Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “phase errors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Analysis of Voyager spectra of the beta Cephei star nu Eridani

Voyager 500-1700 A spectrophotometric observations of the beta Cephei star nu Eri are presented and discussed. The Voyager observations were obtained in 1981 and cover six pulsation cycles of the star. These data are supplemented with a set of nine International Ultraviolet Explorer (IUE) SWP high-resolution observations covering one, earlier epoch, pulsation cycle. Light curves are derived from the Voyager data at 1055 and 1425 A. These light curves are found to be consistent in both shape and period with published optical curves. The 1055 A light curve also exhibits a phenomenon not seen in the optical curves: a small but highly significant systematic increase in the flux of the maximum light phases while maintaining a constant minimum light level over the interval of observation. Substantially larger errors in the longer wavelength data preclude discussion of this phenomenon in the 1425 A light curve. Examination of the far-UV continuum in nu Eri during this period shows that the color temperature is lower for the brighter maxima. Analysis of the far-UV continuum at maximum and minimum light yields an effective temperature difference between these two phases of 2200 + or - 750 K. Spectroscopically, three prominent features are seen in the Voyager data: a feature at 985 A mostly due to a blend of C III 977 A, H I Ly gamma 972 A, and N III 990 A; a feature at 1030 A due to H I Ly beta 1026 A and C II 1037 A; and the Si IV resonance doublet near 1400 A. A comparison of the 912-1700 A spectral region in nu Eri with a set of standard, i.e., nonpulsating stars, shows that nu Eri closely resembles the standard both in continuum shape and spectral line strengths with the possible exception of a slight flux excess between 912 and 975 A. The equivalent width of the 985 A feature is shown to vary in strength over the pulsation cycle in antiphase with the light curve and variations seen in the C IV 1548-1551 lines from the IUE data. This behavior of the 985 A feature is most likely caused by variations in the strength of the Ly gamma component of the blend. Comparisons are also made between nu Eri and the only other beta Cephei star studied in the far-UV, BW Vul, with the most notable differences between the two stars being the much larger delta(T(sub eff)) for BW Vul and the almost total absence of abnormalities in observed spectrum of nu Eri.

Porri, A.↗

Results of November 1981 and May 1982 ATMAP Campaigns at Adelaide (35 Deg S, 138 Deg E)

The mean zonal circulation for both the November and May campaigns are representative of early summer and winter conditions. The mean meridional flow in November was stable and typical of summer conditions at Adelaide. The conditions in May were, however, more variable and appeared to be changing significantly during the campaign. It is possible that there was a strong influence from a large scale wave which could account for the large meridional wind values observed. Overall, the mean tidal structures observed during the core periods were not significantly different from those observed in two-week intervals centered on the cores. In May both components show evidence for propagating components with 30 to 40 km vertical wavelengths. For the semidiurnal components, the phase structures show evidence for vertical propagation with apparent vertical wavelengths of the order of 50 km. The mean amplitudes for the semidiurnal components in May are close to the noise level. Typical errors from the harmonic analysis are + or - 1 to 2 ms(-1) in amplitude and + or - 0.5 hr in phase, but these are probably underestimates.

Vincent, R. A.↗

Interferometric Characterization of Keck Segment Edge Errors

The Keck telescope segments were manufactured by stressed mirror polishing of large circular pieces of Zerodur that were then cut into hexagons and finished by Ion Beam Figuring (IBF). It has long been believed that this process results in segments with little or no edge effects. As a result, this same general approach is planned for segment manufacturing for the Thirty Meter Telescope (TMT) and the European Extremely Large Telescope (E-ELT). However, recent measurements at the Keck telescope suggest that at least some of the Keck segments have significant aberrations within 60 mm of the edge. These aberrations impact the telescope phasing and the overall telescope image quality. We present interferometric measurements of multiple Keck segments, characterizing the surface errors near the edges over spatial periods from 5 cm down to 1 mm. We show that the largest phasing and image quality effects are due to plateaus of unremoved material, left behind after IBF as a result of obscuration by the IBF supports. Apart from these plateaus, the edge quality is relatively good, though not as good as in the segment interiors. Some residual phasing and image quality effects remain, and these are not currently understood.

Martinek, Stephen J.↗

Accurate Realization of GPS Vertical Global Reference Frame

The few millimeter per year level accuracy of radial global velocity estimates with the Global Positioning System (GPS) is at least an order of magnitude poorer than the accuracy of horizontal global motions. An improvement in the accuracy of radial global velocities would have a very positive impact on a number of geophysical studies of current general interest such as global sea-level and climate change, coastal hazards, glacial isostatic adjustment, atmospheric and oceanic loading, glaciology and ice mass variability, tectonic deformation and volcanic inflation, and geoid variability. The goal of this project is to improve our current understanding of GPS error sources associated with estimates of radial velocities at global scales. GPS error sources relevant to this project can be classified in two broad categories: (1) those related to the analysis of the GPS phase observable, and (2) those related to the combination of the positions and velocities of a set of globally distributed stations as determined from the analysis of GPS data important aspect in the first category include the effect on vertical rate estimates due to standard analysis choices, such as orbit modeling, network geometry, ambiguity resolution, as well as errors in models (or simply the lack of models) for clocks, multipath, phase-center variations, atmosphere, and solid-Earth tides. The second category includes the possible methods of combining and defining terrestrial reference flames for determining vertical velocities in a global scale. The latter has been the subject of our research activities during this reporting period.

Elosegui, Pedro↗

Blazhko Effect

The cause of the Blazhko effect, the long-term modulation of the light and radial velocity curves of some RR Lyr stars, is still not understood. The observational characteristics of the Blazhko effect are discussed. Some preliminary results are presented from two recent campaigns to observe RR Lyr, using the International Ultraviolet Explorer along with ground-based spectroscopy and photometry, throughout a pulsation cycle, at a variety of Blazhko phases. A set of ultraviolet light curves have been generated from low dispersion IUE spectra. In addition, the (visual) light curves from IUE's Fine Error Sensor are analyzed using the Fourier decomposition technique. The values of the parameters Psi(sub 21) and R(sub 21) at different Blazhko phases of RR Lyr span the range of values found for non-Blazhko variables of similar period.

Teays, Terry↗

Using LDPC Code Constraints to Aid Recovery of Symbol Timing

A method of utilizing information available in the constraints imposed by a low-density parity-check (LDPC) code has been proposed as a means of aiding the recovery of symbol timing in the reception of a binary-phase-shift-keying (BPSK) signal representing such a code in the presence of noise, timing error, and/or Doppler shift between the transmitter and the receiver. This method and the receiver architecture in which it would be implemented belong to a class of timing-recovery methods and corresponding receiver architectures characterized as pilotless in that they do not require transmission and reception of pilot signals. Acquisition and tracking of a signal of the type described above have traditionally been performed upstream of, and independently of, decoding and have typically involved utilization of a phase-locked loop (PLL). However, the LDPC decoding process, which is iterative, provides information that can be fed back to the timing-recovery receiver circuits to improve performance significantly over that attainable in the absence of such feedback. Prior methods of coupling LDPC decoding with timing recovery had focused on the use of output code words produced as the iterations progress. In contrast, in the present method, one exploits the information available from the metrics computed for the constraint nodes of an LDPC code during the decoding process. In addition, the method involves the use of a waveform model that captures, better than do the waveform models of the prior methods, distortions introduced by receiver timing errors and transmitter/ receiver motions. An LDPC code is commonly represented by use of a bipartite graph containing two sets of nodes. In the graph corresponding to an (n,k) code, the n variable nodes correspond to the code word symbols and the n-k constraint nodes represent the constraints that the code places on the variable nodes in order for them to form a valid code word. The decoding procedure involves iterative computation of values associated with these nodes. A constraint node represents a parity-check equation using a set of variable nodes as inputs. A valid decoded code word is obtained if all parity-check equations are satisfied. After each iteration, the metrics associated with each constraint node can be evaluated to determine the status of the associated parity check. Heretofore, normally, these metrics would be utilized only within the LDPC decoding process to assess whether or not variable nodes had converged to a codeword. In the present method, it is recognized that these metrics can be used to determine accuracy of the timing estimates used in acquiring the sampled data that constitute the input to the LDPC decoder. In fact, the number of constraints that are satisfied exhibits a peak near the optimal timing estimate. Coarse timing estimation (or first-stage estimation as described below) is found via a parametric search for this peak. The present method calls for a two-stage receiver architecture illustrated in the figure. The first stage would correct large time delays and frequency offsets; the second stage would track random walks and correct residual time and frequency offsets. In the first stage, constraint-node feedback from the LDPC decoder would be employed in a search algorithm in which the searches would be performed in successively narrower windows to find the correct time delay and/or frequency offset. The second stage would include a conventional first-order PLL with a decision-aided timing-error detector that would utilize, as its decision aid, decoded symbols from the LDPC decoder. The method has been tested by means of computational simulations in cases involving various timing and frequency errors. The results of the simulations ined in the ideal case of perfect timing in the receiver.

Jones, Christopher↗

A computerized, procedural aid for flight crews

A computer program for detecting pilot error is described. The program observes pilot actions through the aircraft controls and state, and the actions are compared to those of a procedural script which can be considered a prescriptive model of the procedural aspects of flight. Pilot error is a discrepancy between the pilot actions and the script. The script has a hierarchical structure consisting of a single script at the highest level, scripts for the major phases of flight at the next level, scripts for procedures to be executed during these phases, and procedure step scripts at the bottom. The program interprets the aircraft data base in terms of the script, detecting errors of commission from a set of allowed and disallowed changes stored with each script element.

Hammer, J. M.↗

GOES-16 ABI Navigation Assessment

The US Geostationary Operational Environmental Satellite – R Series (GOES-R) was launched on November 19, 2016and was designated GOES-16 upon reaching geostationary orbit ten days later. After checkout and calibration, GOES-16 was relocated to its operational location of 75.2 degrees west and officially became GOES East on December 18, 2017. The Advanced Baseline Imager (ABI) is the primary instrument on the GOES-R series for imaging Earth's surface and atmosphere to significantly improve the detection and observation of severe environmental phenomena. A team supporting the GOES-R Flight Project at NASA's Goddard Space Flight Center developed algorithms and software for independent verification of ABI Image Navigation and Registration (INR), which became known as the INR Performance Assessment Tool Set (IPATS). In this paper, we will briefly describe IPATS on top concept level, and then introduce the Landsat chips, chip registration algorithms, and how IPATS measurements are filtered. We present GOES-16 navigation (NAV) errors from flight data from January 2017 to May 2018. The results show a) IPATS characterized INR variations throughout the post-launch test phase; and b) ABI INR has improved over time as post-launch tests were performed and corrections applied. Finally, we will describe how estimated NAV errors have been used to assess and understand satellite attitude anomalies and scale errors etc. This paper shows that IPATS is an effective tool for assessing and improving GOES-16 ABI INR and is also useful for INR long-term monitoring.

GOES-R↗

The performance of trellis-coded MDPSK with multiple symbol detection

The idea of using a multiple (more than two) symbol observation interval to improve error probability performance is applied to differential detection of trellis-coded multiple phase-shift keying (MPSK) over an additive white Gaussian noise (AWGN) channel. An equivalent Euclidean distance measure per trellis branch is determined for this detection scheme. This is used to define an augmented (larger multiplicity) trellis code whose distance measure is the conventional squared Euclidean distance typical of conventional trellis-coded modulation on the AWGN. Such an augmented multiple trellis code is a convenient mathematical tool for simplifying the analysis. Results are obtained by a combination of analysis (upper Chernoff bounds and asymptotic large-SNR approximations) and computer simulation. It is shown that only a slight increase (e.g., one symbol) in the length of the observation interval will provide a significant improvement in bit error probability performance.

Divsalar, Dariush↗

Phase-Retrieval Uncertainty Estimation and Algorithm Comparison for the JWST-ISIM Test Campaign

Phase retrieval, the process of determining the exitpupil wavefront of an optical instrument from image-plane intensity measurements, is the baseline methodology for characterizing the wavefront for the suite of science instruments (SIs) in the Integrated Science Instrument Module (ISIM) for the James Webb Space Telescope (JWST). JWST is a large, infrared space telescope with a 6.5-meter diameter primary mirror. JWST is currently NASA's flagship mission and will be the premier space observatory of the next decade. ISIM contains four optical benches with nine unique instruments, including redundancies. ISIM was characterized at the Goddard Space Flight Center (GSFC) in Greenbelt, MD in a series of cryogenic vacuum tests using a telescope simulator. During these tests, phase-retrieval algorithms were used to characterize the instruments. The objective of this paper is to describe the Monte-Carlo simulations that were used to establish uncertainties (i.e., error bars) for the wavefronts of the various instruments in ISIM. Multiple retrieval algorithms were used in the analysis of ISIM phase-retrieval focus-sweep data, including an iterativetransform algorithm and a nonlinear optimization algorithm. These algorithms emphasize the recovery of numerous optical parameters, including low-order wavefront composition described by Zernike polynomial terms and high-order wavefront described by a point-by-point map, location of instrument best focus, focal ratio, exit-pupil amplitude, the morphology of any extended object, and optical jitter. The secondary objective of this paper is to report on the relative accuracies of these algorithms for the ISIM instrument tests, and a comparison of their computational complexity and their performance on central and graphical processing unit clusters. From a phase-retrieval perspective, the ISIM test campaign includes a variety of source illumination bandwidths, various image-plane sampling criteria above and below the Nyquist- Shannon critical sampling value, various extended object sizes, and several other impactful effects.

Design Analysis↗

Interferometric phase measurement of zerodur, aluminum and SXA mirrors at cryogenic temperatures

A research program was undertaken to determine the surface figure error of several different types of mirrors at cryogenic temperatures. Two-inch diameter parabolic, spherical and flat mirrors were fabricated from zerodur, aluminum and a metal matrix composite of silicon carbide reinforced aluminum (SXA). The ratio of silicon carbide to aluminum was selected so that the coefficient of thermal expansion (CTE) of the metal matrix matched electroless nickel. A liquuid helium dewar was modified to add an interferometric grade window, a cold electronic shutter and a strain-free copper mirror mount. Interferometric phase measurements on each mirror mounted in the dewar were made without the window, with the window, under vacuum, at around 80K and between 10K and 24K.

Magner, Thomas J.↗

Orbit Determination Support for the Microwave Anisotropy Probe (MAP)

The Microwave Anisotropy Probe (MAP) is a Medium Class Explorers (MIDEX) mission produced in partnership between Goddard Space Flight Center (GSFC) and Princeton University. The main science objective of the MAP mission is to produce an accurate full-sky map of the cosmic microwave background temperature fluctuations anisotropy. MAP was launched from the Cape Canaveral Air Force Station Complex 17 aboard a Delta II 7425-10 expendable launch vehicle at exactly 19:46:46.183 UTC on June 30, 2001. The spacecraft received a nominal direct insertion by the Delta into a 185 km circular orbit. MAP was then maneuvered into a sequence of phasing loops designed to set up a lunar swingby (gravity-assisted acceleration) of the spacecraft onto a transfer trajectory to a Lissajous orbit about the Earth-Sun L2 point. The mission duration is approximately 27 months with 3 to 4 months of transfer time to the final mission orbit about L2. The MAP transfer orbit consisted of 3.5 phasing loops: the first loop has a 7-day period, the second and third loops have a 9-day period, and the last half loop has a 4-day period as illustrated in Figure 1, which also indicates the placement of maneuvers. A Pfinal correction maneuver was performed 18 hours after the last perigee to more closely achieve the targeted lissajous orbit. The lunar encounter or swingby took place approximately 30 days after launch. After the lunar encounter, the spacecraft will cruise for approximately 120 days before it arrives at L2. A Mid-Course Correction (MCC) maneuver was executed seven days after the swingby to further refine the trajectory. Once the MAP satellite is injected into the L2 Lissajous orbit, it will perform occasional stationkeeping maneuvers to maintain the Lissajous orbit for a minimum of two years (and a goal of four years). Because of its complex orbital characteristics, the mission provided a unique challenge to orbit determination (OD) support in many orbital regimes. Extensive trajectory error covariance analysis was performed to predict ephemeris accuracy for the OD process using a Bayesian least-squares technique. The orbit determination error analysis is essential for maneuver planning and maneuver recovery study. Several tracking scenarios were investigated for each phase of the mission. This paper provides a summary of the premission trajectory covariance error analysis, as well as actual real-time OD results. The use and impact of the various tracking stations, systems, and measurements will be discussed. Details of the operational OD support and the inferred OD accuracy will be presented, and the results will be compared to the premission covariance analysis, In addition, there will be a discussion of the challenges presented to OD support including delta-Vs at apogee as well as perigee, and effects due to spacecraft attitude mode, in light of their implications to the OD accuracy and covariance analysis.

Truong, Son H.↗

Error control techniques for satellite and space communications

The performance of bandwidth efficient trellis codes on channels with phase jitter, or those disturbed by jamming and impulse noise is analyzed. An heuristic algorithm for construction of bandwidth efficient trellis codes with any constraint length up to about 30, any signal constellation, and any code rate was developed. Construction of good distance profile trellis codes for sequential decoding and comparison of random coding bounds of trellis coded modulation schemes are also discussed.

Costello, Daniel J., Jr.↗

Growth Curve Parameterization of Metabolic Activity of Yeast Cells for BioSentinel

The goal of the BioSentinel small satellite payload is to measure the effect of deep space radiation on the growth and metabolic activity of yeast cells. Raw test data is generated by fluidics cards containing yeast cells rehydrated at different periods, with metabolic activity measured by the reduction of alamarBlue. Each card well has a sensor array that measures the amount of red, green, and infrared light transmitted through the yeast culture. This illumination data is then converted to absorbance values, which are further converted into concentrations. The ultimate objective is to convert these concentrations into biologically-relevant metrics that can be compared against one another to determine changes due to differential radiation exposure. Beginning with IR absorbance data (corresponding to cell density) from ground studies, three parameters from a sigmoidal growth curve were extracted and analyzed: 𝜆 (lag phase), 𝜇 (max growth rate), and A (max cell growth). The data was fit to the Gompertz model of microbial growth using non-linear regression (Minitab), as the fit error was reduced compared to the simpler logistic growth curve. Graphs showed that the data contained a discrepancy (drift) in the lag phase that is attributable to a slow, constant loss of moisture. Correcting this discrepancy by fitting the first 25 hours of the data to a power function and subtracting these values from the absorbance readings obtained a better statistical fit to the growth curve in the lag phase. A power fit was selected over a linear fit because it reflected the effects of constant volume loss. This correction to the BioSentinel data analysis pipeline will enable quantitative statistical analysis of the effect of different levels of deep space radiation on yeast cells. Future work includes automation of drift correction and curve modeling to extract these parameters directly from data.

Growth Curve↗

Joint Carrier-Phase Synchronization and LDPC Decoding

A method has been proposed to increase the degree of synchronization of a radio receiver with the phase of a suppressed carrier signal modulated with a binary- phase-shift-keying (BPSK) or quaternary- phase-shift-keying (QPSK) signal representing a low-density parity-check (LDPC) code. This method is an extended version of the method described in Using LDPC Code Constraints to Aid Recovery of Symbol Timing (NPO-43112), NASA Tech Briefs, Vol. 32, No. 10 (October 2008), page 54. Both methods and the receiver architectures in which they would be implemented belong to a class of timing- recovery methods and corresponding receiver architectures characterized as pilotless in that they do not require transmission and reception of pilot signals. The proposed method calls for the use of what is known in the art as soft decision feedback to remove the modulation from a replica of the incoming signal prior to feeding this replica to a phase-locked loop (PLL) or other carrier-tracking stage in the receiver. Soft decision feedback refers to suitably processed versions of intermediate results of iterative computations involved in the LDPC decoding process. Unlike a related prior method in which hard decision feedback (the final sequence of decoded symbols) is used to remove the modulation, the proposed method does not require estimation of the decoder error probability. In a basic digital implementation of the proposed method, the incoming signal (having carrier phase theta theta (sub c) plus noise would first be converted to inphase (I) and quadrature (Q) baseband signals by mixing it with I and Q signals at the carrier frequency [wc/(2 pi)] generated by a local oscillator. The resulting demodulated signals would be processed through one-symbol-period integrate and- dump filters, the outputs of which would be sampled and held, then multiplied by a soft-decision version of the baseband modulated signal. The resulting I and Q products consist of terms proportional to the cosine and sine of the carrier phase cc as well as correlated noise components. These products would be fed as inputs to a digital PLL that would include a number-controlled oscillator (NCO), which provides an estimate of the carrier phase, theta(sub c).

Simon, Marvin↗

Precise interferometric tracking of spacecraft at low sun-earth-probe angles

When a spacecraft is at low sun-earth-probe (SEP) angle, phase perturbations induced in the spacecraft's signal by the solar plasma can impede the acquisition of meaningful spacecraft Very Long Baseline Interferometry (VLBI) measurements. This phenomenon imposes limitations on our ability to successfully acquire the spacecraft signal, and also introduces unmodeled errors into data that are successfully acquired. In this paper, an analysis of the solar plasma induced error on interferometric delay rate as a function of SEP angle is performed. In addition, the probability of correct signal phase connection as a function of SEP angle and plasma variability is calculated for 2.3 GHz and 8.4 GHz signals. In December 1986, an experiment was conducted to demonstrate VLBI navigation at low SEP angles, using the Voyager 2 spacecraft. The results of this experiment are consistent with the conclusions reached in the low SEP analysis and are also consistent with a theoretical error model for water vapor fluctuations in the earth's troposphere.

Kahn, Robert D.↗