An integrated systems-based approach to mercury research and technology development

A 3-year strategic planning process was undertaken in Oak Ridge, Tennessee, to develop a research and technology development approach that can help guide mercury remediation in East Fork Poplar Creek (EFPC). Mercury remediation is a high priority for the US Department of Energy s (DOE s) Oak Ridge Office of Environmental Management because of large historical losses of mercury to the environment at the Y-12 National Security Complex (Y-12). Because of the extent of mercury losses and the complexities of mercury transport and fate in the stream environment, the success of conventional options for mercury remediation in the downstream sections of EFPC is uncertain. The overall Oak Ridge mercury remediation strategy focuses on mercury treatment actions at Y-12 in the short-term and research and technology development to evaluate longer-term solutions in the downstream environment. The technology development strategy is consistent with a phased, adaptive management paradigm and DOE s Technology Readiness Level guidelines. That is, early evaluation includes literature review, site characterization, and small-scale studies of a broad number of potential technologies. As more information is gathered, technologies that may have the most promise and potential remediation benefit will be chosen for more extensive and larger-scale pilot testing before being considered for remedial implementation. Field and laboratory research in EFPC is providing an improved level of understanding of mercury transport and fate processes in EFPC that will inform the development of site-specific remedial technologies. Technology development has centered on developing strategies that can mitigate the primary factors affecting mercury risks in the stream: (1) the amount of inorganic mercury available to the stream system, (2) the conversion of inorganic mercury to methylmercury, and (3) the bioaccumulation of methylmercury through the food web. Given the downstream complexities and interdependencies between sources and processes in EFPC, no one task or approach is likely to solve the mercury problem in the creek, thus highlighting the importance of using an integrated, systems-based approach to develop remedial solutions.

Peterson, Mark J↗

3D Characterization and Time-Lapse Imaging of the Desiccation Treatability Test at the Hanford BC-Cribs and Trenches Site using High Performance Computing applied to Electrical Resistivity Imaging - 12271

Contaminated vadose zone materials are a potential source of long-term groundwater contamination at many sites across the Department of Energy (DOE) complex. Deep vadose zone contamination presents a particularly challenging remedial problem due to the difficultly of locating contaminants and the expense of access and ex situ treatment. In situ remediation techniques, whereby remedial amendments must be delivered to contaminated soils, have been identified as a potential alternative. However, amendment delivery is typically uncertain and post delivery remedial performance is often not well understood due to limited information available from sparsely spaced boreholes. Recent advancements in electrical resistivity tomography (ERT) are being used to address these challenges at the Hanford site by providing remote, three-dimensional images of contaminant distribution and four-dimensional (three spatial dimensions plus the time dimension) images of in-situ vadose zone remediation processes. These capabilities were recently demonstrated with a large scale surface characterization effort and during a smaller scale desiccation treatability test at the Hanford BC-Cribs area. The results of these efforts demonstrate the utility of leveraging high-performance computing resources to process ERT data for 3D reconnaissance mapping of subsurface contaminants and for detailed 3D monitoring of vadose zone remediation efforts. Two examples of ERT imaging at a former waste disposal facility have been demonstrated at different scales; a large scale reconnaissance survey spanning many hundreds of meters and a detailed monitoring application spanning a few tens of meters. Although ERT is applicable at many scales, resolution is generally governed by proximity to electrodes. For instance, the BCCT reconnaissance survey demonstrated herein lost resolution with depth (i.e. away from surface electrodes), and was unable to detect a high conductivity anomaly at approximately 75 m below ground surface in the cribs area; the deep anomalies were detected during highly focused borehole sampling. Conversely, the desiccation site characterization and monitoring demonstrated high resolution at a small scale, but only because of close proximity to survey electrodes. Although proximity to electrodes is not the only factor governing ERT resolution, it is often the primary factor for determining how an ERT system should be effectively deployed for a given application. Regardless of resolution limitations, the utility of ERT for remotely detecting wastes and monitoring subsurface processes is evident. ERT imaging is not a final detection or monitoring solution alone, but provides a necessary capability to remotely detect subsurface conditions and understand subsurface processes. Such a capability can significantly increase the efficacy and reduce the cost of remediation by guiding sampling efforts and informing remedial system design and operation. However, given the computational demands of 3D ERT characterization and monitoring inversions, the full imaging capability enabled by contemporary ERT survey systems can generally only be realized with high performance computing resources, both hardware and software. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternate Endpoints for Deep Vadose Zone Environments: Challenges, Opportunities, and Progress

Current requirements for site remediation and closure are standards-based and are often overly conservative, costly, and in some cases, technically impractical to achieve. Use of risk-informed alternate endpoints provide a means to achieve remediation goals that are permitted by regulations and are protective of human health and the environment. Alternate endpoints enable establishing a path for cleanup that may include intermediate remedial milestones and transition points and/or regulatory alternatives to standards-based remediation. A framework is presented that is centered around developing and refining conceptual models in conjunction with assessing risks and potential endpoints as part of a system-based assessment that integrates site data with scientific understanding of processes that control the distribution and transport of contaminants in the subsurface and pathways to receptors. This system based assessment and subsequent implementation of the remediation strategy with appropriate monitoring are targeted at providing a holistic approach to addressing risks to human health and the environment. This holistic approach also enables effective predictive analysis of contaminant behavior to provide defensible criteria and data for making long-term decisions. Developing and implementing an alternate endpoint-based approach for remediation and waste site closure presents a number of challenges and opportunities. Categories of these challenges include scientific and technical, regulatory, institutional, and budget and resource allocation issues. Opportunities exist for developing and implementing systems-based approaches with respect to supportive characterization, monitoring, predictive modeling, and remediation approaches.

endpoints↗

Hydraulic Containment of TCE Contaminated Groundwater at the DOE Portsmouth Gaseous Diffusion Plant

This paper will describe the progress of a groundwater remedial action at the Portsmouth Gaseous Diffusion Plant (PORTS), a Department of Energy (DOE) facility that enriched uranium from the early 1950's until 2000. The X-749 southern boundary hydraulic containment system, combining a four-well extraction system with a previously constructed subsurface barrier wall, has been employed at PORTS. The hydraulic containment project has been implemented as part of containment and remediation of the X-749/X-120 area trichloroethylene (TCE) contaminant. The X-749/X-120 groundwater contaminant plume is located in the south central section (Quadrant I) of the PORTS facility. The plume is associated with the former X-120 Goodyear Training Facility and a landfill known as the X-749 Contaminated Materials Disposal Facility. The principal contaminants of concern are chlorinated solvents (primarily TCE) and technetium-99 (Tc-99). A subsurface barrier wall (X-749 South Barrier Wall) was completed in 1994 at the PORTS southern reservation boundary as an interim remedial measure to slow the advancement of the leading edge of the contaminated groundwater plume or to prevent the plume from migrating off DOE property. Remedial measures identified by Ohio Environmental Protection Agency (Ohio EPA) included installation of a barrier wall around the eastern and southern portions of the X-749 landfill to provide source control and installation of a phyto-remediation system to help contain groundwater flow and remove volatile organic compounds. Previous remedial measures that were implemented as elements of 'closures' on the X-749 landfill included a multimedia cap, barrier walls, and a groundwater collection system. Despite these measures, the X-749/X-120 groundwater plume has migrated beyond the southern DOE property boundary. Current TCE concentrations in off-site groundwater monitoring wells are below the preliminary remediation goal and drinking water maximum contaminant level for TCE of 5 {mu}g/kg, but continue to increase. Hydraulic containment was selected as the method for controlling the plume at the southern DOE property boundary. Recent borings and pumping tests indicate that approximately a 400-foot section of the existing subsurface barrier wall near the DOE property boundary may been improperly keyed into the Sunbury Shale bedrock which underlies the unconsolidated uppermost Gallia sand and gravel aquifer (Gallia). This gap is reported to be as much as 4 vertical feet. In addition, the X-749 groundwater plume is migrating around the western end of the X-749 South Barrier Wall. Four groundwater extraction wells were installed at the DOE property boundary to provide hydraulic control of the plume currently flowing under and around the existing subsurface barrier wall. Placement of the new extraction wells was based on groundwater modeling and data collected from pumping tests in the area. The extracted groundwater is being sent to the on-site X-622 Groundwater Treatment Facility via subsurface piping. The hydraulic containment system began operation in June 2007. The preliminary water elevations from monitoring wells in the vicinity of two of the four extraction wells demonstrate a significant decrease in groundwater potentiometric head in the southern boundary area. The current extraction rates should be adequate to contain the leading edge of the contaminant plume. Monitoring wells in the area will continue to be sampled on a quarterly basis. (authors)

54 ENVIRONMENTAL SCIENCES↗

Alternate Endpoints for Deep Vadose Zone Environments: Challenges, Opportunities, and Progress - 13036

Current requirements for site remediation and closure are standards-based and are often overly conservative, costly, and in some cases, technically impractical to achieve. Use of risk-informed alternate endpoints provide a means to achieve remediation goals that are permitted by regulations and are protective of human health and the environment. Alternate endpoints enable establishing a path for cleanup that may include intermediate remedial milestones and transition points and/or regulatory alternatives to standards-based remediation. A framework is presented that is centered around developing and refining conceptual models in conjunction with assessing risks and potential endpoints as part of a system-based assessment that integrates site data with scientific understanding of processes that control the distribution and transport of contaminants in the subsurface and pathways to receptors. This system-based assessment and subsequent implementation of the remediation strategy with appropriate monitoring are targeted at providing a holistic approach to addressing risks to human health and the environment. This holistic approach also enables effective predictive analysis of contaminant behavior to provide defensible criteria and data for making long-term decisions. Developing and implementing an alternate endpoint-based approach for remediation and waste site closure presents a number of challenges and opportunities. Categories of these challenges include scientific and technical, regulatory, institutional, and budget and resource allocation issues. Opportunities exist for developing and implementing systems-based approaches with respect to supportive characterization, monitoring, predictive modeling, and remediation approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contaminated Soil Volume Estimation at the Maywood Site - 12292

As part of the ongoing remediation process at the Maywood Formerly Utilized Sites Remedial Action Program properties, Argonne National Laboratory assisted the U.S. Army Corps of Engineers (USACE) New York District in revising contaminated soil volume estimates for the remaining areas of the Stepan/Sears properties that require soil remediation. As part of the volume estimation process, an initial conceptual site model (ICSM) was prepared for the entire site that captured existing information (with the exception of soil sampling results) pertinent to the possible location of surface and subsurface contamination above cleanup requirements. This ICSM was based on historical anecdotal information, aerial photographs, and the logs from several hundred soil cores that identified the depth of fill material and the depth to bedrock under the site. Specialized geostatistical software developed by Argonne was used to update the ICSM with historical sampling results and down-hole gamma survey information for hundreds of soil core locations; both sampling results and down-hole gamma data were coded to identify whether the results indicated the presence of contamination above site cleanup requirements. Significant effort was invested in developing complete electronic data sets for the site by incorporating data contained in various scanned documents, maps, etc. The updating process yielded both a best guess estimate of contamination volumes and upper and lower bounds on the volume estimate that reflected the estimate's uncertainty. The site-wide contaminated volume estimate (with associated uncertainty) was adjusted to reflect areas where remediation was complete; the result was a revised estimate of the remaining soil volumes requiring remediation that the USACE could use for planning. Other environmental projects may benefit from this process for estimating the volume of contaminated soil. A comparison of sample and DHG results for various stations with the site ICSM provides one measure of the quality of site understanding relative to the presence of contamination and its likely extent. A second measure of the quality of a contaminated soil volume estimate, in the case of BAASS, is a comparison of the best guess volume estimate with the conservative volume estimate. For Maywood, the conservative volume estimate is more than double the best guess. The data available for the site indicate that the preponderance of this difference is attributable to uncertainty about the exact depth of known contamination. The observed depth of contamination based on sample results and DHG data often varied significantly among adjacent soil cores. In the case of Maywood, where a significant amount of remediation has already taken place, a third measure of the quality of the volume estimates is the retrospective estimate of contaminated soil volumes for areas that have already been remediated [2]. The USACE is currently comparing the latest BAASS volume estimates for those areas with records indicating what was actually removed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Russian-Norwegian Cooperation In Regulation of the Public Radiation Protection in the Northwest Russia - 12440

In 1960's, the large technical bases of the Northern Fleet were arranged on the Kola Peninsula. These bases were involved in support of nuclear submarines performing acceptance and storage of radioactive waste (RW) and spent nuclear fuel (SNF). Since 1985, the waste acceptance has been stopped and the technical bases changed their functions to serve as sites of temporary storage (STS). According to the RF Government Directive of 09 February 2000 No 220-r, the STS were put under Rosatom responsibility in order to conduct operations dealing with the SNF and RW management being accumulated during the naval activity and originated from dismantlement of nuclear submarines and surface ships equipped with nuclear powered installations, as well as to carry out environmental remediation of radiation hazardous facilities in this region. The international collaborative assistance is very important to increase effectiveness of such works. This paper includes the findings of cooperation between the Federal Medical Biological Agency (FMBA) and Norwegian Radiation Protection Authority (NRPA) in radiation protection of the public in the course of the STS remediation. Since 2004, the following works has been carried out in this direction: - radiation threat assessment and identification of the priority directions of radiation and hygienic studies; - radiation situation inspections on-site and within the coastal offshore waters at different stage of remediation; - development of the documents including the criteria for the STS remediation and guidelines for radiation monitoring to control the mentioned criteria compliance; - development of the radio-ecological geo-information system. The developed criteria consider four basic options of the STS remediation - renovation, conversion, conservation and liquidation. The main (dose) and derived remediation levels have been determined for each option. The resulted from monitoring radiation parameters - including contents of {sup 137}Cs, {sup 90}Sr and {sup 60}Co in samples of soil, vegetation, seawater, seaweeds, bottom sediments, invertebrates and vertebrates, gamma dose rate values - are integrated in the database, which is the component of the geo-information system. The developed regulative and methodical documents and the geo-information system have been introduced in Regional Management-120 under FMBA of Russia, which is responsible for the radiation safety supervision, Centre of Hygiene and Epidemiology-120 under FMBA of Russia, which carries out regulatory radiation control, and in the operating organization involved in the STS remediation and responsible for radiation protection of workers and public. The works completed have permitted to solve the majority of problems in enhancement of radiation and hygienic supervision of SevRAO operation. However, some relevant questions in this area need additional efforts. In particular, in the course of specification of the design solutions, obtaining additional data on the radiation situation parameters and clarification of the prognostic assessments, the necessity will certainly arise to amend the regulatory documents taking the adopted design solutions into account. We are on the way to real results. Much has been done for the first time, and although it is difficult to foresee all future problems and challenges, our knowledge, experience and close cooperation permit to assess the prospects confidently. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Launching a Research Archive for FUSRAP Site Records - 17057

The US Department of Energy Office of Legacy Management (LM) maintains a broad set of Formerly Utilized Sites Remedial Action Program (FUSRAP) document collections. The LM FUSRAP technical staff regularly needs access to documents contained in these record collections. The majority of the FUSRAP records are maintained in a large paper-based collection in the LM records storage facility. These records cover the period prior to 1997 in which DOE was responsible for the remediation efforts of FUSRAP sites. Other FUSRAP records are maintained as PDF files in LM's record keeping system. LM also maintains FUSRAP information in reference repositories in SharePoint directories and on network drives. The reference collection allows LM to keep abreast of active site remediation by the U.S. Army Corps of Engineers (USACE) since 1997. Searching these FUSRAP collections in its current arrangement can be time-consuming and can result in incomplete searches. In response, LM proactively developed the FUSRAP Document Information System (FDIS) to provide a rapid, single-point search and retrieval system to provide real-time access to reference copies of FUSRAP documents. Each entry in FDIS includes metadata listing the FUSRAP site, document title, date, source collection, and pertinent keywords. More significant entries (e.g., certification documents, site characterization reports, waste manifests) include a PDF scan of the entire document. Each PDF file is processed using an advanced optical character recognition (OCR) tool. The first significant content added to FDIS is 45,000 entries documenting remediation work performed primarily in the early 1990's by Bechtel National, Inc. With the entries in FDIS, technical staff will be able to search the collection by site, category and keyword to quickly locate precise required content. LM records staff are also adding records that document remediation and monitoring work at FUSRAP sites where cleanup activities are considered complete. Documents for completed FUSRAP sites will be processed before documents for sites currently being remediated. In the future, FDIS will be populated with information about FUSRAP sites with ongoing remediation work as they are released to LM stewardship. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment of Pump-and-Treat Systems

Pump-and-treat (P&T) is a widely applied remedy for groundwater remediation at many types of sites for multiple types of contaminants. Decisions regarding major changes in the remediation approach are an important element of environmental remediation management for a site using P&T. While existing guidance documents provide information on design, operation, and optimization for P&T systems, these documents do not provide specific technical guidance to support remedy decisions regarding when to transition to a new remedy or to initiate closure of the P&T remedy. A structured approach for P&T performance assessment was developed and is described herein, using analysis of three example P&T systems. These examples highlight key aspects of the performance assessment decision logic and represent assessment outcomes associated with optimizing the P&T system, transitioning from P&T to natural attenuation, and supplementing P&T with another technology to hasten transition to natural attenuation.

54 ENVIRONMENTAL SCIENCES↗

Decommissioning of the Hematite Former Fuel Cycle Facility using a decision flow logic based work control process

The remediation and decommissioning of the Hematite Former Fuel Cycle Facility (FFCF), the Hematite Facility, is currently being carried out by Westinghouse Electric Company LLC under the Hematite Decommissioning Project (HDP). The Hematite Facility is located near the town of Hematite, Missouri, USA. The Hematite Facility consists of 228 acres of land with primary operations historically being conducted within the central portion of the property that is roughly 10 acres including Burial Pits and the Site Pond area. Decommissioning and remediation activities are being performed with the eventual objective of the release of the property. Primary contaminants include the legacy disposal and contamination of natural and enriched uranium from the nuclear fuel cycle, as well as chemicals used during the facility operations. Two major regulatory bodies, the U.S. Nuclear Regulatory Commission (NRC) and the Missouri Department of Natural Resources (MDNR), provide critical roles in the approval and oversight of the current regulatory path to remediation, decommissioning and eventual release. Further, remediation and decommissioning activities are performed under the implementing policies, plans, and procedures under the Hematite Decommissioning Plan (DP) and the Record of Decision (ROD). Remediation and decommissioning tasks at the Hematite Former Fuel Cycle Facility, referred to as the Hematite Facility, are performed against a disciplined decision logic flow that applies accumulated technical and monitoring data to determine each step of the excavation, exhumation, and removal of wastes from the Burial Pits and the remaining Areas of Concern (AOC). Decision flow logic is based upon the nuclear criticality safety controls and threshold conditions, relative level of radioactive and chemical contamination, security protocol, and final waste stream disposition. The end result is to remediate the residual radioactive and chemical contamination to approved dose-based and risk-based cleanup criteria as negotiated with U.S. Federal and State Regulators. The purpose of the paper is to provide a summary of the successful implementation of the decision flow logic to the remediation and decommissioning tasks performed to date. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of groundwater monitoring at Everest, Kansas, in April 2008.

On September 7, 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) presented a Scoping Memo (Argonne 2005) for preliminary consideration by the Kansas Department of Health and Environment (KDHE), suggesting possible remedial options for the carbon tetrachloride contamination in groundwater at Everest, Kansas. The suggested approaches were discussed by representatives of the KDHE, the CCC/USDA, and Argonne at the KDHE office in Topeka on September 8-9, 2005, along with other technical and logistic issues related to the Everest site. In response to these discussions, the KDHE recommended (KDHE 2005) evaluation of several remedial processes, either alone or in combination, as part of a Corrective Action Study (CAS) for Everest. The primary remedial processes suggested by the KDHE were the following: Hydraulic control by groundwater extraction with aboveground treatment; Air sparging (AS) coupled with soil vapor extraction (SVE) in large-diameter boreholes (LDBs); and Phytoremediation. As a further outcome of the 2005 meeting and as a precursor to development of a possible CAS, the CCC/USDA completed the following supplemental investigations at Everest to address several specific technical concerns discussed with the KDHE: (1) Construction of interpretive cross sections at strategic locations selected by the KDHE along the main plume migration pathway, to depict the hydrogeologic characteristics affecting groundwater flow and contaminant movement (Argonne 2006a). (2) A field investigation in early 2006 (Argonne 2006b), as follows: (a) Installation and testing of a production well and associated observation points, at locations approved by the KDHE, to determine the response of the Everest aquifer to groundwater extraction near the Nigh property. (b) Groundwater sampling for the analysis of volatile organic compounds (VOCs) and the installation of additional permanent monitoring points at locations selected by the KDHE, to further constrain the existing contaminant plume. (c) Resampling of all existing permanent monitoring points for VOCs and biodegradation parameter analyses, at the request of the KDHE. On the basis of these studies (Argonne 2006a,b) and the CCC/USDA's past investigations at Everest (Argonne 2006c), the CCC/USDA concluded that groundwater extraction is not an effective remedial option for the main body of the groundwater plume, and the KDHE concurred (KDHE 2006); the KDHE later noted, however (KDHE 2007a), that this and other technologies might represent viable remedial options in the event of further downgradient migration of the plume toward the intermittent creek. In February 2007, the CCC/USDA presented preliminary analyses of (1) the AS-SVE remedial alternative, incorporating the use of LDBs, and (2) the risks to human health and the environment posed by the observed carbon tetrachloride plume in groundwater (Argonne 2007a). The results of these analyses demonstrated the following: (1) Neither groundwater extraction nor AS-SVE in LDBs represents a practical approach for effective remediation of the groundwater contamination at Everest (near the Nigh property). (2) Periodic sampling and analyses for VOCs conducted by the CCC/USDA documented that the areal extent and range of carbon tetrachloride concentrations detected in the groundwater plume at Everest had changed relatively little from 2000 to 2006. (3) Estimates of groundwater flow and contaminant migration times, based on the hydrogeologic properties of the groundwater flow system identified at Everest (Argonne 2003, 2006b,c), indicated that, at minimum, approximately 4 years would be required for the carbon tetrachloride plume (in the subsurface) to reach the vicinity of the intermittent creek directly west of the Nigh property, and more than 20 years would be required for the contamination to reach the identified groundwater discharge area southwest of the Nigh property. (4) The existing (January-March 2006) plume posed no immediate danger of contamination to the surface waters of the intermittent creek. In light of these observations, the CCC/USDA proposed a phased program--over approximately 2-3 years--of groundwater sampling, surface water sampling, and related monitoring activities at Everest to (1) identify locations where a phytoremediation system would be effective and determine that area's extent and (2) support the potential development of a phytoremediation treatment alternative for the site. The recommended elements of the monitoring program are summarized in Table 1.1. In conjunction with this program, both the CCC/USDA and the KDHE recommended the construction of several new monitoring wells, at locations along and near the intermittent creek west of the Nigh property (Argonne 2007b; KDHE 2007b).

54 ENVIRONMENTAL SCIENCES↗

Bioremediation of a Large Chlorinated Solvent Plume, Dover AFB, DE

Bioremediation of a Large Chlorinated Solvent Plume, Dover AFB, DE Aleisa Bloom, (Oak Ridge National Laboratory, Oak Ridge, Tennessee, USA) Robert Lyon (bob.lyon@aecom.com), Laurie Stenberg, and Holly Brown (AECOM, Germantown, Maryland, USA) ABSTRACT: Past disposal practices at Dover Air Force Base (AFB), Delaware, created a large solvent plume called Area 6 (about 1 mile long, 2,000 feet wide, and 345 acres). The main contaminants are PCE, TCE, and their degradation products. The remedy is in-situ accelerated anaerobic bioremediation (AAB). AAB started in 2006 and is focusing on source areas and downgradient plume cores. Direct-push injections occurred in source areas where contamination is typically between 5 and 20 feet below ground surface. Lower concentration dissolved-phased contamination is present downgradient at 35 and 50 feet below ground surface. Here, permanent injection/extraction wells installed in transects perpendicular to the flow of groundwater are used to apply AAB. The AAB substrate is a mix of sodium lactate, emulsified vegetable oil, and nutrients. After eight years, dissolved contaminant mass within the main 80-acre treatment area has been reduced by over 98 percent. This successful application of AAB has stopped the flux of contaminants to the more distal portions of the plume. While more time is needed for effects to be seen in the distal plume, AAB injections will soon cease, and the remedy will transition to natural attenuation. INTRODUCTION Oak Ridge National Laboratory Environmental Science Division (ORNL) and AECOM (formerly URS Corporation) have successfully implemented in situ accelerated anaerobic bioremediation (AAB) to remediate chlorinated solvent contamination in a large, multi-sourced groundwater plume at Dover Air Force Base (AFB). AAB has resulted in significant reductions of dissolved phase chlorinated solvent concentrations. This plume, called Area 6, was originally over 1 mile in length and over 2,000 feet wide (Figure 1). It originated from at least four separate source areas that comingled in the subsurface to form the large plume. The major contaminants of concern (COCs) are tetrachloroethene (PCE), trichloroethene (TCE), and 1,1,1-trichloroethane (1,1,1-TCA), which were historically used for degreasing operations in the maintenance of aircraft and support vehicles. Relatively small areas of elevated PCE, TCE, and 1,1,1-TCA were delineated in the shallow portion of the water table aquifer by direct-push groundwater sampling. Focused direct-push AAB treatment occurred in March 2006 at these source areas (Figure 1). Downgradient of the these areas and deeper in the aquifer, AAB treatment was implemented using rows of extraction/injection wells oriented perpendicular to groundwater flow to create multiple reductive zones across the plume cores, defined as areas where more than 1,000 micrograms per liter (ug/L) total solvent concentrations were present. Initial indications of successful degradation were observed within 6 months of starting injections. FIGURE 1. Dover AFB Area 6 plume. This paper describes the AAB implementation and progress of remediation after 8 years of treatment and periodic groundwater monitoring. SITE LITHOLOGY Contamination at the site is limited to the surficial aquifer, which consists of 35 to 50 feet (ft) (11 to 15 meters [m]) of unconsolidated Pleistocene deposits of the Columbia Formation. The Columbia Formation consists of fine to coarse sand with silt and clay lenses and less common gravel lenses. Silts and silty sands are generally encountered to a depth of 10 to 12 ft (3.05 to 3.65 m) below ground surface (bgs) and grade to medium- and coarse-grained sands to a depth of 35 to 50 ft (11 to 15 m) bgs. There is a clay and silt unit (part of the Calvert Formation) below the surficial aquifer that acts as an aquitard to the downward migration of contaminants. The depth to the water table varies across the site but usually ranges from 8 to 15 ft (2.4 to 4.5 m) bgs in the treatment area. REMEDIAL APPROACH AND OPERATIONS Because the Columbia Aquifer is used as a source of potable water off base, the remedial goal is to restore the aquifer to usable condition, i.e., reduce all chemicals of concern to below drinking water maximum contaminant levels (MCLs). To achieve this goal, AAB was selected as the best remedial alternative to reduce the solvent contamination. Source areas with high solvent concentrations were present in the shallow portion of the aquifer. From the source areas, dissolved solvents migrated downgradient and deeper in the aquifer with the flow of groundwater. In the deeper portion of the aquifer, the individual plumes comingle to form the larger Area 6 Plume, which covers approximately 345 acres. Types of Substrate. Previous AAB pilot tests at Dover AFB used either sodium lactate or emulsified vegetable oil (EVO) as substrates to stimulate microbial growth. The best results were obtained with...

Bloom, Aleisa C↗

Bioavailable soil Pb minimized by in situ transformation to plumbojarosite

Exposure to lead (Pb) during early life has persistent adverse health effects. During childhood, ingestion of bioavailable Pb in contaminated soils can be a major route of Pb absorption. Remediation to alter physiochemical properties of soil-borne Pb can reduce Pb bioavailability. Our laboratory-based approach for soil Pb remediation uses addition of iron (Fe) sulfate and application of heat to promote formation of plumbojarosite (PLJ), a sparingly soluble Pb-Fe hydroxysulfate mineral. We treated two soils with anthropogenic Pb contamination and samples of clean topsoil spiked with various Pb compounds (i.e., carbonate, chloride, phosphate [P], or sulfate) to convert native Pb species to PLJ and used a mouse assay to assess relative bioavailability (RBA) of Pb in untreated (U) and remediated soils. Bone and blood Pb levels were significantly lower (P < 0.001, Student's t test) in mice that consumed diets amended with remediated soils than with U soils. Estimated RBA for Pb in both remediated natural soils and Pb-mineral spiked soils were reduced by >90% relative to Pb RBA for U soils, which is substantially more effective than other soil amendments, including P. X-ray absorption spectroscopy showed that >90% of all Pb species in remediated soils were converted to PLJ, and ingested PLJ was not chemically transformed during gastrointestinal tract transit. Post treatment neutralization of soil pH did not affect PLJ stability, indicating the feasibility in field conditions. These results suggest that formation of PLJ in contaminated soils can reduce the RBA of Pb and minimize this medium’s role as a source of Pb exposure for young children.

59 BASIC BIOLOGICAL SCIENCES↗

Time-Lapse Electrical Geophysical Monitoring of Amendment-Based Biostimulation

Biostimulation is increasingly used to accelerate microbial remediation of recalcitrant groundwater contaminants. Effective application of biostimulation requires successful emplacement of amendment in the contaminant target zone. Verification of remediation performance requires postemplacement assessment and contaminant monitoring. Sampling based approaches are expensive and provide low-density spatial and temporal information. Time-lapse electrical resistivity tomography (ERT) is an effective geophysical method for determining temporal changes in subsurface electrical conductivity. Because remedial amendments and biostimulation-related biogeochemical processes often change subsurface electrical conductivity, ERT can complement and enhance sampling-based approaches for assessing emplacement and monitoring biostimulation-based remediation. Field studies demonstrating the ability of time-lapse ERT to monitor amendment emplacement and behavior were performed during a biostimulation remediation effort conducted at the Department of Defense Reutilization and Marketing Office (DRMO) Yard, in Brandywine, Maryland, United States. Geochemical fluid sampling was used to calibrate a petrophysical relation in order to predict groundwater indicators of amendment distribution. The petrophysical relations were field validated by comparing predictions to sequestered fluid sample results, thus demonstrating the potential of electrical geophysics for quantitative assessment of amendment-related geochemical properties. Crosshole radar zero-offset profile and borehole geophysical logging were also performed to augment the data set and validate interpretation. In addition to delineating amendment transport in the first 10 months after emplacement, the time-lapse ERT results show later changes in bulk electrical properties interpreted as mineral precipitation. Results support the use of more cost-effective surfacebased ERT in conjunction with limited field sampling to improve spatial and temporal monitoring of amendment emplacement and remediation performance.

amendment↗

Area Completion Strategies at Savannah River Site: Characterization for Closure and Beyond

During the first four decades of its 56 year existence, the Savannah River Site (SRS) was a key supplier of nuclear material for national defense. During the 1990's, the site's primary missions became waste site closure, environmental restoration, and deactivation and decommissioning (D and D) of remnant cold war apparatus. Since 1989, with the approval of State and Federal regulatory agencies and with the participation of interested stakeholders, SRS has implemented a final remedy for a majority of the more than 500 individual waste sites at the former nuclear materials complex. These waste sites range from small, inert rubble pits to large, heavy industrial areas and radioactive waste disposal grounds. The closure and final remediation of these waste sites mark significant progress toward achieving SRS's overarching goal of reducing or eliminating future environmental damage and human health threats. However, larger challenges remain. For example, what are appropriate and achievable end-states for decommissioned nuclear facilities? What environmental and human health risks are associated with these end-states? To answer these questions within the strictures of smaller budgets and accelerated schedules, SRS is implementing an 'area completion' strategy that: - unites several discrete waste units into one conceptual model, - integrates historically disparate environmental characterization and D and D activities - reduces the number of required regulatory documents, - and, in some cases, compresses schedules for achieving a stakeholder-approved end-state. The area completion approaches being implemented at SRS reflect an evolution of the traditional RCRA/ CERCLA remedial process. Area completion strategies: - group waste units and/or D and D facilities together for characterization, remediation, and possible reuse; - identify data needs and integrate data collection activities for D and D, characterization, and remediation; - identify problems that require action and match areas of concern with appropriate likely responses based on anticipated land use and end-states; - streamline the regulatory process and reduce the number of required regulatory documents; - and accelerate remedial and D and D decisions and reduce project costs versus the traditional 'piecemeal' approach. These strategies are achieving faster, more responsible, and less expensive solutions to managing the Cold War legacy while assuring protection of human and ecological receptors and future industrial workers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Fernald Closure Project: Lessons Learned

For nearly 37 years, the U.S. Department of Energy site at Fernald - near Cincinnati, Ohio - produced 230,000 metric tons (250,000 short tons) of high-purity, low-enriched uranium for the U.S. Defense Program, generating more than 5.4 million metric tons (6 million short tons) of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion mega environmental-remediation project that was completed in October 2006. Project evolved through four phases: - Conducting remedial-investigation studies to determine the extent of damage to the environment and groundwater at, and adjacent to, the production facilities; - Selecting cleanup criteria - final end states that had to be met that protect human health and the environment; - Selecting and implementing the remedial actions to meet the cleanup goals; - Executing the work in a safe, compliant and cost-effective manner. In the early stages of the project, there were strained relationships - in fact total distrust - between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholders groups in the decision-making process, the DOE and Fluor developed a public-participation strategy to open the channels of communication with the various parties: site leadership, technical staff and regulators. This approach proved invaluable to the success of the project, which has become a model for future environmental remediation projects. This paper will summarize the history and shares lessons learned: the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies achieved. Lessons learned fall into ten categories: - Regulatory approach with end-state determinations; - Interaction with stakeholders; - The balanced approach - on-site and off-site waste-disposal alternatives; - The contracting model; - Site safety performance; - Effectiveness of cleanup remedies; - Worker training and transition; - Client interface; - Cost and schedule performance; - Legacy management. Lessons learned can be applied: While each site and project has its own issues, the various lessons learned from the Fernald Closure Project, when taken from a global perspective, can be applied to similar efforts so that pitfalls are avoided and efficiencies realized.

54 ENVIRONMENTAL SCIENCES↗

Closeout of the Melton Valley Completion Project at the Oak Ridge National Laboratory

The U.S. Department of Energy DOE Order 413.3A (Program and Project Management for the Acquisition of Capital Assets) identifies major milestones in a project life cycle that require approval upon achievement, including Critical Decision-4 (CD-4), the project completion milestone. A CD-4 document is required for all DOE projects in accordance with DOE Order 413.3A, Program and Project Management for Acquisition of Capital Assets. A conditional CD-4 report was prepared for the Melton Valley Completion Project (MVCP) in order to document the completion of the remedial action in the Melton Valley watershed. Approval of the MVCP CD-4 was 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in one of the waste trenches that were to be remediated as part of the completion project. This paper will provide an overview of the MVCP remediation work and the process successfully used to demonstrate closeout of a major CERCLA project in accordance with DOE requirements. In summary: The MV ROD was planned to be completed in 12 years; however, under the ACP the remedial activities were completed 6 years ahead of schedule (September 2006). Highlights of the remedial actions include: - Completion of remedial action activities at 219 release sites identified in the MV ROD. - Construction of 58 hectares of multilayer caps for SWSA 4, SWSA 5, SWSA 6, Pits 2, 3 and 4 and Trenches 5, 6, and 7; - Complete excavation, retrieval and over-pack of 204 casks, 8 boxes, and 530 m{sup 3} of loose waste from the TRU waste retrieval project; - Complete demolition and disposition of approx. 557 m{sup 2} of various buildings such as HRE ancillary facilities, NHF, Liquid LLW pumping stations, 7841 Scrap Yard, misc. storage buildings, and well P and A; - Removal of LLW sludges and stabilization of T-1, T-2, and HFIR tanks; - In situ grouting/stabilization of approx. 12 km of inactive waste pipelines; - Excavation and disposition of approx. 38,000 m{sup 3} of soil from HFIR impoundments, HRE cryogenic pond, IHP and contaminated soil from miscellaneous leak sites; - Completion of in-situ grouting of LLLW matrix at Trenches 5 and 7. The CD-4 document to demonstrate attainment of the project completion milestone was prepared to document close-out activities. Approval of the MVCP CD-4 was obtained but deemed 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in Trench 13 of the 22 Trench Area in SWSA 5N. DOE is currently evaluating options for the final disposition of this material and has committed to resolution of the issue by the end of Fiscal Year 2008. At that time, all aspects of the Melton Valley Completion Project will be complete. (authors)