Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Retrofit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

Supercritical CO2 Recuperators, Presented at The ASME Turbo Expo 2017, June 29, 2017, by Dr. John Kelly, President, Altex Technologies Corporation

Closed Brayton super-critical CO2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m3/UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO2. Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $1,500/UA. In addition, the 5,083 kW unit HELC cost of $61.09/kW is 33.6% lower than the $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

High Effectiveness, Compact, High Pressure and Low-Cost Recuperator, Presented at The Fifth International Symposium – Super-Critical CO2 Power Cycles, San Antonio, Texas, March 28-31, 2016, by Dr. John Kelly, President, Altex Technologies Corporation

Closed Brayton super-critical CO2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m3/UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO2. Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $1,500/UA. In addition, the 5,083 kW unit HELC cost of $61.09/kW is 33.6% lower than the $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

High Effectiveness, Compact, High Pressure and Low Cost Recuperator for Super-Critical CO2 Power Cycles, Paper Presented at The Fifth International Symposium – Super-Critical CO2 Power Cycles, San Antonio, Texas, March 28-31, 2016, by Dr. John Kelly, President, Altex Technologies Corporation

Closed Brayton super-critical CO2 power cycles are well suited to waste heat bottoming cycles, due to their increased efficiency and compactness, relative to Rankine steam bottoming cycles. Since waste heat applications would be retrofits, the power system compactness is important. To achieve high efficiency, these power cycles require high pressure recuperative type heat exchangers, of substantial heat duty. Current Printed Circuit Heat Exchangers (PCHE), originally developed for high pressure gas and oil applications, can be used as recuperators, but costs are higher than desired. Altex is developing a purpose-built high pressure and effectiveness recuperator to provide the reliability, compactness, performance and pressure capability of current recuperators, but at a reduced cost. The High Effectiveness Low Cost (HELC) recuperative heat exchanger design yields volume and weight metrics of .0024 m3/UA and 10.2 kg/UA, which are 4% and 77.3% below recuperator target metrics, respectively. A 50 kW test article was designed and fabricated. Performance tests on water and oil showed that the HELC design model could predict heat transfer, to within 10% of the measured value. This model was then used to project HELC performance, when operating on supercritical CO2. Besides performance tests, the test article was hydrostatically tested, for integrity at up to 4,000 psi pressure. At these conditions, some distortion of channels was encountered. To mitigate distortion, the inserts were redesigned and these results were used to project the cost of 500 kW and 5,083 kW HELC units. The cost metric for the 5,083 kW unit was determined to be $1,349/UA, which is 10% lower than the recuperator desired cost metric desired target of $1,500/UA. In addition, the 5,083 kW unit HELC cost of $61.09/kW is 33.6% lower than the $92/kW estimated cost for a PCHE. Hydrostatic pressure tests, at up to 4,000psi, showed that the unit did not leak. However, channels were distorted at this pressure differential. Design updates to minimize stress concentrations and distortion were prepared and analyzed, to show that distortion could be controlled, but to date tests have not been run to prove the design. Project results show the potential of the HELC approach, but more work is required to confirm this potential, at the larger scales of interest.

14 SOLAR ENERGY↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

Healthy Buildings Initiative: Pacific Northwest National Laboratory Pilot Study

Fact sheet describes Pacific Northwest National Laboratory’s pilot of its framework for evaluating indoor environmental quality metrics and quantifying the potential financial costs and gains related to improving occupant productivity in federal buildings. The framework was piloted at PNNL’s Richland, Washington, campus to investigate how integrated energy and health analysis could benefit building retrofit and operation strategies.

FEMP↗

Establishing Regulatory Jurisdictional Boundaries at Collocated Advanced-Reactor Facilities

This white paper discusses establishing and applying nuclear facility jurisdictional boundaries at advanced-nuclear-reactor facilities. It was written for industry review and evaluation with possible consideration by the U.S. Nuclear Regulatory Commission (NRC) for subsequent regulatory action. The paper proposes a regulatory basis for establishing jurisdictional boundaries at operational advanced (i.e., non-light water) reactor installations at sites proximate to and sharing systems with non-NRC regulated facilities (e.g., users of process heat, fossil-plant retrofits, microgrid electrical power, desalination, etc.). Advanced-reactor technologies can be applied to support many industrial applications to replace the burning of fossil fuels as well as produce steam for electricity. The principal application of the current light-water reactor fleet is electricity generation. These varied industrial applications may involve an advanced-reactor design in combination with different site-specific energy-conversion systems. Some of these process-heat applications will require process-heat delivery systems to lie partially outside the advanced-reactor operator’s facility. Energy conversion systems are conventional, non-nuclear equipment and buildings. Given these varied applications, there should be a clear understanding between the advanced-reactor applicant and the NRC regarding a nominal demarcation between those systems that reside within the nuclear facility under the regulatory jurisdiction of the NRC (i.e., within the scope of a 10 Code of Federal Regulations (CFR) 50 operating license or Part 52 design certification and a combined license) and those that fall outside the scope of the NRC (e.g., an industrial facility). Additionally, it is important to have a clear understanding regarding the plant scope that should be addressed in an advanced-reactor facility Part 52, design certification application and the part of the plant scope that could be addressed as part of a site specific combined license application.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Moving Zero Energy Office Buildings to the Mainstream: Establishing Design Guidelines and Energy Targets: Preprint

Office buildings represent a significant portion of the commercial sector and are ideal candidates to lead the market towards achieving zero energy or zero energy ready buildings. The variety of sizes and uses for office buildings make them challenging to determine set design guidance that can be deployed across the market. A project committee for ASHRAE’s Zero Energy - Advanced Energy Design Guide (ZE-AEDG) for small and medium office buildings , comprised of members from five major national associations with market-pull in commercial buildings, created design guidance for achieving zero energy office buildings for new construction and major retrofit. This design guidance focuses on the process, providing a pathway for both office owners and design teams to achieve zero energy status. Energy use intensity targets range from 16 kBtu/ft²·yr to 36 kBtu/ft²·yr for the different climate zones were established such that office buildings can be “zero-ready,” that is, having low energy consumption that can easily be offset with renewables, preferably on-site. The design guidance was rooted in extensive energy modeling, as well as case studies of actual office buildings that have achieved high levels of energy performance and met zero energy or zero energy ready status. A unique aspect of the zero-energy guide is that it is not compared against a baseline but focuses on achieving an absolute target. The paper presents process of creating the targets, the selection of strategies to achieve the targets, and sample case studies that show how the cost-sensitive solutions are achievable for the design community. It also presents outreach strategies to deploy market achievable zero energy measures.

buildings↗

Energy Master Planning for Resilient Public Communities—Best Practices from U.S. Military Installations

Until recently, most planners at military installations addressed energy systems for new facilities on an individual facility basis without consideration of community-wide goals relevant to energy sources, renewables, storage, or future energy generation needs. Building retrofits of public buildings typically do not address energy needs beyond the minimum code requirements making it difficult, if not impossible, to achieve community-level targets on a building-by-building basis. Planning on the basis of cost and general reliability may also fail to deliver community-level resilience. For example, many building code requirements focus on hardening to specific threats, but in a multi-building community, only a few of these buildings may be mission-critical. Over the past two decades, the frequency and duration of regional power outages and water utility disruptions from weather, man-made events, and aging infrastructure have increased. Major disruptions of electric and thermal energy have degraded critical mission capabilities and caused significant economic impacts. In 2016, the U.S. Department of Defense issued guidance that each Service (Army, Navy, Air Force, Marines) complete comprehensive energy plans for the installations that consumed 75% of total building energy. Guidance was updated in 2017 to include metrics for energy resilience, and in some cases, water. This paper describes how community level quantitative and qualitative resilience analysis and metrics have been incorporated into community energy and water planning best practices for military installations in three geographically diverse locations. It is based on research performed under the International Energy Agency’s “Energy in Buildings and Communities Program Annex 73,” focusing on development of guidelines and tools that support the planning of Net Zero Energy Resilient Public Communities as well as research performed under the Department of Defense Environmental Security Technology Certification Program project EW18-D1- 5281, “Technologies Integration to Achieve Resilient, Low- Energy Military Installations.” The first case study reviews progress made on an energy and water planning study conducted at Fort Bliss, Texas. The second and third describes planning conducted at Fort Bragg, North Carolina and the Joint Region Marianas, Guam, respectively, under the updated guidance from 2017 regarding energy and water resilience. Analysis methods, key metrics, and key infrastructure and operational constraints are described, as well as technical, economic and business concepts used during the planning process.

Urban, Angela B.↗

Impact of Tuned Lighting on Skilled Nursing Center Residents' Sleep

The Problem: Sleep disturbance is common among nursing center residents and places them at risk for poor health outcomes. Lighting that changes in color and intensity over the course of the day and night may improve sleep and other outcomes, like dementia behaviors, but has has not been rigorously evaluated under real-world conditions. The Resolution: This single-facility study establishes that facility-level tuned lighting is feasible to implement and evaluate in a nursing center. Researchers randomly-assigned three corridors to one of two lighting conditions, then the other. Residents experienced half as many sleep disturbances while exposed to tuned vs. static lighting. There was no effect on behaviors. Tips for Success: Tuned lighting is a low-risk intervention that could be employed in new construction or when retrofitting fixtures into existing buildings. Key Words: Nursing home, long-term care, lighting, sleep, behaviors

60 APPLIED LIFE SCIENCES↗

Making Data-Driven Policy Decisions for the Nation’s First Building Energy Performance Standards

Nearly every major U.S. city has committed itself to ambitious climate action goals – for Washington, DC this means a 50 percent reduction in greenhouse gases by 2032 and carbon neutrality by 2050. In support of these goals, Washington, DC has passed one of the most aggressive and practical climate action bills in the nation—with the Clean Energy DC Omnibus Act, DC became the first city in the U.S. to adopt energy performance standards for existing buildings. DC’s Building Energy Performance Standards (BEPS) require energy efficiency improvements for all commercial and multifamily buildings that do not meet a sector-specific minimum ENERGY STAR score or equivalent metric, with iterative compliance cycles every five years that will accelerate the pace of whole building retrofits. This paper explores this revolutionary policy framework and uses two data analysis projects that DC conducted to evaluate the potential impact of the BEPS and move towards carbon neutrality. First, we analyze the potential energy savings and greenhouse gas reductions, as well as potential cost impacts, from the implementation of a BEPS policy in DC We then examine the role of BEPS in a carbon neutrality strategy, how BEPS savings iterate over time, and what additional existing building improvements will be driven by the gravitational pull of new building codes on median performance. The paper highlights the benefits and limitations of such data-driven approaches to support policy decisions. Finally, we will review ongoing BEPS implementation, including expected policy directions, critical supportive programs, and lessons learned to date.

Bergfeld, Katie↗

Installer Badges Toolkit

As the focus on home energy efficiency grows, the National Renewable Energy Lab (NREL) and the U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP) are collaborating with the home energy retrofit industry to support the development of skilled workers. The Installer Badges Toolkit provides a flexible, customizable, and voluntary approach to training and skills recognition for WAP implementers, utility programs, private sector workers, and contractors.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Multi-layered Resilient Microgrid Networks

Distribution grid resilience, especially when the grid is under high penetration of Distributed Energy Resources (DER), e.g. PV and energy storage, is essential to ensure the quality of electric power services. The resiliency aspect is particularly important for critical loads that typically include hospitals, police/fire stations, and national security facilities. Networks of multiple interconnected reconfigurable microgrids help to increase renewable energy penetration and may be used as basic building blocks for implementing future resilient power grids. However, this integration requires additional layers of communications, both horizontal and vertical, which may substantially increase the potential cyber attack surfaces as well as escalate risks for wide-spread malfunctions of automation systems. The Mulit-layered Resilient Microgrid Networks project is an industry-academic collaboration between ABB, Duke Energy and the University of Illinois at Urbana-Champaign (UIUC) that has developed and demonstrated a cyber-physical resilient control and communication architecture for deployment of multiple microgrid networks, as well as retrofitting the existing distribution grids by increasing DER penetration levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cyber-physical Resilient Interoperable Microgrid Networks

The paper presents the results of an industry-academic collaboration between ABB, Duke Energy and the University of Illinois at Urbana-Champaign (UIUC) that has developed and demonstrated a cyberphysical resilient control and communication architecture for deployment of multiple microgrid networks, as well as retrofitting the existing distribution grids by increasing DER penetration levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Air Return Strategies and Airborne SARS-CoV-2

Dedicated ducted air return per zone for heating, ventilating, and air-conditioning (HVAC) systems is sometimes claimed to be a superior technique over plenum return strategy from the viewpoint of exposure reduction to airborne pathogens. While both the return strategies have advantages, there is limited evidence in the literature as to which strategy is superior merely from a standpoint of building vulnerability to airborne contaminants. We performed multizonal airborne contaminant dispersion modelling using CONTAM to simulate the overall building vulnerability to airborne SARS-CoV-2 aerosols when released in an office building and evaluated the two air return strategies. Results showed that for ducted returns, maintaining negative pressure in the release zone coupled with 100% outdoor air supply can greatly reduce overall building vulnerability. However, for a building maintained under a slight positive pressure and a recirculated air percentage as low as 31%, ducted returns do not necessarily outperform plenum returns in terms of overall building vulnerability to airborne pathogens. Building-specific details and factors that are not easily represented with multizone modelling are important, making general preferential statements for either strategy difficult to make. Insights from this study can guide new construction and retrofits of buildings both during and after the COVID-19 pandemic with the aim of safe re-occupancy of buildings while keeping the buildings resilient against potential future epidemics spread by airborne agents.

Shrestha, Prateek↗

Integrated and Advanced Lighting Controls: The Next Frontier in Energy Savings?

Lighting energy use has significantly declined as a portion of overall building energy usage due largely to the uptake of more efficient light-emitting diode technology. Although the per unit cost of lighting controls has declined, the installation and use of lighting controls are low and the installation and use of advanced controls are abysmally low. Increased use of advanced and connected lighting controls, and the ability to integrate lighting with other building systems (e.g., heat and air, plug loads, miscellaneous loads) that make the building “smarter,” offer the potential for additional energy savings. Studies into the performance of new, advanced lighting control technologies in commercial buildings have generated new findings. Although each field evaluation has interesting results individually, an analysis of their collective findings across a spectrum of commercial building types will help establish the current state of the technology and implications related to market readiness. This paper will analyze results from available field evaluation studies (recently completed as well as ongoing) of retrofit sites and share findings and insights including: • The amount of energy savings that may be expected from these systems. • Cost effectiveness, monetization, and cost points of these systems. • Ideal characteristics of these systems the most viable. • Lessons learned from the installation, commissioning, and occupant response of these systems. The results will support Department of Energy research investments and help inform efficiency programs of the potential of these emerging technologies and how they may fit within the clean energy future.

Myer, Michael↗

A Mechanical Test Frame for Property Evaluations at Cryogenic Temperature

On-board storage of hydrogen fuel has been designated as a limiting factor in the advancement of fuel cell technologies in the automotive industry. The use of cryo-compressed Type III pressure vessels presents one option to overcome this barrier. These multi-material vessels will be expected to perform at high pressure and extreme low temperatures, which creates a complex engineering design challenge. Many materials exhibit highly temperature-dependent properties, which must be considered for the efficient design of cryo-compressed pressure vessels. Complicating this issue, mechanical property data at cryogenic temperatures is sparse. This technical paper provides a description of a test apparatus commissioned specifically to help address this shortcoming. A mechanical test frame was retrofitted with a continuous flow cryostat capable to evaluate various mechanical properties throughout a broad temperature range of 25 °C to -269 °C with a load limit of 10 kN. An investigation of the thermomechanical properties of an epoxy resin was carried out as a demonstration.

Mechanical characterization, cryogenic pressure ve↗