February DOE Office of Science Highlight Slides
Highlight slides for submission to DOE Office of Science program managers.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Highlight slides for submission to DOE Office of Science program managers.
DOE CESER has sponsored Idaho National Laboratory (INL) to conduct an objective and independent study of potential 6 GHz interference from outdoor operation of unlicensed devices in the 6 GHz band on fixed service (FS) microwave communication links operated by electrical sector incumbents in that band. INL is collaborating with University of Notre Dame (UND), Electric Power Research Institute (EPRI), Lockard & White, Southern Company, and AT&T, to gather data with real-world 6 GHz interference experiments and identify (1) the potential for interference from unlicensed devices and (2) the interference necessary to cause harm to the incumbents. In addition to the functional assessment, a security assessment of the FCC mandated Automatic Frequency Coordination (AFC) System to regulate use of unlicensed 6 GHz standard power devices is also being conducted. A major objective is to create a science-based and defensible methodology used to produce the necessary data and to derive objective conclusions. This proven methodology can then be used to produce objective data and conclusions for other spectrum bands with similar incumbent uses including 4.4 – 4.9 GHz and 7.125 – 7.4 GHz, identified in the reconciliation bill that was adopted on July 4, 2025, as well as the National Spectrum Strategy discussions that are ongoing. This report contains 6 GHz field experiments and findings in the following real-world scenarios with commercial unlicensed standard power (SP) 6 GHz devices regulated by Automated Frequency Coordination (AFC): • University of Notre Dame (UND) Stadium with a capacity of 80,000 spectators, where Wi-Fi operating in 6 GHz has been deployed recently • Southern Company 6 GHz FS microwave link between Columbus and Fortson, Georgia Following are the following key findings from this study. 1. The AFC is under-protective of FS when line-of-sight exists along the path centerline. Data collected at Southern’s 6 GHz fixed link site shows significant erosion of as much as 21.4-24.4 dB of under-protection that can lead to potential service degradation under typical operating conditions. This first key finding is most likely the result of erroneous use of the RF propagation model. INL will collaborate with EPRI and the AFC Functional Requirements Working Group to submit a change request to the WinnForum TS-1014 standard towards correct use of the propagation model by the AFC. 2. There is additive interference effect of about 3 dB from nearly equal power interferers measured from simultaneous operation of two SP AP's operating co-channel with the FS receive from different locations along the path. This second key finding should be used to add the impact of additive interference of operation of multiple APs in the same geographical area, to the next generation of AFCs. INL will collaborate with FCC on the need for the AFC to consider additive interference. We also recommend that additional experiments are conducted on 6 GHz spectrum interference to further improve the AFC operation as the number of outdoor Wi-Fi devices continues to increase. These proposed steps and recommendations will make the co-existence of the incumbents and the 6 GHz outdoor Wi-Fi providers possible without any impact on the incumbents with a win-win outcome for all.
This study addresses the DOE National Laboratory Program on Hanford Tank Waste Cleanup Research and Development, focusing on tank waste retrieval, transport, and closure. Millions of gallons of high-level waste are stored in the double shell tanks (DSTs) at Hanford site. The waste is stored in the primary tank, while the secondary shell acts as a buffer between the primary tank and environment. The DSTs’ bottoms could be corroded due to the corrosive waste properties and contents. Therefore, they are being emptied, and refurbishment is needed before waste storage continues. SRNL addresses the refurbishment of still operational DSTs bottoms with a two-layer refurbishment approach. We propose that the bottom layer consists of a high-density cementitious material to shield the epoxy top layer from radioactive residuals, while the top layer serves as an epoxy sealant. This work focuses on the experimental evaluation on the formulation and testing of the epoxy layer.
The goals are to test and explore the DOE National Labs ability to quickly map, characterize and analyze an event involving Mexico's energy infrastructure system in the wake of a major disruption of energy supplies from Mexico to the US. Focus on the economic impacts and system interdependencies as well as analysis related to restoration and recovery issues.
In order to better use the long-term ARM measurements to evaluate parameterizations of fast processes used in global climate models --- mainly those related to clouds, precipitation and aerosols, the DOE Earth System Modeling (ESM) program funds a new multi-institution project led by the Brookhaven National Laboratory, FAst -physics System Testbed and Research (FASTER). This poster will present an overview of this new project and its scientific relationships to the ASR sciences and ARM measurements.
In 2008 in anticipation of the United States bringing into force the Additional Protocol in early 2009 DOE/NNSA planned and executed training exercises in the conduct of Additional Protocol complementary access activities. Brookhaven National Laboratory and Los Alamos National Laboratory together produced the exercises designed to prepare the following types of DOE laboratories for complementary access - weapons laboratories, nuclear engineering laboratories, and science laboratories. This panel provides a forum to discuss and summarize the results and lessons learned from the 2008 exercise.
Abstract This work documents version two of the Department of Energy's Energy Exascale Earth System Model (E3SM). E3SMv2 is a significant evolution from its predecessor E3SMv1, resulting in a model that is nearly twice as fast and with a simulated climate that is improved in many metrics. We describe the physical climate model in its lower horizontal resolution configuration consisting of 110 km atmosphere, 165 km land, 0.5° river routing model, and an ocean and sea ice with mesh spacing varying between 60 km in the mid‐latitudes and 30 km at the equator and poles. The model performance is evaluated with Coupled Model Intercomparison Project Phase 6 Diagnosis, Evaluation, and Characterization of Klima simulations augmented with historical simulations as well as simulations to evaluate impacts of different forcing agents. The simulated climate has many realistic features of the climate system, with notable improvements in clouds and precipitation compared to E3SMv1. E3SMv1 suffered from an excessively high equilibrium climate sensitivity (ECS) of 5.3 K. In E3SMv2, ECS is reduced to 4.0 K which is now within the plausible range based on a recent World Climate Research Program assessment. However, a number of important biases remain including a weak Atlantic Meridional Overturning Circulation, deficiencies in the characteristics and spectral distribution of tropical atmospheric variability, and a significant underestimation of the observed warming in the second half of the historical period. An analysis of single‐forcing simulations indicates that correcting the historical temperature bias would require a substantial reduction in the magnitude of the aerosol‐related forcing.
Few studies have defined the risk of hearing impairment and tinnitus after retirement. This report measures hearing impairment and tinnitus prevalence among older construction trades workers. The study cohort included 21,340 participants in a national medical screening program. Audiometric hearing impairment was classified according to the Global Burden of Disease Study. Tinnitus was determined by self-report. An internal subcohort of nonconstruction trades workers served as a reference group. Stratified analyses and multivariate analyses were used to measure the prevalence of hearing impairment and tinnitus by age, sex, and job category. Prevalence of any hearing impairment was 55.2% (males, 57.7%; females, 26.8%) and increased rapidly with age. Construction trades workers were 40% more likely to have hearing impairment than the reference group. The overall prevalence of tinnitus was 46.52% and followed patterns similar to hearing impairment. Workers with hearing impairment were more likely to also have tinnitus, but tinnitus was frequently reported in the absence of measured hearing impairment. Hearing impairment and tinnitus prevalence were much higher in this study than in previous research. A significant reason for the difference is that BTMed follows participants after they have retired. To draw conclusions about the risk for work-related chronic diseases and disorders it is important to monitor workers through their lifetimes. Also, tinnitus by itself should be given greater significance. We report the findings reinforce the need to promote noise reduction and hearing conservation in construction.
No abstract prepared.
New supercomputers will allow more detailed simulations for nuclear weapons research and a range of scientific applications.
The Department of Energy Atmospheric Radiation Measurement (ARM) Program is a climate research user facility operating stationary ground sites that provide long-term measurements of climate relevant properties, mobile ground- and ship-based facilities to conduct shorter field campaigns (6-12 months), and the ARM Aerial Facility (AAF). The airborne observations acquired by the AAF enhance the surface-based ARM measurements by providing high-resolution in-situ measurements for process understanding, retrieval-algorithm development, and model evaluation that are not possible using ground- or satellite-based techniques. Several ARM aerial efforts were consolidated into the AAF in 2006. With the exception of a small aircraft used for routine measurements of aerosols and carbon cycle gases, AAF at the time had no dedicated aircraft and only a small number of instruments at its disposal. In this "virtual hangar" mode, AAF successfully carried out several missions contracting with organizations and investigators who provided their research aircraft and instrumentation. In 2009, AAF started managing operations of the Battelle-owned Gulfstream I (G-1) large twin-turboprop research aircraft. Furthermore, the American Recovery and Reinvestment Act of 2009 provided funding for the procurement of over twenty new instruments to be used aboard the G-1 and other AAF virtual-hangar aircraft. AAF now executes missions in the virtual- and real-hangar mode producing freely available datasets for studying aerosol, cloud, and radiative processes in the atmosphere. AAF is also engaged in the maturation and testing of newly developed airborne sensors to help foster the next generation of airborne instruments.
U.S. Department of Energy Order 435.1, 'Radioactive Waste Management,' along with its associated manual and guidance, requires development and maintenance of a radioactive waste management basis for each radioactive waste management facility, operation, and activity. This document presents a radioactive waste management basis for Idaho National Laboratory Research and Education Campus facilities that manage radioactive waste. The radioactive waste management basis for a facility comprises existing laboratory-wide and facility-specific documents. Department of Energy Manual 435.1-1, 'Radioactive Waste Management Manual,' facility compliance tables also are presented for the facilities. The tables serve as a tool to develop the radioactive waste management basis.
The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 156 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For all 156 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $\$$210.6 million, total reported cost savings were $\$$215.1 million, and total guaranteed cost savings were $\$$$204.5 million. This means that on average: ESPC contractors guaranteed 97% of the estimated cost savings; projects reported achieving 102% of the estimated cost savings; and projects reported achieving 105% of the guaranteed cost savings. For 155 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 11.938 million MMBtu, and reported savings were 12.138 million MMBtu, 101.7% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 155 projects were 19.052 million MMBtu, and reported saving were 19.516 million MMBtu, 102.4% of the estimated energy savings.
Background information for the FY 2007 GPRA methodology review on guidelines for expert reviewers.
As the title suggests, this report provides a summary of the status and progress for the Preliminary Design Concepts Work Package. Described herein are design concepts and thermal analysis for crystalline and salt host media. The report concludes that thermal management of defense waste, including the relatively small subset of high thermal output waste packages, is readily achievable. Another important conclusion pertains to engineering feasibility, and design concepts presented herein are based upon established and existing elements and/or designs. The multipack configuration options for the crystalline host media pose the greatest engineering challenges, as these designs involve large, heavy waste packages that pose specific challenges with respect to handling and emplacement. Defense-related Spent Nuclear Fuel (DSNF) presents issues for post-closure criticality control, and a key recommendation made herein relates to the need for special packaging design that includes neutron-absorbing material for the DSNF. Lastly, this report finds that the preliminary design options discussed are tenable for operational and post-closure safety, owing to the fact that these concepts have been derived from other published and well-studied repository designs.
The need for sustainable and secure nuclear energy is summarized. Driven by economics and public-private partnerships, the technology is evolving. Cost control and regulatory simplification are needed for a nuclear renaissance. Small modular reactors--simple, scalable, and inherently safe--may be the future.
The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 151 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.