Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “controllable loads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Experimental demonstration and performance evaluation of a complex fenestration system for daylighting and thermal harvesting

Two significant design strategies for mitigating building energy consumption are daylight redirection and solar energy harvesting. Effective daylighting implementation enhances the amount of useful natural light within a space and offsets the need for electric lighting. Solar energy harvesting systems can mitigate energy costs from mechanical systems by managing incoming thermal loads or capturing solar energy that can be used to supplement thermal systems in the building. While there are many available façade-based technologies that can perform daylighting or solar thermal energy harvesting, there remains a limitation in available systems that can perform both of them simultaneously. This paper, describes the design and experimental demonstration of a Liquid Filled Prismatic Louver (LFPL) system, which combines both energy-saving strategies. The LFPL system was installed in a south-facing room in New York City and evaluated for indoor daylight penetration and potential for thermal energy harvesting. Daylight redirection is achieved through the prismatic louver geometry and proper orientation, whereas thermal energy harvesting is achieved through IR absorption from the liquid (e.g., water) within the prisms. Daylighting performance was evaluated by illuminance measurements at key locations within the space, whereas thermal harvesting performance was evaluated through temperature measurements and thermal imaging analysis. We show that the LFPL system, with all prismatic elements oriented at the same angle, achieve a 2-fold and 8-fold enhancement in daylight redirection to the ceiling, for prism orientations of 10° and 20°, respectively. We also demonstrate the system’s capability to adjust to specific lighting needs, within the space, through the dynamic individual orientation of prismatic elements; thus, achieving a concentrated ceiling illuminance enhancement of ~100 times and ~200 times at 2.5 and 4.3 m away from the window sill, providing workplane illuminance enhancement of 6 and 2 times more than in the case of the control room with regular windows. Furthermore, we illustrate a reduction of potential heating loads at locations close to the window from the combination of infrared absorption in the water volume and the redirection of the incoming solar radiation, leading to a reduction of the workplane temperature by an average of 7–10 °C.

14 SOLAR ENERGY↗

Coupled methane and NO x conversion on Pt + Pd/Al 2 O 3 monolith: Conversion enhancement through feed modulation and Mn 0.5 Fe 2.5 O 4 spinel addition

The performance of a dual-layer Pt-Pd/Al 2 O 3 washcoated monolith promoted by an Al 2 O 3 -supported Mn 0.5 Fe 2.5 O 4 spinel base layer was evaluated with the objective to develop a catalyst with a lower loading of Platinum group metal (PGM) for stoichiometric natural gas vehicle (NGV) emission control. Flow reactor results show that a combination of a lean/rich modulated feed and spinel addition gives enhanced methane and NO conversions compared to a steady-state feed having the same overall composition. Washcoated catalysts – PGM-only, spinel-only, PGM + spinel – were compared over a wide range of operating conditions. The results show a decrease in the methane conversion light-off temperature of up to 85 °C for an application-relevant feed (CH 4 + NO + H 2 + CO + O 2 + H 2 O + CO 2 ) while a moderate 40 °C decrease was observed for a simple feed (CH 4 + O 2 + H 2 O + CO 2 ). In the absence of spinel the modulation enhancement is negatively impacted at high methane conversion (> 80 %). The data show that the O 2 storage and release property of the spinel is needed to fully exploit the modulation enhancement. The mechanism responsible for the enhancement is linked to suppression of O 2 inhibition on the methane oxidation rate near the stoichiometric neutral point (λ = 1). Sufficiently fast cycling achieves a balance between a metallic and oxidic precious metal crystallites favorable for methane activation. The addition of spinel moves this balance closer to the λ = 1 feed, enabling a high oxidation efficiency with lower byproduct NH 3 selectivity. Enhancement in the NO conversion follows the methane conversion due to an easier NO reduction under the slightly rich of stoichiometric feed. Comparison of the PGM + spinel catalysts to PGM-only catalysts shows that the addition of spinel in combination with modulation can achieve the same activity with a lower PGM loading.

03 NATURAL GAS↗

Flexible dynamic boundary microgrid operation considering network and load unbalances

Flexible microgrids with dynamic boundaries have recently been introduced in the literature. With the ability to reconfigure the topology of the microgrids dynamically through remotely controlled switches, flexible microgrids with dynamic boundaries can further improve the resiliency and energy efficiency of microgrids with distributed energy resources (DERs). This paper focuses on the optimal operation considering one of the predominant characteristics of microgrids and distribution systems – unbalanced networks and loads. In existing literature, balanced modeling of microgrids is more common due to its attractive simplicity. The three-phase power unbalance has not been considered as a constraint on the generation units in a microgrid. Further, negative sequence constraints have also been neglected. In this article, we propose a set of constraints that is specifically related to the capabilities of inverter interfaced resources to supply unbalanced current/power when the microgrid is islanded from the main distribution grid. We incorporate the new set of constraints into two optimization formulations leveraging two convex relaxations of the three-phase power flow equations: mixed-integer linear programming (MILP) and mixed-integer semidefinite programming (MISDP) that optimize the dispatch of controllable switches and DERs in the microgrid. The algorithms are then extended to networked microgrids with grid-forming sources. We test the algorithms on a realistic community microgrid model in Puerto Rico as well as standardized IEEE distribution test feeders. The testing results demonstrate the performance of the proposed algorithms. The MILP is fast and scalable, and the MISDP enforces the negative sequence voltage constraints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Electro-mechanical Modeling of Wind Turbine and Energy Storage Systems with Enhanced Inertial Response

In this paper, a coordinated control scheme for wind turbine generator (WTG) and supercapacitor energy storage system (ESS) is proposed for temporary frequency supports. Inertial control is designed by using generator torque limit considering the security of WTG system, while ESS releases its energy to compensate the sudden active power deficit during the recovery process of turbine rotor. WTG is modeled using the fatigue, aerodynamic, structure, turbulence (FAST) code, which identifies the mechanical loadings of the turbine and addresses electro-mechanical interactions in the wind energy system. A damping controller is augmented to the inertial control to suppress severe mechanical oscillations in the shaft and tower of the turbine during frequency supports. Furthermore, the result of small-signal stability analysis shows that the WTG-ESS tends to improve the stability of the whole multi-energy power grid. The major contributions of this paper will be validated by utilizing the proposed control method that combines the grid support capability and maintaining the integrity of structural design of the turbine for normal operations.

17 WIND ENERGY↗

Resilience of the Electric Grid Through Trustable IoT-Coordinated Assets

The electricity grid has evolved from a physical system to a cyberphysical system with digital devices that perform measurement, control, communication, computation, and actuation. The increased penetration of distributed energy resources (DERs) including renewable generation, flexible loads, and storage provides extraordinary opportunities for improvements in efficiency and sustainability. However, they can introduce new vulnerabilities in the form of cyberattacks, which can cause significant challenges in ensuring grid resilience. We propose a framework in this paper for achieving grid resilience through suitably coordinated assets including a network of Internet of Things devices. A local electricity market is proposed to identify trustable assets and carry out this coordination. Situational Awareness (SA) of locally available DERs with the ability to inject power or reduce consumption is enabled by the market, together with a monitoring procedure for their trustability and commitment. With this SA, we show that a variety of cyberattacks can be mitigated using local trustable resources without stressing the bulk grid. Multiple demonstrations are carried out using a high-fidelity cosimulation platform, real-time hardware-in-the-loop validation, and a utility-friendly simulator.

distributed energy resources↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Discrete-Time Causal Control of a Wave Energy Converter With Finite Stroke in Stochastic Waves

We consider feedback control design for a wave energy converter (WEC) for which the power takeoff (PTO) system has a finite stroke limit. Stationary stochastic wave loading is assumed, with a known spectrum, and the plant dynamics are assumed to be linear. We develop a technique for the design of a discrete-time controller, which has three design stages. In the first stage, a linear controller is optimized while imposing a relaxation of the maximum stroke constraint on the design. In the second stage, a tandem nonlinear feedback loop is designed for the purpose of stroke protection. In the third stage, the two designs (linear and nonlinear) are fused in a manner that preserves the stability of the overall system. The technique is demonstrated in a simulation of a simple cylindrical buoy. We show that the controller may be tuned through the adjustment of scalar design parameters, which adjust the tradeoff between the mean generated power and the force levels required to protect the stroke.

16 TIDAL AND WAVE POWER↗

Robust Optimal Control of Inverter-Based Resources Under Grid-Forming Operation

In this paper, we propose and solve a robust control problem for inverter-based resources under grid-forming operation to regulate the voltage and frequency. One major challenge is to mitigate the effect of unmeasurable load current disturbance, grid and load parametric uncertainties. Moreover, strong coupling between the state variables on both the AC and DC sides, as well as between the modulating control input and the frequency impose additional challenges. To address these challenges, first, a robust control problem is solved at the high level via transformation into an equivalent, but more tractable, optimal control problem. Then, in the middle layer a voltage control law is designed on the one side, and a frequency control law on the other side. Finally, an inverter filter current controller is designed to complete the controller design. Theoretical results are derived to provide stability guarantees for the resulting closed-loop system. Specifically, we show that the inverter current injection error is dissipative, the frequency error is semi-globally asymptotically stable, and the inverter terminal voltage error is globally asymptotically stable, all with provided sufficient conditions. Here, numerical simulation experiments are used to validate the theoretical claims. Furthermore, the developed controller is compared with existing work in literature to show the efficacy of the proposed approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Pressure Rail System Design with Variable Pressure Control Strategy

This paper presents the design and the control method of a Multiple Pressure Rail system (MPR) with a variable pressure control logic that allows minimization of throttling loss, therefore, increasing the overall fluid power actuation efficiency. An MPR system allows controlling hydraulic actuators with a pressure control logic, as opposed to traditional flow control logics which are well established in mobile applications. A proper setting of the number of pressure rails and the pressure level in each rail permits optimizing the system efficiency of an MPR solution. MPR systems have been recently proposed with different purposes, but seldom adopt variable pressure control strategies to manage the pressure variations in the rails. Moreover, the related past work attempts to maximize the energy recovery during overrunning load conditions. This paper, instead, addresses the case of an MPR system that handles a multitude of hydraulic functions without significant overrunning loads, as it occurs in many mobile applications such as in agriculture. The paper first presents the design alternatives considered for the MPR system, including the supply, the control valves, and the controller. Second, a dedicated test rig is developed to support experimental activities and validations of a lumped parameter model developed within this research to develop the MPR control strategy. The results describe the operating features of the proposed MPR solution. By considering the case of a traditional LS system, the paper results also show how system efficiency can be highly improved, with energy savings in the order of 49%

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bridging Control and Deployment: A Cross-Layer Analysis of Scalable Building Cluster Control

Building cluster control has emerged as a promising approach for enabling flexible and coordinated operation of distributed building systems, yet its transition from pilot demonstrations to routine grid-interactive operation remains limited. This paper argues that this gap cannot be explained by control algorithms alone. Instead, it arises from interacting barriers in communication infrastructure, data and semantic interoperability, uncertainty management, stakeholder participation, market design, and policy support. Accordingly, the paper reviews both technical and non-technical barriers to building cluster control. Technical challenges include heterogeneous devices and protocols, communication latency and reliability, distributed decision-making, and uncertainty propagation across aggregated loads. Non-technical barriers include user participation, stakeholder coordination, incentive allocation, and data governance. Existing solution approaches are synthesized, including semantic interoperability frameworks, edge and hierarchical communication architectures, distributed and transactive control strategies, uncertainty-aware optimization, policy mechanisms, and market reforms. Based on this analysis, two research directions are identified: testing infrastructures that can evaluate control performance under realistic multi-building conditions, and abstraction methods that allow building clusters to interact with other energy sectors through standardized flexibility representations. Overall, the paper provides a structured review of how building cluster control can move from isolated demonstrations toward reproducible, market-compatible, and grid-relevant implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Optimization and Control of a Hybrid Gas Turbine/sCO 2 Power System

During phase-I, the project team led by Echogen Power Systems (EPS) had two primary objectives based on investigating the application of gas turbines with supercritical carbon dioxide (sCO 2 ) power cycles. The first objective was to improve the overall efficiency and performance of a hybrid gas turbine/sCO 2 power system through a joint optimization of the two subsystems (gas turbine and sCO 2 power cycle) using non-linear optimization techniques that simultaneously evaluate thermal performance of the combined cycle. The hybrid power system included several points of interaction, including (but not limited to) gas turbine exhaust, fuel heating, inlet chilling and turbine cooling. The second objective was to establish a baseline transient response model of the hybrid power system and a notional microgrid and begin steps to integrate the control systems of the three major elements (gas turbine, sCO 2 cycle and grid controller). The project team established a baseline performance for a combined cycle power plant using a production gas turbine and scaled sCO 2 power cycle only utilizing exhaust heat recovery. Echogen’s non-linear techno-economic optimization code was extended by adding gas turbine component models derived from a in-house developed gas turbine design code. With the two cycles coupled by the gas turbine exhaust, design parameters of both cycles were allowed to vary simultaneously to determine performance opportunity versus isolated designs. Returning to the baseline gas turbine/sCO 2 power cycle transient models: Echogen had in-house developed sCO 2 cycle transient model in GT-Suite system simulation software, and had partnered with Siemens Finspång for gas turbine transient model, and Siemens PTI group to provide micro-grid load profile as well as hybrid power cycle generated load (power and frequency) analysis. The transient model for the SGT-750 Siemens gas turbine was a “black-box” functional mock-up interface (FMI) model developed by Siemens Industrial Turbomachinery in Finspång, Sweden. The SGT-750 is a twin-shaft gas turbine that produces 40 MW electricity with an efficiency of about 40% at ISO conditions. At 100% gas turbine throttle (load), the SGT-750 has average exhaust conditions of 114.6 kg/s and 469.8°C. The transient model for sCO 2 power cycle was developed by Echogen in GT-SUITE 1D system simulation software platform. The basic CO 2 flow circuit has single-shaft turbomachinery with net 11.5 MW electrical power output at design conditions. The power turbine has a double-ended shaft with one end connected to synchronous generator through a fixed-ratio gearbox. The other end of power turbine is connected to the compressor through a continuously variable transmission. The major components of the sCO 2 power cycle modeled include air cooled condenser/cooler, CO 2 compressor, recuperator, two waste heat exchanger coils, power turbine, continuous variable transmission, gearbox and generator. Integration of SGT-750 transient model and sCO 2 power cycle transient model was done in Matlab Simulink. In the integrated model, the gas turbine and sCO 2 power cycle interacted at two points, first one being the gas turbine exhaust gas flow rate and temperature, which were inputs to sCO 2 power cycle model. The second point was the distribution of micro-grid load demand signal between the SGT-750 generator and sCO 2 cycle generator. For a given combined-cycle load demand, the gas turbine load demand was equal to the total demand minus the sCO 2 cycle power generated. In the present study the integrated model was simulated for two cases of grid load demand: (i) for a step change, both positive-step and negative-step, in grid load demand (ii) for a micro-grid load demand curve provided by Siemens PTI group. Finally, the time series plots representing load demand versus integrated system response were presented including the sCO 2 power cycle control system performance plots. The actual generated power and frequency of both the generators, gas turbine and sCO 2 power cycle, was supplied to Siemens PTI group for dynamic grid assessment, results of which are provided in appendices.

03 NATURAL GAS↗

Control Co-Design of Wind Turbines

Wind energy is recognized worldwide as cost-effective and environmentally friendly, and it is among the fastest-growing sources of electrical energy. To further decrease the cost of wind energy, wind turbines are being designed at ever-larger scales. To expand the deployment of wind energy, wind turbines are also being designed on floating platforms for placement in deep-water locations offshore. Both larger-scale and floating wind turbines pose challenges because of their greater structural loads and deflections. Complex, large-scale systems such as modern wind turbines increasingly require a control co-design approach, whereby the system design and control design are performed in a more integrated fashion. This article reviews recent developments in control co-design of wind turbines. We provide an overview of wind turbine design objectives and constraints, issues in the design of key wind turbine components, modeling of the wind turbine and environment, and controller coupling issues. Wind turbine control functions and the integration of control design in co-design are detailed with a focus on co-design compatible control approaches.

17 WIND ENERGY↗