Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plug”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Monitoring and Characterization of Miscellaneous Electrical Loads in a Large Retail Environment

Buildings account for 40% of primary energy consumption in the United States (residential 22%; commercial 18%). Most (70% residential and 79% commercial) is used as electricity. Thus, almost 30% of U.S. primary energy is used to provide electricity to buildings. Plug loads play an increasingly critical role in reducing energy use in new buildings (because of their increased efficiency requirements), and in existing buildings (as a significant energy savings opportunity). If all installed commercial building miscellaneous electrical loads (CMELs) were replaced with energy-efficient equipment, a potential annual energy saving of 175 TWh, or 35% of the 504 TWh annual energy use devoted to MELs, could be achieved. This energy saving is equivalent to the annual energy production of 14 average-sized nuclear power plants. To meet DOE's long-term goals of reducing commercial building energy use and carbon emissions, the energy efficiency community must better understand the components and drivers of CMEL energy use, and develop effective reduction strategies. These goals can be facilitated through improved data collection and monitoring methodologies, and evaluation of CMELs energy-saving techniques.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reducing Idle Power Consumption in Office Spaces Saves U.S. Navy in Energy Costs (Fact Sheet)

As part of a two-year project to demonstrate energy efficiency measures, renewable energy generation, and energy systems integration, the National Renewable Energy Laboratory (NREL) has identified advanced plug load controls as a promising technology for reducing energy use and related costs in the U.S. Navy's Naval Facilities Engineering Command (NAVFAC) office spaces.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AVTA federal fleet PEV readiness data logging and characterization study for the National Park Service: Grand Canyon National Park

This report focuses on the Grand Canyon National Park (GCNP) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively PEVs) can fulfill the mission requirements.

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Preparedness Task 3: Detailed Assessment of Target Electrification Vehicles at Joint Base Lewis McChord Utilization

Task 2 involved identifying daily operational characteristics of select vehicles and initiating data logging of vehicle movements in order to characterize the vehicle’s mission. Individual observations of these selected vehicles provide the basis for recommendations related to PEV adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively PEVs) can fulfill the mission requirements and provides observations related to placement of PEV charging infrastructure. This report provides the results of the data analysis and observations related to the replacement of current vehicles with PEVs. This fulfills part of the Task 3 requirements. Task 3 also includes an assessment of charging infrastructure required to support this replacement. That is the subject of a separate report.

33 ADVANCED PROPULSION SYSTEMS↗

Workplace Charging. Charging Up University Campuses

This case study features the experiences of university partners in the U.S. Department of Energy's (DOE) Workplace Charging Challenge with the installation and management of plug-in electric vehicle (PEV) charging stations.

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Grid Interaction Exploration: Cooperative Research and Development Final Report, CRADA Number CRD-11-431

Under this agreement NREL plans to collect, analyze, and share with Xcel Energy data regarding the driving and charging performance of plug-in electric vehicles. NREL will research activities critical to energy storage, electric propulsion, and the emerging issues surrounding the integration of vehicles into the current and future grid. It will provide NREL with access to one of the firstall-electric vehicles available in the market as part of NREL's Advanced Technology Vehicle Fleet (ATVF).

25 ENERGY STORAGE↗

Aligning PEV Charging Times with Electricity Supply and Demand

Plug-in electric vehicles (PEVs) are a growing source of electricity consumption that could either exacerbate supply shortages or smooth electricity demand curves. Extensive research has explored how vehicle-grid integration (VGI) can be optimized by controlling PEV charging timing or providing vehicle-to-grid (V2G) services, such as storing energy in vehicle batteries and returning it to the grid at peak times. While much of this research has modeled charging, implementation in the real world requires a cost-effective solution that accounts for consumer behavior. To function across different contexts, several types of charging administrators and methods of control are necessary to minimize costs in the VGI context.

33 ADVANCED PROPULSION SYSTEMS↗

SPI Conformance Gel Applications in Geothermal Zonal Isolation

Zonal isolation in geothermal injection and producing wells is important while drilling the wells when highly fractured geothermal zones are encountered and there is a need to keep the fluids from interfering with the drilling operation. Department of Energy’s (DOE) Energy Efficiency and Renewable Energy (EERE) objectives are to advance technologies to make it more cost effective to develop, produce, and monitor geothermal reservoirs and produce geothermal energy. Thus, zonal isolation is critical to well cost, reservoir evaluation and operations. Traditional cementing off of the lost circulation or thief zones during drilling is often done to stem the drilling mud losses. This is an expensive and generally unsuccessful technique losing the potential of the remaining fracture system. Selective placement of strong SPI gels into only the offending fractures can maintain and even improve operational efficiency and resource life. The SPI gel system is a unique silicate based gel system that offers a promising solution to thief zones and conformance problems with water and CO2 floods and potentially geothermal operations. This gel system remains a low viscosity fluid until an initiator (either internal such as an additive or external such as CO2) triggers gelation. This is a clear improvement over current mechanical methods of using packers, plugs, liners and cementing technologies that often severely damage the highly fractured area that is isolated. In the SPI gels, the initiator sets up the fluid into a water-like (not a precipitate) gel and when the isolated zone needs to be reopened, the SPI gel may be removed with an alkaline solution without formation damage occurring. In addition, the SPI gel in commercial quantities is expected to be less expensive than competing mechanical systems and has unique deep placement possibilities. This project seeks to improve upon the SPI gel integrity by modifying the various components to impart temperature stability for use in geothermal.

15 GEOTHERMAL ENERGY↗

Utilities Power Change: Engaging Commercial Customers in Workplace Charging

Using electricity to power vehicles can help advance energy security and reduce emissions, and also presents a new market opportunity for utilities looking to diversify and offer an added benefit to commercial customers. By providing plug-in electric vehicle (PEV) charging stations for their employees, commercial customers can help attract and retain a cutting-edge workforce. These employers also signal a commitment to sustainability and demonstrate progressive leadership and a willingness to adopt advanced technology.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Telematics and Data Science: Informing Energy-Efficient Mobility: October 25, 2016 - October 31, 2017

The University of Connecticut (UCONN) is exploring the possibility of adding electric vehicles (EVs) - including battery electric vehicles (BEVs), plug-in hybrid electric vehicles (PHEVs), or both-to its vehicle fleet. This report presents results of the UCONN fleet EV Suitability pilot program and offers recommendations for transitioning fleet vehicles to EVs as well as implementing adequate charging infrastructure.

33 ADVANCED PROPULSION SYSTEMS↗

Advanced Vehicle Testing and Evaluation Final Technical Report Encompassing Project Activities From October 1, 2011 to April 30, 2018

The Advanced Vehicle Testing and Evaluation (AVTE) project incorporated the conduct of advanced technology vehicle and infrastructure testing in the U.S. Department of Energy (DOE) Advanced Vehicle Testing Activity (AVTA). It was the only activity tasked by DOE to conduct independent field evaluations of vehicle technologies that use advanced technology systems and subsystems in vehicles that reduce petroleum consumption. The results are available through reports published on the AVTA website at http://avt.inl.gov/. The AVTE project provided insight into advanced vehicle technology's long-term performance, durability, maintenance, and lifecycle costs that cannot be found elsewhere. The site is a resource for DOE stakeholders and the public to gain knowledge on advanced technology vehicle progress and innovation. Vehicles tested included light and heavy-duty vehicles with conventional, hybrid, plug-in hybrid, and all-electric propulsion systems. Vehicles were tested on closed tracks and chassis dynamometers, as well as operated on public roads, in fleet operations, and over prescribed routes. All testing was controlled by procedures developed specifically to support such testing. Testing and evaluations were conducted in the following phases: Development and refinement of test procedures, which established testing procedures; Baseline performance testing, which established a performance baseline; Accelerated reliability testing, which determined vehicle reliability; Fleet testing, used to evaluate vehicle economics in fleet operation, and End of test performance evaluation. Test results from all aspects of testing were posted by Idaho National Laboratory (INL) to their website. This final report documents work conducted for the entirety of contract DE-EE0005501 by Intertek Testing Services NA, Inc. (Intertek). The contract was performed from October 1, 2011 through April 30, 2018, and includes 18 amendments to the original award with the most recent Amendment 18 dated March 28, 2018. The final budget for the AVTE project totaled 20,220,873 dollars. As a cooperative agreement, Intertek was obligated to provide cost share of 4,044,175 dollars, leaving 16,176,698 dollars as the Federal share of the agreement. Actual total expenditure for the AVTE project was 20,286,850 dollars. The full 16,176,698 dollars Federal share was expended and 4,110,152 dollars of cost share was provided by Intertek. This resulted in an over-share of 65,977 dollars. There were 106 light-duty on-road vehicles vehicles tested in both fleet and accelerated reliability testing. One additional vehicle was rented to obtain performance testing only. Three heavy-duty truck and trailer combinations were tested as part of the semi-autonomous driving with heavy-duty vehicles in a platoon. Overall project scope and direction was determined between Intertek, DOE, and technical teams from Idaho National Laboratory (INL), Argonne National Laboratory (ANL), and National Renewable Energy Laboratory (NREL). The project was administered by the DOE’s National Energy Technology Laboratory (NETL).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Publicly Accessible Charging Site Host Recruitment During The EV Project

Several assumptions were established at the start of The EV Project. One of the assumptions upon which the Project was based was that plug-in electric vehicle (PEV) drivers would require some form of charging infrastructure away from their residences. The basic need for infrastructure outside the home was assumed to be a key foundation of future EV growth. This assumption was based on surveys conducted as part of the EV Project1, on previous experience of The EV Project management team with charging infrastructure deployment and use, and on a strong desire by Nissan (which was the initial PEV partner of The EV Project), to have visible away-from-home charging infrastructure to support vehicle sales. It was assumed that PEV drivers would have range anxiety and have an expectation that charging infrastructure will be there for their use.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

What can be learned from The EV Project to inform others who may be interested in a similar study?

In 2009, a project proposed by Electric Transportation Engineering Corporation (ETEC, a subsidiary of ECOtality Inc.) was selected via a competitive bid process as part of the American Recovery and Reinvestment Act’s (ARRA) Funding Opportunity Announcement 28 - Transportation Electrification. At the start of the fourth quarter of 2009, ETEC signed an agreement with the US Department of Energy (DOE) as recipient of a cost-share grant funded by the ARRA to study the use of charging infrastructure by Plug-in Electric Vehicle (PEV) drivers. The project was subsequently called The EV Project. By studying the use of the vehicles and the charge infrastructure, the EV Project would attempt to understand; • how many publicly accessible charge sites would be needed to promote widespread adoption of EVs, • where and at which venues should publicly accessible charging sites be located to be most effective, • which type of charging (AC Level 2 vs DC Level 2 (fast chargers)) would be most utilized by PEV driver’s, • how much would EV drivers be willing to pay for the convenience of away-from-home charging, • what impact did (and would) the PEV charging at (residential and publicly accessible) sites have on the local electrical grid, • which type of away-from-home charging was of more interest, workplace or publicly available, • could charging site hosts realize enough benefit from the chargers to support the deployment levels desired or needed, and • how did the geographically diverse regions of the United States differ with respect to the above? This paper examines The EV Project to learn what was done to meet the ambitious objectives of this infrastructure study, and what was learned from both failures and successes. What can the experience of having conducted The EV Project inform others about what worked, what didn’t work, and what could be done better if undertaking a similar project?

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Best Practices for Electric Vehicle Supply Equipment Installations in the National Parks: Challenges, Lessons Learned, Installation Best Practices, and Recommendations for the National Park Service

In recent years, the National Renewable Energy Laboratory (NREL) and the National Park Service (NPS) have partnered to undertake a variety of projects intended to provide electric vehicle supply equipment (EVSE) to park visitors. Efforts to install charging infrastructure in the national parks have been underway for almost a decade, with installation projects as part of NPS partnerships with several organizations. These projects have been initiated through a variety of funding sources, such as coordinated donations and agreements with other governmental agencies including the U.S. Department of Energy (DOE). This report captures challenges, lessons learned, and best practices from recent NPS EVSE projects based on interviews with NPS employees and stakeholders involved in the projects. The report summarizes notable takeaways and makes recommendations to help ensure the success of future charging installation projects. Preserving this information will be valuable for informing and ensuring the success of future charging installation efforts at national parks, as well as for organizations outside of NPS. Note that this report focuses on light-duty plug-in electric vehicle (EV) projects, though NPS is also pursuing medium- and heavy-duty EV efforts.

33 ADVANCED PROPULSION SYSTEMS↗

HIGH EFFICIENCY HIGH DENSITY GAN BASED 6.6KW BI-DIRECTIONAL ON-BOARD CHARGER FOR PEVS

Executive Summary: In the 4th quarter of 2014, a program was formally initiated at Delta Products to develop and commercialize a lightweight, compact and high efficiency bi-directional on-board Charger (OBC) for plug-in electric vehicle use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE- EE0006834. Delta products was the prime contractor to DOE during the three-year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Transphorm, Inc., The Center for Power Electronics Systems (CPES) at Virginia Tech, and Fiat Chrysler Automobiles. The OBC uses novel control schemes enabled by Gallium Nitride (GaN) switches to obtain charger efficiency of 95% and reduce volume and mass by 50% of the existing state-of-the-art silicon (Si) based chargers and inverters. A Si-based bidirectional OBC is typically implemented with two separate modules: a charger and an inverter. A GaN-based bidirectional OBC can integrate both functions into a single module. It will result in substantial reductions in size, weight and cost. This enables the introduction of WBG devices in automotive production programs. The inverter function integrated with PHEV can act as emergency power source in case of power interruption. This increases the power security when the electric infrastructure is damaged by extreme weather conditions. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of OBC prototypes is described in detail. After the program history is reviewed, the key attributes of the resulting OBC are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this OBC to meet or exceed DOE's targets for this program, including: • Construction of a working product-intent prototype of a bi-directional on-board Charger (OBC); • Peak efficiency of 95% and volume reduction of 50% compared to a recent production modules of similar ratings. • Bi-directional operation at 120Vac and 240Vac in vehicle. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information relating to the product design and test results are contained in the appendices to this report.

30 DIRECT ENERGY CONVERSION↗

Annual Technology Baseline: The 2020 Transportation Update

Consistent cost and performance data for various transportation technologies can be difficult to find and may change frequently for certain technologies. With the Annual Technology Baseline (ATB), the National Renewable Energy Laboratory annually provides an organized and centralized set of such cost and performance data. The ATB uses the best information from the Department of Energy national laboratories' transportation analysts. The ATB has been reviewed by experts and it includes powertrains such as gasoline, diesel, natural gas, hybrid, plug-in hybrid, battery electric, and fuel cell, as well as fuels such as gasoline, ethanol, diesel, biodiesel, natural gas, electricity, and hydrogen.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Spatial and Temporal Analysis of the Total Cost of Ownership for Class 8 Tractors and Class 4 Parcel Delivery Trucks

The medium- and heavy-duty transportation sector is experiencing rapid changes in powertrain technology innovation, with recent announcements of battery electric and fuel cell electric trucks being offered. The economics of these alternative powertrain vehicles are uncertain and difficult to compare directly. This analysis seeks to provide a rigorous, techno-economic analysis of all of these alternative powertrain vehicles within the same analytic framework. Specifically, this report evaluates the total cost of ownership (TCO) of six different truck powertrain technologies (diesel, diesel hybrid electric, plug-in hybrid electric, compressed natural gas, battery electric, and fuel cell electric) for three different truck vocations (Class 8 long haul [750-mile range and 500-mile range], Class 8 short haul [300-mile range], and Class 4 parcel delivery [120-mile range]), for three different time frames (2018, 2025, and Ultimate).

08 HYDROGEN↗