Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

HPC - Facilities Penta

Strategy, Planning, Acquiring- very large scale computing require very large physical infrastructures, pipes, pumps, power, etc. Planning and acquiring $25M+ infrastructure projects and bringing in more power to the county takes a lot of long lead time / planning. Integration- New physical infrastructure must be integrated into our buildings, with the LANL site power and water systems, with existing infrastructure, and with the machines. Very large physical infrastructure projects are necessary. Management and Utilization – Ongoing operations, monitoring, maintenance, and trouble shooting of the physical infrastructure is required.

Computer Hardware↗

Incorporating climate change into risk-informed resilience planning

In response to the development of portfolio-wide Climate Action Plans by federal agencies, federal sites are working to incorporate the impacts of climate change into their resilience assessments. However, it can be challenging to incorporate climate change scenarios into resilience assessments given the uncertainty inherent in climate change modeling. Incorporating these factors into a resilience plan requires an understanding of what the different climate scenarios mean, as well as how to estimate potential impacts of climate change on hazard occurrence on a regional, or even local, scale under different scenarios. We discuss approaches to incorporating this data into risk-informed resilience assessment processes, such as those implemented in the Department of Energy’s (DOE) Federal Energy Management Program’s (FEMP) Technical Resilience Navigator (TRN) and the Sustainability Performance Division’s (SPD) Vulnerability Assessment and Resilience Plan (VARP) Risk Assessment Tool. We also describe the climate scenarios and the availability of hazard data for site resilience planning, based on modeling included in the International Panel on Climate Change (IPCC), the National Climate Assessment (NCA), and state-level reports. We present examples from the TRN risk assessment and the VARP Risk Assessment Tool to illustrate how sensitivity analysis can be used to incorporate climate change projections into the resilience planning process.

Rabinowitz, Hannah S.↗

Environmental Biosciences Program Quarterly Report

Current research projects have focused Environmental Biosciences Program (EBP) talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene, low-dose ionizing radiation (gamma and neutron) and alpha radiation from plutonium. Trichloroethylene research has been conducted as a joint collaborative effort with the University of Georgia. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the United States Department of Energy (DOE). Laboratory work has been completed on several trichloroethylene risk assessment projects, and these projects have been brought to a close. Plans for restructuring the performance schedule of the remaining trichloroethylene projects have been submitted to the department. A comprehensive manuscript on the scientific basis of trichloroethylene risk assessment is in preparation. Work on the low-dose radiation risk assessment projects is also progressing at a slowed rate as a result of funding uncertainties. It has been necessary to restructure the proponency and performance schedule of these projects, with the project on Low-Dose Radiation: Epidemiology Risk Models transferred to DOE Office of Science proponency under a separate funding instrument. Research on this project will continue under the provisions of the DOE Office of Science funding instrument, with progress reported in accordance with the requirements of that funding instrument. Progress on that project will no longer be reported in quarterly reports for DE-FC09-02CH11109. Following a meeting at the Savannah River Site on May 8, 2008, a plan was submitted for development of an epidemiological cohort study and prospective medical surveillance system for the assessment of disease rates among workers at the Savannah River Site (SRS). This project will be incorporated into the ongoing project on Population Health Risks in the Vicinity of the Savannah River Site. During a meeting at the SRS on October 21, 2008, a presentation was made on EBP participation in the development and operation of an Epidemiology Consortium at the SRS. A follow-up meeting with SRS officials is planned for 29 and 30 January 2009 at Medical University of South Carolina (MUSC).An epidemiology project on population health risk assessment is being conducted to assess health risks among populations in the vicinity of the SRS. This project is using the capabilities of the EBP GIS for the geographical assessment of cancer and non-cancer disease rates, as well as the potential association of population health risks with environmental exposures. Although funding uncertainties have slowed progress on some aspects of this project, it has not been necessary to restructure the performance schedule to date.

54 ENVIRONMENTAL SCIENCES↗

Columbia River Treaty 2014/2024 Review: Phase 1 Technical Studies

Since 1964, the Columbia River Treaty has provided significant benefits to the United States and Canada through coordinated river management by the two countries. It remains the standard against which other international water coordination agreements around the world are compared. When the Treaty was negotiated, its goals were to provide significant flood control and power generation benefits to both countries. However, the Treaty contains two provisions that may significantly change these benefits as early as the year 2024. First, in 2024 the 60 years of purchased flood control space in Canadian Treaty projects expires. Instead of a coordinated and managed plan to regulate both Canadian and U.S. projects for flood control, the Treaty calls for a shift to a Canadian operation under which the United States can call upon Canada for flood control assistance. The United States can request this “called upon” assistance as needed but only to the extent necessary to meet forecast flood control needs in the United States that cannot adequately be met by U.S. projects. When called upon is requested, the United States will then have to pay Canada for its operational costs and any economic losses resulting from the called upon flood control operation. Second, while the Treaty has no specified end date, it does allow either Canada or the United States the option to terminate most of the provisions of the Treaty on or after Sept. 16, 2024, with a minimum of 10 years advance written notice. Thus, the year 2024 is the first year a notice of termination would take effect assuming written notice of termination is given by the Canadian or U.S. governments by 2014. Unless the Treaty is terminated or the federal governments elect to modify the Treaty, its provisions continue indefinitely, except for the changes in flood control discussed above. Given the significance of both of these provisions, it is important that the parties to the Treaty understand the implications for post-2024 Treaty planning and Columbia River operations. The U.S. Army Corps of Engineers and the Bonneville Power Administration, the agencies that implement the Treaty in the United States on behalf of the U.S. Entity (see Treaty Governance sidebar), are conducting a multi-year effort to understand these implications. This effort is called the 2014/2024 Columbia River Treaty Review.

Columbia River Treaty, United States, Canada, tech↗

Multi-scale impacts of climate change on hydropower for long-term water-energy planning in the contiguous United States

Climate change impacts on watersheds can potentially exacerbate water scarcity issues where water serves multiple purposes including hydropower. The long-term management of water and energy resources is still mostly approached in a siloed manner at different basins or watersheds, failing to consider the potential impacts that may concurrently affect many regions at once. There is a need for a large-scale hydropower modeling framework that can examine climate impacts across adjoining river basins and balancing authorities (BAs) and provide a periodic assessment at regional to national scales. Expanding from our prior assessment only for the United States (US) federal hydropower plants, we enhance and extend two regional hydropower models to cover over 85% of the total hydropower nameplate capacity and present the first contiguous US-wide assessment of future hydropower production under Coupled Model Intercomparison Project phase 6’s high-end Shared Socioeconomic Pathway 5-8.5 emission scenario using an uncertainty-aware multi-model ensemble approach. We present regional hydropower projections, using both BA regions and US Hydrologic Subregions (HUC4s), to consistently inform the energy and water communities for two future periods—the near-term (2020–2039) and the mid-term (2040–2059) relative to a historical baseline period (1980–2019). We find that the median projected changes in annual hydropower generation are typically positive—approximately 5% in the near-term, and 10% in the mid-term. However, since the risk of regional droughts is also projected to increase, future planning cannot overly rely on the ensemble median, as the potential of severe hydropower reductions could be overlooked. The assessment offers an ensemble of future hydropower generation projections, providing regional utilities and power system operators with consistent data to develop drought scenarios, design long duration storage and evaluate energy infrastructure reliability under intensified inter-annual and seasonal variability.

13 HYDRO ENERGY↗

Emission projections for the U.S. Environmental Protection Agency Section 812 Second Prospective Clean Air Act cost/benefit analysis

This paper describes the analysis, methods, and results of the recently completed emission projections. There are several unique features of this analysis. One is the use of consistent economic assumptions from the Department of Energy's Annual Energy Outlook 2005 (AEO 2005) projections as the basis for estimating 2010 and 2020 emissions for all sectors. Another is the analysis of the different emissions paths for both with and without CAAA scenarios. Other features of this analysis include being the first EPA analysis that uses the 2002 National Emission Inventory files as the basis for making 48-state emission projections, incorporating control factor files from the Regional Planning Organizations (RPOs) that had completed emission projections at the time the analysis was performed, and modeling the emission benefits of the expected adoption of measures to meet the 8-hr ozone National Ambient Air Quality Standards (NAAQS), the Clean Air Visibility Rule, and the PM2.5 NAAQS. This analysis shows that the 1990 CAAA have produced significant reductions in criteria pollutant emissions since 1990 and that these emission reductions are expected to continue through 2020. CAAA provisions have reduced volatile organic compound (VOC) emissions by approximately 7 million t/yr by 2000, and are estimated to produce associated VOC emission reductions of 16.7 million t by 2020. Total oxides of nitrogen (NOx) emission reductions attributable to the CAAA are 5, 12, and 17 million t in 2000, 2010, and 2020, respectively. Sulfur dioxide (SO{sub 2}) emission benefits during the study period are dominated by electricity-generating unit (EGU) SO{sub 2} emission reductions. These EGU emission benefits go from 7.5 million t reduced in 2000 to 15 million t reduced in 2020. 16 refs., 6 figs., 13 tabs.

01 COAL, LIGNITE, AND PEAT↗

Potential for Development of Solar and Wind Resource in Bhutan

With support from the U.S. Agency for International Development (USAID), the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) produced maps and data of the wind and solar resources in Bhutan. The solar resource data show that Bhutan has an adequate resource for flat-plate collectors, with annual average values of global horizontal solar radiation ranging from 4.0 to 5.5 kWh/m2-day (4.0 to 5.5 peak sun hours per day). The information provided in this report may be of use to energy planners in Bhutan involved in developing energy policy or planning wind and solar projects, and to energy analysts around the world interested in gaining an understanding of Bhutan's wind and solar energy potential.

14 SOLAR ENERGY↗

SU-E-T-179: Exploring Appropriate Offset Values for Pencil Beam and Monte Carlo Dose Optimization in Lung Stereotactic Body Radiotherapy Encompassing the Effects of Respiration and Tumor Location

Purpose: Exploring appropriate offset values in dose optimization with pencil beam (PB) algorithm to minimize dosimetric differences with plans calculated with Monte Carlo (MC) for lung cancer treatment with Stereotactic Body Radiotherapy (SBRT). Methods: 20 cases of Non-Small Cell Lung Cancer, treated with gated full motion range SBRT were selected. According to the proximity of the Gross Tumor Volume (GTV) to the chest wall, two groups are defined: peripherally located when GTV merges with the chest wall for at least 50% of the lesion diameter, and centrally located when the GTV is surrounded by lung tissue. Treatment plans were created on 4D average intensity projection (AIP) CT set with Brainlab iPlanDose 4.1.2 planning system. The D97 of PTV was normalized to 50Gy using the fast PB and compared with MC. The optimized plan was then recomputed over each 4D respiratory phase, and compared with MC using the same plan MU's. Results: The mean difference in the PB and MC D97 of the ITV was 10.5% (±0.8%) of the prescription dose (50Gy). PB algorithm showed 2.3–2.4% less overestimation to the D97 of the ITV, when comparing to MC, in the maximum exhalation phase than in the maximal inhalation phase. Significantly smaller dose difference between PB and MC is also shown in plans for peripheral lesions (7.7 ± 0.7%) versus for central lesions (12.7±0.8%) (p< 0.01). Conclusion: The dosimetric differences between PB and MC can be reasonably predicted depending on the location of lesion in the lung, and may be used as offset value in dose optimization with PB. Since the maximal exhalation phase demonstrates less dose discrepancy between the two algorithms than that in maximal inhalation phase, caution is suggested when the latter is included as a major phase portion in the respiration gated lung SBRT.

60 APPLIED LIFE SCIENCES↗

Characteristics of KE Basin Sludge Samples Archived in the RPL - 2007

Samples of sludge were collected from the K East fuel storage basin (KE Basin) floor, contiguous pits (Weasel Pit, North Load Out Pit, Dummy Elevator Pit, and Tech View Pit), and fuel storage canisters between 1995 and 2003 for chemical and radionuclide concentration analysis, physical property determination, and chemical process testing work. Because of the value of the sludge in this testing and because of the cost of obtaining additional fresh samples, an ongoing program of sludge preservation has taken place with the goals to track the sludge identities and preserve, as well as possible, the sludge composition by keeping the sludge in sealed jars and maintaining water coverage on the sludge consistent with the controlling Fluor Hanford (FH) Sampling and Analysis plans and FH contracts with the Pacific Northwest National Laboratory (PNNL). This work was originally initiated to provide material for planned hydrothermal treatment testing in accordance with the test plan for the Sludge Treatment Project (STP) corrosion process chemistry follow on testing (Delegard et al. 2007). Although most of the planned hydrothermal testing was canceled in July 2007 (as described in the forward of Delegard et al. 2007), sample consolidation and characterization was continued to identify a set of well-characterized sludge samples that are suited to support evolving STP initiatives. The work described in the letter was performed by the PNNL under the direction of the Sludge Treatment Project, managed by Fluor Hanford.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Develop Safety Plan for Installation and Operation of the Observation Wells (SECARB Phase III Task 3.1.3a [Early] Project at Cranfield)

Sandia Technologies developed and deployed a worker health and safety plan for the CFU31_F2 and CFU 31F3 observation wells, covering the SECARB activities following drilling the wells to total depth. The purpose of this health and safety plan (HASP) is to assign responsibilities, establish personnel protection standards, specify safe operating procedures, and provide for contingencies that may arise during the Cranfield Phase III Monitor Well installation. This HASP has been developed in accordance with Sandia Technologies, LLC (Sandia) safety and health standard operating procedures. Specific programs and procedures, as required by site activities, are identified herein.

01 COAL, LIGNITE, AND PEAT↗

Revitalizing Canton City Schools: A Sustainable and Cost-Effective Energy Efficiency Plan

The primary objective of this project was to focus on conducting the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Level 2 Energy Audits of all the schools/school facilities in the portfolio, and on developing a comprehensive Strategic Plan for implementing energy improvements. The overall aim of budget period 1 (BP1) was to implement Energy Audits and the Strategic Plan to provide a clear pathway to prioritize energy improvements as well as allow the district to access private sector funding (if needed) and/or tax credits and realize high-impact health and safety benefits for Budget Period 2.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

PSIP For HDF5 Pilot Project (Final Report)

Productivity and Sustainability Improvement Planning (PSIP) is a lightweight, incremental and iterative approach (much in the same spirit as Agile methodologies) for making routine software process improvements in software projects. It is designed to be easily applied in existing development workflows. Quoting from a November 2019 workshop paper describing PSIP. PSIP breaks from classic software process improvement approaches such as CMM(I), SPICE, ISO 9000 or Six Sigma, in that it trades comprehensive standards and certification-driven assessment for self-defined, internally driven goals. It does, however, carry forward such ideas as having staged models of improvement (like CMM(I)) in the form of progress tracking cards. Additionally, PSIP is more aligned with lean and agile methods; it adopts their emphasis on iterative improvement and continuous learning. At its core, PSIP is an instantiation of the Plan-Do-Check-Act management cycle (PDCA, also known as Plan-Do-Study-Adjust) which provides the foundation for much of the modern software process improvement literature. This situates PSIP within a constellation of bottom-up, inductive software process improvement methods. PSIP is designed around the notion that already overburdened teams can define and carry out a series of small, incremental steps of progression towards improvement goals without significant (there will be some, but the goal is to avoid significant) disruption to ongoing development activities. A key enabling tool in PSIP is the use of Progress Tracking Cards (PTCs) which define the steps of progression towards a given improvement goal. This is the theory of PSIP. The PSIP for HDF5 project was aimed at putting PSIP into practice with the purpose of evaluating its effectiveness in planning and facilitating quality and process improvements in a scientific software project as well as its associated artifacts. The HDF5 project was chosen as a use case to evaluate PSIP for several reasons. First, NNSA labs and LLNL in particular have a keen interest in how HDF5 quality impacts its uptake and sustainability as a community adopted and supported code. Next, HDF5 is a foundational library, a key substrate in the HPC/CSE software stack, and any improvements there realized through this contract will have benefits to many DOE applications depending on it. HDF5 also represents an older, legacy code with technical debts to pay down. These characteristics are similar to many NNSA and even some ECP code projects. But, because HDF5 is an I/O library, it represents a simpler use case within which to study PSIP than a full-fledged and significantly more complex PDE simulation code. We believe these attributes make HDF5 an ideal use case for evaluating PSIP.

97 MATHEMATICS AND COMPUTING↗

LOCOMOTIVES - Comprehensive Impact and Cost Assessment Framework of Carbon Lowering Approaches for the US Rail Freight System

The goal of this project is to develop a tool to aid railroads and other stakeholders assess and approach the decarbonization of freight rail operations by identifying new, viable low-carbon energy storage and conversion systems for future locomotive systems and how they should be deployed on the existing US freight rail network. In the first quarter, the project focused on collecting data, establishing a simulation workflow, and engaging industry through the creation of the Industry Advisory Board (IAB). In the second quarter, the project focused on selecting fuel pathways and powertrain technologies, setting performance targets, conducting a techno-economic analyses, and developing the simulation framework that would serve as the backbone of the future toolhead. The third quarter involved developing an industry-oriented interactive dashboard powered by a five-step sequential framework, as well as holding industry advisory board meetings as per the initial technology-to-market plan. In the remaining project quarters, the NUFRIEND dashboard were fine-tuned with the help of IAB member feedback and in-depth scenario analyses were conducted to support the techno-economic analysis of energy sources. Additionally, dashboard documentation, project insights, and open-source code on GitHub were prepared and released. Throughout the project, the team completed testing and analysis of all model components, integrated all initial test scenarios, and conducted stakeholder engagement. Lower-carbon drop-in fuels can be deployed as admixtures and are considered uniform across the network at a desired penetration rate, while hydrogen and battery-electric technology deployment poses a more complex problem as they require significant investments to be made in the siting of refueling/charging facilities and the replacement of locomotive fleets. Thus, strategies for locating and sizing refueling/charging facilities on a railroad’s network to meet their energy demands were developed to inform deployment decisions. To address this challenge, the Northwestern University Freight Rail Infrastructure & Energy Network Decarbonization (NUFRIEND) framework presents a five-step sequential framework to select O-D paths, locate facilities, reroute flows, size facilities, and evaluate the deployment for alternative energy sources that require locomotive powertrains to be converted and new refueling infrastructure to be deployed. The NUFRIEND Framework is an industry-oriented tool for simulating the deployment of new energy technologies across the US freight rail network. The framework provides a comprehensive network-level optimization and scenario simulation tool for decarbonizing the freight rail sector, addressing the uncertainties surrounding technological developments by supporting sensitivity analyses for different operational and technological parameters through a transparent and flexible input module. It offers practical alternatives to diesel locomotives and can be applied for any railroad considering the specific network structure and freight demand, outputting evaluation metrics for the associated emissions and costs relative to diesel operations. A number of relevant simulation scenarios were run and analyzed for key insights on the value of different alternative technologies for freight rail decarbonization. The project developments and findings have been presented at numerous conferences and events.

08 HYDROGEN↗

A Section 110 Evaluation of the Project 57 Rad-Safe Area Personnel Decontamination Building, Nye County, Nevada

Project 57 was an open-air, plutonium-dispersal safety test conducted by the United States in 1957 on a portion of the Nevada Test and Training Range (NTTR) (formerly the Las Vegas Bombing and Gunnery Range). The Project 57 test area, once known as Area 13, was a block of land abutting the northeastern boundary of the Nevada Test Site (NTS). The NTS was renamed the Nevada National Security Site (NNSS) in 2010. In keeping with the historical Cold War period designation, NTS will be used when discussing historic period events, while NNSS will be applied for contemporary activities. During Project 57, the high explosives of a nuclear weapon were triggered asymmetrically to simulate an accidental detonation. The test was conducted to study the extent of plutonium contamination from a nonnuclear yield accident, as well as assess the biological and environmental hazards such an event could create. Following the conclusion of the experiment, the contaminated area surrounding the ground zero (GZ) was fenced off and some of the contaminated equipment was buried in place. The Project 57 Rad-Safe area was abandoned. In 1981, the U.S. Department of Energy (DOE) decontaminated and decommissioned the Project 57 site. This Section 110 documentation was prompted by recognition that more than five decades have passed since the abandonment of the Project 57 Rad-Safe area, particularly the personnel decontamination building, which leaves the temporary structure vulnerable to natural forces of weathering and decay. However, these temporary facilities remain partially standing, allowing for a condition assessment and recommendations regarding the Rad-Safe area’s historical significance. The National Nuclear Security Administration, Nevada Field Office (NNSA/NFO) determined there was no area of potential effect (APE) (direct, indirect, or visual) because there is no planned undertaking and the Project 57 Rad-Safe area will continue to remain unused. Instead, a 4.5-acre study area was established to facilitate recording the Project 57 personnel decontamination building and the remaining accessory resources. The study area is bounded on the east by Valley Road and it extends to the east far enough to encompass the former Project 57 Rad-Safe area (Figure A-2). The Section 110 study area is located in the northwest quarter of Section 35, Township 07S Range 54E Mount Diablo Base and Meridian. It is on the 1962 Groom Mine SW USGS 7.5-minute series topographic quadrangle. Desert Research Institute (DRI) surveyed the Section 110 study area, resulting in the recording and evaluation of the Project 57 Rad-Safe area personnel decontamination building and four accessory resources (AR-1 through AR-4). Copies of the building form and report are on file at DRI and with the NNSA/NFO in Las Vegas, Nevada.

54 ENVIRONMENTAL SCIENCES↗

DOE-NE Proliferation and Terrorism Risk Assessment: FY12 Plans Update [Slides]

This presentation provides background information on FY12 plans for the DOE Office of Nuclear Energy Proliferation and Terrorism Risk Assessment program. Program plans, organization, and individual project elements are described. Research objectives are: (1) Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of current reactors; (2) Develop improvements in the affordability of new reactors to enable nuclear energy; (3) Develop Sustainable Nuclear Fuel Cycles; and (4) Understand and minimize the risks of nuclear proliferation and terrorism - Goal is to enable the use of risk information to inform NE R&D program planning.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

WINS. Market Simulation Tool for Facilitating Wind Energy Integration

Integrating 20% or more wind energy into the system and transmitting large sums of wind energy over long distances will require a decision making capability that can handle very large scale power systems with tens of thousands of buses and lines. There is a need to explore innovative analytical and implementation solutions for continuing reliable operations with the most economical integration of additional wind energy in power systems. A number of wind integration solution paths involve the adoption of new operating policies, dynamic scheduling of wind power across interties, pooling integration services, and adopting new transmission scheduling practices. Such practices can be examined by the decision tool developed by this project. This project developed a very efficient decision tool called Wind INtegration Simulator (WINS) and applied WINS to facilitate wind energy integration studies. WINS focused on augmenting the existing power utility capabilities to support collaborative planning, analysis, and wind integration project implementations. WINS also had the capability of simulating energy storage facilities so that feasibility studies of integrated wind energy system applications can be performed for systems with high wind energy penetrations. The development of WINS represents a major expansion of a very efficient decision tool called POwer Market Simulator (POMS), which was developed by IIT and has been used extensively for power system studies for decades. Specifically, WINS provides the following superiorities; (1) An integrated framework is included in WINS for the comprehensive modeling of DC transmission configurations, including mono-pole, bi-pole, tri-pole, back-to-back, and multi-terminal connection, as well as AC/DC converter models including current source converters (CSC) and voltage source converters (VSC); (2) An existing shortcoming of traditional decision tools for wind integration is the limited availability of user interface, i.e., decision results are often text-based demonstrations. WINS includes a powerful visualization tool and user interface capability for transmission analyses, planning, and assessment, which will be of great interest to power market participants, power system planners and operators, and state and federal regulatory entities; and (3) WINS can handle extended transmission models for wind integration studies. WINS models include limitations on transmission flow as well as bus voltage for analyzing power system states. The existing decision tools often consider transmission flow constraints (dc power flow) alone which could result in the over-utilization of existing resources when analyzing wind integration. WINS can be used to assist power market participants including transmission companies, independent system operators, power system operators in vertically integrated utilities, wind energy developers, and regulatory agencies to analyze economics, security, and reliability of various options for wind integration including transmission upgrades and the planning of new transmission facilities. WINS can also be used by industry for the offline training of reliability and operation personnel when analyzing wind integration uncertainties, identifying critical spots in power system operation, analyzing power system vulnerabilities, and providing credible decisions for examining operation and planning options for wind integration. Researches in this project on wind integration included (1) Development of WINS; (2) Transmission Congestion Analysis in the Eastern Interconnection; (3) Analysis of 2030 Large-Scale Wind Energy Integration in the Eastern Interconnection; (4) Large-scale Analysis of 2018 Wind Energy Integration in the Eastern U.S. Interconnection. The research resulted in 33 papers, 9 presentations, 9 PhD degrees, 4 MS degrees, and 7 awards. The education activities in this project on wind energy included (1) Wind Energy Training Facility Development; (2) Wind Energy Course Development.

17 WIND ENERGY↗

Processing Plan for Potentially Reactive/Ignitable Remote Handled Transuranic Waste at the Idaho Cleanup Project - 12090

Remote Handle Transuranic (RH-TRU) Waste generated at Argonne National Laboratory - East, from the examination of irradiated and un-irradiated fuel pins and other reactor materials requires a detailed processing plan to ensure reactive/ignitable material is absent to meet WIPP Waste Acceptance Criteria prior to shipping and disposal. The Idaho Cleanup Project (ICP) approach to repackaging Lot 2 waste and how we ensure prohibited materials are not present in waste intended for disposal at Waste Isolation Pilot Plant 'WIPP' uses an Argon Repackaging Station (ARS), which provides an inert gas blanket. Opening of the Lot 2 containers under an argon gas blanket is proposed to be completed in the ARS. The ARS is an interim transition repackaging station that provides a mitigation technique to reduce the chances of a reoccurrence of a thermal event prior to rendering the waste 'Safe'. The consequences, should another thermal event be encountered, (which is likely) is to package the waste, apply the reactive and or ignitable codes to the container, and store until the future treatment permit and process are available. This is the same disposition that the two earlier containers in the 'Thermal Events' were assigned. By performing the initial handling under an inert gas blanket, the waste can sorted and segregate the fines and add the Met-L-X to minimize risk before it is exposed to air. The 1-gal cans that are inside the ANL-E canister will be removed and each can is moved to the ARS for repackaging. In the ARS, the 1-gal can is opened in the inerted environment. The contained waste is sorted, weighed, and visually examined for non compliant items such as unvented aerosol cans and liquids. The contents of the paint cans are transferred into a sieve and manipulated to allow the fines, if any, to be separated into the tray below. The fines are weighed and then blended with a minimum 5:1 mix of Met-L-X. Other debris materials found are segregated from the cans into containers for later packaging. Recoverable fissile waste material (Fuel and fuel-like pieces) suspected of containing sodium bonded pieces) are segregated and will remain in the sieve or transferred to a similar immersion basket in the ARS. The fuel like pieces will be placed into a container with sufficient water to cover the recoverable fissile waste. If a 'reactive characteristic' is present the operator will be able to observe the formation of 'violent' hydrogen gas bubbles. When sodium bonded fuel-like pieces are placed in water the expected reaction is a non-violent reaction that does not meet the definition of reactivity. It is expected that there will be a visible small stream of bubbles present if there is any sodium-bonded fuel-like piece placed in the water. The test will be completed when there is no reaction or the expected reaction is observed..At that point, the fuel like pieces complete the processing cycle in preparation for characterization and shipment to WIPP. If a violent reaction occurs, the fuel-like pieces will be removed from the water, split into the required fissile material content, placed into a screened basket in a 1 gallon drum and drummed out of the hot cell with appropriate RCRA codes applied and placed into storage until sodium treatment is available. These 'violent' reactions will be evidenced by gas bubbles being evolved at the specimen surface where sodium metal is present. The operators will be trained to determine if the reaction is 'violent' or 'mild'. If a 'violent' reaction occurs, the sieve will be immediately removed from the water, placed in a 1 gallon paint can, canned in the argon cover gas and removed from the hot cell to await a future treatment. If the reaction is 'mild', the sieve will then be removed from the water; the material weighed for final packaging and allowed to dry by air exposure. Lot 2 waste cans can be opened, sorted, processed, and weighed while mitigating the potential of thermal events that could occur prior to exposing to air. Exposure to air is a WIPP compliance step demonstrating the absence of reactive or ignitable characteristics. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗