Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Method of Testing and Predicting Failures of Electronic Mechanical Systems

A method employing a knowledge base of human expertise comprising a reliability model analysis implemented for diagnostic routines is disclosed. The reliability analysis comprises digraph models that determine target events created by hardware failures human actions, and other factors affecting the system operation. The reliability analysis contains a wealth of human expertise information that is used to build automatic diagnostic routines and which provides a knowledge base that can be used to solve other artificial intelligence problems.

Iverson, David L.↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A new bipolar Qtrim power supply system

This year marks the 15th run of RHIC (Relativistic Heavy Ion Collider) operations. The reliability of superconducting magnet power supplies is one of the essential factors in the entire accelerator complex. Besides maintaining existing power supplies and their associated equipment, newly designed systems are also required based on the physicist’s latest requirements. A bipolar power supply was required for this year’s main quadruple trim power supply. This paper will explain the design, prototype, testing, installation and operation of this recently installed power supply system.

43 PARTICLE ACCELERATORS↗

RES-E-NEXT: Next Generation of RES-E Policy Instruments

The rapid deployment of renewable sources of electricity (RES-E) is transforming power systems globally. This trend is likely to continue with large increases in investment and deployment of RES-E capacity over the coming decades. Several countries now have penetration levels of variable RES-E generation (i.e., wind and solar) in excess of 15% of their annual electricity generation; and many jurisdictions (e.g., Spain, Portugal, Ireland, Germany, and Denmark; and, in the United States, Colorado) have experienced instantaneous penetration levels of more than 50% variable generation.1 These penetration levels of variable RES-E have prompted many jurisdictions to begin modifying practices that evolved in an era of readily dispatchable, centralised power systems. Providing insights for the transition to high levels of variable RES-E generation is the focus of this document, which is the final report of the RES-E-NEXT project commissioned by the International Energy Agency’s implementing agreement on Renewable Energy Technology Deployment (IEA-RETD). It presents a comprehensive assessment of issues that will shape power system evolution during the transition to high levels of variable RES-E generation. While policy will be a central tool to sustain the growth of RES-E capacity and to enable power system transitions, the scope of the report extends beyond policy considerations to include the related domains of regulation, power market design, and system operation protocols. This broad scope is in recognition that a changing resource mix with greater penetration levels of variable RES-E has broad implications for grid operations, wholesale and retail power markets, and infrastructure needs. The next decade will be a critical transition period for power system stakeholders, as global deployment of RES-E capacity (and especially variable RES-E capacity) continues to scale-up in many regions of the world. To address increased penetration levels of RES-E in power systems and the new challenges that could emerge, coordinated portfolios of policies, market designs, regulations, and operational protocols are essential. The goal for policymakers is to facilitate investment in RES-E technologies and to enable efficient and reliable system operation, costeffective service delivery, and continued public acceptance. Although the factors that impact the speed and scale of RES-E deployment manifest uniquely in each power system, in the transition to high shares of variable RES-E this report identifies four critical domains and the changing drivers that will shape next-generation policy for each. These domains are introduced in Table I, and comprise the major sections of this report.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Clocks and timing in the NASA Deep Space Network

A new timing system has been developed for the NASA Deep Space Network (DSN) and is currently in the final stages of integration, testing and implementation in all three DSN sites. The DSN is a distributed antenna network for deep space communication, whose facilities are continuously engaged in spacecraft tracking, Very Long Baseline Interferometry (VLBI) or Radio Astronomy activities. Its primary components consist of three Deep Space Communication Centers (DSCC) separated nearly equidistant around the Earth in California, USA; Spain; and Australia. Within each DSCC, synchronized, low jitter timing signals must be distributed to many users over distances of up to 30 kilometers. The design criteria for the timing system required state of the art stability and jitter performance, but also extremely high operability and reliability. This paper describes some of the key features and recent system performance data as measured both in the laboratory and the operational DSN.

clocks↗

Remote Diagnosis and Operational Response to an In-Flight Failure of the Drill Feed Mechanism Onboard the Mars Science Laboratory Rover

On November 30th, 2016 (Sol 1536 of the mission), the Mars Science Laboratory (MSL) flight operations team commanded the Curiosity rover to drill into a Martian rock to acquire the mission’s 16th rock powder sample. The drilling operation was halted when the drill feed mechanism unexpectedly stalled shortly after disengaging its magnetically-actuated friction brake at the start of a long move to extend the drill bit into contact with the target rock. The drilling campaign was put on hold and later abandoned as diagnostic experimentation revealed a tendency for the actuator to transition in and out of a high-drag state in which the mechanism could not actuate. In the subsequent months, the team conducted a variety of in-flight and ground-based investigations to determine root cause and identify mitigation strategies for continued operation. Mechanism reliability continued to degrade and by June 2017, it became clear that the mechanism could not be relied upon to support drilling operations. The team succeeded in fully extending the feed, enabling the development of new sampling techniques that would not rely on the feed mechanism. The first feed-extended drilling sample was successfully collected on Sol 2057, 521 sols after the initial feed stall. This paper discusses the anomaly investigation process, failure analysis, and feed mechanism operation mitigation strategies. It concludes with key lessons learned about mechanism design, mission architecture, and operational best practices.

Lin, Megan Richardson↗

Electromechanical actuation for thrust vector control applications

At present, actuation systems for the Thrust Vector Control (TVC) for launch vehicles are hydraulic systems. The Advanced Launch System (ALS), a joint initiative between NASA and the Air Force, is a launch vehicle that is designed to be cost effective, highly reliable and operationally efficient with a goal of reducing the cost per pound to orbit. As part of this initiative, an electromechanical actuation system is being developed as an attractive alternative to the hydraulic systems used today. NASA-Lewis is developing and demonstrating an Induction Motor Controller Actuation System with a 40 hp peak rating. The controller will integrate 20 kHz resonant link Power Management and Distribution (PMAD) technology and Pulse Population Modulation (PPM) techniques to implement Field Oriented Vector Control (FOVC) of a new advanced induction motor. Through PPM, multiphase variable frequency, variable voltage waveforms can be synthesized from the 20 kHz source. FOVC shows that varying both the voltage and frequency and their ratio (V/F), permits independent control of both torque and speed while operating at maximum efficiency at any point on the torque-speed curve. The driver and the FOVC will be microprocessor controlled. For increased system reliability, a Built-in Test (BITE) capability will be included. This involves introducing testability into the design of a system such that testing is calibrated and exercised during the design, manufacturing, maintenance and prelaunch activities. An actuator will be integrated with the motor controller for performance testing of the EMA TVC system. The design and fabrication of the motor controller is being done by General Dynamics Space Systems Division. The University of Wisconsin-Madison will assist in the design of the advanced induction motor and in the implementation of the FOVC theory. A 75 hp electronically controlled dynamometer will be used to test the motor controller in all four quadrants of operation using flight type control algorithms. Integrated testing of the controller and actuator will be conducted at a facility yet to be named. The EMA system described above is discussed in detail.

Roth, Mary Ellen↗

Operationally Efficient Propulsion System Study (OEPPS)

A description is presented, through view graphs, of the problems encountered in today's launch vehicles and how these problems have adversely affected the ability to achieve serviceability, reliability, and operability. The need is emphasized to recognize and understand the operations problems and the effort that must be made to avoid them in future designs. Technology areas that will enhance operations requirements are also presented.

Wong, G. S.↗

Foundations for the Future Power System: Inverter-Based Resource Interconnection Standards

As power systems evolve to become reliant on solar, wind, batteries, and other inverter-based resources (IBRs), it is essential that those resources meet certain minimum performance and capability criteria designed to ensure the power system operates stably and reliably. Because those criteria, as enshrined in interconnection standards, take years to develop and are very long lived, they need to account for not only the present state of the power system but also its expected future state over the lifetime of the power plants to which they will apply. In addition, they need to be specific enough to ensure reliability without over specifying and, thereby, impeding innovation. Because power systems are shifting rapidly from a state where IBRs make up a small to medium portion of generation to one where the generation will, at times, come predominantly from IBRs, interconnection standards are especially challenging to develop today. Good interconnection standards can make the power system more reliable and less costly to operate, whereas poorly designed standards can lead to major problems, like the famous German 50.2-Hz problem, which introduced a risk of losing many gigawatts of solar on a frequency excursion and resulted in many IBRs being retrofitted at great cost to mitigate a major system reliability risk. Readying the power system by specifying forward-looking technical minimum functional capabilities for IBRs can be an effective approach to avoid future retrofits.

data models↗

Laser data links for communication satellites

Laser data relays potentially offer continuous 1 Gb/sec bandwidths, drastically increasing low-altitude satellite data collection capacity over present store-and-dump techniques. Availability of the laser link as a reliable alternative, operating within conventional low-altitude communication subsystem weight and power allocations, will create customer pressure for adoption. Major communication relay system impacts are discussed including reliability, mechanical design, attitude control, on-board data handling, contamination control, and traffic-net management. Interface parameters which drive the fundamental relay satellite design concepts are discussed, and conditions requiring early quantitative analysis are identified.

Ohern, W. L.↗

Quench Behavior of 18-mm-Period, 1.1-m-Long Nb 3 Sn Undulator Magnets

A novel Nb 3 Sn-based superconducting undulator (SCU) was developed and integrated into the Advanced Photon Source (APS) at Argonne National Laboratory. The SCU achieved user operation within an accelerator environment. Compared to its Nb-Ti counterpart, the Nb 3 Sn SCU operates at substantially higher currents. Thus, a detailed experimental evaluation of the SCU magnets’ performance was necessary under both “wet” and indirectly cooled conditions to ensure its reliability during operation. Here our study indicated that the cooling method has a noticeable influence on the magnet's behavior. Specifically, energy dissipation in the magnets during quenches was observed to be greater under indirect cooling than with “wet” cooling. This investigation provided insights into the safe operational limits. Guided by these insights the more challenging high-current tests were successfully carried out at the end of the user phase. The SCU achieved the design undulator field of 1.17 T at 820 A and 4.2 K, with a magnetic gap of 9.5 mm and a period of 18 mm. Actual performance exceeded the specifications, reaching 850 A.

43 PARTICLE ACCELERATORS↗

Access 5 - Step 1: Human Systems Integration Program Plan (HSIPP)

This report describes the Human System Interface (HSI) analysis, design and test activities that will be performed to support the development of requirements and design guidelines to facilitate the incorporation of High Altitude Long Endurance (HALE) Remotely Operated Aircraft (ROA) at or above FL400 in the National Airspace System (NAS). These activities are required to support the design and development of safe, effective and reliable ROA operator and ATC interfaces. This plan focuses on the activities to be completed for Step 1 of the ACCESS 5 program. Updates to this document will be made for each of the four ACCESS 5 program steps.

Source record↗

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Polarity effects on wake–up behavior of Al 0.94 B 0.06 N ferroelectrics

Wurtzite ferroelectric materials are promising candidates for energy-efficient memory technologies, particularly for applications requiring high operating temperatures. Asymmetric wake-up behaviors, in which the polarization reversal depends both on polarity and cycle number for the first few dozen cycles, must be better understood for reliable device operation. Here, the detailed analysis of the asymmetric wake-up behavior of thin film Al 0.94 B 0.06 N was performed combining time-resolved switching measurements with Rayleigh analysis, piezoelectric measurements, and etching experiments of progressively switched samples. Furthermore, the analysis shows that the gradual opening of the polarization hysteresis loops associated with wake-up is driven by a gradual increase in the domain-wall density and/or domain-wall mobility with electric field cycle to the polarity opposite to the growth polarity. The insights of this discovery will help to guide interface and polarity design in the eventual deployment of reliable devices based on these materials.

36 MATERIALS SCIENCE↗

Computerized procedure systems: procedure edition and maintenance challenges - 232

Very few nuclear power plants are using computerized procedures to guide the control room operation. A CPS implementation consists of two processes: digitalization and computerization. The former deals with the transformation of paper-based procedure into a digital data; the latter is referred to as the addition to that data of extra information that is meaningful for decision-making. This information may include real-time data (plant parameter values and binary process values to indicate equipment states), provide access to trends and historical data, etc. In order to be efficient and to optimize the digitalization and computerization processes, these set of aids should be implemented at the same time as operating procedures are digitalized There are references of plants having successfully implemented Computerized Procedures Systems (CPS) for emergency procedures, but when questioned about normal or abnormal operating procedures, operators and plant management seem reluctant to take that step. Given that a CPS is meant, by design concept, to increase operation crew efficiency by facilitating the procedures execution and reducing human error, why are we reluctant to enjoy CPS benefits in the most common plant status (i.e. normal operation)? Although there are many answers to this question, one is shared by most of the users: CPSs are not designed for editing and maintaining procedures easily and reliably. Normal operating procedures, in opposition to the emergency procedures, are often reviewed. Nowadays, these edition activities are performed easily with a word processor software and using paper, but what is required when dealing with a CPS? (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Investigation into Cryogenic Tank Insulation Systems for the Mars Surface Environment

In order to use oxygen that is produced on the surface of Mars from In-Situ production processes in a chemical propulsion system, the oxygen must first be converted from vapor phase to liquid phase and then stored within the propellant tanks of the propulsion system. The oxygen must then be stored in the liquid phase for several years between when the liquefaction operations are initiated and when the ascent stage lifts off the Martian surface. Since the Space Exploration Initiative, NASA has been investing small sums of money into soft vacuum systems for Mars Applications. A study was done into these various insulation systems for soft vacuum insulation, to determine what types of systems might be best to further pursue. Five different architectures or cycles were considered: Aerogel-based multilayer Insulation (MLAI), Space Evacuated Mars Vacuum Jacket (SEMOV) (also known as lightweight vacuum jacket), Load Responsive-Multilayer Insulation, Spray on Foam with MLI, and MLAI in SEMOV. Models of each architecture were developed to give insight into the performance and losses of each of the options. The results were then compared across six categories: Insulation System Mass, Active System Power (both input and heat rejection), Insulation System Cost, Manufacturability, Reliability, and Operational Flexibility. The result was that a trade between reliability and mass was clearly identified. Systems with high mass, also had high perceived reliability; whereas, systems with lower mass and power had a much lower perceived reliability. In the end, the numerical trades of these systems showed nominally identical rankings. As a result it is recommended that NASA focus its Martian insulation development activities on demonstrating and improving the reliability of the lightweight identified systems.

Soft vacuum↗