AND/OR graph representation of assembly plans

A compact representation of all possible assembly plans of a product using AND/OR graphs is presented as a basis for efficient planning algorithms that allow an intelligent robot to pick a course of action according to instantaneous conditions. The AND/OR graph is equivalent to a state transition graph but requires fewer nodes and simplifies the search for feasible plans. Three applications are discussed: (1) the preselection of the best assembly plan, (2) the recovery from execution errors, and (3) the opportunistic scheduling of tasks. An example of an assembly with four parts illustrates the use of the AND/OR graph representation in assembly-plan preselection, based on the weighting of operations according to complexity of manipulation and stability of subassemblies. A hypothetical error situation is discussed to show how a bottom-up search of the AND/OR graph leads to an efficient recovery.

Homem De Mello, Luiz S.↗

Attitude Design for the LADEE Mission

The Lunar Atmosphere and Dust Environment Explorer (LADEE) satellite successfully completed its 148-day science investigation in a low-altitude, near-equatorial lunar orbit on April 18, 2014. The LADEE spacecraft was built, managed and operated by NASA's Ames Research Center (ARC). The Mission Operations Center (MOC) was located at Ames and was responsible for activity planning, command sequencing, trajectory and attitude design, orbit determination, and spacecraft operations. The Science Operations Center (SOC) was located at Goddard Space Flight Center and was responsible for science planning, data archiving and distribution. This paper details attitude design and operations support for the LADEE mission. LADEE's attitude design was shaped by a wide range of instrument pointing requirements that necessitated regular excursions from the baseline one revolution per orbit "Ram" attitude. Such attitude excursions were constrained by a number of flight rules levied to protect instruments from the Sun, avoid geometries that would result in simultaneous occlusion of LADEE's two star tracker heads, and maintain the spacecraft within its thermal and power operating limits. To satisfy LADEE's many attitude requirements and constraints, a set of rules and conventions was adopted to manage the complexity of this design challenge and facilitate the automation of ground software that generated pointing commands spanning multiple days of operations at a time. The resulting LADEE Flight Dynamics System (FDS) that was developed used Visual Basic scripts that generated instructions to AGI's Satellite Tool Kit (STK) in order to derive quaternion commands at regular intervals that satisfied LADEE's pointing requirements. These scripts relied heavily on the powerful "align and constrain" capability of STK's attitude module to construct LADEE's attitude profiles and the slews to get there. A description of the scripts and the attitude modeling they embodied is provided. One particular challenge analysts faced was in the design of LADEE maneuver attitudes. A flight rule requiring pre-maneuver verification of in-flight maneuver conditions by ground operators prior to burn execution resulted in the need to accommodate long periods in the maneuver attitude. This in turn complicated efforts to satisfy star tracker interference and communication constraints in lunar orbit. In response to this challenge, a graphical method was developed and used to survey candidate rotation angles about the thrust vector. This survey method is described and an example of its use on a particular LADEE maneuver is discussed. Finally, the software and methodology used to satisfy LADEE's attitude requirements are also discussed in the context of LADEE's overall activity planning effort. In particular, the way in which strategic schedules of instrument and engineering activities were translated into actual attitude profiles at the tactical level, then converted into precise quaternion commands to achieve those pointing goals is explained. In order to reduce the risk of time-consuming re-planning efforts, this process included the generation of long-term projections of constraint violation predictions for individual attitude profiles that could be used to establish keep-out time-frames for particular attitude profiles. The challenges experienced and overall efficacy of both the overall LADEE ground system and the attitude components of the Flight Dynamics System in meeting LADEE's varied pointing requirements are discussed.

LADEE↗

Multi-Time Scale Coordinated Control and Scheduling of Inverter-Based TCLs With Variable Wind Generation

To address microgrid tie flow errors caused by wind generation variability, here we propose and develop a multi-time scale coordinated control and scheduling strategy for inverter-based thermostatically controlled loads (TCLs). First, in hour-time scale, inverter-based TCLs with adjusting temperature set-point are modeled as virtual generators to compensate tie flow deviations in the day-ahead plan. Next, in minute-time scale, virtual batteries representing operating behaviors of inverter-based TCLs with frequency control are scheduled determined by the control of virtual generators in hour-time scale. The virtual batteries are scheduled to smooth out tie flow errors corresponding to day-ahead plan and hour-time scale schedules. The multi-time scale control methods are coordinated to employ the response potential of inverter-based TCLs and response curve-based methods are proposed to control inverter-based TCLs considering the customer privacy. The multi-time scale stochastic schedules which are based on response curves of inverter-based TCLs are coordinated to accommodate wind generation variability. Simulation results demonstrate that the microgrid tie flow errors are effectively mitigated by the proposed multi-time scale coordinated control and scheduling of inverter-based TCLs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

OMP-26 - An interactive scheduling tool for the 26 meter subnetwork

Operations Mission Planner for the 26 Meter (26M) Antenna Subnetwork (OMP-26) is an interactive scheduling tool developed by the Jet Propulsion Laboratory (JPL) to assist in allocating the Deep Space Network (DSN) 26M antennas to support Earth-orbiting Spacecraft (SC). Prior to integrating OMP-26 into the 26M scheduling arena, the text-based, labor-intensive task lacked the sufficient means to support the 1992 mission support increase. Therefore, JPL developed the OMP-26 interactive scheduling tool to automate the time consuming tasks of the existing, manual scheduling process. OMP-26 has addressed the scheduling dilemma by assisting schedulers to identify and resolve conflicts more quickly through its graphical display features and constraint-checking editing capability. Although OMP-26 has reduced the scheduler's existing workload by easing the identification and resolution of conflicts, it will not meet the needs of another mission support increase to occur by 1995. Therefore, future plans for OMP-26 involve transitioning from a solely interactive scheduling tool to one that is highly automated and more powerful.

Rosas, Jody L.↗

Distributed network scheduling

Distributed Network Scheduling is the scheduling of future communications of a network by nodes in the network. This report details software for doing this onboard spacecraft in a remote network. While prior work on distributed scheduling has been applied to remote spacecraft networks, the software reported here focuses on modeling communication activities in greater detail and including quality of service constraints. Our main results are based on a Mars network of spacecraft and include identifying a maximum opportunity of improving traverse exploration rate a factor of three; a simulation showing reduction in one-way delivery times from a rover to Earth from as much as 5 to 1.5 hours; simulated response to unexpected events averaging under an hour onboard; and ground schedule generation ranging from seconds to 50 minutes for 15 to 100 communication goals.

planning↗

Automating Mid- and Long-Range Scheduling for the NASA Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system was designed and deployed as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users of the DSN. These users represent not only NASA's deep space missions, but also international partners and ground-based science and calibration users. The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. This paper describes some key aspects of the S(sup 3) system and on the challenges of modeling complex scheduling requirements and the ongoing extension of S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

Deep Space Network↗

Ground-based Automated Scheduling for Operations of the Mars 2020 Rover Mission

The National Aeronautics and Space Administration’s (NASA) Mars 2020 Rover, named Perseverance, landed on the surface of Mars in Jezero Crater on February 18, 2021. Since the landing, the rover’s activities have been planned with the aid of a ground-based automated scheduling system called Copilot. Automated scheduling is very rare for planetary rover missions. Historically humans have created a schedule manually and ensured that the schedule satisfied all constraints. Higher levels of automation in the system allows science planners to produce schedules for the rover more quickly. In addition to scheduling user-provided activities, Copilot generates and schedules two types of support activities: sleep activities and heating activities. Some activities require the CPU to be on as they execute, so Copilot schedules wakeups and shutdowns of the CPU at the appropriate times. Some activities require areas of the rover to be heated before they can execute, and that heating must be maintained throughout the duration of the activity. Copilot schedules the preheat and maintenance heating activities for the user-provided activities that require them. To facilitate Copilot usage, the Crosscheck tool shows the science planners how Copilot constructed a schedule. For activities that fail to be scheduled, Crosscheck gives information on the constraints that the activity would have violated. This gives the users insight into how to change the input activities and constraints in order to achieve a schedule that satisfies their goals.

Towey, Shannon↗

Energy Scheduling-based Operating Envelopes including a Distribution System Branch Screening Algorithm

This paper presents an energy scheduling-based formulation for computing operating envelopes including a distribution branch screening algorithm, termed DBS-ES. The contribution of the paper is two-fold: firstly, it presents an innovative methodology for calculating operating envelopes using energy scheduling (baseline), and secondly, it enhances this methodology by incorporating a custom distribution branch screening algorithm (DBS-ES). The custom algorithm leverages power system knowledge to reduce both model build time and total processing time while maintaining the same scheduling results as the baseline. The effectiveness of the proposed approach is demonstrated through experiments on the IEEE13, IEEE123, and EPRI Secondary test feeders. Results highlight a 24.5% decrease in model build time and an 8.17% decrease in total processing time when using DBS-ES compared to the baseline, specifically for the IEEE123 test feeder. Additionally, the paper briefly discusses the influence of utility-controlled storage on computing operating envelopes, noting a general incre

24 POWER TRANSMISSION AND DISTRIBUTION↗

Facilitating Crew-Computer Collaboration During Mixed-Initiative Space Mission Planning

As NASA looks toward longer duration missions, there will inevitably be a stronger emphasis on crew autonomy, particularly in the domains of mission planning. Ensuring that astronauts, while subject to lengthy periods of communication delay with Earth-based mission support personnel, are able to independently adapt their schedules to rapidly changing environments is a critical aspect of deep-space exploration. This task will likely require the assistance of computer support systems, as the task of mission planning is complex and currently requires dedicated console operators. A mixed-initiative approach can help alleviate some of the more workload-heavy aspects of planning by offloading the intricate task of constraint management to a computer, while still allowing the crew member to maintain overall control of the plan. Playbook is a mission planning tool that has been developed specifically to support this type of mixed-initiative scheduling. This paper examines: 1) the operational evidence of the challenges and viability of autonomous crew planning, and 2) the novel scheduling capabilities in Playbook that are meant to address those findings.

human-computer interaction↗

Preflight and In-Flight Exercise Conditions for Astronauts on the International Space Station

The physiological demands of spaceflight require astronauts to have certain physical abilities. They must be able to perform routine and off-nominal physical work during flight and upon re-entry into a gravity environment to ensure mission success, such as an Extra Vehicular Activity (EVA) or emergency egress. To prepare the astronauts for their mission, a Wyle Astronaut Strength Conditioning and Rehabilitation specialist (ASCR) works individually with the astronauts to prescribe preflight strength and conditioning programs and in-flight exercise, utilizing Countermeasure Systems (CMS) exercise hardware. PURPOSE: To describe the preflight and in-flight exercise programs for ISS crewmembers. METHODS: Approximately 2 years before a scheduled launch, an ASCR is assigned to each astronaut and physical training (PT) is routinely scheduled. Preflight PT of astronauts consists of carrying out strength, aerobic and general conditioning, employing the principles of periodization. Exercise programs are prescribed to the astronauts to account for their individual fitness levels, planned mission-specific tasks, areas of concern, and travel schedules. Additionally, astronauts receive instruction on how to operate CMS exercise hardware and receive training for microgravity-specific conditions. For example, astronauts are scheduled training sessions for the International Space Station (ISS) treadmill (TVIS) and cycle ergometer (CEVIS), as well as the Advanced Resistive Exercise Device (ARED). In-flight programs are designed to maintain or even improve the astronauts pre-flight levels of fitness, bone health, muscle strength, power and aerobic capacity. In-flight countermeasure sessions are scheduled in 2.5 h blocks, six days a week, which includes 1.5 h for resistive training and 1 h for aerobic exercise. CONCLUSIONS: Crewmembers reported the need for more scheduled time for preflight training. During flight, crewmembers have indicated that the in-flight exercise is sufficient, but would like more reliable and capable hardware.

Guilliams, Mark E.↗

Mars Reconnaissance Orbiter (MRO): The Next Step in Mars Exploration

This slide presentation reviews the Mars Reconnaissance Orbiter (MRO), and the science strategy that motivates the exploration of Mars. The MRO is one of several missions that are planned to enhance our understanding of the planet. Included in this presentation is a review of the schedule for the MRO, the science objectives of the mission, the payloads that ae planned for MRO, and the hoped for science that will be attained from them. A review of the mission, from launch to the primary science relay is reviewed and an overview of the orbiter is shown. The presentation details the payloads, and the expected data from the instruments.

water↗

Automating Mid- and Long-Range Scheduling for NASA's Deep Space Network

NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system is architected as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users who utilize the DSN (representing 37 projects including international partners and ground-based science and calibration users). The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. S(sup 3) has been used for negotiating schedules since April 2011, including the baseline schedules for three launching missions in late 2011. S(sup 3) supports a distributed scheduling model, in which changes can potentially be made by multiple users based on multiple schedule "workspaces" or versions of the schedule. This has led to several challenges in the design of the scheduling database, and of a change proposal workflow that allows users to concur with or to reject proposed schedule changes, and then counter-propose with alternative or additional suggested changes. This paper describes some key aspects of the S(sup 3) system and lessons learned from its operational deployment to date, focusing on the challenges of multi-user collaborative scheduling in a practical and mission-critical setting. We will also describe the ongoing project to extend S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.

scheduling↗

Multi-Element Integrated Project Planning at Kennedy Space Center

This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

Mullon, Robert↗

Distributed project scheduling at NASA: Requirements for manual protocols and computer-based support

The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of Space Shuttle mission planning.

Richards, Stephen F.↗

Mission Planner Algorithm for Urban Air Mobility – Initial Performance Characterization

In this paper, an initial characterization was performed of the Mission Planner algorithm developed by NASA for Urban Air Mobility (UAM) operations research. The algorithm plans conflict-free trajectories for flights to support a given set of UAM passenger trips. The UAM trips are planned in an on-demand, first-come, first-served manner, such that any given trip is subject to the constraints imposed by previously planned trips. For this analysis, the mission planning algorithm considered only the trajectory constraints from previously-planned trips in one test condition and added vertiport constraints for the second test condition. The conflict and constraint resolution strategies used by the Mission Planner were characterized by their percentage contribution to planning iterations, their percentage effectiveness in those iterations, and their contributions to the departure delay applied to each UAM trip’s flight. With the exception of the climb and descent vertical speed strategies, most strategies showed reasonable or good performance in all test scenarios. In the test condition with vertipad constraints enabled, both the total number of iterations executed, and the number of flights that required planning iterations, was reduced for all scenarios. This was the result of the natural conditioning of the traffic achieved with scheduling and the additional information available to the Mission Planner from the vertiport scheduler. The next steps for this work will include improvements to the mission planning strategies and analyses with additional constraints and under other demand scenarios.

Guerreiro, Nelson M.↗

Increasing Human Spaceflight Capabilities: Demonstration of Crew Autonomy Through Self-Scheduling Onboard International Space Station

For the first time in a spaceflight operational environment, our team enabled an ISS (International Space Station) crewmember to plan, reschedule, and execute their activities in real-time while abiding by flight and scheduling constraints. The Crew Autonomous Scheduling Test (CAST) investigated the novel concept of operations: allowing crew to manage their own timeline.

crew autonomy↗

Visual task analysis /VISTA/

Computer system VISTA, automatically plots selective PERT networks in order to develop accurate, standardized scheduling documentation as an essential element to project planning. This automation of plotting networks generates standardized networks due to a priority scheme adopted for calculating paths between events.

Burkes, T.↗