Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “site”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Project plans for transuranic waste at small quantity sites in the Department of Energy comples-10522

Los Alamos National Laboratory, Carlsbad Office (LANL-CO), has been tasked to write Project Plans for all of the Small Quantity Sites (SQS) with defense related Transuranic (TRU) waste in the Department of Energy (DOE) complex. Transuranic Work-Off Plans were precursors to the Project Plans. LANL-CO prepared a Work-Off Plan for each small quantity site. The Work-Off Plan that identified issues, drivers, schedules, and inventory. Eight sites have been chosen to deinventory their legacy TRU waste; Bettis Atomic Power Laboratory, General Electric-Vallecitos Nuclear Center, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory-Area 300, Nevada Test Site, Nuclear Radiation Development, Sandia National Laboratory, and the Separations Process Research Unit. Each plan was written for contact and/or remote handled waste if present at the site. These project plans will assist the small quantity sites to ship legacy TRU waste offsite and de-inventory the site of legacy TRU waste. The DOE is working very diligently to reduce the nuclear foot print in the United States. Each of the eight SQSs will be de-inventoried of legacy TRU waste during a campaign that ends September 2011. The small quantity sites have a fraction of the waste that large quantity sites possess. During this campaign, the small quantity sites will package all of the legacy TRU waste and ship to Idaho or directly to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The sites will then be removed from the Transuranic Waste Inventory if they are de-inventoried of all waste. Each Project Plan includes the respective site inventory report, schedules, resources, drivers and any issues. These project plans have been written by the difficult waste team and will be approved by each site. Team members have been assigned to each site to write site specific project plans. Once the project plans have been written, the difficult team members will visit the sites to ensure nothing has been overlooked and to verify the inventory. After each site has approved their project plan, the site will begin writing procedures and packaging/repackaging their waste. In some cases the sites have already begun the process. The waste will be shipped after all of the waste has been characterized and approved.

54 ENVIRONMENTAL SCIENCES↗

Identification and quantification of distinct active sites in Hf-Beta zeolites for transfer hydrogenation catalysis

Despite the significant progress made in characterizing different framework heteroatom sites that exist in Lewis acidic zeolites with probe molecule adsorption and spectroscopy, methods to reliably quantify site counts remain indefinite and have been primarily limited to Sn and Ti Lewis acid sites. Here, methods to quantify framework Lewis acidic Hf 4+ sites in zeolite Beta (Hf-Beta) with two Lewis base titrants (pyridine, deuterated acetonitrile) were developed using infrared (IR) spectroscopy. Lewis acid site counts for Hf-Beta zeolites were validated by measuring integrated molar extinction coefficients (IMECs; ε, cm μmol –1 ) on Sn-Beta zeolites using identical Lewis base titrants to benchmark site counts with established literature procedures to quantify Lewis acid sites in Beta zeolites from IR spectra. Highlighting the importance of benchmarking active site counts against well-established experimental protocols, IMECs of CD 3 CN bound to open (ε(Sn; 2316 cm –1 ): 1.80 ± 0.25) and closed (ε(Sn; 2308 cm –1 ): 3.76 ± 0.33) Sn sites were ~1.8x larger than those previously reported while total Lewis acid site counts agreed with those measured by pyridine (ε(Sn; 1451 cm –1 ): 1.58 ± 0.16) on six different Sn-Beta zeolites. IMECs measured for IR peaks reflecting pyridine bound to Lewis acidic Hf sites (ε(Hf; 1448 cm –1 ): 1.54 ± 0.21) and CD 3 CN bound to open (ε(Hf; 2313 cm –1 ): 2.40 ± 0.22) and closed (ε(Hf; 2307 cm –1 ): 3.55 ± 0.41) Hf sites, gave similar counts for the total number of Lewis acidic sites across six Hf-Beta zeolites (Si/Hf = 100–413). Consistent with previous reports with Sn-Beta catalysts where open Sn sites are responsible for catalytic turnover, apparent first and zero-order MPVO rate constants (0.01–1 M cyclohexanone in 2-butanol; per total Hf, 373 K) correlated with the total number of open Hf sites, per total Hf, but not with the total number of closed Hf sites or total Lewis acid site counts. Measured initial MPVO rates (0.1 M cyclohexanone in 2-butanol, per open Hf, 373 K) were ~25x higher on hydrophobic Hf-Beta-F than on hydrophilic Hf-Beta-OH zeolites. Overall, the apparent first-order MPVO rate constants (2-butanol solvent, per open Hf, 373 K) were ~6x higher on Hf-Beta-F than on Hf-Beta-OH zeolites. The characterization methods reported here enable normalization of MPVO turnover rates on Sn- and Hf-Beta zeolites by their number of open sites. Finally, this enables performing quantitative rate comparisons across Lewis acid zeolites of varying active site identity, solvation, and pore topology used in liquid-phase catalysis.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Proposed Mars Surveyor Landing Sites in Northern Meridiani Sinus, Southern Elysium Planitia, and Argyre Planitia

Our objective is to propose two landing sites that the Mars Surveyor 2001 Lander and Athena Rover could go to on Mars that should meet the safety requirements of the spacecraft landing system and optimize surface operations (chiefly driven by power and communications requirements). An additional site within Argyre Planitia, initially proposed by Parker to the Mars Surveyor Landing Site program, is also proposed for potential consideration for post-2001 missions to Mars, as it is well outside the current latitude limits for the Athena Rover. All three sites are designed to be situated as close to a diversity of geologic units within a few kilometers of the landing site so that diversity can be placed in a geologic context. This objective is very different from the Mars Pathfinder requirement to land at a site with a maximum chance for containing a diversity of rocks within a few tens of meters of the lander. That requirement was driven by the Sojourner mobility limit of a few tens of meters. It can be argued that the Athena project, with its much larger mobility capability, might actually want to avoid such a site, because placing collected samples in geologic context would be difficult. While it has been argued, both before and after the Mars Pathfinder landing, that the provenance for local blocks may be determined by orbiter spectra, primarily from the MGS TES instrument, our ability to do so has yet to be demonstrated. Indeed, several months after conclusion of the Pathfinder mission, we have yet to reach a consensus on the composition of local materials. Our primary data set for selecting a landing site within the latitude and elevation constraints of the 2001 mission is the Viking Orbiter image archive. The site must be selected to place the landing ellipse so as to avoid obvious hazards, such as steep slopes, large or numerous craters, or abundant large knobs. For this purpose, we chose a resolution limit of better than 50 m/pixel. This necessarily excludes from the present study images from current and future orbiter spacecraft, until such data does become readily available. Within each proposed region, it may be possible to identify additional sites once these data become available. Second, the fine-component thermal inertia data, should be greater than about 5 or 6 cgs Units (10(exp -3) cal/sq cm s(exp -0.5)/K). Low thermal inertias imply dusty environments, which could pose a mobility hazard. Similarly, the albedo of the site should not be particularly high, which would also suggest dusty surfaces. Low albedos are preferred, as they often coincide with low Viking red:violet ratios and indicate less dusty surfaces. Next, the Modeled Block Abundance should also not be too high or too low. Based on the Viking Lander and Mars Pathfinder experiences, percentages of blocks should be on the order of 5-25%. Too many blocks could pose a hazard to the landing and mobility. Too few blocks could also indicate a dusty surface. Primary Landing Site: Northern Meridiani Sinus (Proposed by T. J. Parker and K., S. Edgett) Vital Statistics: (1) Latitude, Longitude: 0-3 N, 350-2 W. *Elevation (Viking): about0.5-1.5 Ian. (2) Viking Orbiter Image coverage: Excellent coverage by 15 - 25 m/pixel images (orbits 709A and 410B). Possible stereo coverage in region where two orbits overlap (probably small parallax angle, as these orbits are not listed in NASA Contractor Report 3501) (3) Albedo: about .18 -.26 (4) Block Abundance: 5-26% (5)Fine-Component Thermal Inertia: 5-9 cgs units This region consists of bright deposits similar to those described by Edgett et al, that also lie within a prominent dark albedo region. These deposits are flat-lying, to such a degree that they ramp against topography rather than draping over it. This led Edgett and Parker to suggest that they may be subaqueous sediments, possibly lacustrine or marine evaporites, laid down sometime from the late Noachian to middle Hesperian (age determination pending crater counts). A contact between this material and elevated, dissected highlands to the south was identified , and is described by Edgett et al. Our desire in proposing this landing site is to sample the edge of this deposit where it has been exposed through etching, presumably eolian deflation (the deposit, though in the highlands, is itself only lightly to moderately cratered). This should enable access to in situ stratigraphy. The actual landing site will be selected where slopes are not expected to be steep, such that the rover itself should be able to traverse them and sample layered materials on the way, either up or down the slope. Perhaps due to uncertainties at this time as to the friability or meter-scale roughness of the deposit, it might make sense to place the landing ellipse on the exhumed highland surface adjacent to the deflated margin of the deposit and plan on driving to the deposit rather than landing on it and driving downslope. This should also enable imaging the margin for evidence of layering should it prove too difficult to climb. A target ellipse on the highland surface should also allow Athena access to ancient Noachian highland materials, particularly if placed near crater ejecta or an inlier of knobby material. Secondary Landing Site: Southern Elysium Planitia (Proposed by T. J. Parker) Vital Statistics: (1) Latitude, Longitude: 1.5-3.5 S, 195-198 W. (2) Elevation (Viking): -1.0 km. (3) Viking Orbiter Image coverage: Excellent coverage by 15 - 25 m/pixel images (orbit 725). Possible stereo coverage between images from beginning and end of orbit that overlap (probably small parallax angle) (4) Albedo: about .27-.28 (5) Block Abundance: 4-7% (6) Fine-Component Thermal Inertia: about 3 cgs units This region consists of eroded knobby material, probably of Noachian age, though much of the crater population has been destroyed, that is onlapped at a sharp contact by an extensive plains unit in southern Elysium Planitia that is Amazonian in age. The plains materials have been attributed to unusually low-viscosity flood lavas from fissures south of the Elysium volcanic rise, or to lacustrine materials associated with a large, Amazonian lake at the source of Marte Vallis. Parker and Schenk presented evidence in support of the latter interpretation, though they attributed the putative shore morphology to an embayment of a northern plains ocean into the southern Elysium region. Detailed examination of the margin of the deposit, showing erosion, not simply burial, of small crater rims and fluidized ejecta blankets, also points to lacustrine or marine sedimentation rather than volcanic plains burial. The plains surface exhibits a "crusty" appearance that many researchers have attributed to pressure ridges in lava flows. In a lacustrine context, they also resemble pressure ridges in desiccated evaporite deposits and salt-rimmed pools (now dry) similar in scale and morphology to spectacular, hundred meter-scale pool rims in alkaline Lake Natron, East African Rift. The eroded highland margin surface adjacent to these plains appears to be fairly smooth, even at 15 m/pixel. Isolated knob inliers are scattered from a few kilometers to several tens of "kilometers apart. Heights of the knobs have not been measured yet but, based on experience with similar features in the Pathfinder landing ellipse, are probably typically on the order of several tens of meters high and smaller, though some of the largest knobs in the region are probably up to a few hundred meters high. Two craters larger than a kilometer in diameter, with fluidized deposits, lie nearby the proposed landing site. Very high-resolution images from MOC should help to determine whether a landing site navigable by the Athena rover could be placed in this region. The space between knobs and craters is large enough to enable placement of a target landing ellipse between them but still provide access to one or more of them and to the margin of the Elysium plains material. Post-2001 Mars Surveyor Landing Site: Argyre Planitia (Proposed by T. J. Parker) Vital Statistics: (1) Latitude, Longitude: 55-56 S, 41-43 W. (2) Elevation (Viking): 1.0 km. (3) Viking Orbiter Image coverage: Excellent coverage by 40 m/pixel images (orbits 567B, 568B, and 569B). Excellent stereo coverage with large parallax angles over the entire landing site region, and much of central and southern Argyre. (4) Albedo: about .23-.24 (5) Block Abundance: No data (6) Fine-Component Thermal Inertia: No data The floors of both the Argyre and Hellas basins contain etched layered materials that are probably thick accumulations of channel or lacustrine sediments. The deposits in Hellas are much more eroded than those in Argyre, and Hellas lacks a channel outlet. Argyre is unique in that Uzboi Vallis flowed out of the basin, requiring overflow of a standing body of water within Argyre. This makes it the largest impact basin on Mars with channels both draining into it and flowing out from it. Hellas' channels may be catastrophic flood channels, whereas Argyre was fed by modest-scale valley networks, though the outlet at Uzboi Vallis was a catastrophic flood Highland craters and basins of this kind should be high-priority landing targets for missions intended to focus on the search for either prebiotic organic materials or even simple fossil microorganisms. Basins with internally-draining valley networks should be preferred over flood channels, as they could have provided the long-term influx of water favorable to the origin of life. (Catastrophic floods are not conducive to fossil preservation, due to their very short durations and high transportation energies). They also afford an opportunity to study the evolution of the planet's climate and volatiles during the period of time between the late Noachian and early Hesperian, when a drastic change from a proposed early warm, wet climate to one more closely resembling the modern environment is thought to have occurred. Large basin

Parker, T. J.↗

Colonie, New York, FUSRAP Site: Pathway from Remediation to Redevelopment - 19465

The Colonie, New York, Formerly Utilized Sites Remedial Action Program (FUSRAP) Site consists of a 4.5-hectare (11.2-acre) US Department of Energy (DOE)-owned vacant property (Main Site) and 56 commercial and residential vicinity properties (VPs). The site was owned and operated by National Lead Industries (NL) from 1937 to 1984. The Main Site was used for manufacturing fuel and weapons components using uranium and thorium. Depleted uranium dust was emitted from exhaust stacks that contaminated the site and the VPs. NL also filled in portions of the site with industrial waste and released contaminants to groundwater. The state court shut the plant down in 1984. The site was acquired by DOE in 1985, which remediated the VPs and began to remediate the Main Site up to 1997. The US Army Corps of Engineers (USACE) undertook remedial actions beginning in 1997. The site has three Operable Units (Main Site, Groundwater, and VPs). The Main Site soil was remediated to residential standards except for three small easement areas. The soils in the easement areas are safe for exposure to workers. There is a groundwater plume beneath the site that will require the use of monitoring and temporary land use controls until cleanup standards are met. The VPs require no further action. A 2-year transition period from USACE to the DOE Office of Legacy Management (LM) began on June 18, 2018, with the receipt of the Site Closeout Report from USACE. LM has determined that the 4.5-hectare site is excess to its mission needs and intends to pursue sale of the property for redevelopment. There are several processes required before the disposal can occur. Organizations with similar sites that are federally owned and ready for private redevelopment may benefit from reviewing the Colonie site disposition processes. This paper will discuss (1) Determining disposal alternatives for the Colonie, New York, site. (2) Describing the federal requirements for the disposal of excess real property. (3) Communicating to stakeholders that the site is ready for disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Designing a Site Closure Strategy for Uranium in Groundwater and Surface Water - 19534

A site closure strategy was designed and mapped for residual uranium present in groundwater and surface water at the US DOE Office of Legacy Management (LM) Monticello Mill Tailings Site (MMTS) Operable Unit (OU) III, which is regulated under CERCLA. The MMTS is a former mill site that was used to process uranium and vanadium ore in southeastern Utah until 1960. OU III includes surface water in Montezuma Creek and groundwater present in a shallow alluvial aquifer along the creek valley for several kilometers downgradient of the former mill site. The current remedy consists of an operating pump-and-treat system, monitored natural attenuation (MNA), and institutional controls (ICs). Performance evaluations indicate that a prolonged restoration period is likely, as well as an asymptotic trend in uranium concentrations that still exceed the remediation goal. Multiple strategies and scenarios were evaluated before selecting a preferred site closure strategy. Recommendations were developed to support advancing the site towards closure over the next few years and guide the process of regulatory interactions and decision making at the MMTS OU III. Site closure is an important milestone that reflects successful remedial progress at LM sites. Post-closure site management would be maintained to ensure conditions are protective of human health and the environment. The site closure strategy was considered in the context of site remedial progress. The primary sources of groundwater contamination have been removed, including mill tailings and contaminated soils, sediment, and debris. Five-year reviews have regularly concluded that the remedy is protective of human health and environment and that ICs are effective in preventing exposure to contaminated groundwater. The affected aquifer is low-yielding and has no history of domestic use. In 2004, the final remedy selected in the Record of Decision (ROD) was MNA with ICs. However, a pump-and-treat system was installed and continues to operate as a contingency remedy in the area with the highest residual uranium concentrations. The need for a contingency pump-and-treat system was triggered by a departure of the long-term monitoring data from model projections that were used as the basis for remedy performance metrics specified in the ROD. In 2015, the pump-and-treat system was expanded. Average uranium concentrations have declined locally over time. However, monitoring data and column studies indicate that the system effectiveness will eventually become ineffective in reducing uranium concentrations, likely due to the reequilibration of uranium present in the solid matrix in various states (i.e., sorbed, precipitated). Currently, there are no agreed-upon metrics for discontinuing the contingency pump-and-treat system. Three closure strategies effectively applied at other CERCLA sites were considered at MMTS OU III: (1) restoring natural attenuation conditions and conducting MNA; (2) applying alternate concentration limits (ACLs); and (3) waiving a remedial goal based on technical impracticability (TI). Each closure strategy was evaluated in the following manner: (1) identifying the criteria and requirements associated with current regulations, policy, and guidance, (2) assessing the ability to meet those criteria based on the current site knowledge and the conceptual site model, and (3) identifying data gaps that need to be filled to further assess the closure strategy. Following this evaluation, a preferred closure strategy was selected: to transition to a remedy based on MNA and maintenance of ICs, without active remediation. Several scenarios for transitioning to the preferred closure strategy were identified. Each scenario consisted of 'if/then logic' associated with a larger decision diagram. The decision diagram considered the current conceptual site model (CSM) and potential outcomes of studies that will be conducted to fill data gaps, as well as the performance of the existing treatment system and long-term monitoring data. Two scenarios for transitioning to the preferred closure strategy were highlighted for future planning and were described in detail. For both scenarios, the preferred closure strategy includes demonstrating criteria for MNA acceptance, pump-and-treat termination, long-term monitoring, and eventual site delisting. Recommended actions over the next few years were also developed, including updating the CSM, conducting numerical modeling to predict remedial performance and time frames, conducting geochemical analyses to assess uranium fate and transport, and summarizing the lines of evidence and basis for MNA. This detailed example of the development of a site-specific closure strategy provides the thought process and decision logic used to assess uncertainty using an if/then framework; identify common elements and recommended actions to advance the site towards closure; and navigate the inherent uncertainty in the timing of future events, outcome of regulatory discussions, and remedial progress over time that is common to many complex US DOE facilities. In addition, the national regulations, policy, guidance, and state of practice regarding commonly used site closure strategies was summarized for consideration, including MNA, ACLs, and TI. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structural analysis of substrate recognition by glucose isomerase in Mn2+ binding mode at M2 site in S. rubiginosus

Highlights: • A snapshot of metal binding at the SruGI M2 site in the presence of Mn{sup 2+}. • Metal binding at the M2 site elicits a configuration change at the M1 site. • Glucose molecule can only bind to the M1 site in presence of Mn{sup 2+} at the M2 site. • Two-step sequential process for SruGI substrate recognition, in Mn{sup 2+} at M2 site mode. Glucose isomerase (GI) catalyzes the reversible enzymatic isomerization of d-glucose and d-xylose to d-fructose and d-xylulose, respectively. This is one of the most important enzymes in the production of high-fructose corn syrup (HFCS) and biofuel. We recently determined the crystal structure of GI from S. rubiginosus (SruGI) complexed with a xylitol inhibitor in one metal binding mode. Although we assessed inhibitor binding at the M1 site, the metal binding at the M2 site and the substrate recognition mechanism for SruGI remains the unclear. Here, we report the crystal structure of the two metal binding modes of SruGI and its complex with glucose. This study provides a snapshot of metal binding at the SruGI M2 site in the presence of Mn{sup 2+}, but not in the presence of Mg{sup 2+}. Metal binding at the M2 site elicits a configuration change at the M1 site. Glucose molecule can only bind to the M1 site in presence of Mn{sup 2+} at the M2 site. Glucose and Mn{sup 2+} at the M2 site were bridged by water molecules using a hydrogen bonding network. The metal binding geometry of the M2 site indicates a distorted octahedral coordination with an angle of 55–110°, whereas the M1 site has a relatively stable octahedral coordination with an angle of 85–95°. We suggest a two-step sequential process for SruGI substrate recognition, in Mn{sup 2+} binding mode, at the M2 site. Our results provide a better understanding of the molecular role of the M2 site in GI substrate recognition.

60 APPLIED LIFE SCIENCES↗

Evolutionary Mirages: Selection on Binding Site Composition Creates the Illusion of Conserved Grammars in Drosophila Enhancers

The clustering of transcription factor binding sites in developmental enhancers and the apparent preferential conservation of clustered sites have been widely interpreted as proof that spatially constrained physical interactions between transcription factors are required for regulatory function. However, we show here that selection on the composition of enhancers alone, and not their internal structure, leads to the accumulation of clustered sites with evolutionary dynamics that suggest they are preferentially conserved. We simulated the evolution of idealized enhancers from Drosophila melanogaster constrained to contain only a minimum number of binding sites for one or more factors. Under this constraint, mutations that destroy an existing binding site are tolerated only if a compensating site has emerged elsewhere in the enhancer. Overlapping sites, such as those frequently observed for the activator Bicoid and repressor Kru¨ppel, had significantly longer evolutionary half-lives than isolated sites for the same factors. This leads to a substantially higher density of overlapping sites than expected by chance and the appearance that such sites are preferentially conserved. Because D. melanogaster (like many other species) has a bias for deletions over insertions, sites tended to become closer together over time, leading to an overall clustering of sites in the absence of any selection for clustered sites. Since this effect is strongest for the oldest sites, clustered sites also incorrectly appear to be preferentially conserved. Following speciation, sites tend to be closer together in all descendent species than in their common ancestors, violating the common assumption that shared features of species’ genomes reflect their ancestral state. Finally, we show that selection on binding site composition alone recapitulates the observed number of overlapping and closely neighboring sites in real D. melanogaster enhancers. Thus, this study calls into question the common practice of inferring ‘‘cis-regulatory grammars’’ from the organization and evolutionary dynamics of developmental enhancers.

59 BASIC BIOLOGICAL SCIENCES↗

Upper Eocene Spherules at ODP Site 1090B

Our two labs independently discovered upper Eocene microtektites and microkrystites at ODP Site 1090, a new South Atlantic locality near the Agulhus Ridge. This is a significant new data point for the strewn fields of these spherules, which were recently extended into the Atlantic sector of the Southern Ocean when they were reported at ODP Site 689 on the Maude Rise. The microtektites have been regarded as related to North American tektites and the microkrystites as belonging to the clinopyroxene-bearing (cpx) spherule strewn field. Initial reports indicate that Site 1090 contains a complete sequence of upper Eocene sediments composed of diatom and nannofossil oozes. The magneto- and bio-stratigraphy indicate that impact-age sediments should occur in core 30X of Hole 1090B. One of us (FTK) took 2 cc samples at 10 cm intervals over 600 cm of core for Ir analyses and the senior author (SL) took 3 cc samples at 20 cm intervals to search for spherules. Both studies proved successful and additional samples were obtained to confirm initial results and better define the Ir anomaly and spherule abundances. Peak Ir concentrations of 0.97 ng/g were found at 1090B-30X-5, 105-106cm and 0.78 ng/g at 115-116 cm. Anomalous Ir concentrations (greater than 0.1 ng/g) extend over about 100 cm of core. Preliminary results indicate that the excess Ir at this site is about 25 ng per sq cm. About 380 microtektites (>63 pm) and 2492 microkrystites (>63 pm) were recovered over a 1.8 m interval with a peak abundance of microtektites (106/gram) and microkrystites (562/gram) at 1090B-30X- 5, 114-115 cm. The largest microtektite is approximately 960 x 1140 micron in size. About 55 % are spherical, and the rest are disc, cylinder, dumbbell, teardrop, or fragments. Most of the microtektites are transparent colorless, but a few are transparent pale brown or green. Preliminary data indicate that the microtektites at Site 1090 have similar major oxide compositions to those at Site 689. About 50% of the cpx spherules are spherical, the rest are fragments. They range from yellowish translucent to dark opaque. Based on stratigraphic data, occurrence of a positive Ir anomaly, and similar appearance and major oxide compositions of the Site 1090 spherules to those at Site 689, we believe that the spherule layer(s) are the same at both sites. However, there are significant differences between these two sites. At Site 689 the peak abundance of the cpx spherules is slightly below that of the microtektites. We can distinguish no such separation at Site 1090, despite a somewhat higher sediment accumulation rates. Peak Ir concentrations are about four times higher at Site 1090, resulting in a similarly higher total flux of Ir for this site compared to Site 689 on the Maude Rise. This is generally consistent with the flux of cpx spherules (greater than 63 pm) which is estimated to be approximately -2100 per sq cm, about twice that of Site 689D (1040 sq cm) and with the cpx-spherule component being a principal carrier of the Ir signal. The number of microtektites per sq cm (greater than 63 micron) is nearly the same at both sites, approximately 300 in 1090B and 280 in 689B. A decrease in the greater than 63 micron size fraction (consisting primarily of diatoms and radiolaria) is coincident with the spherule layer at both sites suggesting that the impact(s) that produced the spherule layer(s) may have had an adverse affect on the marine plankton.

Liu, S.↗

Uranium Fate and Transport Modeling, Guterl Specialty Steel Site, New York - 13545

The Former Guterl Specialty Steel Corporation Site (Guterl Site) is located 32 kilometers (20 miles) northeast of Buffalo, New York, in Lockport, Niagara County, New York. Between 1948 and 1952, up to 15,875 metric tons (35 million pounds) of natural uranium metal (U) were processed at the former Guterl Specialty Steel Corporation site in Lockport, New York. The resulting dust, thermal scale, mill shavings and associated land disposal contaminated both the facility and on-site soils. Uranium subsequently impacted groundwater and a fully developed plume exists below the site. Uranium transport from the site involves legacy on-site pickling fluid handling, the leaching of uranium from soil to groundwater, and the groundwater transport of dissolved uranium to the Erie Canal. Groundwater fate and transport modeling was performed to assess the transfer of dissolved uranium from the contaminated soils and buildings to groundwater and subsequently to the nearby Erie Canal. The modeling provides a tool to determine if the uranium contamination could potentially affect human receptors in the vicinity of the site. Groundwater underlying the site and in the surrounding area generally flows southeasterly towards the Erie Canal; locally, groundwater is not used as a drinking water resource. The risk to human health was evaluated outside the Guterl Site boundary from the possibility of impacted groundwater discharging to and mixing with the Erie Canal waters. This condition was evaluated because canal water is infrequently used as an emergency water supply for the City of Lockport via an intake located approximately 122 meters (m) (400 feet [ft]) southeast of the Guterl Site. Modeling was performed to assess whether mixing of groundwater with surface water in the Erie Canal could result in levels of uranium exceeding the U.S. Environmental Protection Agency (USEPA) established drinking water standard for total uranium; the Maximum Concentration Limit (MCL). Geotechnical test data indicate that the major portion of uranium in the soil will adsorb or remain bound to soil, yet leaching to groundwater appears as an on-site source. Soil leaching was modeled using low adsorption factors to replicate worst-case conditions where the uranium leaches to the groundwater. Results indicate that even after several decades, which is the period of time since uranium was processed at the Guterl Site, leaching from soil does not fully account for the currently observed levels of groundwater contamination. Modeling results suggest that there were historic releases of uranium from processing operations directly to the shallow fractured rock and possibly other geochemical conditions that have produced the current groundwater contamination. Groundwater data collected at the site between 1997 and 2011 do not indicate an increasing level of uranium in the main plume, thus the uranium adsorbed to the soil is in equilibrium with the groundwater geochemistry and transport conditions. Consequently, increases in the overall plume concentration or size are not expected. Groundwater flowing through fractures under the Guterl Site transports dissolved uranium from the site to the Erie Canal, where the groundwater has been observed to seep from the northern canal wall at some locations. The seeps discharge uranium at concentrations near or below the MCL to the Erie Canal. Conservative mixing calculations were performed using two worst-case assumptions: 1) the seeps were calculated as contiguous discharges from the Erie Canal wall and 2) the uranium concentration of the seepage is 274 micrograms per liter (μg/L) of uranium, which is the highest on-site uranium concentration in groundwater and nearly ten-fold the actual seep concentrations. The results indicate that uranium concentrations in the seep water would have to be more than 200 times greater than the highest observed on-site groundwater concentrations (or nearly 55,000 μg/L) to potentially exceed the drinking water standard (the MCL) for total uranium in the Erie Canal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Likelihood of Bone Recurrence in Prior Sites of Metastasis in Patients With High-Risk Neuroblastoma

Purpose/Objectives: Despite recent improvements in outcomes, 40% of children with high-risk neuroblastoma will experience relapse, facing a guarded prognosis for long-term cure. Whether recurrences are at new sites or sites of original disease may guide decision making during initial therapy. Methods and Materials: Eligible patients were retrospectively identified from institutional databases at first metastatic relapse of high-risk neuroblastoma. Included patients had disease involving metaiodobenzylguanidine (MIBG)-avid metastatic sites at diagnosis and first relapse, achieved a complete or partial response with no more than one residual MIBG-avid site before first relapse, and received no total body irradiation or therapy with {sup 131}I-MIBG before first relapse. Anatomically defined metastatic sites were tracked from diagnosis through first relapse to determine tendency of disease to recur at previously involved versus uninvolved sites and to assess whether this pattern was influenced by site irradiation. Results: Of 159 MIBG-avid metastatic sites identified among 43 patients at first relapse, 131 (82.4%) overlapped anatomically with the set of 525 sites present at diagnosis. This distribution was similar for bone sites, but patterns of relapse were more varied for the smaller subset of soft tissue metastases. Among all metastatic sites at diagnosis in our subsequently relapsed patient cohort, only 3 of 19 irradiated sites (15.8%) recurred as compared with 128 of 506 (25.3%) unirradiated sites. Conclusions: Metastatic bone relapse in neuroblastoma usually occurs at anatomic sites of previous disease. Metastatic sites identified at diagnosis that did not receive radiation during frontline therapy appeared to have a higher risk of involvement at first relapse relative to previously irradiated metastatic sites. These observations support the current paradigm of irradiating metastases that persist after induction chemotherapy in high-risk patients. Furthermore, they raise the hypothesis that metastatic sites appearing to clear with induction chemotherapy may also benefit from radiotherapeutic treatment modalities (external beam radiation or {sup 131}I-MIBG)

62 RADIOLOGY AND NUCLEAR MEDICINE↗

An unexpected phosphate binding site in Glyceraldehyde 3-Phosphate Dehydrogenase: Crystal structures of apo, holo and ternary complex of Cryptosporidium parvum enzyme

The structure, function and reaction mechanism of glyceraldehyde 3-phosphate dehydrogenase (GAPDH) have been extensively studied. Based on these studies, three anion binding sites have been identified, one 'Ps' site (for binding the C-3 phosphate of the substrate) and two sites, 'Pi' and 'new Pi', for inorganic phosphate. According to the original flip-flop model, the substrate phosphate group switches from the 'Pi' to the 'Ps' site during the multistep reaction. In light of the discovery of the 'new Pi' site, a modified flip-flop mechanism, in which the C-3 phosphate of the substrate binds to the 'new Pi' site and flips to the 'Ps' site before the hydride transfer, was proposed. An alternative model based on a number of structures of B. stearothermophilus GAPDH ternary complexes (non-covalent and thioacyl intermediate) proposes that in the ternary Michaelis complex the C-3 phosphate binds to the 'Ps' site and flips from the 'Ps' to the 'new Pi' site during or after the redox step. We determined the crystal structure of Cryptosporidium parvum GAPDH in the apo and holo (enzyme + NAD) state and the structure of the ternary enzyme-cofactor-substrate complex using an active site mutant enzyme. The C. parvum GAPDH complex was prepared by pre-incubating the enzyme with substrate and cofactor, thereby allowing free movement of the protein structure and substrate molecules during their initial encounter. Sulfate and phosphate ions were excluded from purification and crystallization steps. The quality of the electron density map at 2{angstrom} resolution allowed unambiguous positioning of the substrate. In three subunits of the homotetramer the C-3 phosphate group of the non-covalently bound substrate is in the 'new Pi' site. A concomitant movement of the phosphate binding loop is observed in these three subunits. In the fourth subunit the C-3 phosphate occupies an unexpected site not seen before and the phosphate binding loop remains in the substrate-free conformation. Orientation of the substrate with respect to the active site histidine and serine (in the mutant enzyme) also varies in different subunits. The structures of the C. parvum GAPDH ternary complex and other GAPDH complexes demonstrate the plasticity of the substrate binding site. We propose that the active site of GAPDH can accommodate the substrate in multiple conformations at multiple locations during the initial encounter. However, the C-3 phosphate group clearly prefers the 'new Pi' site for initial binding in the active site.

36 MATERIALS SCIENCE↗

Potential Mars Surveyor 2001 Landing Sites: Low-Elevation Cratered "Highlands" in Central and Eastern Sinus Meridiani and Near Amenthes Fossae

The main scientific goal for the Mars Surveyor Program 2001 (MSP 01) landed mission is to collect and characterize 91 rock and 13 soil core samples using an integrated instrument suite onboard the Athena Rover. If possible, these samples will be retrieved and returned to Earth via a MSP 05 or MSP 07 mission. Preliminary engineering constraints for the MSP 01 landing site call for a location that lies between 15 S and 30 N, and below about 2 km elevation (based on Viking-era topography). Desirable landing sites for MSP 01 are to be located "in the ancient highlands where the environmental conditions may have been favorable to the preservation of evidence of possible prebiotic or biotic processes including the emergence (and, potentially, the persistence) of life". We interpret this to mean that the desirable sites include those that have evidence of aqueous sediments that might have been deposited during the Noachian and/or Hesperian Epochs of Mars' history. In addition to the search for subaqueous sedimentary deposits, we took into consideration the fact that the rover, Athena, will need to be able to access these materials. Thus, a site where aeolian deflation has occurred might be desirable because it might expose, in situ, layered sedimentary deposits. Deflated areas, of course, might include potential landing hazards in the form of meterscale buttes and mesas (e.g., Christmas Lake Valley, OR), thus careful study of such sites with high resolution images will be required before a decision is made to land. We have been examining three regions that have potential to be considered for MSP 01 landing sites. This work is based on Viking (VIS, IRTM) and Phobos 2 (Termoskan) observations and should be regarded as preliminary because we believe that the final site selection should also be based upon analysis of Mars Global Surveyor observations that help constrain mineralogy (TES) and local geomorphology (MOC, MOLA). (1) Eastern Sinus Meridiani Region (proposed by K. S. Edgett) Sinus Meridiani is a persistent low-albedo (< 0. 16) region on the martian equator that has been recognized for about 400 years. All of Sinus Meridiani is below the 2 km elevation constraint for MSP 01. The region includes cratered highlands, valley networks, aeolian dunes, and possible aqueous sedimentary deposits. The landing site study region is located in the eastern portion of Sinus Meridiani. It is bounded by latitudes 10 S to 2 N, longitudes 355 W to 345 W, and the elevations are mostly 1-2 km. The center of this area contains a medium-albedo (0.19-0.21), relatively smooth-surfaced deposit that was suggested by Rice to be a lacustrine deposit. Several potential landing areas can be suggested within this region. Based on Viking and Phobos 2 data, the favored sites so far are centered at 7.6 S, 346.9 W and 0.8 S, 349 W. Thermal inertias are 3.2-7.0 x 10(exp -3) cal /sq cm s(exp -0.5)/K; and rock abundances are around 2-6%. The site at 7.6 S, 346.9 W is at the southern end of the smooth, medium-albedo unit that might have a lacustrine origin. At this location, numerous channels appear to have drained toward the smooth unit. Viking images from orbit 747A show this area at about 15 m/pixel ground resolution. The images reveal that aeolian deflation has occurred along the deposit's margins. Bright (i.e., albedo >= 0.21) aeolian dunes are present on the channel floors and in some of the depressions on the smooth unit. The bright, apparently active dunes might consist of material (perhaps lakedeposited sands) that has been eroded from the smooth unit. The site at approximately 0.8 S, 349 W is selected because it offers an opportunity to solve a long-standing puzzle about Mars remote sensing. There are three main "color" units on Mars: "dark red, dark gray, and bright red". This landing site would allow the Athena rover an opportunity to investigate all three materials within close proximity (the best place on Mars to do so). There are no high resolution (better than 100 m/pixel) Viking or Mariner images of this site. (2) Central Sinus Meridiani Region (proposed by K. S. Edgett and T. J. Parker) Central Sinus Meridiani is characterized by two types of surfaces [4]. One is like typical martian cratered highlands elsewhere- there are old valley networks and old impact craters. The other is relatively smooth and flat. These two units are in contact around 3.1 S between 5 W and 4 E longitudes. Valley networks- including one at 6'S, 358 W that rivals the Grand Canyon of Arizona- once drained toward the smooth unit. Edgett and Parker [4] proposed that the smooth unit might consist of sediments laid down in a large Noachian-aged sea/ocean that would have covered much of the northern hemisphere. Schultz and Lutz [I I I suggested that it is a paleopolar layered deposit. Regardless, the smooth unit where it contacts the cratered terrain would make an excellent site for Athena rover to investigate. The site is best seen in Viking high resolution images from orbits 408B (about 30 m/pixel) and 746A (about 12 m/pixel). These images suggest that aeolian deflation has occurred along the margin of the smooth unit, and this deflation has exposed horizontal larrs of material. The elevation is about 0.5 km; thermal inertias are 6.5-8.0 x 10(exp -3) cal /sq cm s(exp -0.5) / K; rock abundances are 2-4%; and the surface is probably sandy with dark drifts and ripples but almost no actual dunes. We suggest a landing around 3.2 S, 3.0 W would test the aqueous sediment hypothesis and provide a potentially smooth surface on which to land. (3) Amenthes Fossae Region (proposed by S. N. Huntwork and K. S. Edgett) The Amenthes Fossae are a series of graben/fissures that are circumferential to the southeast side of Isidis Planitia. These fissures cross a variety of ancient, heavily cratered Noachian terrain and younger, Hesperian and Amazonian terrain. We focused our search on a region 0-15 N, 250 - 270 W. Elevations are -0.5 to 2 km. Depending upon whether Isidis Planitia was ever a water-rich environment, this region might have been influenced by aqueous sedimentation. Valley networks are common, and they drained toward the north and northwest. We focused our work on a set of Viking orbiter high-resolution images, 719A 1-48. These have resolutions 16-24 rri/pixel. We examined images 20-23, centered at 2 N, 258 W. This site, on the plains just southwest of a 42 km-diameter crater, includes a valley network channel, a relatively young crater ejecta deposit, a few buttes composed of presumably ancient, Noachian bedrock, and a "plains" unit. The plains might make an ideal landing surface, except for the presence of some fine-scale ridges (oriented approximately N-S). The ridges are probably yardangs, thus this site offers a place where aeolian deflation has probably exposed some of the layered rock units that comprise the "plains". Thermal inertias are 7.9-8.3 x 10(exp -3) cal/sq cm s(exp -0.5) /K and rock abundances are 10-15%. A rover traverse might include the opportunity to go down to the floor (and sample along the walls) of the valley network channel at 2 N 258.1 W.

Edgett, K. S.↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The role of historical operations information for supporting remedial investigation work at the former Harshaw Chemical Site - 8279.

In the early stages of hazardous, toxic, and radioactive waste (HTRW) site investigations, basic record searches are performed to help direct the agencies investigating contaminated sites to areas of concern and to identify contaminants of interest (COI). Plans developed on the basis of this preliminary research alone are often incomplete and result in unexpected discoveries either while in the field investigating the site or after the reports have been written. Many of the sites investigated under the Formerly Utilized Sites Remedial Action program (FUSRAP) have complex histories that are slowly uncovered over the life of the project. Because of programmatic constraints, nuances of these sites are often discovered late in their programs and result in increased expenditures in order to fully characterize the site, perform a robust feasibility study, and recommend appropriate alternatives for remediation. By identifying resources for public records, classified records, historic aerial photographs, and other sources of site-specific historical information, a process can be established to optimize the collection of information and to develop efficient and complete project plans. In many cases, interviews with past site employees are very useful tools. In combining what is found in the records, observed on historic aerial photographs, and heard from former employees and family members, teams investigating these sites can begin to compile sound and more complete conceptual site models (CSMs). The former Harshaw Chemical Site (HCS) illustrates this discovery process. HCS is part of FUSRAP. Preliminary investigations by the US Department of Energy (DOE) in the 1970s provided an initial CSM of activities that had taken place that may have resulted in contamination. The remedial investigation (RI) conducted by the US Army Corps of Engineers (USACE) was designed around this CSM. The RI work, however, identified a number of site conditions that were unexpected, including new potential COI associated with recycled uranium and contaminant locations that were inconsistent with the original CSM. As part of an RI Addendum effort, the USACE reconsidered its understanding of HCS historical activities. This effort included an intensive review of available historical aerial photography, an in-depth Potentially Responsible Parties (PRP) investigation, additional analysis of the production processes in place at HCS, and targeted supplemental data collection. The result of this effort was a revised CSM that included a number of previously unidentified potential COI and a much clearer understanding of the processes and resulting waste streams potentially associated with environmental contamination. Because of their complex and often poorly documented operational histories, unexpected discoveries will always be a part of investigating sites such as HCS. Taking advantage of available resources and expending funds for thorough historical research early in the life of a project will help to reduce the chances for expensive field remobilizations and significant schedule delays. A complete and accurate site history also allows for more efficient long-term technical and budgetary planning, thus eliminating many obstacles associated with the ultimate disposition of HTRW sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Role of Historical Operations Information for Supporting Remedial Investigation Work at the Former Harshaw Chemical Site

In the early stages of hazardous, toxic, and radioactive waste (HTRW) site investigations, basic record searches are performed to help direct the agencies investigating contaminated sites to areas of concern and to identify contaminants of interest (COI). Plans developed on the basis of this preliminary research alone are often incomplete and result in unexpected discoveries either while in the field investigating the site or after the reports have been written. Many of the sites investigated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) have complex histories that are slowly uncovered over the life of the project. Because of programmatic constraints, nuances of these sites are often discovered late in their programs and result in increased expenditures in order to fully characterize the site, perform a robust feasibility study, and recommend appropriate alternatives for remediation. By identifying resources for public records, classified records, historic aerial photographs, and other sources of site-specific historical information, a process can be established to optimize the collection of information and to develop efficient and complete project plans. In many cases, interviews with past site employees are very useful tools. In combining what is found in the records, observed on historic aerial photographs, and heard from former employees and family members, teams investigating these sites can begin to compile sound and more complete conceptual site models (CSM(s). The former Harshaw Chemical Site (HCS) illustrates this discovery process. HCS is part of FUSRAP. Preliminary investigations by the U.S. Department of Energy (DOE) in the 1970's provided an initial CSM of activities that had taken place that may have resulted in contamination. The remedial investigation (RI) conducted by the U.S. Army Corps of Engineers (USACE) was designed around this CSM. The RI work, however, identified a number of site conditions that were unexpected, including new potential COI associated with recycled uranium and contaminant locations that were inconsistent with the original CSM. As part of an RI Addendum effort, the USACE reconsidered its understanding of HCS historical activities. This effort included an intensive review of available historical aerial photography, an in-depth Potentially Responsible Parties (PRP) investigation, additional analysis of the production processes in place at HCS, and targeted supplemental data collection. The result of this effort was a revised CSM that included a number of previously unidentified potential COI and a much clearer understanding of the processes and resulting waste streams potentially associated with environmental contamination. Because of their complex and often poorly documented operational histories, unexpected discoveries will always be a part of investigating sites such as HCS. Taking advantage of available resources and expending funds for thorough historical research early in the life of a project will help to reduce the chances for expensive field re-mobilizations and significant schedule delays. A complete and accurate site history also allows for more efficient long-term technical and budgetary planning, thus eliminating many obstacles associated with the ultimate disposition of HTRW sites. (authors)

54 ENVIRONMENTAL SCIENCES↗

An approach to evaluating and monitoring ecological resources for sustainability on DOE remediation sites: Hanford as a case study - 15524

Protecting ecological and environmental resources is a worthy aspect of the Department of Energy's site missions, for each of its sites, during and after remediation. Ecological resources are important to a range of stakeholders, including regulatory agencies, resource agencies, natural resource trustees, Tribal governments, and the public, and may be an essential component of Native American cultural resources. Because the nature and value of ecological resources can change over time as a result of remediation, succession, and global climate change, it is imperative for DOE to have instituted an acceptable method of evaluating resources before initiation of active remediation, over the ensuing century when institutional and engineering controls are considered to be in effect. Having such a methodology in place also would be key to resource sustainability. Department of Energy sites generally have environmental programs, so instituting specific unified practices for evaluating resources should not be difficult to implement. Instituting these practices would assure the public that ecological resources, as well as human and cultural resources, are being protected now, and can be protected into the future. Key ecological species and/or unique habitats have been preserved at Department of Energy sites since the mid-20. century because of federal government stewardship. Such preservation is particularly true for the sites with larger land areas, including the Hanford Reservation, the Idaho National Laboratory and the Savannah River Site. Individual sites typically have extensive studies of site biodiversity, but site resources are not routinely examined within a regional or national context (Eco-region). The evaluation of the on-site resources with those resources in the appropriate Eco-region provides a context for 'valuing' on- site resources. On-site resources should also be evaluated in terms of federal and state legislation where species may have legal protection and require legal consideration during remediation if present or adjacent to the remediation site. A method is needed in this study for evaluating ecological resources prior to remediation and during remediation, and a paradigm is proposed that will ensure sustainability. Finally, in a period of climate change and instability, developing methods of evaluating ecological resources is essential to successful protection, enhancement, and sustainability. The ecological methodology is part of a Hanford site-wide Risk Review Project, conducted by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP). Our method adapts an existing methodology that includes using established levels for evaluating ecological resources by expanding the existing methodology to include field work for validating previous resource level designations, to assess the occurrence of invasive/exotic species, and to identify landscape scale features (patch size, connectivity). Evaluations should be conducted in the remediation unit itself, and in a buffer zone surrounding the remediation site. The methodology described has been applied to several remediation areas at Hanford, and issues that emerged during its application are discussed. The methodology can be applied at the major sites. Application of the Eco-region analysis will provide regulators and the public with an understanding of the value of the ecological resources in relation to the region, as well as an appreciation for the stewardship role the Department of Energy has played in protecting these resources since the beginning of the Cold War Era and can continue to do so sustainably. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparing the FUSRAP Colonie Interim Storage Site for Transfer Back to the US Department of Energy Office of Legacy Management - 19215

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Colonie Interim Storage Site was transferred from the US Department of Energy (US DOE) to the US Army Corps of Engineers (USACE) in 1997. The USACE initiated remediation efforts at the Site under FUSRAP. The Site was separated into three distinct operable units (OU) to more efficiently manage the remedial process: 1) Groundwater OU, 2) Main Site Soils OU, and 3) Vicinity Property OU. The USACE has completed remedial actions at each of these three OUs and has advanced the OU remedies at the Site to the long-term stewardship stage to be executed by the US DOE Office of Legacy Management (LM). The US DOE LM is the current real property owner of record of the Colonie Main Site. A summary of each OU and the activities needed to prepare for site transfer follows: OU 1 - USACE issued the Colonie Groundwater OU Record of Decision (ROD) (USACE 2010a) on April 9, 2010. The Groundwater ROD remedy is monitored natural attenuation (MNA) and long-term monitoring (LTM) of groundwater after source removal completion. Results of groundwater monitoring indicate reductions in concentrations of contaminants of concern (COC). Based on the marked progress to date, USACE has optimized the groundwater LTM program (USACE, 2014) by reducing the well network, sampling frequency, and analytical parameters, and by abandoning wells that are no longer needed. A Groundwater ROD Five-Year Review report was submitted to the New York State Department of Environmental Conservation (NYSDEC) for review in 2018. NYSDEC agreed that MNA is still an appropriate remedial method although it is progressing at a slower rate than predicted. OU 2 - From 1999 to 2007, USACE completed the large-scale removal of soil at the Main Site, which included the adjacent Town of Colonie Vicinity Property. Radioactively contaminated soil along with accessible metals-contaminated soil and soil containing volatile organic compounds (VOC) were removed during this effort. A total of 103,402 cubic meters (m{sup 3}) of soil was excavated and disposed offsite. On March 26, 2015, USACE signed the Main Site Soils OU ROD (USACE, 2015a). The ROD remedy included provisions for Land Use Controls (LUC) consisting of institutional controls (IC) through an Environmental Easement for management of three small and discrete inaccessible locations within three of the 27 Final Status Survey units of the Main Site. The Environmental Easement provides a means of protection based on both current and future land use by placing restrictions on soil excavation and reuse. The easement and a supporting Site Management Plan (SMP) will be finalized by LM in coordination with NYSDEC. OU 3 - the Vicinity Property OU ROD was signed on 20 September 2017. This ROD declared No Action (NA) for dust and No Further Action (NFA) for soil and other media for the Vicinity Properties. Prior to the ROD, USACE performed dust sampling and other characterization activities at representative commercial and residential Vicinity Property locations. These efforts were reported in the Colonie FUSRAP Site Vicinity Property Operable Unit Remedial Investigation Summary Report (USACE, 2016). A Site Closeout Report (SCOR) was issued to NYSDEC and approved in 2018. The approval of this report starts the transfer process back to the LM. Ongoing and future transfer activities include records retention and management, preparation and filing of real estate records, physical site management (fencing, landscape maintenance, well abandonment) and coordination with state regulators and LM staff. This presentation is intended to make all stakeholders aware of the necessary steps for site transfer from the USACE back to the LM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

External Engagement During Evaluations of Shutdown Nuclear Power Plant Sites - 19221

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. A key part of the shutdown site evaluations are visits to the sites. These site visits typically take place over 3 days. The first day is spent at the nuclear power plant site. The second day is spent evaluating the near-site transportation infrastructure, including rail infrastructure, potential heavy-haul routes, and potential rail and barge transload locations. The third day is often spent meeting with community engagement or advisory panels. External engagement activities during site visits are conducted in two areas. The first area involves inviting tribal and state representatives, State Regional Group (SRG) representatives, and Federal Railroad Administration (FRA) representatives to participate in the entire site visit. The SRG representatives are from the Southern States Energy Board, the Western Interstate Energy Board, the Council of State Governments - Midwest, or the Council of State Governments - Eastern Regional Conference, according to the location of the nuclear power plant. State representatives typically represent their state department of energy, state department of environmental or natural resources, State Rail Safety Participation Program, state police, state department of transportation, radiation protection organization, or emergency management organization. Tribal representatives explore issues associated with cultural affiliation and tribal involvement with past and present site activities. As the regulator of the U.S. railroads, the FRA representatives bring unique experience to the site visits. They also coordinate meetings with the railroads that serve the shutdown sites. The second area of external engagement activities during site visits involves meeting with local community engagement or advisory panels. Meeting with local community engagement or advisory panels provides an opportunity to inform these panels on DOE activities and the roles and responsibilities of federal agencies during site decommissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗