulation in cylindrical geometry.

97 MATHEMATICS AND COMPUTING↗

Hybrid Enrichment Verification Array: Module Characterization Studies

The work presented in this report is focused on the characterization and refinement of the Hybrid Enrichment Verification Array (HEVA) approach, which combines the traditional 186-keV 235 U signature with high-energy prompt gamma rays from neutron capture in the detector and surrounding collimator material, to determine the relative enrichment and 235 U mass of the cylinder. The design of the HEVA modules (hardware and software) deployed in the current field trial builds on over seven years of study and evolution by PNNL, and consists of a ø3''×3'' NaI(Tl) scintillator coupled to an Osprey digital multi-channel analyzer tube base from Canberra. The core of the HEVA methodology, the high-energy prompt gamma-ray signature, serves as an indirect method for the measurement of total neutron emission from the cylinder. A method for measuring the intrinsic efficiency of this “non-traditional” neutron signature and the results from a benchmark experiment are presented. Also discussed are potential perturbing effects on the non-traditional signature, including short-lived activation of materials in the HEVA module. Modeling and empirical results are presented to demonstrate that such effects are expected to be negligible for the envisioned implementation scenario. In comparison to previous versions, the new design boosts the high-energy prompt gamma-ray signature, provides more flexible and effective collimation, and improves count-rate management via commercially available pulse-processing electronics with a special modification prompted by PNNL.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Shift Verification and Validation

This documentation outlines the verification and validation of Shift for the Consortium for Advanced Simulation of Light Water Reactors (CASL). Five main types of problems were used for validation: small criticality benchmark problems; full-core reactor benchmarks for light water reactors; fixed-source coupled neutron-photon dosimetry benchmarks; depletion/burnup benchmarks; and full-core reactor performance benchmarks. We compared Shift results to measured data and other simulated Monte Carlo radiation transport code results, and found very good agreement in a variety of comparison measures. These include prediction of critical eigenvalue, radial and axial pin power distributions, rod worth, leakage spectra, and nuclide inventories over a burn cycle. Based on this validation of Shift, we are confident in Shift to provide reference results for CASL benchmarking.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Additional Model Datasets and Results to Accelerate the Verification and Validation of RELAP-7

The RELAP-7 code verification and validation activities are ongoing under the code assessment plan proposed in the previous document (INL-EXT-16-40015). Among the list of V&V test problems in the ‘RELAP-7 code V&V RTM (Requirements Traceability Matrix)’, the RELAP-7 7-equation model has been tested with additional demonstration problems and the results of these tests are reported in this document. In this report, we describe the testing process, the test cases that were conducted, and the results of the evaluation.

97 MATHEMATICS AND COMPUTING↗

RELAP-7 Software Verification and Validation Plan - Requirements Traceability Matrix (RTM) Part 2: Code Assessment Strategy, Procedure, and RTM Update

This document addresses two subjects involved with the RELAP-7 Software Verification and Validation Plan (SVVP): (i) the principles and plan to assure the independence of RELAP-7 assessment through the code development process, and (ii) the work performed to establish the RELAP-7 assessment plan, i.e., the assessment strategy, literature review, and identification of RELAP-7 requirements. Then, the Requirements Traceability Matrices (RTMs) proposed in previous document (INL-EXT-15-36684) are updated. These RTMs provide an efficient way to evaluate the RELAP-7 development status as well as the maturity of RELAP-7 assessment through the development process.

97 MATHEMATICS AND COMPUTING↗

Standardized Definitions for Code Verification Test Problems

This document contains standardized definitions for several commonly used code verification test problems. These definitions are intended to contain sufficient information to set up the test problem in a computational physics code. These definitions are intended to be used in conjunction with exact solutions to these problems generated using Exact- Pack, www.github.com/lanl/exactpack.

97 MATHEMATICS AND COMPUTING↗

Turf Conversion Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings as a result of water conservation measures (WCMs) in energy performance contracts associated with converting turfgrass or other water-intensive plantings to water-wise and sustainable landscapes. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Turf Conversion Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings as a result of water conservation measures (WCMs) in energy performance contracts associated with converting turfgrass or other water-intensive plantings to water-wise and sustainable landscapes. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Outdoor Irrigation Measurement and Verification Protocol

This measurement and verification (M&V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with outdoor irrigation efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M&V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Outdoor Irrigation Measurement and Verification Protocol

This measurement and verification (M&V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with outdoor irrigation efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M&V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Cooling Tower (Evaporative Cooling System) Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with cooling tower efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Cooling Tower (Evaporative Cooling System) Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with cooling tower efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

The Verification and Validation Strategy Within the Second Wind Forecast Improvement Project (WFIP 2)

The Wind Forecast Improvement Project 2 (WFIP2), in the complex terrain of the Columbia Gorge, focuses on a set of weather phenomena that poses particular challenges for wind and wind power forecasting. It further aims to understand and improve the skill of weather forecast models, particularly the National Oceanic and Atmospheric Administration's (NOAA's) High Resolution Rapid Refresh (HRRR), in complex terrain. The project also includes an extensive field campaign in the Columbia River Gorge, during which data from many different instruments were collected. WFIP2 is funded by the U.S. Department of Energy (DOE). Scientists from four U.S. national laboratories, NOAA, Vaisala, and universities contribute to the project with wide and varied interests and skill sets. Therefore, coordinated verification & validation (V&V) efforts across these members allows for the development of a clear picture of model improvements and scientific findings within WFIP2. The WFIP2 V&V team is tasked with providing tools, methods, and guidance to enable repeatable, metrics-based assessment of the Weather Research and Forecasting (WRF) model and associated modeling suites for analysis and forecasting of mesoscale weather phenomena that are important for wind energy in the Columbia River Gorge and other parts of the continental United States. This report summarizes what has been worked on and accomplished within the duration of the WFIP2 project, 4 years, by the V&V team.

17 WIND ENERGY↗

Verification and Validation for Energy System Co-Design and Simulation

This project was only active for two months and was terminated due to a re-organization of the sponsoring initiative. The original purpose of the project was to develop and apply verification and validation (V&V) methodologies for the Energy System Co-Design with Multiple Objectives and Power Electronics (E-COMP) Initiative. This report summarizes the project and the work that was completed in the shortened time frame.

42 ENGINEERING↗