Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Annual Waste Minimization Summary Report, Calendar Year 2009

This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC, for the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year 2009. This report was developed in accordance with the requirements of the Nevada Test Site Resource Conservation and Recovery Act Permit (No. NEV HW0021), and as clarified in a letter dated April 21, 1995, from Paul Liebendorfer of the Nevada Division of Environmental Protection to Donald Elle of the U.S. Department of Energy, Nevada Operations Office. The NNSA/NSO Pollution Prevention (P2) Program establishes a process to reduce the volume and toxicity of waste generated by NNSA/NSO activities and ensures that proposed methods of treatment, storage, and/or disposal of waste minimize potential threats to human health and the environment. The following information provides an overview of the P2 Program, major P2 accomplishments during the reporting year, a comparison of the current year waste generation to prior years, and a description of efforts undertaken during the year to reduce the volume and toxicity of waste generated by NNSA/NSO.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

End of FY10 report - used fuel disposition technical bases and lessons learned : legal and regulatory framework for high-level waste disposition in the United States.

This report examines the current policy, legal, and regulatory framework pertaining to used nuclear fuel and high level waste management in the United States. The goal is to identify potential changes that if made could add flexibility and possibly improve the chances of successfully implementing technical aspects of a nuclear waste policy. Experience suggests that the regulatory framework should be established prior to initiating future repository development. Concerning specifics of the regulatory framework, reasonable expectation as the standard of proof was successfully implemented and could be retained in the future; yet, the current classification system for radioactive waste, including hazardous constituents, warrants reexamination. Whether or not consideration of multiple sites are considered simultaneously in the future, inclusion of mechanisms such as deliberate use of performance assessment to manage site characterization would be wise. Because of experience gained here and abroad, diversity of geologic media is not particularly necessary as a criterion in site selection guidelines for multiple sites. Stepwise development of the repository program that includes flexibility also warrants serious consideration. Furthermore, integration of the waste management system from storage, transportation, and disposition, should be examined and would be facilitated by integration of the legal and regulatory framework. Finally, in order to enhance acceptability of future repository development, the national policy should be cognizant of those policy and technical attributes that enhance initial acceptance, and those policy and technical attributes that maintain and broaden credibility.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Application of Particle Accelerators to Mitigate Energy and Climate Change Problems Facing America

Reliable CO 2 -free baseload power is needed to address ever-increasing demands for electricity while minimizing adverse climate change. Diversified power supply provided by solar, wind, geothermal, and nuclear reactors can displace the use of fossil fuels. The United States (U.S.) is taking a new look at nuclear power as a source of electrical energy and the nuclear industry is proposing new approaches which may minimize capital costs. However, nuclear power comes with a variety of technical problems. Chief among those is managing the used fuel from nuclear reactors. No long-term, practicable solution to this problem is available. The lack of progress on a comprehensive waste management strategy restricts growth in the nuclear power industry and minimizes the role that nuclear energy may serve as part of a zero-carbon future (Bahr, 2021). According to the Nuclear Waste Policy Act of 1982, as amended, the U.S. Government has possession of the used reactor fuel and incurs large annual storage fees paid to utilities to store and safeguard the accumulated used fuel. In effect, short term on-site storage of nuclear waste is the current waste management plan. The amount of used reactor fuel in the U.S. is approximately 80,000 metric tons. While no geologic repository exists within the U.S., the potential site at Yucca Mountain, NV would accommodate 70,000 metric tons, which fails to meet current and future needs. Given the technical and political challenges associated with establishing a single geological storage site, it is necessary for the U.S. to implement technologies that improve the suitability of geological storage by reducing the volume and radiotoxicity of stored material. No extant technology meets this need. Accelerator driven waste burners have been proposed as a scalable method to process used nuclear fuel, however considerable technical challenges remain which impede commercialization. Innovations in design require investigation of novel materials, development of accurate models and simulations, and a comprehensive assessment of safety and performance. This proposal elaborates how LANL is uniquely positioned to make key contributions to this area of research.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Nuclear Fuel Receipt Rate Analysis within an Integrated Waste Manage-ment System Architecture that Includes Consolidated Interim Storage

A key parameter in analyzing the performance of an integrated waste management system (IWMS) architecture for the disposition of spent nuclear fuel (SNF) is the SNF receipt rate from reactor and other custodian sites. The introduction of one or more federal consolidated interim storage facilities (CISFs) into the IWMS architecture can enable the receipt rate profile as a function of time to be accelerated relative to system architectures without a CISF. The question then arises as to what an optimal SNF receipt rate profile for an IWMS architecture might be in view of practical constraints and desired system performance attributes and associated metrics. This paper describes a sensitivity study on SNF receipt rates and the associated results for a selected set of IWMS scenarios aimed an in-forming near-term planning for interim storage capabilities and transportation assets. Two different strategies are compared, one that fills an initial CISF quickly and then idles the transportation system while a disposal system is prepared, and a second strategy that aims to provide a more continuous use of transportation assets and receipt capabilities at the IWMS while the disposal system is readied for SNF receipt. Cost considerations and other factors such as impact on timing of clearing reactor sites of SNF, efficient use of capital assets, and other metrics, including those which may be important to a CISF host community, are examined. Based on the analysis, an initial approach is presented targeting a continuous receipt strategy while having the flexibility to step up receipt capabilities to a reasonable degree when needed and beneficial within overall system constraints.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Future German R and D on HLW Disposal - 16519

In 2009, after the General elections, the new German Government showed a relatively positive attitude towards a prolonged use of nuclear power. Power plant shutdown was planned for the year 2032. Nuclear power was considered as a sort of transition energy technology until the energy supply would take place by the use of renewable energy sources. This was in line with the legal framework and the political strategy of the energy turnaround. Then, 17 nuclear power plants (NPP) were operational. The Fukushima incident heralded the sound of drastic changes in the German energy policy: Besides an intermediate stop of operation of reactors until a so-called stress test was accomplished, the general political decision was to phase-out nuclear earlier than planned and to implement faster the decisions regarding the energy transition policy. The shut-down of the last German nuclear power plant will occur in 2022. Accordingly, all the necessary legal changes were made. A consensus about the appropriate waste management strategy for heat generating waste (spent nuclear fuel (SNF) and vitrified waste (HLW)) was still pending at this time. Public and political discussions on this subject continued as in the years before. In July 2013, after intensive discussions, most of the parties represented in the German parliament agreed to eventually tackle the challenge of finding a repository by a consensual, transparent and science-based approach. This was to be codified in a law. In July 2013, the Site Selection Act passed the parliament. This law should pave the way for a new holistic process that addresses social, political, and scientific aspects of siting and the site selection process. The basics for this process should be provided by the 'Commission Storage of Radioactive Waste Materials' which was established according this law. Against this background discussions showed that scientific-technical R and D activities should be mirrored accordingly and R and D has to deal both with the future challenges of radioactive waste HLW disposal and related aspects. Considering this the Federal Ministry for Economic Affairs and Energy (BMWi), which is responsible for non-site specific R and D, created the new Research Concept 'Research for the management of radioactive waste', being fundamental and the frame for non-site specific R and D projects funded by BMWi. Key changes - mirroring the new requirements and different aspects - touch the issues: host rock research, i.e. all potential host rocks available in Germany are equally addressed and there is no prioritization, consideration of consequences of prolonged storage at NPP sites, alternative waste management strategies compared to direct disposal in a mined repository, and involvement of socio-technical aspects.This paper intends to highlight the key changes, its consequences, and will give a brief overview on first initiated R and D activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 75: US NRC - Current and Emerging US NRC Regulatory Topics

The panel addressed several current and emerging NRC regulatory issues impacting the radioactive waste arena. The panelists provided different perspectives on several key issues such as the revision of 10 CFR Part 61, scoping study on very low-level waste and consolidated interim storage of spent nuclear fuel among other timely regulatory topics. Co-Chairs, John Tappert and Larry Camper, introduced the session panel members and provided a summary of the purpose of the session. The panel focused on several current and emerging US NRC regulatory issues impacting the radioactive waste arena and stakeholders. The panelists provided different perspectives on several key regulatory issues such as: the revision of 10CFR Part 61, the Greater-than-Class C (GTCC) and Transuranic (TRU) waste disposal, coping with studies on very low-level waste and waste classification system, as well as other timely regulatory topics. Presentations proposed include: 1 - Overview of NRC Low-Level Radioactive Waste Activities and Initiatives (Christepher McKenney, US NRC (USA)); 2 - Is the Grass Really Greener? Canadian Regulatory Perspective (Karine Glenn, Canadian Nuclear Safety Commission (Canada)); 3 - EPRI Perspectives on 10CFR61 Revision (Lisa Edwards, EPRI (USA)); 4 - State of Nuclear Industry and Radwaste Management (Janet Schlueter, Nuclear Energy Institute (USA)); 5 - Concrete Steps the U.S. NRC Can Take to Improve LLW Disposal (Tom Magette, Talisman International (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Toxic Substances Control Act (TSCA) Polychlorinated Biphenyl (PCB)/Radioactive Waste Annual Inventory for Calendar Year 2013

The Toxic Substances Control Act, 40 CFR 761.65(a)(1) provides an exemption from the one year storage time limit for PCB/radioactive waste. PCB/radioactive waste may exceed the one year time limit provided that the provisions at 40 CFR 761.65(a)(2)(ii) and 40 CFR 761.65(a)(2)(iii) are followed. These two subsections require, (ii) "A written record documenting all continuing attempts to secure disposal is maintained until the waste is disposed of" and (iii) "The written record required by subsection (ii) of this section is available for inspection or submission if requested by EPA." EPA Region 10 has requested the Department of Energy (DOE) to submit an inventory of radioactive-contaminated PCB waste in storage at the Idaho National Laboratory (INL) for the previous calendar year. The annual inventory is separated into two parts, INL without Advanced Mixed Waste Treatment Project (AMWTP) (this includes Battelle Energy Alliance, LLC, CH2M-WG Idaho, LLC, and the Naval Reactors Facility), and AMWTP.

99 GENERAL AND MISCELLANEOUS↗

Toxic Substances Control Act (TSCA) Polychlorinated Biphenyl (PCB)/Radioactive Waste Annual Inventory for Calendar Year 2014

The Toxic Substances Control Act, 40 CFR 761.65(a)(1) provides an exemption from the one year storage time limit for PCB/radioactive waste. PCB/radioactive waste may exceed the one year time limit provided that the provisions at 40 CFR 761.65(a)(2)(ii) and 40 CFR 761.65(a)(2)(iii) are followed. These two subsections require, (ii) "A written record documenting all continuing attempts to secure disposal is maintained until the waste is disposed of" and (iii) "The written record required by subsection (ii) of this section is available for inspection or submission if requested by EPA." EPA Region 10 has requested the Department of Energy (DOE) to submit an inventory of radioactive-contaminated PCB waste in storage at the Idaho National Laboratory (INL) for the previous calendar year. The annual inventory is separated into two parts, INL without Advanced Mixed Waste Treatment Project (AMWTP) (this includes Battelle Energy Alliance, LLC, CH2M-WG Idaho, LLC, and the Naval Reactors Facility), and AMWTP.

99 GENERAL AND MISCELLANEOUS↗

COUPLING STATE-OF-THE-SCIENCE SUBSURFACE SIMULATION WITH ADVANCED USER INTERFACE AND PARALLEL VISUALIZATION: SBIR Phase I Final Report

This is a Phase I report on a project to significantly enhance existing subsurface simulation software using leadership-class computing resources, allowing researchers to solve problems with greater speed and accuracy. Subsurface computer simulation is used for monitoring the behavior of contaminants around nuclear waste disposal and storage areas, groundwater flow, environmental remediation, carbon sequestration, methane hydrate production, and geothermal energy reservoir analysis. The Phase I project was a collaborative effort between Thunderhead Engineering (project lead and developers of a commercial pre- and post-processor for the TOUGH2 simulator) and Lawrence Berkeley National Laboratory (developers of the TOUGH2 simulator for subsurface flow). The Phase I project successfully identified the technical approaches to be implemented in Phase II.

97 MATHEMATICS AND COMPUTING↗

Fuel Pond Sludge - Lessons Learned from Initial De-sludging of Sellafield's Pile Fuel Storage Pond - 12066

The Pile Fuel Storage Pond (PFSP) at Sellafield was built and commissioned between the late 1940's and early 1950's as a storage and cooling facility for irradiated fuel and isotopes from the two Windscale Pile reactors. The pond was linked via submerged water ducts to each reactor, where fuel and isotopes were discharged into skips for transfer along the duct to the pond. In the pond the fuel was cooled then de-canned underwater prior to export for reprocessing. The plant operated successfully until it was taken out of operation in 1962 when the First Magnox Fuel Storage Pond took over fuel storage and de-canning operations on the site. The pond was then used for storage of miscellaneous Intermediate Level Waste (ILW) and fuel from the UK's Nuclear Programme for which no defined disposal route was available. By the mid 1970's the import of waste ceased and the plant, with its inventory, was placed into a passive care and maintenance regime. By the mid 1990s, driven by the age of the facility and concern over the potential challenge to dispose of the various wastes and fuels being stored, the plant operator initiated a programme of work to remediate the facility. This programme is split into a number of key phases targeted at sustained reduction in the hazard associated with the pond, these include: - Pond Preparation: Before any remediation work could start the condition of the pond had to be transformed from a passive store to a plant capable of complex retrieval operations. This work included plant and equipment upgrades, removal of redundant structures and the provision of a effluent treatment plant for removing particulate and dissolved activity from the pond water. - Canned Fuel Retrieval: Removal of canned fuel, including oxide and carbide fuels, is the highest priority within the programme. Handling and export equipment required to remove the canned fuel from the pond has been provided and treatment routes developed utilising existing site facilities to allow the fuel to be reprocessed or conditioned for long term storage. - Sludge Retrieval: In excess of 300 m{sup 3} of sludge has accumulated in the pond over many years and is made up of debris arising from fuel and metallic corrosion, wind blown debris and bio-organic materials. The Sludge Retrieval Project has provided the equipment necessary to retrieve the sludge, including skip washer and tipper machines for clearing sludge from the pond skips, equipment for clearing sludge from the pond floor and bays, along with an 'in pond' corral for interim storage of retrieved sludge. Two further projects are providing new plant processing routes, which will initially store and eventually passivate the sludge. - Metal Fuel Retrieval: Metal Fuel from early Windscale Pile operations and various other sources is stored within the pond; the fuel varies considerably in both form and condition. A retrieval project is planned which will provide fuel handling, conditioning, sentencing and export equipment required to remove the metal fuel from the pond for export to on site facilities for interim storage and disposal. - Solid Waste Retrieval: A final retrieval project will provide methods for handling, retrieval, packaging and export of the remaining solid Intermediate Level Waste within the pond. This includes residual metal fuel pieces, fuel cladding (Magnox, aluminium and zircaloy), isotope cartridges, reactor furniture, and miscellaneous activated and contaminated items. Each of the waste streams requires conditioning to allow it to be and disposed of via one of the site treatment plants. - Pond Dewatering and Dismantling: Delivery of the above projects will allow operations to progressively remove the radiological inventory, thereby reducing the hazard/risk posed by the plant. This will then allow subsequent dewatering of the pond and dismantling of the structure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of treatment as an alternative WM pathway: examples of I-graphite and metallic components such as steam generators - 15212

EDF is working continuously to optimize and secure its waste management pathways, leading in some case to develop appropriate treatment solutions that could be implemented parallel to reference solutions, complementary or as alternative solutions to already existing paths. This approach is illustrated by the examples of steam generators replaced during the operation of French PWR power plants, and of irradiated graphite (stacks and sleeves), coming from the decommissioning of UNGG reactors, which have been shut down. Concerning graphite wastes, the near surface disposal facility intended for this waste does not exist yet, and is currently giving rise to the research of a suitable site, and an evaluation of its performances. While accompanying ANDRA (French national agency for nuclear waste management), in charge of the development of the facility, and while waiting for more data to be available, EDF is continuing the consolidation of graphite wastes radiological inventory, and is working on the development of an alternative management solution, based on a thermal treatment process. Depending on the nature of the treatment, and on the choice of operating parameters, this treatment may contribute to reduce graphite wastes volume and/or promote its acceptance in a disposal facility. Reducing the radiological inventory by decontamination is one of the means to achieve these objectives. Concerning replaced steam generators, nearly 200 of them will have been removed by 2030, and stored on site waiting for their treatment, which represents about 65 000 tons of metal. Initially intended to be cut and packed on NPPs' sites during their dismantling, EDF is studying the economic value of having the steam generators treated in a centralized facility, which allows reducing the volume of final wastes by optimizing cutting operations, while considering recycling after melting. However, this studied pathway implies a number of difficulties to be overcome. In particular, the shipment of such large components to a centralized facility may be complex. Moreover, French regulatory framework does not allow recycling outside nuclear industry, therefore limiting recycling opportunities to storage containers for radioactive wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conception and Operation of a New Treatment Center for Radioactive Waste from High Energy Accelerators - 18293

CERN has operated high-energy accelerators for more than 60 years of research in fundamental physics. The side-product of this activity is the generation of low- and intermediate-level radioactive waste, most of which is in solid form and free of surface contamination. Today, one operational year produces about 400 tons of radioactive waste which need to be disposed of towards the final repositories of the two CERN Host States, France and Switzerland. A new facility for the collection, interim storage, characterization and treatment of radioactive waste became operational at CERN in 2015. This facility was specifically conceived for an accelerator complex with a wide range of challenging waste items, which are often unique in their irradiation history as well as in their physical, chemical and radiological characteristics. The disposal rate was ramped up in 2016 with a unique treatment process tailored for metallic low-level waste. In 2017, two parallel processes were successfully tested for the elimination of radioactive cables and for the recycling of valuable metals. This paper gives an overview of the challenges in the design, commissioning and operation of the CERN radioactive waste treatment center. It outlines the methodology followed for the conception of the elimination processes, which can be of guidance for the development of similar facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current Problems and Solutions for the Long-term Storage of LLW in Germany - 17512

The primary aim of the Lower Saxony regulating authority is that all radioactive waste in long-term interim storage is made safe and their contents precisely documented. The requirements for regulating authority include: documentation, recovery, inspection, reconditioning, longer-term interim storage with full accessibility for inspection and transfer to the national disposal facility. The waste acceptance requirements of the disposal site Konrad as well as requirements for the interim storage facilities have to be met for all stored waste packages. Beside this, some challenges came up in the last few years, e.g. waste products with restrictions concerning the stability because of corrosion, fouling or fermentation processes. Some of these examples are shown. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Advancing Robotic Ultrasonic Volumetric Inspection Technology for Hanford Under-tank Inspection - 19474

The Hanford River Protection Project is reliant on safe interim storage of high-level waste at the Hanford site and will continue to depend on it until the waste has been treated and vitrified by the Hanford Waste Treatment and Immobilization Plant (WTP). The Hanford double-shell tanks (DSTs) have provided interim storage since the DSTs were put into service (1971 - 1986) and the RPP will continue to rely on their service until least 2050, at which time the 27 in-service DSTs will be 14-54 years beyond their original design lives. As the DSTs continue to age and be operated beyond design life, reliable leak integrity assessments of primary tanks and secondary liners will become increasingly important in order to provide situational awareness to tank operations personnel and to support risk-informed decisions on the selection of DSTs as waste feed staging tanks and the order and timing of future DST refurbishment or, alternatively, DST retrieval sequence. This paper summarizes progress made in fiscal year (FY) 2018 on the engineering of a robotic air-slot volumetric inspection system (RAVIS) that is designed to perform ultrasonic (volumetric) leak integrity inspections of physically inaccessible primary tank bottom plates and welds. Leak integrity inspections performed with the RAVIS will supplement today's primary tank leak integrity inspections, which are currently limited to physically accessible sidewall plates and welds. The RAVIS will be deployed into air slots of the insulating concrete (refractory) pad beneath the primary tanks and use its ultrasonic guided wave phased-array (GWPA) sensor to electronically steer an ultrasonic beam 360-degrees around the sensor to volumetrically examine adjacent carbon steel plates and welds covered by refractory pad material. Deployments of RAVIS down multiple air-slots will be performed to determine which regions of a tank bottom have sound leak integrity or which regions are in need of future wall thickness restoration or weld repair due to pitting corrosion, general corrosion, or heat/stress-induced cracks. The initial RAVIS design and the flaw detection test results for the first air-slot GWPA sensor that was designed to fit inside the air-slots will be presented in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risks of Hazardous Substances in Radioactive Waste for the Konrad Repository in Germany - 17522

When disposing of radioactive waste with negligible heat generation, the activity of the radionuclides is limited. However, the waste including radioactive material comprises a certain proportion of non-radioactive material. The risk of hazardous contamination of the groundwater by non-radioactive substances must be taken into account. It must be ascertained that the non-radioactive material cannot affect near-surface groundwater, which is a resource for drinking water supply. To achieve this, limit values on the amount of hazardous substances in the total waste volume shall be determined. In 2002 a regulatory approval was granted to the 'Konrad' final storage facility for radioactive waste with negligible heat generation according to the German Water Resources Act. This approval is embedded in the license (plan-approval decision) based on the German Atomic Energy Act. The approval is based on the model of a possible discharge of contaminants from the final storage facility. In a long-term simulation spanning 300,000 years, contact of the waste with the groundwater in the surrounding rock formations over the postoperational phase was conservatively assumed. The maximum amount of allowable disposal of substances - such that no concern of affecting the near-surface groundwater arises - can be derived from the solubility of the respective substances. Implementing the permit according to the Water Resources Act requires: - classification of the waste through delivery declaration obligations - monitoring the substance inspection in the waste to assess its suitability for the disposal, and - stock keeping procedures for the disposal waste by the operator. While the repository is operated by the Federal Office for Radiation Protection (BfS) (http://www.bfs.de./EN/home/home{sub n}ode;), reporting to the Federal Environment Ministry, the statutory water permit is issued and applied by the State of Lower Saxony as responsible state authority. A waste package/container list supplements a comprehensive list of substances. From this - depending on the respectively conditioned waste - material vectors can be derived. For this purpose, BfS provides a database with a substances and container list to the waste owners. In the meantime, first experiences have been collected in applying the approval. More than 540 waste containers with a total mass of almost 6,000 Mg have been controlled and are ready for disposal. In our presentation we will show the recent development in supervising the preparation for the disposal of mixed waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Container Filtration to Minimize Microbial Escape During Long-Term Storage on Mars

In the search for life on Mars, keeping its surface pristine and free of microbes due to human presence is of utmost importance. Astronauts will use emptied logistics containers during their Mars stay to store waste. These containers will be left on the planet’s surface and are a potential source of microorganism contamination. It is desired for these containers to be free from leaks for a minimum of 50 years. If leaks do occur, a likely location will be at any ports. At these locations the mating surfaces will be sealed using a flexible gasket material like a thin metal or a polymer. Eventually these seals will fail. To mitigate these effects, a particulate filter can be employed to equilibrate the pressure between the Martin environment and inside the container. To meet planetary protection requirements, the filter can only allow particulates smaller than 0.2 m diameter to pass. This paper discusses why a particulate filter may be needed and how such a filter could be tested to survive and operate in the harsh Martian environment.

planetary protection↗

Waste Container Filtration to Minimize Microbial Escape During Long-Term Storage on Mars

In the search for life on Mars, keeping its surface pristine and free of microbes due to human presence is of utmost importance. Astronauts will use emptied logistics containers during their Mars stay to store waste. These containers will be left on the planet’s surface and are a potential source of microorganism contamination. It is desired for these containers to be free from leaks for a minimum of 50 years. If leaks do occur, a likely location will be at any ports. At these locations the mating surfaces will be sealed using a flexible gasket material like a thin metal or a polymer. Eventually these seals will fail. To mitigate these effects, a particulate filter can be employed to equilibrate the pressure between the Martin environment and inside the container. To meet planetary protection requirements, the filter can only allow particulates smaller than 0.2 μm diameter to pass. This paper discusses why a particulate filter may be needed and how such a filter could be tested to survive and operate in the harsh Martian environment.

planetary protection↗