Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “dams”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Kalispel Non-Native Fish Suppression Project 2007 Annual Report.

Non-native salmonids are impacting native salmonid populations throughout the Pend Oreille Subbasin. Competition, hybridization, and predation by non-native fish have been identified as primary factors in the decline of some native bull trout (Salvelinus confluentus) and westslope cutthroat trout (Oncorhynchus clarki lewisi) populations. In 2007, the Kalispel Natural Resource Department (KNRD) initiated the Kalispel Nonnative Fish Suppression Project. The goal of this project is to implement actions to suppress or eradicate non-native fish in areas where native populations are declining or have been extirpated. These projects have previously been identified as critical to recovering native bull trout and westslope cutthroat trout (WCT). Lower Graham Creek was invaded by non-native rainbow (Oncorhynchus mykiss) and brook trout (Salvelinus fontinalis) after a small dam failed in 1991. By 2003, no genetically pure WCT remained in the lower 700 m of Graham Creek. Further invasion upstream is currently precluded by a relatively short section of steep, cascade-pool stepped channel section that will likely be breached in the near future. In 2008, a fish management structure (barrier) was constructed at the mouth of Graham Creek to preclude further invasion of non-native fish into Graham Creek. The construction of the barrier was preceded by intensive electrofishing in the lower 700 m to remove and relocate all captured fish. Westslope cutthroat trout have recently been extirpated in Cee Cee Ah Creek due to displacement by brook trout. We propose treating Cee Cee Ah Creek with a piscicide to eradicate brook trout. Once eradication is complete, cutthroat trout will be translocated from nearby watersheds. In 2004, the Washington Department of Fish and Wildlife (WDFW) proposed an antimycin treatment within the subbasin; the project encountered significant public opposition and was eventually abandoned. However, over the course of planning this 2004 project, little public involvement or education was conducted prior to the planned implementation. Therefore, in 2007 we implemented an extensive process to provide public education, address public concerns and provide opportunity for public involvement in implementing piscicides and other native fish recovery actions in the subbasin.

13 HYDRO ENERGY↗

Wind River Watershed Restoration 2004-2005 Annual Report.

During 2004, researchers from U.S. Geological Survey's Columbia River Research Laboratory (USGS-CRRL) collected temperature, flow, and habitat data to characterize physical habitat condition and variation within and among tributaries and mainstem sections in the Wind River subbasin. Juvenile salmonid population surveys were conducted within select study areas throughout the subbasin. We expanded our survey coverage of the mainstem Wind River to a reach in the vicinity of Carson National Fish Hatchery to assess effects of non-indigenous Chinook on native steelhead. These efforts add to a database of habitat and fish data collected in the Wind River since 1996. This research contributes to the Wind River Restoration Project, which includes active stream habitat restoration and monitoring of adult and juvenile steelhead populations. We maintained a network of 32 thermographs in the Wind River subbasin during 2004. Additionally, Underwood Conservation District provided us with data from seven thermographs that they maintained during 2004. Thermograph data are identifying areas with chronic high water temperatures and stream sections where high rates of warming are occurring. During 2004, water temperatures at 26 thermograph sites exceeded the 16 C limit for surface waters set by the Washington Department of Ecology. Water temperatures exceeded 20 C at five sites in the Trout Creek watershed. Our thermograph dataset includes information from as early as 1996 at some sites and has become a valuable long-term dataset, which will be crucial in determining bioenergetic relationships with habitat and life-histories. We have monitored salmonid populations throughout the Wind River subbasin by electrofishing and snorkeling. We electrofished four stream sections for population estimates during 2004. In these sections, and others where we simply collected fish without a population estimate, we tagged juvenile steelhead and Chinook salmon with Passive Integrated Transponder (PIT) tags to track growth and movement of individuals. We snorkeled nine stream sections during 2004. Juvenile steelhead populations have varied greatly between streams and between years. Numbers of age-0 steelhead have increased substantially since 2000 within the MINE reach (rkm 35.0-40.0) section of the upper Wind River. Because of potential negative interactions with steelhead, naturally spawned populations of introduced juvenile Chinook salmon are of concern in the mainstem of the Wind River. During 2004, we deployed over 3,000 PIT tags in the Wind River subbasin, primarily in juvenile steelhead, but also in juvenile Chinook. We are compiling a dataset of recapture information on these tagged fish as well as interrogation information from Bonneville Dam and other sites. The habitat and fish data collected have been used in Ecosystem Diagnosis and Treatment modeling efforts, the Wind River Subbasin Plan, and the Total Maximum Daily Load report from Washington Department of Ecology. Continued monitoring of changes in habitat, combined with data on fish populations, will help guide planning efforts of land and fish managers. As long-term active and passive restoration actions are implemented in the Wind River and its tributaries, these data will provide the ability to measure change. Because the Wind River subbasin has no steelhead hatchery or supplementation, these data will be useful to compare population trends in subbasins with hatchery or supplementation management.

13 HYDRO ENERGY↗

Hood River and Pelton Ladder Evaluation Studies, Annual Report 2000-2001.

The Bonneville Power Administration (BPA) funded the development of two master plans which outline the rationale, and general approach, for implementing a defined group of projects that are an integral part of a comprehensive watershed goal to 'Protect, enhance and restore wild and natural populations of anadromous and resident fish within the Hood River Subbasin'. The Hood River Production Master Plan and the Pelton Ladder Master Plan were completed in 1991 and subsequently approved by the Northwest Power Planning Council in 1992. Action items identified in the two master plans, as well as in a later document entitled 'Hood River/Pelton Ladder Master Agreement' (ODFW and CTWSRO Undated), are designed to achieve two biological fish objectives: (1) to increase production of wild summer and winter steelhead (Oncorhynchus mykiss) to levels commensurate with the subbasins current carrying capacity and (2) re-establishing a self-sustaining population of spring chinook salmon (Oncorhynchus tshawytscha). Numerical fish objectives for subbasin escapement, spawner escapement, and subbasin harvest are defined for each of these species in Coccoli (2000). Several projects are presently funded by the BPA to achieve the Hood River subbasin's numerical fish objectives for summer and winter steelhead and spring chinook salmon. They include BPA project numbers 1998-021-00 (Hood River Fish Habitat), 1998-053-03 (Hood River Production Program - CTWSRO: M&E), 1998-053-07 (Parkdale Fish Facility), 1998-053-08 (Powerdale/Oak Springs O&M), and 1998-053-12 (Hood River Steelhead Genetics Study). Collectively, they are implemented under the umbrella of what has come to be defined as the Hood River Production Program (HRPP). The HRPP is jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO). Strategies for achieving the HRPP's biological fish objectives for the Hood River subbasin were initially devised based on various assumptions about (1) subbasin carrying capacity, (2) survival rates for selected life history stages, and (3) historic and current escapements of wild, natural, and hatchery stocks of anadromous salmonids to the Hood River subbasin. The Oregon Department of Fish and Wildlife began funding a monitoring and evaluation (M&E) project in December 1991 to collect the quantitative biological information needed to (1) more accurately assess the validity of these assumptions and (2) evaluate the proposed hatchery supplementation component of the HRPP. Bonneville Power Administration assumed funding of the M&E project in August 1992. The M&E project was initially confined to sampling anadromous salmonids escaping to an adult trapping facility operated at Powerdale Dam; which is located at River Mile (RM) 4.5 on the mainstem of the Hood River. Stock specific life history and biological data was collected to (1) monitor subbasin spawner escapements and (2) collect pre-implementation data critical to evaluating the newly proposed HRPP's potential biological impact on indigenous populations of resident fish. The scope of the M&E project was expanded in 1994 to collect the data needed to quantify (1) subbasin smolt production and carrying capacity, (2) smolt to adult survival rates, and (3) the spatial distribution of indigenous populations of summer and winter steelhead, spring and fall chinook salmon, and coho salmon. A creel was incorporated into the M&E project in December 1996 to evaluate the HRPP with respect to its defined subbasin and spawner escapement objectives for Hood River stocks of wild and hatchery summer and winter steelhead and for natural and Deschutes stock hatchery spring chinook salmon. In 1996, the M&E project also began monitoring streamflow at various locations in the Hood River subbasin. Streamflow data will be used to correlate subbasin smolt production with summer streamflows. Data collected from 1991-1999 is reported in the following annual progress reports: Olsen et al. (1994), Olsen et al. (1995), Olsen and French (1996), Olsen et al. (1996), Olsen and French (1999), and Olsen and French (2000). The annual progress reports document information collected on (1) rearing densities of indigenous fish, (2) subbasin steelhead smolt production, (3) post-release survival of acclimated and direct released hatchery summer and winter steelhead smolts, (4) smolt to adult anadromous salmonid survival rates, (5) jack and adult anadromous salmonid escapements and harvest, (6) spatial distribution of adult anadromous salmonid holding in the Hood River subbasin, (7) selected life history patterns and morphological and meristic characteristics of wild, natural, and hatchery resident and anadromous salmonids, and (8) summer streamflows.

13 HYDRO ENERGY↗

Characterization and Monitoring Data for Evaluating Constructed Emergent Sandbar Habitat in the Missouri River Mainstem

Emergent sandbar habitat (ESH) in the Missouri River Mainstem System is a critical habitat element for several federally listed bird species: the endangered interior least tern (Sterna antillarum) and the threatened Northern Great Plains piping plover (Charadrius melodus). The Army Corps of Engineers (Corps) provides the primary operational management of the Missouri River and is responsible under the Endangered Species Act (ESA) to take actions within its authorities to conserve listed species. To comply with the 2000 USFWS BiOp and the 2003 amended USFWS BiOp, the Corps has created habitats below Gavins Point Dam using mechanical means. Initial monitoring indicates that constructed sandbars provide suitable habitat features for nesting and foraging least terns and piping plovers. Terns and plovers are using constructed sandbars and successfully reproducing at or above levels stipulated in the BiOp. However, whether such positive impacts will persist cannot yet be adequately assessed at this time.

54 ENVIRONMENTAL SCIENCES↗

Lake Roosevelt White Sturgeon Recovery Project : Annual Progress Report, January 2003 – March 2004.

This report summarizes catch data collected from white sturgeon Acipenser transmontanus in Lake Roosevelt during limited setlining and gill netting activities in the fall of 2003, and documents progress toward development of a U.S. white sturgeon conservation aquaculture program for Lake Roosevelt. From 27-30 October, 42 overnight small mesh gill net sets were made between Marcus and Northport, WA for a total catch of 15 juvenile white sturgeon (275-488 mm FL). All sturgeon captured were of Canadian hatchery origin. These fish had been previously released as sub-yearlings into the Canadian portion (Keenleyside Reach) of the Transboundary Reach of the Columbia River during 2002 and 2003. Most sturgeon (n=14) were caught in the most upstream area sampled (Northport) in low velocity eddy areas. Five fish exhibited pectoral fin deformities (curled or stunted). Growth rates were less than for juvenile sturgeon captured in the Keenleyside Reach but condition factor was similar. Condition factor was also similar to that observed in juvenile sturgeon (ages 1-8) captured in the unimpounded Columbia River below Bonneville Dam between 1987-92. From 10-14 November, 28 overnight setline sets were made in the Roosevelt Reach between the confluence of the Spokane River and Marcus Island for a total catch of 17 white sturgeon (94-213 cm FL). Catch was greatest in the most upstream areas sampled, a distribution similar to that observed during a WDFW setline survey in Lake Roosevelt in 1998. The mean W{sub r} index of 110% for fish captured this year was higher than the mean W{sub r} of 91% for fish captured in 1998. Excellent fish condition hindered surgical examination of gonads as lipid deposits made the ventral body wall very thick and difficult to penetrate with available otoscope specula. Acoustic tags (Vemco model V16 coded pingers, 69 kHz, 48-month life expectancy) were internally applied to 15 fish for subsequent telemetry investigations of seasonal and reproductively motivated movements. In August 2003, three Vemco VR2 fixed station acoustic receivers, supplied by the UCWSRI Transboundary Telemetry Project, were deployed in the vicinities of Kettle Falls Bridge, Marcus Island, and Northport, WA. Data downloaded from these receivers through December 2003 confirmed the findings of a previous telemetry study that the Marcus area is an important overwintering habitat for white sturgeon. On 18 February 2004, juvenile white sturgeon (n=2,000) were transported from Kootenay Sturgeon Hatchery in British Columbia to WDFW Columbia Basin Hatchery (CBH) in Moses Lake, WA. Fish were reared at CBH to approximately 30 g and individually outfitted with PIT tags and scute marked. On 11 May 2004, fish were released into Lake Roosevelt in the vicinities of Kettle Falls Bridge, North Gorge, and Northport.

13 HYDRO ENERGY↗

Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).

The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed to maximize program benefits and address limiting factors.

13 HYDRO ENERGY↗

Investigations into the Early Life History of Naturally Produced Spring Chinook Salmon and Summer Steelhead in the Grande Ronde River Subbasin, Annual Report 2008 : Project Period 1 February 2008 to 31 January 2009.

This study was designed to document and describe the status and life history strategies of spring Chinook salmon and summer steelhead in the Grande Ronde River Subbasin. We determined migration timing, abundance, and life-stage survival rates for juvenile spring Chinook salmon Oncorhynchus tshawytscha and summer steelhead O. mykiss in four streams during migratory year 2008 from 1 July 2007 through 30 June 2008. As observed in previous years of this study, spring Chinook salmon and steelhead exhibited fall and spring movements out of natal rearing areas, but did not begin their smolt migration through the Snake and lower Columbia River hydrosystem until spring. In this report we provide estimates of migrant abundance and migration timing for each study stream, and their survival and timing to Lower Granite Dam. We also document aquatic habitat conditions using water temperature and stream flow in four study streams in the subbasin.

13 HYDRO ENERGY↗

Snake River Fall Chinook Salmon Life History Investigations, Annual Report 2008.

This study was initiated to provide empirical data and analyses on the dam passage timing, travel rate, survival, and life history variation of fall Chinook salmon that are produced in the Clearwater River. The area of interest for this study focuses on the lower four miles of the Clearwater River and its confluence with the Snake River because this is an area where many fish delay their seaward migration. The goal of the project is to increase our understanding of the environmental and biological factors that affect juvenile life history of fall Chinook salmon in the Clearwater River. The following summaries are provided for each of the individual chapters in this report.

13 HYDRO ENERGY↗

Life-cycle analysis results of geothermal systems in comparison to other power systems.

A life-cycle energy and greenhouse gas emissions analysis has been conducted with Argonne National Laboratory's expanded Greenhouse Gases, Regulated Emissions, and Energy Use in Transportation (GREET) model for geothermal power-generating technologies, including enhanced geothermal, hydrothermal flash, and hydrothermal binary technologies. As a basis of comparison, a similar analysis has been conducted for other power-generating systems, including coal, natural gas combined cycle, nuclear, hydroelectric, wind, photovoltaic, and biomass by expanding the GREET model to include power plant construction for these latter systems with literature data. In this way, the GREET model has been expanded to include plant construction, as well as the usual fuel production and consumption stages of power plant life cycles. For the plant construction phase, on a per-megawatt (MW) output basis, conventional power plants in general are found to require less steel and concrete than renewable power systems. With the exception of the concrete requirements for gravity dam hydroelectric, enhanced geothermal and hydrothermal binary used more of these materials per MW than other renewable power-generation systems. Energy and greenhouse gas (GHG) ratios for the infrastructure and other life-cycle stages have also been developed in this study per kilowatt-hour (kWh) of electricity output by taking into account both plant capacity and plant lifetime. Generally, energy burdens per energy output associated with plant infrastructure are higher for renewable systems than conventional ones. GHG emissions per kWh of electricity output for plant construction follow a similar trend. Although some of the renewable systems have GHG emissions during plant operation, they are much smaller than those emitted by fossil fuel thermoelectric systems. Binary geothermal systems have virtually insignificant GHG emissions compared to fossil systems. Taking into account plant construction and operation, the GREET model shows that fossil thermal plants have fossil energy use and GHG emissions per kWh of electricity output about one order of magnitude higher than renewable power systems, including geothermal power.

01 COAL, LIGNITE, AND PEAT↗

Emissions, Monitoring, and Control of Mercury from Subbituminous Coal-Fired Power Plants - Phase II

Western Research Institute (WRI), in conjunction with Western Farmers Electric Cooperative (WFEC), has teamed with Clean Air Engineering of Pittsburgh PA to conduct a mercury monitoring program at the WEFC Hugo plant in Oklahoma. Sponsored by US Department of Energy Cooperative Agreement DE-FC-26-98FT40323, the program included the following members of the Subbituminous Energy Coalition (SEC) as co-sponsors: Missouri Basin Power Project; DTE Energy; Entergy; Grand River Dam Authority; and Nebraska Public Power District. This research effort had five objectives: (1) determine the mass balance of mercury for subbituminous coal-fired power plant; (2) assess the distribution of mercury species in the flue gas (3) perform a comparison of three different Hg test methods; (4) investigate the long-term (six months) mercury variability at a subbituminous coal-fired power plant; and (5) assess operation and maintenance of the Method 324 and Horiba CEMS utilizing plant personnel.

01 COAL, LIGNITE, AND PEAT↗

Fish scale-loss caused by simulated hydraulic shear stress

Riverine fishes found within streams impacted by hydropower also often pass through hydropower turbines during annual downstream migrations. During turbine passage events, fish may experience a suite of stressors including rapid pressure changes, impacts from turbine blades, and exposure to hydraulic shear. Scale-loss is often observed in fish collected below dams and hydraulic shear is the most likely cause of this trauma. While exposure to shear may cause other injuries, scale-loss appears to be the most common non-lethal injury observed to date. We sought to quantify how hydraulic shear may cause scale-loss in rainbow trout, gizzard shad, and hybrid striped bass by precisely controlling the exposure level (velocity) and duration (seconds) of a water jet. We targeted the same area for all three species found between the operculum and dorsal fin on the left, lateral surface. Exposure velocities ranged from 0 (controls) to 11.0 meters/second but fish were only exposed to the water jet for 1.5 seconds. A 0.2 milligram/milliliter solution of fluorescein was used to stain the areas of scale-loss by submerging each fish in this solution for at least 6 minutes. Fluorescein was used because it interacts with epithelial tissue that has been damaged and it fluoresces under ultraviolet lighting. Fish were photographed under short- and longwave ultraviolet lighting in a dark chamber to capture fluorescence. Fish photographs were analyzed using ImageJ and the proportion of descaled area was estimated for each fish within a 35 by 35-millimeter square. In general, these data highlight how exposure to hydraulic shear may lead to significant levels of descaling in riverine fishes.

13 HYDRO ENERGY↗

Updated Baseline Cost Model for Hydropower (2023)

The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.

13 HYDRO ENERGY↗

ORNL National Hydropower Fish Passage Database

Fish passage facilities are used to mitigate impacts of hydropower dams to migratory fish in rivers, but information on the location, types, and characteristics of this infrastructure is incomplete at a national scale. Researchers at Oak Ridge National Laboratory (ORNL) partnered with fish passage engineers and hydropower experts from the US Fish and Wildlife Service (USFWS), the National Oceanic Atmospheric Administration’s National Marine Fisheries Service (NOAA NMFS), and the Low Impact Hydropower Institute (LIHI) to create the first national scale database of fish passage infrastructure at US hydropower developments. This database consists of the ORNL_Fish_Passage_Dataset.zip file with 13 individual .csv files that contain information on fish passage facility engineering characteristics, targeted fish species, operational schedule, and costs. which is of great value to a diverse range of stakeholders. This information was collected between December 2023 and July 2025 from project partners, other hydropower stakeholders, online datasets available for download, and a stakeholder questionnaire Information. This data resource addresses a large gap in knowledge of the deployment of fish passage technology and is freely available to members of the hydropower community, including federal and state regulators and resource agencies, non-governmental organizations (NGOs), industry, and other user groups to support project planning and regulatory (re)licensing activities. This database supports the US Department of Energy Water Power Technologies Office objective to develop decision support tools and data resources that improve environmental performance and ensure hydropower’s long-term value to the American public.

Matson, Paul [Oak Ridge National Laboratory (ORNL)↗

U.S. Hydropower Relicensing and License Surrender Data and Metadata, 2026

The U.S. Hydropower Relicensing and License Surrender Database (2026) provides a comprehensive, nationwide snapshot (as of December 31, 2025) of hydropower projects across the United States that are undergoing Federal Energy Regulatory Commission (FERC) relicensing or license surrender processes. Compiled by Oak Ridge National Laboratory, the dataset includes detailed project-level attributes such as geographic location, ownership type, waterway, project type (hydropower or pumped storage), regulatory milestones (e.g., Notice of Intent, application dates, FERC issuance dates), licensing process type (ILP, TLP, ALP), operational characteristics, capacity changes, settlement agreements, construction or turbine‑generator investments, and project status categories spanning relicensing, surrenders, exemptions, and terminations. Together, the relicensing and surrender records offer a detailed view of regulatory trends, infrastructure transitions, dam removals, and economic drivers influencing the evolution of the U.S. hydropower fleet.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

ORNL Hydropower Cost Database Extract from FERC Form-1

The ORNL FERC Form 1 Hydropower Cost Database Extract is a cleaned and compiled version of the hydropower component of the Federal Energy Regulatory Commission’s (FERC) Electric Utility Annual Report, also known as Form-1. The database includes conventional and pumped storage hydropower plants owned by non-federal major utilities that submitted the Form 1 data from 1994-2020, representing about 22% of existing conventional hydropower capacity and 61% of pumped storage capacity. The database includes the escalation factors and describes the methods used to scale costs to a common data year, as well as tables of identifiers necessary to link the hydropower plants to two other relevant databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets database. This database provides historical capital and operating costs for three schedules/classes defined in Form 1: Large Hydro, Pumped Storage Hydro, and Small Hydro. The Large Hydro and Pumped Storage Hydro data include cost items, such as land, structures, facilities, etc.

13 HYDRO ENERGY↗

Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems

The Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems offers an approximation of geomembrane lining system costs for pumped storage hydropower (PSH) reservoirs. Geomembrane lining systems have been used around the world for over 60 years for the construction of dams and reservoirs. Although geomembrane lining systems have found widespread use in the construction of canals and waste containment systems, they have not been utilized in the construction of new PSH facilities in the United States since the Mount Elbert PSH powerplant in Colorado. For this reason, PSH developers in the United States expressed the need for a tool that would allow them to estimate the costs of geomembrane lining systems for their PSH projects. To meet this need, the Cost Model for Pumped Storage Hydropower Geomembrane Lining Systems was developed by Oak Ridge National Laboratory with support from Argonne National Laboratory and Stantec, Inc. This Cost Model will enable PSH developers to develop a preliminary estimate of the cost of geomembrane lining systems and to better understand different reservoir lining options and their cost and performance characteristics, thus enabling them to make informed decisions related to preferred reservoir lining systems for their PSH projects.

DeNeale, Scott [Oak Ridge National Laboratory (ORN↗

Using acoustic telemetry for high-resolution sablefish movement informing potential interactions with a tidal turbine

As the MHK industry moves forward to the commercial phase, knowledge of potential environmental effects need to be documented and established. At present, the potential for fish interactions and subsequent injury or mortality are a significant concern with instream turbines. Sensors, methodologies, and analyses need to be developed to detect collision or near-miss events. These data will reduce uncertainty of the likelihood of such events and provide information to regulators to make informed decisions on permitting and possible mitigation measures if needed. Acoustic telemetry is a primary method for studying fine-scale fish movements because it can remotely track fish in three dimensions with accuracy. The Juvenile Salmon Acoustic Telemetry System (JSATS) developed by Pacific Northwest National Laboratory has proven effective for fish passage estimates and fine-scale movement in river impoundments and near dams. Leveraging the success of previous JSATS applications and applying it to the marine environment, juvenile sablefish (Anoplopoma fimbria) were tagged and tracked using a fixed-position receiver array in a marine tidal channel for the first time. Applying this technology to future installations of MHK turbines will provide information on fish avoidance and evasion behavior as well as blade strike and potential injury and mortality.

Staines, Garrett J.↗

Integrating Hybrid-Clustering and Localized Regression for Time Synchronization of a Hierarchical Underwater Acoustic Sensor Array

Time synchronization is a critical requirement for the application of underwater acoustic sensor network (UWSN). Although a number of time synchronization protocols have been proposed for UWSN, none of them can be directly applied to autonomous acoustic receivers due to lack of hardware platform to communicate with each other. In this paper, we propose a machine learning-based time synchronization framework for autonomous receiver arrays, using the Juvenile Salmon Acoustic Telemetry System as a case study. The proposed framework consists of array partition and time synchronization. Using detections of receiver attached beacons as input, this framework synchronizes all receiver clocks to a root receiver clock. The framework has been successfully used in a field study at Trevallyn Dam forebay in Tasmania, Australia.

Fu, Tao↗