Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electrical distribution system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

PFLOTRAN-SIP: A PFLOTRAN Module for Simulating Spectral-Induced Polarization of Electrical Impedance Data

Spectral induced polarization (SIP) is a non-intrusive geophysical method that collects chargeability information (the ability of a material to retain charge) in the time domain or its phase shift in the frequency domain. Although SIP is a temporal method, it cannot measure the dynamics of flow and solute/species transport in the subsurface over long times (i.e., 10–100 s of years). Data collected with the SIP technique need to be coupled with fluid flow and reactive-transport models in order to capture long-term dynamics. To address this challenge, PFLOTRAN-SIP was built to couple SIP data to fluid flow and solute transport processes. Specifically, this framework couples the subsurface flow and transport simulator PFLOTRAN and geoelectrical simulator E4D without sacrificing computational performance. PFLOTRAN solves the coupled flow and solute-transport process models in order to estimate solute concentrations, which were used in Archie’s model to compute bulk electrical conductivities at near-zero frequency. These bulk electrical conductivities were modified while using the Cole–Cole model to account for frequency dependence. Using the estimated frequency-dependent bulk conductivities, E4D simulated the real and complex electrical potential signals for selected frequencies for SIP. These frequency-dependent bulk conductivities contain information that is relevant to geochemical changes in the system. This study demonstrated that the PFLOTRAN-SIP framework is able to detect the presence of a tracer in the subsurface. SIP offers a significant benefit over ERT in the form of greater information content. It provided multiple datasets at different frequencies that better constrained the tracer distribution in the subsurface. Consequently, this framework allows for practitioners of environmental hydrogeophysics and biogeophysics to monitor the subsurface with improved resolution.

54 ENVIRONMENTAL SCIENCES↗

Microgrid Black Start Challenges: The Role of Grid-Forming Inverters

Grid-forming (GFM) inverters are becoming increasingly important for future power systems, particularly in establishing and restarting microgrids after blackouts. The use of GFM inverters enables microgrids to operate independently of utility power and provide key advantages over synchronous generators in black start scenarios, including rapid startup and stable voltage and frequency support for critical loads. However, inverter-driven black start introduces unique challenges and operational considerations. This article examines key challenges and solutions, emphasizing inverter design, control strategies, and microgrid system requirements. Drawing on analysis, simulation, and experimental results, this article highlights the central role of GFM inverters in ensuring reliable and resilient microgrid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NREL Price Series Developed for the ARPA-E FLECCS Program

The price data for four regions (CAISO, ERCOT, MISO-W, and PJM-W) are developed using the ReEDS to PLEXOS conversion as described in (Gagnon et al. 2020). The reference ReEDS case chosen is based on the 2020 Standard Scenario Mid-case, which uses the 2020 ReEDS model version (Cole et al. 2020; Ho et al. 2021). All ReEDS model inputs use 2020 Standard Scenarios Mid-case assumptions except for CO2 prices, which are implemented as linearly increasing CO2 price trajectories beginning at $0/tCO2 in 2020 and ending at either $100/tCO2 or $150/tCO2 in 2035 to dive capacity expansion towards a low-carbon system that could support CCS deployment. However, these scenarios also prohibit CCS deployment in this time frame so that resulting price data are not influenced by the deployment and operation of CCS itself. Implementing the ReEDS to PLEXOS conversion tool, PLEXOS is then simulated using the 2035 ReEDS infrastructure for both CO2 price scenarios, with the following model version and setup: PLEXOS Version: 8.2 Solver: Xpress-MP 35.01.01 Mixed integer optimization relative gap 1% System configuration: • Total number of nodes: 134 (consistent with ReEDS balancing areas) • Line losses enforced using piecewise linear approximation • Energy dump was enabled Price data is aggregated to the ISO/RTO level using load-weighted averages. References: Cole, Wesley, Sean Corcoran, Nathaniel Gates, Daniel Mai, Trieu, and Paritosh Das. 2020. “2020 Standard Scenarios Report: A U.S. Electricity Sector Outlook.” NREL/TP-6A20-77442. Golden, CO: National Renewable Energy Laboratory. https://www.nrel.gov/docs/fy21osti/77442.pdf. Gagnon, Pieter, Will Frazier, Elaine Hale, and Wesley Cole. 2020. “Cambium Documentation: Version 2020.” NREL/TP-6A20-78239. National Renewable Energy Lab. (NREL), Golden, CO (United States). https://doi.org/10.2172/1734551. Ho, Jonathan, Jonathon Becker, Maxwell Brown, Patrick Brown, Ilya (ORCID:0000000284917814) Chernyakhovskiy, Stuart Cohen, Wesley (ORCID:000000029194065X) Cole, et al. 2021. “Regional Energy Deployment System (ReEDS) Model Documentation: Version 2020.” NREL/TP-6A20-78195. Golden, CO: National Renewable Energy Laboratory. https://doi.org/10.2172/1788425.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a DC Distribution Testbed for High-Power EV Charging

This paper explores the design and implementation of a power hardware-in-the-loop (P-HIL) setup for DC distribution infrastructure integrated with high-power charging (HPC) of electric vehicles (EVs), DC loads, and sources. The utilization of DC distribution holds significant potential for enhancing the operation of a HPC station architecture. However, there are challenges establishing a DC charging hub including interoperability, commoditization, distributed energy resource integration, stability, DC protection, and lack of common system level controllers. To address these challenges, a testing setup is required that accommodates commercial off-the-shelf (COTS) products to evaluate different use cases at rated power and voltage levels. The developed P-HIL setup features a dedicated DC charging hub, DC-coupled chargers, DC loads/sources, DC protection, and a communication architecture. The integrated P-HIL system provides a versatile testing environment to address technology and interoperability gaps and implements a smart energy management system (SEMS). This platform enables comprehensive and robust testing of COTS devices, charger prototypes, SEMS controllers and protection schemes, which together will accelerate transition to EVs at scale. The setup is tested for various use-cases at full-scale, integrating 950 V DC bus voltage, 660 kW grid-tied inverter, 150 kW COTS charger, and 100 kW energy storage system within an open-source SEMS platform.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Real-Time Dispatcher for a Distributed Energy Resource Power Plant to Provide Grid Services [SWR-25-17]

This software dispatches the aggregated power of a distributed energy resource (DER) plant located on an electrical distribution network. It is designed to provide the following services to the grid in real-time: (i) voltage support of the distribution network, (ii) virtual power plant at the substation with power factor support, and (iii) operating reserves for automatic generator control for the transmission system. This dispatcher integrates with the local power plant controller and utilizes the battery energy storage system (BESS) to smooth the volatile net power output from the DERs. It can also integrate with a day-ahead scheduler to strategically charge and discharge.

Comden, Joshua [National Renewable Energy Laborato↗

Decomposing Loosely Coupled Mixed-Integer Programs for Optimal Microgrid Design

Microgrids are frequently employed in remote regions, in part because access to a larger electric grid is impossible, difficult, or compromises reliability and independence. Although small microgrids often employ spot generation, in which a diesel generator is attached directly to a load, microgrids that combine these individual loads and augment generators with photovoltaic cells and batteries as a distributed energy system are emerging as a safer, less costly alternative. In this work, we present a model that seeks the minimum-cost microgrid design and ideal dispatched power to support a small remote site for one year with hourly fidelity under a detailed battery model; this mixed-integer nonlinear program (MINLP) is intractable with commercial solvers but loosely coupled with respect to time. A mixed-integer linear program (MIP) approximates the model, and a partitioning scheme linearizes the bilinear terms. We introduce a novel policy for loosely coupled MIPs in which the system reverts to equivalent conditions at regular time intervals; this separates the problem into subproblems that we solve in parallel. We obtain solutions within 5% of optimality in at most six minutes across 14 MIP instances from the literature and solutions within 5% of optimality to the MINLP instances within 20 minutes.

97 MATHEMATICS AND COMPUTING↗

Will Solar Panels Help When the Power Goes Out? Planning for PV Resilience

PV systems, like all energy systems, must chart a difficult course in order to improve resilience. They need to simultaneously withstand extreme conditions that cause grid power disruptions, be configured in a way that allows electricity to be delivered to meet the PV user's needs, and overcome disruptions arising from solar resource intermittency. Certain considerations reveal themselves as key to a PV system's resilience benefits. Choice of hardware is critical, as is site selection for the PV array. Voluminous evidence in a hurricane context demonstrates that durable hardware, properly maintained and sited, leads to PV systems surviving extreme weather with their functionality intact. Structurally weak or poorly maintained PV equipment, on the other hand, has demonstrated failures during extreme weather events. PV system stakeholders should ensure that best practices are followed for hardware procurement and siting. It is also important to understand that PV systems are not one-size-fits-all. While incorporating islanding capabilities and energy storage into the system's electrical topology will typically enhance resilience, the user's needs will determine the optimally resilient conformation of any given system. These factors - appropriate hardware, siting, maintenance, and system design - are the primary drivers of PV resilience. PV systems possess high potential for resilient energy generation due to their distributed, abundant, and free fuel supply, but the technology itself does not inherently lead to resilient outcomes. Realizing PV's potential for resilience requires consideration of these determinative factors.

14 SOLAR ENERGY↗

The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure

With the support of DOE's Vehicle Technologies Office and the DOE/DOT Joint Office (JO), NREL has applied the EVI-X modeling suite to conduct a National Electric Vehicle Infrastructure Needs Assessment. This report considers a 2030 scenario in which 50% of light-duty sales are electric (including plug-in hybrids), resulting in an on-road stock of 33 million vehicles. We consider the needs of vehicles used for typical daily driving, drivers without access to residential charging, corridor charging supporting long-distance travel, and ride-hailing electrification. We find that a cumulative capital investment of $82 billion in public and private charging infrastructure will be necessary in our baseline scenario (approximately 3x greater than our estimate of planned investments to date). This result is framed as a conservative estimate as the assumed costs include charging equipment and installation but exclude the cost of grid upgrades and distributed energy resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High Speed Medium Voltage CHP System with Advanced Grid Support

The project was a collaboration between Clemson University and TECO Westinghouse Motor Company. The goal of the project was to develop a medium voltage commercial grid-tied system with advanced grid support functions. Current state-of-the-art in medium voltage, multi-megawatt power electronic systems do not support advanced grid functions, traditionally due to power electronic limitations and required applications. The developed system is capable of interacting with the power system at the distribution level to efficiently integrate gas turbine generation systems or any other ac generation system with up to 20MWe of power production capacity. This project demonstrated a high level of technical readiness of the 1MW, 500Hz, 15000 RPM high frequency Combined Heat and Power (CHP) generator and electric machine system, utilizing advanced grid support functions required by IEEE Std. 1547-2018.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Fast Modular Reactor (FMR) - Development Plan of a New 50 MWe Gas-cooled Fast Reactor

General Atomics Electromagnetic Systems (GA-EMS) will be developing a new 50-megawatt electric (MWe) fast modular reactor (FMR), under the Department of Energy’s (DOE’s) Advanced Reactor Demonstration Program (ARDP), Advanced Reactor Concepts 2020 (ARC-20) development pathway, that provides safe, carbon free electricity, capable of incremental capacity additions. A modular design allows it to be factory-built and assembled on-site to keep the cost of capital low, while the dry-cooling facilitates siting to complement renewables in nearly any location. GA-EMS is committed to commercialization of the proposed reactor, with a demonstration by 2030, and deployment by the mid-2030s. The ultimate goal of the design is to develop flexible and dispatchable carbon-free power source for the 2035 US electricity market. The GAEMS- led team will verify that simplified characteristics (e.g., inert helium gas coolant, pellet-loaded fuel rod, installation-free of heat sink requirements, small and passive heat removal systems) of the FMR will result in a safe, maintainable, cost-effective, distributed, nuclear energygenerating station. Three key specific project objectives for the next three years include: Development of the conceptual design of the 50- MWe FMR plant, Achievement of Technology Readiness Level (TRL) 4 for key system and component technologies through in-pile tests, out-of-pile tests, and numerical experiments; and Development of robust techno-economic analysis (TEA) and pre-application licensing approach necessary for timely demonstration and eventual commercialization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cyber Resilient Flexible Alternating Current Transmission Systems (XFACTS)

This report summarizes the activities conducted under the DOE-OE funded project DEOE0000897, Cyber Attack Resilient Flexible AC Systems – XFACTS. Hitachi Energy (HE), in collaboration with ABB Inc. (ABB), Bonneville Power Administration (BPA), University of Illinois at Urbana-Champaign (UIUC), Iowa State University (ISU), and University of Idaho (UI) pursued the development of a system of defense for Flexible Alternating current Transmission Systems against cyber-attacks (XFACTS). A FACTS substation enhanced with XFACTS defense mechanisms will be capable of mitigating cyberattacks especially those that seek to control electrical parameters like voltage or current and interrupt the power flow in AC lines. It empowers existing FACTS controllers and associated intelligent electronic devices to detect and mitigate malicious intents to depress system voltages, destabilize power flows, trip AC circuit breakers, corrupt currents, and voltages, even if the malicious commands and the measurements have correct syntax. The XFACTS functions utilize the physics of active power electronic systems, control and protection, electric power engineering principles, and state estimation to bring more in-depth cyber defense closer to the protected FACTS substation devices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Approaches for Autonomous Peer to Peer Communication: For Resilient Community Microgrids

The final phase of the Islandable Communications task of the SECURE project consisted of integrating the islandable communications network into a microgrid simulation at NREL. Initially integration was planned for a microgrid implemented as a mix of simulation and physical hardware. As the project evolved, the microgrid became fully simulated. The simulation environment was structured to break out the communication paths that would pass over a communication network in a field demonstration. The Islandable Communication network was integrated into the simulation environment, allowing both a commercial cellular carrier and a Private LTE network to be evaluated. The microgrid simulation showed differences in performance and behavior when operating over the wireless networks (compared to operating over wired Ethernet in the lab). These differences point to further research opportunities to better understand how microgrid communication carried over real-world or impaired networks affects the microgrid system behavior.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The rise of electric vehicles—2020 status and future expectations

Electric vehicles (EVs) are experiencing a rise in popularity over the past few years as the technology has matured and costs have declined, and support for clean transportation has promoted awareness, increased charging opportunities, and facilitated EV adoption. Suitably, a vast body of literature has been produced exploring various facets of EVs and their role in transportation and energy systems. This paper provides a timely and comprehensive review of scientific studies looking at various aspects of EVs, including: (a) an overview of the status of the light-duty-EV market and current projections for future adoption; (b) insights on market opportunities beyond light-duty EVs; (c) a review of cost and performance evolution for batteries, power electronics, and electric machines that are key components of EV success; (d) charging-infrastructure status with a focus on modeling and studies that are used to project charging-infrastructure requirements and the economics of public charging; (e) an overview of the impact of EV charging on power systems at multiple scales, ranging from bulk power systems to distribution networks; (f) insights into life-cycle cost and emissions studies focusing on EVs; and (g) future expectations and synergies between EVs and other emerging trends and technologies. The goal of this paper is to provide readers with a snapshot of the current state of the art and help navigate this vast literature by comparing studies critically and comprehensively and synthesizing general insights. This detailed review paints a positive picture for the future of EVs for on-road transportation, and the authors remain hopeful that remaining technology, regulatory, societal, behavioral, and business-model barriers can be addressed over time to support a transition toward cleaner, more efficient, and affordable transportation solutions for all.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Plentiful electricity turns wholesale prices negative

In 2020, average wholesale electricity prices in the United States fell to $21/MWh, their lowest level since the beginning of the 21st century. Low natural gas prices and the proliferation of low marginal cost resources like wind and solar had already established a trend toward lower wholesale prices, and this trend was exacerbated by declining electricity demand due to the Covid-19 pandemic in 2020. Negative real-time hourly wholesale prices occurred in about 4% of all hours and wholesale market nodes across the United States, but these were not distributed evenly. Regional clusters emerged, for example, in the Permian Basin in western Texas, and in Kansas and western Oklahoma in the Southwest Power Pool (SPP), negative prices accounted for more than 25% of all hours. Negative electricity prices result either from local congestion of the transmission system leading supply to exceed demand locally or due to system-wide oversupply. Looking at the latter condition in SPP, we find that all major generator types contribute to this excess supply, because of limited ramping flexibility or self-scheduled out-of-market unit commitments. Additional monetary production incentives such as renewable energy credits or tax credits also enable negative bids; indeed, negative prices predominantly occur when demand levels are low and wind production levels are high. Frequent negative prices can inform the value of additional renewable energy investments at specific locations, the need for transmission and storage development, and opportunities load growth or adaptation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Frequency Recovery in Power Grids Using High-Performance Computing

Maintaining electric power system stability is paramount, especially in extreme contingencies involving unexpected outages of multiple generators or transmission lines that are typical during severe weather events. Such outages often lead to large supply-demand mismatches followed by subsequent system frequency deviations from their nominal value. The extent of frequency deviations is an important metric of system resilience, and its timely mitigation is a central goal of power system operation and control. This paper develops a novel nonlinear model predictive control (NMPC) method to minimize frequency deviations when the grid is affected by an unforeseen loss of multiple components. Our method is based on a novel multi-period alternating current optimal power flow (ACOPF) formulation that accurately models both nonlinear electric power flow physics and the primary and secondary frequency response of generator control mechanisms. We develop a distributed parallel Julia package for solving the large-scale nonlinear optimization problems that result from our NMPC method and thereby address realistic test instances on existing high-performance computing architectures. Our method demonstrates superior performance in terms of frequency recovery over existing industry practices, where generator levels are set based on the solution of single-period classical ACOPF models.

nonlinear model predictive control↗