Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “POWER DEMAND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

US 2023/0182605 A1 Network constraint energy management system for electric vehicle depot charging and scheduling

Network constraint energy management system for electric vehicle (EV) depot charging and scheduling. In an embodiment, a power schedule is received from an economic dispatch application for a charging depot comprising EV charging station(s) and distributed energy resource(s). The power schedule may be simulated on a distribution network model of the charging depot, according to load flow analysis, to determine whether any grid-code violations occur. In response to the detection of violation(s), a constraint may be generated for each violating node, and the economic dispatch application may be re-executed with the constraint(s) to produce a new power schedule, until no violations are detected. When not all load demand can be satisfied by the power schedule, a charging schedule may be adjusted to ensure that critical energy requirements are satisfied. The final power and charging schedules may be used to schedule and control power generation and charging in the charging depot.

Hafiz, Faeza↗

Quantifying the Opportunity Space for Future Electricity Generation: An Application to Offshore Wind Energy in the United States

This report provides a high-level indicator of the future electricity demand for additional electric power generation that is not met by existing generation sources between 2015 and 2050. The indicator is applied to coastal regions, including the Great Lakes, to assess the regional opportunity space for offshore wind. An assessment of opportunity space can be a first step in determining the prospects and the system value of a technology. The metric provides the maximal amount of additional generation that is likely required to satisfy load in future years.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EPRI Report: Guidance in the Use of Robotics and Automation for Decommissioning Nuclear Power Plants - 17440

In the coming ten years, approximately 100 commercial nuclear power plants will be shut down worldwide, adding to the fifty nuclear power plants already shut down that have not yet entered into decommissioning. Just under a half of the overall cost of decommissioning a nuclear power plant is utility staffing costs (costing approximately 20 million USD per year of the decommissioning project), with waste and dismantlement costs making up the remainder. Decommissioning across the globe is being executed largely by manual labor. Some overview organizations such as OECD have concluded that the nuclear industry has not fully exploited or implemented current technological capabilities, and relies on outdated technology to perform decommissioning tasks. The use of more efficient and effective decommissioning technologies and processes could reduce the decommissioning project schedule and therefore the $20 M/year staffing costs incurred throughout the decommissioning project life. Such systems may also offer a substantial benefit with respect to worker safety and exposure reduction. However, tasks for which use of such systems is beneficial must be carefully considered. The systems themselves need to be robust and generally trouble free to operate in the demanding environment of commercial power plant decommissioning. EPRI is preparing a report, Guidance in the Use of Robotics and Automation for Decommissioning Nuclear Power Plants, which documents approaches that can perform decommissioning work in a safe and ALARA manner while reducing the overall cost to decommission a nuclear power plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bounding the costs of electric vehicle managed charging—supply curves for scenarios from 2025 to 2050

As electric vehicle (EV) adoption increases, the resulting EV battery charging will increase demand on the electric power grid. Through EV managed charging (EVMC) programs, charging can be shifted in time to support electric grid reliability and reduce electricity costs. EVMC can offer an alternative to additional supply-side generation, but the costs of EVMC implementation must be understood to evaluate the cost-benefits of EVMC. This paper presents bottom-up, forward-looking (from 2025 through 2050) estimates of the incremental costs associated with different EVMC dispatch mechanisms available to electric utilities. The costs of enabling EVMC for a range of customer participation levels are presented in the form of supply curves, which provide per-EV costs for a targeted level of participation. The largest drivers of cost variation are assumptions about future charging flexibility paradigms described in four scenarios. These supply curves can be used to quantify the expected costs of EVMC programs and enable comparison with supply-side or other demand flexibility alternatives.

25 ENERGY STORAGE↗

Tailoring coherent beam combined laser pulse trains for high peak and average power applications

Laser systems based on coherent beam combination (CBC) that rely on tiled pupil architecture intrinsically carry digital capabilities independently applicable to all three essential characteristics of a laser pulse: amplitude, phase and polarization. Those capabilities allow the far-field energy distribution to be flexibly tailored in real time. Operation in the femtosecond regime at high repetition rates gives access to a wide range of applications requiring both high peak and average powers. We address the task of independent peak versus average power adjustment needed for applications seeking to decouple nonlinear phenomena associated with GW peak power from the thermal load inherent to kW average power operation. The technical solutions proposed are presented in the framework of the Ecole Polytechnique XCAN CBC laser platform (61 independent channels) with an emphasis on thermal management measures implemented to ensure its nominal operation.

47 OTHER INSTRUMENTATION↗

Modeling Variable Renewable Energy and Storage in the Power Sector

The emergence of variable renewable energy and battery storage technologies have fundamentally transformed the electric power sector and generated demand for analysis to understand their roles in future energy systems. Although unique characteristics of these resources are well-recognized and require more sophisticated methodologies to capture effectively, guidance is limited on best practices and research gaps. This paper selectively reviews recent literature and draws upon our collective modeling experience to offer recommendations to analysts and consumers of model outputs on approaches for modeling variable renewable energy and storage in long-term electric sector models. We focus on regional- and national-scale models with technological, temporal, and spatial detail given their prevalence in planning and policy analysis, though insights are applicable in other settings. The review highlights how the research frontier has advanced in representing renewables and energy storage over the past decade; however, given the many considerations involved with appropriately capturing salient economic and operational characteristics of renewables, there is a gap between commonly used models and state-of-the-art methods. Model simplifications can materially impact policy analysis associated with power sector decarbonization and high renewables deployment, and improving model representations of variable renewables can enhance insights for policymakers and other stakeholders. This review can point the way for improved methods for established models and designs for emerging ones.

energy and environmental policy↗

Energy-water analysis of the 10-year WECC transmission planning study cases.

In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports modules for calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

13 HYDRO ENERGY↗

Powered by dsgrid [Slides]

NREL's demand-side grid (dsgrid) toolkit harnesses decades of sector-specific energy modeling expertise to understand current and future U.S. electricity load for power systems analyses. The primary purpose of dsgrid is to create comprehensive electricity load data sets at high temporal, geographic, sectoral, and end-use resolution. These data sets enable detailed analyses of current patterns and future projections of end-use loads. This presentation will include NREL power grid researcher Elaine Hale.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reactor Subsystem Simulation for Nuclear Hybrid Energy Systems

Nuclear Hybrid Energy Systems (NHES) could be a key part of the solution to achieving energy security, may provide reliable power availability even with increasing renewable energy penetration into the power grid, and may allow repurposing excess electricity in times of low demand. Incorporating a fission-based power source in a multi-output system (electricity and process heat) can offer significant advantages over carbon-based production sources, such as coal or natural gas, including reduction in atmospheric carbon emissions. In an integrated multi-output system, thermal energy from the nuclear reactor subsystem can be diverted to industrial applications in times of low electricity demand. High temperature, high quality heat from advanced reactor designs might be used for hydrogen production or synthetic fuel production (coal-to-liquid or natural gas-to-liquid processes). Low temperature heat from advanced reactor designs or the current and future fleet of light water reactors (LWRs) might be applied to desalination processes or be stored for later use in low temperature ammonia or hydrocarbon-based thermal cycles. The NHES research team is currently developing a dynamic simulation of an integrated hybrid energy system. A detailed simulation of proposed NHES architectures will allow initial computational demonstration of a tightly coupled NHES to identify key reactor subsystem requirements, identify candidate reactor technologies for a hybrid system, and identify key challenges to operation of the coupled system. This work will provide a baseline for later coupling of design-specific reactor models through industry collaboration. The modeling capability addressed in this report focuses on the reactor subsystem simulation. Many computational tools and methods are available for modeling a nuclear reactor, power conversion systems and associated process applications. One method is to develop a single program capable of modeling the entire system. Another is to combine two or more existing computer programs, each modeling a portion of the system for which it is validated, where the programs exchange information to compute the solution. The former method requires a lengthy development and verification and validation process. The latter method leverages industry standard software to reduce development and funding requirements. Preliminary system models have been developed by Idaho National Laboratory researchers and are currently being enhanced to assess integrated system performance given multiple sources (e.g., nuclear + wind) and multiple applications (i.e., electricity + process heat). Initial efforts to integrate a Fortran-based simulation of a small modular reactor (SMR) with the balance of plant model have been completed in FY12. This initial effort takes advantage of an existing SMR model developed at North Carolina State University to provide initial integrated system simulation for a relatively low cost. The SMR subsystem simulation details are discussed in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fast 704 MHz Ferroelectric Tuner for Superconducting Cavities

The Omega-P SBIR project described in this Report has as its goal the development, test, and evaluation of a fast electrically-controlled L-band tuner for BNL Energy Recovery Linac (ERL) in the Electron Ion Collider (EIC) upgrade of the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory (BNL). The tuner, that employs an electrically-controlled ferroelectric component, is to allow fast compensation to cavity resonance changes. In ERLs, there are several factors which significantly affect the amount of power required from the wall-plug to provide the RF-power level necessary for the operation. When beam loading is small, the power requirements are determined by (i) ohmic losses in cavity walls, (ii) fluctuations in amplitude and/or phase for beam currents, and (iii) microphonics. These factors typically require a substantial change in the coupling between the cavity and the feeding line, which results in an intentional broadening of the cavity bandwidth, which in turn demands a significant amount of additional RF power. If beam loading is not small, there is a variety of beam-drive phase instabilities to be managed, and microphonics will still remain an issue, so there remain requirements for additional power. Moreover ERL performance is sensitive to changes in beam arrival time, since any such change is equivalent to phase instability with its vigorous demands for additional power. In this Report, we describe the new modular coaxial tuner, with specifications suitable for the 704 MHz ERL application. The device would allow changing the RF-coupling during the cavity filling process in order to effect significant RF power savings, and also will provide rapid compensation for beam imbalance and allow for fast stabilization against phase fluctuations caused by microphonics, beam-driven instabilities, etc. The tuner is predicted to allow a reduction of about ten times in the required power from the RF source, as compared to a compensation system with narrower bandwidth. It is planned to build a 704 MHz version of the tuner, to check its underlying principles, and to make high-power tests at power densities aimed towards controlling 50 kW of average power. Steps towards this goal will be limited by, among other factors, losses in the actual ferroelectric elements in the ferroelectric assemblies. As the ferroelectric material loss tangent is reduced through efforts by the supplier Euclid TechLabs LLC, the concomitant power loss in its ferroelectric assemblies will drop, and the average power-handling capability of the Omega-P tuner will rise. It can thus be anticipated that the Phase II development project of the 704 MHz tuner will be iterative, but the pace and ultimate power-handling level of the tuner is difficult to predict at this early stage in Euclid's development program. Fortunately, since Omega-P's conceptual tuner is a simple module (nominally rated for 5 kW), so that the number of modules required in each tuner can be chosen, depending upon the cavity power level needed, plus the power for tuner losses.

43 PARTICLE ACCELERATORS↗

Centralized and Decentralized Control for Demand Response

Demand response has been recognized as an essential element of the smart grid. Frequency response, regulation and contingency reserve functions performed traditionally by generation resources are now starting to involve demand side resources. Additional benefits from demand response include peak reduction and load shifting, which will defer new infrastructure investment and improve generator operation efficiency. Technical approaches designed to realize these functionalities can be categorized into centralized control and decentralized control, depending on where the response decision is made. This paper discusses these two control philosophies and compares their relative advantages and disadvantages in terms of delay time, predictability, complexity, and reliability. A distribution system model with detailed household loads and controls is built to demonstrate the characteristics of the two approaches. The conclusion is that the promptness and reliability of decentralized control should be combined with the predictability and simplicity of centralized control to achieve the best performance of the smart grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Market and Policy Barriers for Demand Response Providing Ancillary Services in U.S. Markets

This study provides an examination of various market and policy barriers to demand response providing ancillary services in both ISO/RTO and non-ISO/RTO regions, especially at the program provider level. It is useful to classify barriers in order to create a holistic understanding and identify parties that could be responsible for their removal. This study develops a typology of barriers focusing on smaller customers that must rely on a program provider (i.e., electric investor owned utility or IOU, ARC) to create an aggregated DR resource in order to bring ancillary services to the balancing authority. The barriers were identified through examinations of regulatory structures, market environments, and product offerings; and discussions with industry stakeholders and regulators. In order to help illustrate the differences in barriers among various wholesale market designs and their constituent retail environments, four regions were chosen to use as case studies: Colorado, Texas, Wisconsin, and New Jersey.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Economic Dispatch and Load-Following Strategies for Nuclear Integrated Energy Systems

The need for distributed and adaptable energy resources that can handle the growing unpredictability in both supply and demand is rising as the power system continues to modernize. In order to satisfy those needs and maintain grid resilience, nuclear power plants can dynamically control their output, despite typically being used as baseload generators. By incorporating energy storage and renewable energy sources, nuclear integrated energy systems are designed to satisfy the electrical and thermal demands of different end-user applications while ensuring flexible power operation. These systems generate revenue by participating in both wholesale and ancillary services electricity markets, as well as commodity markets for various byproducts generated from coupled industrial processes. This study addresses the economic dispatch efficiency of a tightly coupled nuclear integrated energy system comprising a gigawatt-scale light water reactor, commercialized in the U.S., a high-temperature steam electrolysis unit, a district heating network, and specified electrical loads. To demonstrate the nuclear power plant’s flexibility within the day-ahead unit commitment and economic dispatch framework, while maintaining equilibrium even during periods of refueling outages, this paper develops a mixed-integer linear programming framework that models the subsystems and components of its nuclear steam supply system. A systematic comparative analysis of flexible versus baseload nuclear power plant operation under varying levels of renewable energy integration indicates that flexible operation enhances system profitability by more than 18% while also increasing energy storage utilization, improving reactor responsiveness to load fluctuations, and allowing for greater participation across numerous electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Electric Vehicles and the Electric Grid

In response to the need for the decarbonization of the transport sector and to reduce the reliance on fossil fuels, it is expected that large fleets of plug-in electric vehicles (PEVs) will constitute an important share of the electricity demand in the not so distant future. These devices can, and would behave as any regular demand if they are allowed to charge as soon as they are connected to the electric grid. If such charging process is allowed, then several adverse impacts on the power grids such as increased system-wide peak demand, and early reinforcements of the distribution, transmission and/or generation systems would be required. However, as opposed to conventional demands, these new devices are equipped with a battery that enables them deferring their needs for electric energy in time. If the pliant nature of this demand is exploited in such a way that the charging of these devices takes place when it is more convenient for the power system, then not only would the adverse impacts to the system would be avoided, but also, a new stream of services could be offered to the electric power grid in the form of demand response, power injections in V2G and regulating reserves. This article discusses the consequences of integrating significant volumes of PEVs into power systems, in both, uncontrolled and controlled manners.

Ortega Vazquez, Miguel A.↗

Demand Response and Energy Storage Integration Study

Demand response and energy storage resources present potentially important sources of bulk power system services that can aid in integrating variable renewable generation. While renewable integration studies have evaluated many of the challenges associated with deploying large amounts of variable wind and solar generation technologies, integration analyses have not yet fully incorporated demand response and energy storage resources. This report represents an initial effort in analyzing the potential integration value of demand response and energy storage, focusing on the western United States. It evaluates two major aspects of increased deployment of demand response and energy storage: (1) Their operational value in providing bulk power system services and (2) Market and regulatory issues, including potential barriers to deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

OPTIMAL CONTROL AND ENERGY-SAVING ANALYSIS OF COMMON PRESSURE RAIL ARCHITECTURES: HHEA & STEAM

In recent years several novel hydraulic architectures have been proposed with the intention of significantly increasing system efficiency. Two of these architectures, Steigerung der Energieeffizienz in der Arbeitshydraulik mobiler Arbeitsmaschinen (STEAM), and the Hybrid Hydraulic-Electric Architecture (HHEA), use a system of multiple common pressure rails (CPRs) to serve the multiple degrees-of-freedom of the machine. The key difference is that STEAM throttles hydraulic power from these rails while HHEA combines electric and hydraulic power to meet actuator demands. As a throttle-less architecture, HHEA is expected to save more energy than STEAM at the expense of added complexity. Therefore, it is useful to quantify this additional energy saving. Both systems have discrete operational choices corresponding to how the CPRs are utilized for each actuator. It is necessary to determine optimal operation for each of these architectures for analysis and fair comparison. Techniques for optimal operation of the HHEA have been developed previously from the Langrange multiplier method. Applying the same optimal control method to STEAM encountered some technical challenge leading to the optimal control algorithm not being able to satisfy certain constraints. The issue is analyzed and solved by adding noise to the optimization. Using this proposed algorithm, case studies are performed to compare the energy-saving potentials of STEAM and HHEA for two sizes of excavators and a wheel-loader performing representative duty cycles. The baseline is a standard load-sensing architecture. Results show that STEAM and HHEA can reduce energy consumption between 35-65% and 50-80% respectively

24 POWER TRANSMISSION AND DISTRIBUTION↗

Switch Opening and Exchange Method for Stochastic Distribution Network Reconfiguration

The purpose of distribution network reconfiguration (DNR) is to determine the optimal topology of an electricity distribution network, which is an efficient measure to reduce network power losses. Electricity load demand and photovoltaic (PV) output are uncertain and vary with time of day, and will affect the optimal network topology. Single-hour deterministic DNR is incapable of handling this uncertainty and variability. Therefore, this paper proposes to solve a multi-hour stochastic DNR (SDNR). Existing solution methods for DNR are either inaccurate or excessively time-consuming, and are therefore incapable of solving multi-hour SDNRs for large distribution networks. In this regard, a switch opening and exchange (SOE) method is proposed. Starting from a looped network with all switches closed, the SOE consists of three steps. The first step is to sequentially open the switches until all of the loops are opened. The second and third steps modify the status of branches obtained in the first step to obtain better radial topologies. Five test systems are used to validate the accuracy and fast solution speed of the SOE and the superiority of multi-hour SDNR over single-hour deterministic DNR.

distribution network reconfiguration↗

Accumulator Sizing for the Hybrid Hydraulic Electric Architecture (HHEA) Using Dynamic Programming

Abstract The Hybrid Hydraulic Electric Architecture (HHEA) is an approach to electrifying and improving that does not require very large electric machines. The majority power is provided hydraulically via a set of common pressure rails while small electric machines are used to modulate that power to meet exact demand. Each common pressure rail has an accumulator, which keeps the pressure of each rail near constant as long as the volume in the accumulator does not change much. A main pump adds or removes fluid from each accumulator as needed to reduce volume changes in the accumulators. It is the operation of this main pump which is investigated here. In previous analysis it was assumed that the size of the accumulators was large enough to account for any difference in fluid volume without significantly changing the pressure. In this paper, the required accumulator sizes are studied using a dynamic programming approach. At each time step the inlet and outlet of the main pump could be connected to any of the common pressure rails. These decisions for the main pump were optimized to minimize the required accumulator size. Case studies are conducted using drive cycles from a 22-ton excavator, a 20-ton wheel loader and a 5-ton excavator. The machines could be operated with total accumulator sizes of less than 20, 10, and 5 liters respectively. Required accumulator size was found to vary with pump flow rate, the frequency at which the pump/motor was able to change operating conditions, the tolerance level of pressure deviation and the accumulator’s polytropic index.

24 POWER TRANSMISSION AND DISTRIBUTION↗