Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Austin's Home Performance with Energy Star Program: Making a Compelling Offer to a Financial Institution Partner

Launched in 2006, over 8,700 residential energy upgrades have been completed through Austin Energy's Home Performance with Energy Star (HPwES) program. The program's lending partner, Velocity Credit Union (VCU) has originated almost 1,800 loans, totaling approximately $12.5 million. Residential energy efficiency loans are typically small, and expensive to originate and service relative to larger financing products. National lenders have been hesitant to deliver attractive loan products to this small, but growing, residential market. In response, energy efficiency programs have found ways to partner with local and regional banks, credit unions, community development finance institutions (CDFIs) and co-ops to deliver energy efficiency financing to homeowners. VCU's experience with the Austin Energy HPwES program highlights the potential benefits of energy efficiency programs to a lending partner.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Commercial remote sensing small satellite feasibility study

The Stennis Space Center acts as the program office for remote sensing activities on behalf of the NASA Office of Commercial Programs. Stennis is supplying systems engineering support to determine the technical and economic feasibility of a commercial remote sensing small satellite. Study efforts focus on the systems design of launch vehicle, sensor system, communications, attitude control, power, computational processing, and ground station capabilities. Results reveal that an example small satellite system, with a limited capability remote sensing payload, could be deployed for less than $20M. Technological advances and overall cost reductions in space systems may enable industry to develop new and expanded information service markets.

Birk, Ronald J.↗

Advanced mobile satellite communications using COMETS satellite in MM-wave and Ka-band

Early in the 21st century, the demand for personal communications using mobile, hand-held, and VSAT terminals will rapidly increase. In a future system, many different types of services should be provided with one-hop connection. The Communications Research Laboratory (CRL) has studied a future advanced mobile satellite communications system using millimeter wave and Ka band. In 1990, CRL started the Communications and Broadcasting Engineering Test Satellite (COMETS) project. The satellite has been developed in conjunction with NASDA and will be launched in 1997. This paper describes the COMETS payload configuration and the experimental system for the advanced mobile communications mission.

Ohmori, Shingo↗

Bitsy Thinks Big

AeroAstro, of Herndon, Virginia, developed a nanospacecraft core module capable of developing recyclable spacecraft designs using standard interfaces. From this core module, known as the Bitsy(TM) kernel, custom spacecraft are able to connect mission-specific instruments and subsystems for variation in mission usage. The nanospacecraft core module may be used in conjunction with an existing microsatellite bus or customized to meet specific requirements. Building on this premise, AeroAstro has developed a line of satellite communications equipment, sun sensors, and Lithium-Ion batteries which are all incorporated in its complete line of mission-specific nanospacecraft. The Bitsy technology is also a key component in AeroAstro#s satellite inspection products and orbital transfer services. In the future, AeroAstro plans to market an even less expensive version of the Bitsy technology. The plan, which is targeted to universities, markets a sort of "satellite in a kit," for less than $1 million. This technology would allow universities to build true space hardware for a fraction of the cost of launching a regular satellite.

Source record↗

Managing Satellites

Integral Systems, Inc.'s EPOCH 2000 forms the core of NASA's Near Earth Asteroid Rendezvous (NEAR) mission's command and control center. EPOCH 2000, which allows ground operators to monitor and control satellites over a wide area network, owes part of its heritage from work completed to support Goddard Space Flight Center. The software automates telemetry processing, commanding, anomaly detection, and archiving collected data. The NEAR spacecraft, launched in February 1996, will rendezvous in early 1999 and orbit the Asteroid Eros for a year. Integral Systems also provided Low Earth Orbit Autonomous Ground Terminals (LEO-Ts) to NASA. The LEO-T is designed to make it easier and less expensive for principal investigators to obtain telemetry, tracking and control services for their science missions. The company products have supported well over 70 satellite missions aimed at scientific research, meteorology, or communications applications.

Source record↗

Key space telescope design considerations

The Space Telescope (ST), a 2.4 meter aperture astronomical telescope, will be launched into low earth orbit by the Space Shuttle in the mid-1980's. This high resolution telescope will be capable of operating from Lyman-alpha (121.6 nm) through the near infrared; support five different scientific instruments at its focal plane (two cameras, two spectrographs, and one photometer); and by periodic on-orbit servicing and ground refurbishment be able to operate with technologically current scientific instruments for at least 15 years. This paper identifies the critical Space Telescope design requirements and describes design techniques which were selected to satisfy these requirements.

Olivier, J. R.↗

Application of a space station to communications satellites

The economic benefits of a space station relative to communications satellites are discussed in terms of technology experiments, spacecraft checkout, repair, servicing, and refurbishment (RSR), and mating an OTV with satellites for boost to GEO. The zero gravity, vacuum conditions, and atmosphere free long ranges are environmental features that can be used for testing large, flexible antennas and laser communications devices. Some resistance might be encountered to checkout in LEO due to the substantial success of launches to GEO without LEO checkout. However, new generations of larger, more complex satellites may warrant the presence of a space station to verify performance of new spacecraft. One RSR positive aspect for a space station is as a storage site for propellant, as well as for reusable OTV booster engines. Also, the space station can serve as a base for manned or unmanned repair spacecraft which will travel to GEO to fix malfunctions in geostationary satellites.

Ramler, J. R.↗

Second-generation mobile satellite system. A conceptual design and trade-off study

In recent years, interest has grown in the mobile satellite (MSAT) system, a satellite-based communications system capable of providing integrated voice and data services to a large number of users. To explore the potential of a commercial mobile satellite system (MSS) beyond the horizon of the first generation, using technologies of the 1990's and to assist MSAT-X in directing its efforts, a conceptual design has been performed for a second-generation system to be launched around the mid-1990's. The design goal is to maximize the number of satellite channels and/or minimize the overall life-cycle cost, subject to the constraint of utilizing a commercial satellite bus with minimum modifications. To provide an optimal design, a series of trade-offs are performed, including antenna sizing, feed configurations, and interference analysis. Interference is a serious problem for MSAT and often an overlapping feed design is required to reduce interbeam interference. The trade-off studies will show that a simple non-overlapping feed is sufficient for the second-generation system, thus avoiding the need for the complicated beam-forming network that is associated with the overlapping feed designs. In addition, a system that operates at L-band, an alternative frequency band that is being considered by some for possible MSAT applications, is also presented.

Sue, M. K.↗

Geostationary Operational Environmental Satellite (GOES I-M) METSAT project

The primary objective of the METSAT project is to provide a satellite system that meets the National Environmental Satellite Data and Information Service (NESDIS) requirements as specified by NOAA. For the GOES I-M spacecraft, these requirements include an imager and sounder system, a data collection system, and a search and rescue system. The Space Transportation System and GOES I-M development philosophy and the satellite transfer orbit philosophy are explained. The spacecraft will be launched from the Kennedy Space Center using Atlas G/Centaur D-1A expendable launch vehicles. The coverage required for launch and the support of transfer and drift orbits will consist of the 26-m antenna as prime and the TBD antenna as backup for 11 days at all complexes. There will be contingency support 15 days for on-station spacecraft checkout. After the initial 30 to 45 days, the Deep Space Network (DSN) is committed for emergency support. Contingency and emergency support will be provided by Goldstone only. Information is given in tabular form for DSN support, frequency assignments, telemetry, command, and tracking support responsibility.

Blaney, K.↗

Project Freebird: An orbital transfer vehicle

Freebird is a space-based orbital transfer vehicle designed to repair and deorbit orbital assets. Freebird is based at International Space Station Alpha (ISSA) at an inclination of 51.6 deg and is capable of three types of missions: crewed and teleoperated LEO missions, and extended robotic missions. In a crewed local configuration, the vehicle can visit inclinations between 30.8 deg and 72.4 deg at altitudes close to 390 km. Adding extra fuel tanks extends this range of inclination up to 84.9 deg and down to 18.3 deg. Furthermore, removing the crew module, using the vehicle in a teleoperated manner, and operating with extra fuel tanks allows missions to polar and geosynchronous orbits. To allow for mission flexibility, the vehicle was designed in a semimodular configuration. The major system components include a crew module, a 'smart box' (which contains command, communications, guidance, and navigation equipment), a propulsion pack, extra fuel tanks, and a vehicle storage facility (VSF) for storage purposes. To minimize risk as well as development time and cost, the vehicle was designed using only proven technology or technology which is expected to be flight-qualified in time for the intended launch date of 2002. And, because Freebird carries crew and operates near the space station, it must meet or exceed the NASA reliability standard of 0.994, as well as other standard requirements for such vehicles. The Freebird program was conceived and designed as a way to provide important and currently unavailable satellite repair and replacement services of a value equal to or exceeding operational costs.

Aneses, Carlos A.↗

The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research into Operations for America's Space Program

The Applied Meteorology Unit (AMU) provides technology transition and technique development to improve operational weather support to the Space Shuttle and the entire American space program. The AMU is funded and managed by NASA and operated by a contractor that provides five meteorologists with a diverse mix of advanced degrees, operational experience, and associated skills including data processing, statistics, and the development of graphical user interfaces. The AMU's primary customers are the U.S. Air Force 45th Weather Squadron at Patrick Air Force Base, the National Weather Service Spaceflight Meteorology Group at NASA Johnson Space Center, and the National Weather Service Melbourne FL Forecast Office. The AMU has transitioned research into operations for nineteen years and worked on a wide range of topics, including new forecasting techniques for lightning probability, synoptic peak winds,.convective winds, and summer severe weather; satellite tools to predict anvil cloud trajectories and evaluate camera line of sight for Space Shuttle launch; optimized radar scan strategies; evaluated and implemented local numerical models; evaluated weather sensors; and many more. The AMU has completed 113 projects with 5 more scheduled to be completed by the end of 2010. During this rich history, the AMU and its customers have learned many lessons on how to effectively transition research into operations. Some of these lessons learned include collocating with the operational customer and periodically visiting geographically separated customers, operator submitted projects, consensus tasking process, use of operator primary advocates for each project, customer AMU liaisons with experience in both operations and research, flexibility in adapting the project plan based on lessons learned during the project, and incorporating training and other transition assistance into the project plans. Operator involvement has been critical to the AMU's remarkable success and many awards from NASA, the National Weather Association, and two citations from the Navy's Center of Excellence for Best Manufacturing Practices. This paper will present the AMU's proven methods and explain how they may be applied by other organizations to effectively transition research into operations.

Madura, John T.↗

Mobile satellite service communications tests using a NASA satellite

Emerging applications of commercial mobile satellite communications include satellite delivery of compact disc (CD) quality radio to car drivers who can select their favorite programming as they drive any distance; transmission of current air traffic data to aircraft; and handheld communication of data and images from any remote corner of the world. Experiments with the enabling technologies and tests and demonstrations of these concepts are being conducted before the first satellite is launched by utilizing an existing NASA spacecraft.

Chambers, Katherine H.↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 1: Executive summary

An array deployment assembly, power regulation and control assembly, the necessary interface, and display and control equipment comprise the power extension package (PEP) which is designed to provide increased power and duration, as well as reduce fuel cell cryogen consumption during Spacelab missions. Compatible with all currently defined missions and payloads, PEP imposes minimal weight and volume penalties on sortie missions, and can be installed and removed as needed at the launch site within the normal Orbiter turnaround cycle. The technology on which it is based consists of a modified solar electric propulsion array, standard design regulator and control equipment, and a minimally modified Orbiter design. The requirements from which PEP was derived, and the system and its performance capabilities are described. Features of the recommended project are presented.

Source record↗

Long Term Displacement Data of Woven Fabric Webbings Under Constant Load for Inflatable Structures

Inflatable modules for space applications offer weight and launch volume savings relative to current metallic modules. Limited data exist on the creep behavior of the restraint layer of inflatable modules. Long-term displacement and strain data of two high strength woven fabric webbings, Kevlar and Vectran, under constant load is presented. The creep behavior of webbings is required by designers to help determine service life parameters of inflatable modules. Four groups of different webbings with different loads were defined for this study. Group 1 consisted of 4K Kevlar webbings loaded to 33% ultimate tensile strength and 6K Vectran webbings loaded to 27% ultimate tensile strength, group 2 consisted of 6K Kevlar webbings loaded to 40% and 43% ultimate tensile strength, and 6K Vectran webbings loaded to 50% ultimate tensile strength, group 3 consisted of 6K Kevlar webbings loaded to 52% ultimate tensile strength and 6K Vectran webbings loaded to 60% ultimate tensile strength, and group 4 consisted of 12.5K Kevlar webbings loaded to 22% ultimate tensile strength, and 12.5K Vectran webbings loaded to 22% ultimate tensile strength. The uniquely designed test facility, hardware, displacement measuring devices, and test data are presented. Test data indicate that immediately after loading all webbings stretch an inch or more, however as time increases displacement values significantly decrease to fall within a range of several hundredth of an inch over the remainder of test period. Webbings in group 1 exhibit near constant displacements and strains over a 17-month period. Data acquisition was suspended after the 17th month, however webbings continue to sustain load without any local webbing damage as of the 21st month of testing. Webbings in group 2 exhibit a combination of initial constant displacement and subsequent increases in displacement rates over a 16-month period. Webbings in group 3 exhibit steady increases in displacement rates leading to webbing failure over a 3-month period. Five of six webbings experienced local damage and subsequent failure in group 3. Data from group 4 indicates increasing webbing displacements over a 7-month period. All webbings in groups 1, 2, and 4 remain suspended without any local damage as of the writing of this paper. Variations in facility temperatures over test period seem to have had limited effect on long-term webbing displacement data.

Kenner, Winfred S.↗

Rapid Spacecraft Payload Development: In-Orbit Demonstration of Flight Software Reuse, Scalability, and Dependability

As space mission design trends towards shared, multi-mission platforms and high-performance onboard computing architectures, the number of spacecraft launched into operation is also steadily rising. Through ridesharing, spacecraft miniaturization, and other cost-reduction measures, the barriers to space are lowering, resulting in compounded growth in the amount of flight software being deployed. To meet the needs of both the growing quantity and evolving nature of spacecraft, flight software design must accordingly adapt to support more efficient development, solutions to computational resource-sharing, and software reusability. This paper focuses on a software payload demonstrating several core technologies that improve the state-of-the-art in these identified areas. Launched into low-earth orbit in January 2022, our software payload was conceived, designed, and delivered in a span of merely two months. It was developed on top of the NASA core Flight System (cFS) framework and the Distributed Spacecraft Autonomy (DSA) Comm cFS application, which translates cFS software bus messages across a Data Distribution Service (DDS) network. The flight software, packaged in Linux container images, was deployed as one of 18 flight applications managed through the Unibap SpaceCloud Framework. The applications were run on a Unibap iX5-102 radiation-tolerant payload computer, hosted on the D-Orbit SCV-004 spacecraft as part of an ESA-sponsored in-orbit technology test. Our payload, referred to as the DSA D-Orbit software, demonstrates the reusability of the DSA Comm app in a substantially different context and purpose as its original mission. Comm’s original design goal was to reliably distribute messages between spacecraft swarms of arbitrary size and dynamic network topology. However, we leverage this same functionality to introduce redundancy and opportunistic parallel data processing in the context of a representative onboard image processing workload. This adaptive mission architecture was enabled in part by the SpaceCloud Framework’s use of container virtualization as the payload integration interface. By using a base container image with common high-level language runtimes and libraries, we were able to rapidly design, develop, and validate our image processing application without many of the technological barriers common to flight software development. We present details the goals, approach, results, and lessons learned through this technology demonstration experiment and contextualize those observations against present and future challenges in spacecraft software development.

computer programming↗

Lawrence Berkeley National Laboratory 2016 Annual Financial Report

FY2016 was a year of significant change and progress at Berkeley Lab. In March, Laboratory Director Michael Witherell assumed his new role when former Lab Director Paul Alivisatos became Vice Chancellor for Research at UC Berkeley. Dr. Witherell has solidified the Lab’s strategy, with a focus on long term science and technology priorities. Large-scale science efforts continued to expand at the Lab, including the Dark Energy Spectroscopic Instrument now heading towards construction, and the LUX-ZEPLIN dark matter detector to be built underground in South Dakota. Another proposed project, the Advanced Light Source-Upgrade, was given preliminary approval and will be the Lab’s largest scientific investment in years. Construction of the Integrative Genomics Building began, and will bring together researchers from the Lab’s Joint Genome Institute, now based in Walnut Creek, and the Systems Biology Knowledgebase (K-Base) under one roof. Investment in the Lab’s infrastructure also continues, informed by the Lab’s Infrastructure Strategic Plan. Another important focus is on developing the next generation of scientists with the talent and diversity needed to sustain Berkeley Lab’s scientific leadership and mission contributions to DOE and the Nation. Berkeley Lab received $897.5M in new FY2016 funding, a 12.5% increase over FY2015, for both programmatic and infrastructure activities. While the Laboratory experienced a substantial increase in funding, it was accompanied by only a modest increase in spending, as areas of growth were partially offset by the completion of several major efforts in FY2015. FY2016 costs were $826.9M, an increase of 1.9% over FY2015. Similar to the prior year, the indirect-funded Operations units worked with generally flat budgets to yield more funding for strategic needs. A key challenge for Berkeley Lab continues to be achieving the best balance to fund essential investments, deliver highly effective operational mission support and remain cost-competitive. Through a comprehensive approach to prioritize competing needs, the Lab ended the year in a favorable financial position. The Office of the Chief Financial Officer (OCFO) played a key role in providing analysis and decision support to Executive Leadership, enabling the Lab to enhance its financial management strategies. In FY2016, the OCFO updated its analytic approaches and models to enhance long term financial projections under various funding and investment scenarios, and to assess total cost of ownership for major proposed investments. These improvements provided the new Lab Director and Senior Leadership with more comprehensive information and analytic support for planning and prioritization efforts. Within the OCFO, we focused on core operations and key initiatives defined in our OCFO Strategic Roadmap. The Lab’s Financial System transitioned from stabilization to optimization, with a focus on expanding the financial reporting capabilities considerably. We completed implementation of the eCommerce platform, achieving a notable outcome for the Lab in close partnership with DOE’s Office of Science. In other accomplishments, we launched a financial literacy program to enable Lab managers and staff to understand and execute their financial management and stewardship responsibilities more effectively; made substantial progress in enhancing our Field Finance model that provides financial support to client divisions and areas; developed a business process governance model to define OCFO business processes, clarify roles, and strengthen service delivery; and implemented a Partners in Leadership training program to build leadership capacity among our staff. We completed a ‘refresh’ of our Strategic Roadmap, which now defines our priorities for FY2017-FY2019. As a part of this effort, we made a subtle but important change to the OCFO mission statement to call out the Lab’s research and stewardship mission to sustain the Lab’s science and technology capabilities now and into the future. Berkeley Lab’s FY2016 progress on all fronts - scientific, operations, and financial management – position the Lab to continue bringing science solutions to the world as we charge into the 21st Century.

Source record↗

Satellite Conjunction Assessment, Risk Analysis and Collision Avoidance Best Practices: The History, Evolution and Opportunities

Since Explorer 1 was launched on January 31, 1958, the United States (U.S.) has reaped the benefits of space exploration. New markets and new technologies have spurred the economy and changed lives in many ways across the national security, civil, and commercial sectors. Space technologies and space-based capabilities now provide global communications, navigation and timing, weather forecasting, and more. Space exploration also presents challenges that impact not only the U.S. but also its allies and other partners. A significant increase in the volume and diversity of activity in space means that it is becoming increasingly congested. Emerging commercial ventures such as satellite servicing, in-space manufacturing, and tourism as well as new technologies enabling small satellites and large constellations of satellites present serious challenges for safely and responsibly using space in a stable, sustainable manner. To meet these challenges, the U.S. seeks to improve global awareness of activity in space by publicly sharing flight safety-related information and by coordinating its own on-orbit activity in a safer, more responsible manner. It seeks to bolster stability and reduce current and future operational on-orbit risks so that space is sustained for future generations. To this end, new and better Space Situational Awareness (SSA) capabilities are needed to keep pace with the increased congestion, and the U.S. seeks to create a dynamic environment that encourages and rewards commercial providers who improve these capabilities. The National Aeronautics and Space Administration (NASA) Spacecraft Conjunction Assessment and Collision Avoidance Best Practices Handbook reflects how NASA currently operates, which has evolved over time. Consideration is given to important topics such as spacecraft and constellation design; spacecraft “trackability;” pre-launch preparation and early launch activities; on-orbit collision avoidance; and automated trajectory guidance and maneuvering. This talk aims to present examples of responsible practices for spacecraft Owners/Operators (O/O) to consider for lowering collision risks and operating safely in space (from LEO and beyond) in a stable and sustainable manner. As technology and innovation continues to improve upon existing capabilities, what kind of new challenges are presented in the SSA community? Can space exploration and commercial ventures thrive while keeping paramount the safety and protection of the space environment? What are the challenges and opportunities that need to be addressed and considered for space situational awareness in Cis-Lunar Space? It may prove useful for entities offering, or intending to offer, SSA or Conjunction Assessment (CA) services to consider such examples of responsible practices to protect the space environment for future use by all.

Collision Avoidance↗

Correlation of the Hubble Space Telescope (HST) Space Telescope Imaging Spectrometer (STIS) On-Orbit Data with Pre-launch Predictions and Ground Contamination Controls

The Hubble Space Telescope (HST) Space Telescope Imaging Spectrograph (STIS) was deployed on-orbit in February 1997. The contamination program for STIS was stringently controlled as the five-year end-of-life deposition was set at 158, per optical element. Contamination was controlled through materials selection, extensive vacuum outgassing certifications, cleaning techniques, and environmental controls. In addition to ground contamination controls, on-orbit contamination controls were implemented for both the HST servicing mission activities and early post-servicing mission checkout. The extensive contamination control program will be discussed and the STIS on-orbit data will be correlated with the prelaunch analytical predictions.

Hansen, Patricia A.↗