Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “arms control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

The StarLight interferometer architecture and operational concepts

The StarLight flight project was designed to demonstrate the key technologies of spacebome long-baseline stellar interferometry and precision formation flying for potential use on the Terrestrial Planet Finder (TPF) and other future astrophysics missions. Interferometer performance validation could be achieved over a 6-12 month period by obtaining several hundred fringe visibility amplitude measurements for stars in the band 600-1000 nm for a variety of stellar visibilities (0.2-1.0), magnitudes (Mv = 2-5), and baselines (B = 30-125 meters). Interferometry could be performed both in a 1 meter fixed-baseline combiner-only mode and in a two-spacecraft formation mode. In formation mode, the combiner spacecraft would remain at the focus of a virtual parabola, while the collector spacecraft assumed various positions along the parabola such that the two arms of the interferometer remained equal over a variety of separations and bearing angles. Challenges to be encountered in flight include high-bandwidth inter-spacecraft stellar and metrology pointing control, alignment and shear correction, delay and delay-rate estimation, visibility calibration, and robust fringe tracking in the presence of local and inter-spacecraft dynamics. This paper is based on the StarLight project design-capture of March 2002 and will describe the StarLight Interferometer System architecture and selected operational concepts (both of which have relevance to the on-going TPF Technology Program).

stellar↗

Thermal design of the sample handling assembly in the sampling and caching subsystem on the Mars 2020 rover

The Mars 2020 Rover is scheduled to land on Mars on February 18, 2021. One of the primary mission objectives for the Mars 2020 Rover is to collect a set of Martian regolith samples for potential future return to Earth. Regolith and rock samples will be collected and placed into sample tubes using a coring drill, located at the end of a large Robotic Arm, on the outside of the rover. Filled sample tubes will be transferred from the outside of the Rover into the Adaptive Caching Assembly (ACA), located inside the Rover chassis, via the Bit Carousel. Once the filled sample tube is brought into the ACA, the Sample Handling Assembly (SHA) will transfer it to all of the internal processing stations of the ACA for volume assessment, sealing and finally drop-off on the Martian surface. The ACA is a volume within the rover chassis that is not temperature-controlled. Actuators inside the SHA and its End Effector (EE) must be warmed to above -55°C and -25°C, respectively, prior to use. This paper discusses the thermal design of the SHA that uses heaters and temperature sensors to warm up and maintain the temperature-sensitive arm components within temperature limits during operation. Thermal performance predictions for Mars surface operations are also presented.

Lee, Chern-Jiin↗

Modeling and Harmonic Stability of MMC-HVDC With Passive Circulating Current Filters

A modular multilevel converter (MMC) is an emerging converter technology widely used in wind power applications using high-voltage direct current (HVDC) transmission, and it has been largely investigated in medium-voltage solar harvesting as well as electric motor drives. Different from studies dealing with active circulating current control loops, this paper focuses on impedance modeling and harmonic stability studies for MMCs with passive circulating current filters (PCCFs). A power stage circuit including a PCCF is transformed and remodeled to obtain small-signal formulations. This transformation leads to additional high-order matrix computing complexity due to the added impedance subnetwork matrix from the PCCF as well as relevant crossed-frequency impacts. To simplify the computational burden, the proposed model aims to solve one arm equation instead of all six MMC arm equations. To achieve this result, additional challenges occur when the MMC is connected to a renewable energy source instead of the grid voltage, where low-level zero-sequence components might exist in the neutral point of three phases, especially in the case of no integrated advanced modular voltage balancing control, which prevents computational simplification. To overcome this challenge, further impedance matrix adjustments are conducted in this paper to theoretically suppress the impact of zero-sequence harmonics when obtaining small-signal impedance, taking into account the frequency coupling effect. Finally, simulations are carried out to validate the developed impedance model under different operating scenarios. Harmonic stability case studies of MMCs with PCCFs connected to renewable energy current sources are also presented, where frequency-domain stability analyses based on Bode diagrams are compared to time-domain simulation waveforms and FFTs, which validate the effectiveness of the proposed impedance model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Human-Automation Allocations for Current Robotic Space Operations

Within the Human Research Program, one risk delineates the uncertainty surrounding crew working with automation and robotics in spaceflight. The Risk of Inadequate Design of Human and Automation/Robotic Integration (HARI) is concerned with the detrimental effects on crew performance due to ineffective user interfaces, system designs and/or functional task allocation, potentially compromising mission success and safety. Risk arises because we have limited experience with complex automation and robotics. One key gap within HARI, is the gap related to functional allocation. The gap states: We need to evaluate, develop, and validate methods and guidelines for identifying human-automation/robot task information needs, function allocation, and team composition for future long duration, long distance space missions. Allocations determine the human-system performance as it identifies the functions and performance levels required by the automation/robotic system, and in turn, what work the crew is expected to perform and the necessary human performance requirements. Allocations must take into account each of the human, automation, and robotic systems capabilities and limitations. Some functions may be intuitively assigned to the human versus the robot, but to optimize efficiency and effectiveness, purposeful role assignments will be required. The role of automation and robotics will significantly change in future exploration missions, particularly as crew becomes more autonomous from ground controllers. Thus, we must understand the suitability of existing function allocation methods within NASA as well as the existing allocations established by the few robotic systems that are operational in spaceflight. In order to evaluate future methods of robotic allocations, we must first benchmark the allocations and allocation methods that have been used. We will present 1) documentation of human-automation-robotic allocations in existing, operational spaceflight systems; and 2) To gather existing lessons learned and best practices in these role assignments, from spaceflight operational experience of crew and ground teams that may be used to guide development for future systems. NASA and other space agencies have operational spaceflight experience with two key Human-Automation-Robotic (HAR) systems: heavy lift robotic arms and planetary robotic explorers. Additionally, NASA has invested in high-fidelity rover systems that can carry crew, building beyond Apollo's lunar rover. The heavy lift robotic arms reviewed are: Space Station Remote Manipulator System (SSRMS), Japanese Remote Manipulator System (JEMRMS), and the European Robotic Arm (ERA, designed but not deployed in space). The robotic rover systems reviewed are: Mars Exploration Rovers, Mars Science Laboratory rover, and the high-fidelity K10 rovers. Much of the design and operational feedback for these systems have been communicated to flight controllers and robotic design teams. As part of the mitigating the HARI risk for future human spaceflight operations, we must document function allocations between robots and humans that have worked well in practice.

robotic allocation↗

RCT Continuing Training (Q2 2021) [Slides]

This quarter’s training assignment is split into two sections. Section one will review the fundamental elements of removing items from controlled areas. This section discusses each decision point and the required actions to determine if an item is suitable for release. Section two briefly reviews Area Radiation Monitors, commonly referred to as ‘ARMs’, and discusses the required actions to take in the event of an ARM alarm.” Report includes slides and transcript.

61 RADIATION PROTECTION AND DOSIMETRY↗

Convective Parameters Derived from Radiosonde Data (SONDEPARAM) Value-Added Product Report

Radiosondes provide fundamental observations of the vertical profile of atmospheric state (pressure, temperature, humidity, and winds), with important implications for subsequent studies on environmental controls on cloud conditions. Within convective cloud environments, there is an increasing demand for additional value-added products (VAPs) to facilitate the use of U.S. Department of Energy Atmospheric Radiation Measurement (ARM) user facility radiosonde data sets. Such VAPs should provide quick and reliable estimates for several standard radiosonde parameters or quantities of interest using common assumptions, as well as open, flexible code for visualization and user interaction. The Convective Parameters Derived from Radiosonde Data (SONDEPARAM) VAP will apply several robust algorithms used in Wang et al. (2020) for the calculation of useful radiosonde convective cloud parameters, including the convective available potential energy (CAPE), convective inhibition (CIN), and other convective parameters, for several different assumptions regarding the initial parcel characteristics (i.e., surface-based, most unstable, mixed layer). These ARM VAP codes are developed in open, flexible Python formats, with the intention that these parameters/calculations will be incorporated into traditional ARM quick-look radiosonde plotting, yet associated with user-available codes for ease in user reproduction and assumption modification.

54 ENVIRONMENTAL SCIENCES↗

Sequentially deployable maneuverable tetrahedral beam

A tetrahedral beam that can be compactly stowed, sequentially deployed, and widely manipulated to provide a structurally sound yet highly maneuverable truss structure is comprised of a number of repeating units of tandem tetralhedral sharing common sides. Fixed length battens are jointed into equilateral triangles called batten frames. Apexes of adjacent triangles are interconnected by longerons having a mid-point folding hinge. Joints, comprised of gussets pivotabley connected by links, permit two independent degrees of rotational freedom between joined adjacent batten frames, and provide a stable structure from packaged configuration to complete deployment. The longerons and joints can be actuated in any sequence, independently of one another. The beam is suited to remote actuation. Longerons may be provided with powered mid-point hinges enabling beam erection and packaging under remote control. Providing one or more longerons with powered telescoping segments permits the shape of the beam central axis to be remotely manipulated so that the beam may function as a remote manipulator arm.

Mikulas, M. M., Jr.↗

Telerobotic assembly of space station truss structure

Discussed are methods of assembling the space station's structure utilizing only telerobotic devices, i.e.: (1) an approximately anthropomorphic telerobot with two dextrous arms; (2) the Shuttle Remote Manipulator System (SRNS); (3) various material handling machines. Timelines and task recommendations for autonomous operations are also included. Also described are some experimental results comparing two manipulator control devices.

Fischer, Grahme↗

Proposed studies of a 30 meter imaging interferometer concept

An imaging interferometer in space based on the use of 15 m sections of graphite-epoxy truss structure to form the basic mechanical support system is suggested. One simple design is a Y-shaped array of 3 coplanar arms, each 15 m long and 1.5 m in diameter, together with a perpendicualr mast of similar length. Roughly 15 observing telescopes of 0.5 m diameter would be used, with laser interferometers controlling the optical pathlengths. The total mass of the imaging interferometer is 3000 kg. With this design, the entire interferometer can be carried to orbit with a single STS launch and then deployed. The interferometer could be operated either in a fully illuminated Sun-synchronous orbit at 1400 km altitude or loosely attached to the Space Station.

Stebbins, R. T.↗

Lunar drill footplate and casing

To prevent hole collapse during lunar drilling operations, a casing has been devised of a graphite reinforced polyimide composite which will be able to withstand the lunar environment. Additionally, this casing will be inserted into the ground in segments two meters long which will penetrate the regolith simultaneously with the auger. The vertical action of the mobile platform will provide a downward force to the casing string through a special adaptor, giving the casing the needed impetus to sink the anticipated depth of ten meters. Casing segments will be connected with a simple snap arrangement. Excess casing will be cut off by a cylindrical cutting tool which will also transport the excess casing away from the hole. A footplate will be incorporated to grasp the auger rod string during rod segment additions or removals. The footplate grasping mechanism will consist of a set of vice-like arms, one end of each bearing threaded to a common power screw. The power screw will be threaded such that one end's thread pitch opposes that of the other end. The weight of the auger and rod string will be transmitted through the arms to the power screw and absorbed by a set of three ball bearing assemblies. The power screw will be driven by a one-half horsepower brushless motor actuated by radio control. The footplate will rest on four short legs and be anchored with pins that are an integral part of each leg.

Maassen, Erik C.↗

Design of a pressurized lunar rover

A pressurized lunar rover is necessary for future long-term habitation of the moon. The rover must be able to safely perform many tasks, ranging from transportation and reconnaissance to exploration and rescue missions. Numerous designs were considered in an effort to maintain a low overall mass and good mobility characteristics. The configuration adopted consists of two cylindrical pressure hulls passively connected by a pressurized flexible passageway. The vehicle has an overall length of 11 meters and a total mass of seven metric tons. The rover is driven by eight independently powered two meter diameter wheels. The dual-cylinder concept allows a combination of articulated frame and double Ackermann steering for executing turns. In an emergency, the individual drive motors allow the option of skid steering as well. Two wheels are connected to either side of each cylinder through a pinned bar which allows constant ground contact. Together, these systems allow the rover to easily meet its mobility requirements. A dynamic isotope power system (DIPS), in conjunction with a closed Brayton cycle, supplied the rover with a continuous supply of 8.5 kW. The occupants are all protected from the DIPS system's radiation by a shield of tantalum. The large amount of heat produced by the DIPS and other rover systems is rejected by thermal radiators. The thermal radiators and solar collectors are located on the top of the rear cylinder. The solar collectors are used to recharge batteries for peak power periods. The rover's shell is made of graphite-epoxy coated with multi-layer insulation (MLI). The graphite-epoxy provides strength while the thermally resistant MLI gives protection from the lunar environment. An elastomer separates the two materials to compensate for the thermal mismatch. The communications system allows for communication with the lunar base with an option for direct communication with earth via a lunar satellite link. The various links are combined into one signal broadcast in the S-band at 2.3 GHz. The rover is fitted with a parabolic reflector disk for S-band transmission, and an omnidirectional antenna for local extravehicular activity (EVA) communication. The rover's guidance, navigation, and control subsystem consists of an inertial guidance system, an orbiting lunar satellite, and an obstacle avoidance system. In addition, the rover is equipped with a number of external fixtures including two telerobotic arms, lights, cameras, EVA storage, manlocks, a docking fixture, solar panels, thermal radiators, and a scientific airlock. In conclusion, this rover meets all of the design requirements and clearly surpasses them in the areas of mobility and maneuverability.

Bhardwaj, Manoj↗

Lunar surface operations. Volume 3: Robotic arm for lunar surface vehicle

A robotic arm for a lunar surface vehicle that can help in handling cargo and equipment, and remove obstacles from the path of the vehicle is defined as a support to NASA's intention to establish a lunar based colony by the year 2010. Its mission would include, but not limited to the following: exploration, lunar sampling, replace and remove equipment, and setup equipment (e.g. microwave repeater stations). Performance objectives for the robotic arm include a reach of 3 m, accuracy of 1 cm, arm mass of 100 kg, and lifting capability of 50 kg. The end effectors must grip various sizes and shapes of cargo; push, pull, turn, lift, or lower various types of equipment; and clear a path on the lunar surface by shoveling, sweeping aside, or gripping the obstacle present in the desired path. The arm can safely complete a task within a reasonable amount of time; the actual time is dependent upon the task to be performed. The positioning of the arm includes a manual backup system such that the arm can be safely stored in case of failure. Remote viewing and proximity and positioning sensors are incorporated in the design of the arm. The following specific topic are addressed in this report: mission and requirements, system design and integration, mechanical structure, modified wrist, structure-to-end-effector interface, end-effectors, and system controls.

Shields, William↗

STS-78 Flight Day 1

On this first day of the STS-78 mission, the flight crew, Cmdr. Terence T. Henricks, Pilot Kevin R. Kregel, Payload Cmdr. Susan J. Helms, Mission Specialists Richard M. Linnehan, Charles E. Brady, Jr., and Payload Specialists Jean-Jacques Favier, Ph.D. and Robert B. Thirsk, M.D., can be seen preforming pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Henricks shares a unique view of Columbia's climb to orbit with flight controllers from a small camera that was mounted on the flight deck. The video follows Columbia's flight from just before main engine start through main engine cutoff, showing the force of main engine and solid booster ignition as experienced by the astronauts.

Source record↗

Neural Development Under Conditions of Spaceflight

One of the key tasks the developing brain must learn is how to navigate within the environment. This skill depends on the brain's ability to establish memories of places and things in the environment so that it can form cognitive maps. Earth's gravity defines the plane of orientation of the spatial environment in which animals navigate, and cognitive maps are based on this plane of orientation. Given that experience during early development plays a key role in the development of other aspects of brain function, experience in a gravitational environment is likely to be essential for the proper organization of brain regions mediating learning and memory of spatial information. Since the hippocampus is the brain region responsible for cognitive mapping abilities, this study evaluated the development of hippocampal structure and function in rats that spent part of their early development in microgravity. Litters of male and female Sprague-Dawley rats were launched into space aboard the Space Shuttle Columbia on either postnatal day eight (P8) or 14 (P14) and remained in space for 16 days. Upon return to Earth, the rats were tested for their ability to remember spatial information and navigate using a variety of tests (the Morris water maze, a modified radial arm maze, and an open field apparatus). These rats were then tested physiologically to determine whether they exhibited normal synaptic plasticity in the hippocampus. In a separate group of rats (flight and controls), the hippocampus was analyzed using anatomical, molecular biological, and biochemical techniques immediately postlanding. There were remarkably few differences between the flight groups and their Earth-bound controls in either the navigation and spatial memory tasks or activity-induced synaptic plasticity. Microscopic and immunocytochemical analyses of the brain also did not reveal differences between flight animals and ground-based controls. These data suggest that, within the developmental window studied, microgravity has minimal long-term impact on cognitive mapping function and cellular substrates important for this function. Any differences due to development in microgravity were transient and returned to normal soon after return to Earth.

Kosik, Kenneth S.↗

How to Build a Rover: An Overview of the Mars 2020 Mission’s Vehicle System Testbed

While NASA’s Mars rover Perseverance continues to make groundbreaking achievements on the Red Planet, its twin is hard at work here on Earth. The Operational Perseverance Twin for the Integration of Mechanisms and Instruments Sent to Mars, or OPTIMISM, is the Mars 2020 Vehicle System Testbed (VSTB) rover operated by NASA Jet Propulsion Laboratory (JPL) in Pasadena, California. OPTIMISM’s home is the JPL Mars Yard; an outdoor field with red soil that simulates the terrain encountered by Perseverance. The VSTB is a full-scale engineering model of the flight rover, serving a number of functions to ensure mission operations can continue smoothly and on schedule. The VSTB possesses instrumentation, computers, mechanisms, cameras, and a Mobility subsystem that are nearly identical to its extraterrestrial twin. Its high fidelity allows the rover to be a highly effective tool to fully test system functionality and performance prior to commanding the flight rover. The early stages of building OPTIMISM began a few months prior to Perseverance departing JPL for Cape Canaveral, FL in early 2020. Electrical integration of the flight system avionics, and compatibility checkouts of the electrical ground support equipment ensured that the foundation of the electrical system was operational and in place. Next, the internal harnessing was installed and compatibility checks of the rover instrumentation and mechanisms were performed to confirm the system was prepared for full buildup. Finally, mechanical assembly of the rover chassis with its external components completed the integration of the system before it was moved to the Mars Yard for its initial phase of testing to perform verification & validation (V&V) of the Mobility subsystem requirements. By the time Perseverance landed at Jezero Crater in February 2021, the first phase of VSTB operations was underway. Surface guidance, navigation, and control (SGNC) testing for the Mobility subsystem ensured functionality and performance requirements were met for various capabilities such as visual odometry (VO), mapping, and automatic navigation (AutoNav). Subsequent integration of the robotic arm (RA) onto the VSTB enabled the V&V campaign for surface sampling operations (SSO) to commence. As the mission’s engineering operations (EO) have gotten underway, the VSTB has been utilized for an array of purposes including troubleshooting software anomalies, and performing dry-runs for first time activities (FTAs) prior to sending the commands to Perseverance. OPTIMISM will continue to serve mission critical functions as long as Perseverance is roving the Red Planet.

Rojas, Jose Trujillo↗

Structural load control during construction

In the absence of gravitational pull, the major design considerations for large space structures are stiffness for controllability, and transient dynamic loadings (as opposed to the traditional static load associated with earth-based structures). Because of the absence of gravitational loading, space structures can be designed to be significantly lighter than their counterparts on Earth. For example, the Space Shuttle manipulator arm is capable of moving and positioning a 60,000 lb payload, yet weighs less than 1,000 lbs. A recent design for the Space Station which had a total weight of about 500,000 lbs. used a primary loadcarrying keel beam which weighed less than 10,000 lbs. For many large space structures designs it is quite common for the load-carrying structure to have a mass fraction on the order of one or two percent of the total spacecraft mass. This significant weight reduction for large space structures is commonly accompanied by very low natural frequencies. These low frequencies cause an unprecedented level of operational complexity for mission applications which require a high level of positioning and control accuracy. This control problem is currently the subject of considerable research directed towards reducing the flexibility problem. In addition, however, the small mass fraction typically results in structures which are quite unforgiving to inadvertent high loadings. In other words, the structures are 'fragile.' In order to deal with the fragility issue CSC developed a load-limiting concept for space truss structures. This concept is aimed at limiting the levels of load which can occur in a large space structure during the construction process as well as during subsequent operations. Currently, the approach for dealing with large loadings is to make the structure larger. The impact this has on construction is significant. The larger structures are more difficult to package in the launch vehicle, and in fact in some instances the concept must be changed from a deployable truss to an erectable truss to permit packaging. The new load-limiting concept is aimed at permitting the use in large space structures of smaller trusses with a high level of strength robustness, in order to simplify the construction process. To date several analyses conducted on the concept have demonstrated its feasibility, and an experiment is currently being designed to demonstrate its operation.

Mikulas, Martin M., Jr.↗

Telerobotic assembly of space station truss structures

Discussed here are methods of assembling the space station's structure utilizing only telerobotic devices, i.e.: (1) an approximately anthropomorphic telerobot with two dextrous arms; (2) the Shuttle Remote Manipulator System (SRMS); and (3) various material handling machines. Timelines and task recommendations for autonomous operations are also included. Also described are some experimental results comparing two manipulator control devices.

Fischer, G.↗

Force-velocity and power characteristics of rat soleus muscle fibers after hindlimb suspension

The effects of 1, 2, and 3 wk of hindlimb suspension (HS) on force-velocity and power characteristics of single rat soleus fibers were determined. After 1, 2, or 3 wk of HA, small fiber bundles were isolated, placed in skinning solution, and stored at -20 C until studied. Single fibers were isolated and placed between a motor arm and force transducer, functional properties were studied, and fiber protein content was subsequently analyzed by sodium dodecyl sulfate-polyacrylamide gel electrophoresis (SDS-PAGE). Additional fibers were isolated from soleus of control after 1 and 3 wk of HS, and fiber type distribution and myosin light chain stoichiometry were determined from SDS-PAGE analysis. After 1 wk of HS, percent type I fibers declined from 82 to 74%, whereas hybrid fibers increased from 10 to 18%. Percent fast type II fibers increased from 8% in control and 1 wk of HS to 26% by 3 wk of HS. Most fibers showed an increased unloaded maximal shortening velocity (V sub O)), but myosin heavy chain remained entirely slow type I. The mechanism for increased V(sub O) is unknown. There was a progressive decrease in fiber diameter and peak force after 1, 2, and 3 wk of HS, respectively. One week of HS resulted in a shift of the force-velocity curve, and between 2 and 3 wk of HS the curve shifted further such that V(sub O) was higher than control at all relative loads less than 45% peak isometric force. Peak absolute power output of soleus fibers progressively decreased through 2 wk of HS but showed no further change at 3 wk. The results suggest that between 2 and 3 wk the HS-induced alterations in the force-velocity relationship act to maintain the power output of single soleus fibers despite a continued reduction in fiber force.

Mcdonald, K. S.↗