Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OPERATIONAL PROBLEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

The use of hydrogen for aircraft propulsion in view of the fuel crisis

Some factors influencing the technical feasibility of operating a liquid hydrogen-fueled airplane are discussed in light of the projected decrease of fossil fuels. Other sources of energy, such as wind, tidal, solar, and geothermal, are briefly mentioned. In view of projected decreases in available petroleum fuels, interest has been generated in exploiting the potential of liquid hydrogen (LH2) as an aircraft fuel. Cost studies of LH2 production show it to be more expensive than presently used fuels. Regardless of cost considerations, LH2 is viewed as an attractive aircraft fuel because of the potential performance benefits it offers. Accompanying these benefits, however, are many new problems associated with aircraft design and operations; for example, problems related to fuel system design and the handling of LH2 during ground servicing. Some of the factors influencing LH2 fuel tank design, pumping, heat exchange, and flow regulation are discussed.

Weiss, S.↗

RHIC 12x150A current lead temperature controller: design and implementation

There are 60 12 x 150A current leads distributed in six RHIC service buildings; each lead delivers power supply current from room temperature to cryogenic temperature in RHIC. Due to the humid environment, condensation occurs frequently and ice forms quickly during operation, especially during an extensive storage period. These conditions generate warnings and alarms to which personnel must respond and establish temporary solutions to keep the machine operating. In here, we designed a temperature control system to avoid such situations. This paper discusses its design, implementation, and some results. There are six service buildings in the RHIC complex; each building has two valve boxes that transfer room-temperature current cables from the power supplies into superconducting leads, and then transport them into the RHIC tunnel. In there, the transition between the room-temperature lead into superconducting lead is critical and essential; smooth running during the physics store is crucial for the machine's continuing operation. One of the problems that often occurred previously was the icing of these current leads that could result in a potential leakage current onto ground, thereby preventing a continuous supply of physics store. Fig. 1 illustrates a typical example on a power lead. Among the modifications of the design of the valve box, we list below the new requirements for designing the temperature controller to prevent icing occurring: (1) Remotely control, monitor, and record each current lead's temperature in real time. Prevent icing or overheating of a power lead. (2) Include a temperature alarm for the high/low level threshold. In this paper we discuss the design, implementation, upgrades to, and operation of this new system.

43 PARTICLE ACCELERATORS↗

Enhancing Global Competitiveness: Benchmarking Airline Operational Performance in Highly Regulated Environments

Enhancing competitiveness in the global airline industry is at the forefront of attention with airlines, government, and the flying public. The seemingly unchecked growth of major airline alliances is heralded as an enhancement to global competition. However, like many mega-conglomerates, mega-airlines will face complications driven by size regardless of the many recitations of enhanced efficiency. Outlined herein is a conceptual model to serve as a decision tool for policy-makers, managers, and consumers of airline services. This model is developed using public data for the United States (U.S.) major airline industry available from the U/S. Department of Transportation, Federal Aviation Administration, the National Aeronautics and Space Administration, the National Transportation Safety Board, and other public and private sector sources. Data points include number of accidents, pilot deviations, operational performance indicators, flight problems, and other factors. Data from these sources provide opportunity to develop a model based on a complex dot product equation of two vectors. A row vector is weighted for importance by a key informant panel of government, industry, and consumer experts, while a column vector is established with the factor value. The resulting equation, known as the national Airline Quality Rating (AQR), where Q is quality, C is weight, and V is the value of the variables, is stated Q=C[i1-19] x V[i1-19]. Looking at historical patterns of AQR results provides the basis for establishment of an industry benchmark for the purpose of enhancing airline operational performance. A 7 year average of overall operational performance provides the resulting benchmark indicator. Applications from this example can be applied to the many competitive environments of the global industry and assist policy-makers faced with rapidly changing regulatory challenges.

Bowen, Brent D.↗

A Novel Application of Parallel Betweenness Centrality to Power Grid Contingency Analysis

In Energy Management Systems, contingency analysis is commonly performed for identifying and mitigating potentially harmful power grid component failures. The exponentially increasing combinatorial number of failure modes imposes a significant computational burden for massive contingency analysis. It is critical to select a limited set of high-impact contingency cases within the constraint of computing power and time requirements to make it possible for real-time power system vulnerability assessment. In this paper, we present a novel application of parallel betweenness centrality to power grid contingency selection. We cross-validate the proposed method using the model and data of the western US power grid, and implement it on a Cray XMT system - a massively multithreaded architecture - leveraging its advantages for parallel execution of irregular algorithms, such as graph analysis. We achieve a speedup of 55 times (on 64 processors) compared against the single-processor version of the same code running on the Cray XMT. We also compare an OpenMP-based version of the same code running on an HP Superdome shared-memory machine. The performance of the Cray XMT code shows better scalability and resource utilization, and shorter execution time for large-scale power grids. This proposed approach has been evaluated in PNNL’s Electricity Infrastructure Operations Center (EIOC). It is expected to provide a quick and efficient solution to massive contingency selection problems to help power grid operators to identify and mitigate potential widespread cascading power grid failures in real time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Computing the Feasible Spaces of Optimal Power Flow Problems

The solution to an optimal power flow (OPF) problem provides a minimum cost operating point for an electric power system. The performance of OPF solution techniques strongly depends on the problem’s feasible space. This paper presents an algorithm that is guaranteed to compute the entire feasible spaces of small OPF problems to within a specified discretization tolerance. Specifically, the feasible space is computed by discretizing certain of the OPF problem’s inequality constraints to obtain a set of power flow equations. All solutions to the power flow equations at each discretization point are obtained using the Numerical Polynomial Homotopy Continuation (NPHC) algorithm. To improve computational tractability, “bound tightening” and “grid pruning” algorithms use convex relaxations to preclude consideration of many discretization points that are infeasible for the OPF problem. Here, the proposed algorithm is used to generate the feasible spaces of two small test cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reconfigurable Microwave Phase Delay Element for Frequency Reference and Phase-Shifter Applications

A technique was developed to provide a reconfigurable high-precision micro - wave electrical phase delay for resonators and phase shifters. The invention employs multiple branches of transmission lines with open-ended or ground-ended terminations as configurable bits or digits. This technique minimizes the errors due to limited precision of switching devices. In addition, the proposed linear analytical approach significantly produces a much simpler design than that of other prior inventions at the time of this reporting. Microwave components such as filters, phase delay elements, or resonators require a method that can accurately adjust their frequency responses. Most tuning techniques offer very wide frequency tuning range; however, it is often difficult and expensive to tune their response in a very narrow operating frequency, especially when the tuning element reaches its minimum discrete step due to fabrication tolerances. The problem becomes worse as the operating frequency is in mm-wave frequency range (>26 GHz). The electrical tuning sensitivity of a microwave line is dependent on the position of the tuning element with respect to the reference termination. By placing this tuning element away from this reference with the main transmission line connecting the two elements together the sensitivity of the tuning element can change significantly. This concept can be used in the system that requires multiple tuning sensitivities. In this case, multiple tuning branches are superimposed in the main transmission line. The proposed invention allows the transmission-line electrical length to be accurately programmed using switching elements that have limited accuracy. The invention consists of multiple branches of transmission lines connected to discrete switching devices with open-ended terminations. They are used as discrete tuning elements. These elements are connected to the main microwave transmission line and are separated by a well-defined electrical degree spacing. Each branch is programmed to have different electrical degree sensitivity, such as a combination of discrete steps in each branch, which results in a reflective line with a unique effective phase response. To reduce the number of switching devices, it is desirable to program the devices in binary configuration where each branch represents one bit in the base-2 number system. This invention allows the transmission line electrical length to be tuned precisely with customizable sensitivity based on the known sensitivity of the base tuning circuit. The tuning resolution is dependent on the distance among tuning branches.

Hsieh, Wen-Ting↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

IMP I, H, and J

The schedule for the IMP project for the eighth, ninth, and tenth satellites of the series is presented. A description of the spacecraft and the weekly summaries of the operations performed on the spacecraft are provided. The project planning, project problems, recommendations, and reports of launch operations are described. Drawings of the satellite structures are included.

Source record↗

Transient rotordynamic analysis for the space-shuttle main engine high-pressure oxygen turbopump

A simulation study was conducted to examine the transient rotordynamics of the space shuttle main engine (SSME) high pressure oxygen turbopump (HPOTP) with the objective of identifying, anticipating, and avoiding rotordynamic problem areas. Simulations were performed for steady state operations at emergency power levels and for critical speed transitions. No problems are indicated in steady state operation of the HPOTP emergency power levels, although the results indicated that a rubbing condition will be experienced during critical speed transition at shutdown, particularly involving rotor deceleration rate and imbalance distribution rubbing at the turbine floating-ring seals. The condition is correctable by either reducing the imbalance at the HPOTP hot gas turbine wheels, or by a more rapid deceleration of the rotor through it critical speed.

Childs, D. W.↗

Computationally Efficient Learning of Large Scale Dynamical Systems: A Koopman Theoretic Approach

In recent years there has been a considerable drive towards data-driven analysis, discovery and control of dynamical systems. To this end, operator theoretic methods, namely, Koopman operator methods have gained a lot of interest. In general, the Koopman operator is obtained as a solution to a least-squares problem, and as such, the Koopman operator can be expressed as a closed-form solution that involves the computation of Moore-Penrose inverse of a matrix. For high dimensional systems and also if the size of the obtained data-set is large, the computation of the Moore-Penrose inverse becomes computationally challenging. In this paper, we provide an algorithm for computing the Koopman operator for high dimensional systems in a time-efficient manner. We further demonstrate the efficacy of the proposed approach on two different systems, namely a network of coupled oscillators (with state-space dimension up to 2500) and IEEE 68 bus system (with state-space dimension 204 and up to 24,000 time-points).

Sinha, Subhrajit↗

Choreographer Pre-Testing Code Analysis and Operational Testing.

Choreographer is a "moving target defense system", designed to protect against attacks aimed at IP addresses without corresponding domain name system (DNS) lookups. It coordinates actions between a DNS server and a Network Address Translation (NAT) device to regularly change which publicly available IP addresses' traffic will be routed to the protected device versus routed to a honeypot. More details about how Choreographer operates can be found in Section 2: Introducing Choreographer. Operational considerations for the successful deployment of Choreographer can be found in Section 3. The Testing & Evaluation (T&E) for Choreographer involved 3 phases: Pre-testing, Code Analysis, and Operational Testing. Pre-testing, described in Section 4, involved installing and configuring an instance of Choreographer and verifying it would operate as expected for a simple use case. Our findings were that it was simple and straightforward to prepare a system for a Choreographer installation as well as configure Choreographer to work in a representative environment. Code Analysis, described in Section 5, consisted of running a static code analyzer (HP Fortify) and conducting dynamic analysis tests using the Valgrind instrumentation framework. Choreographer performed well, such that only a few errors that might possibly be problematic in a given operating situation were identified. Operational Testing, described in Section 6, involved operating Choreographer in a representative environment created through Emulytics TM . Depending upon the amount of server resources dedicated to Choreographer vis-á-vis the amount of client traffic handled, Choreographer had varying degrees of operational success. In an environment with a poorly resourced Choreographer server and as few as 50-100 clients, Choreographer failed to properly route traffic over half the time. Yet, with a well-resourced server, Choreographer handled over 1000 clients without missrouting. Choreographer demonstrated sensitivity to low-latency connections as well as high volumes of traffic. In addition, depending upon the frequency of new connection requests and the size of the address range that Choreographer has to work with, it is possible for all benefits of Choreographer to be ameliorated by its need to allow DNS servers rather than the end client to make DNS requests. Conclusions and Recommendations, listed in Section 7, address the need to understand the specific use case where Choreographer would be deployed to assess whether there would be problems resulting from the operational considerations described in Section 3 or performance concerns from the results of Operational Testing in Section 6. Deployed in an appropriate architecture with sufficiently light traffic volumes and a well-provisioned server, it is quite likely that Choreographer would perform satisfactorily. Thus, we recommend further detailed testing, to potentially include Red Team testing, at such time a specific use case is identified

97 MATHEMATICS AND COMPUTING↗

A preliminary study of containment concepts for aircraft landing on elevated STOL-ports

A preliminary study of containment systems for aircraft landing on elevated STOL-ports was conducted as part of an overall study of human acceptance problems associated with STOL operations. The study included a survey and feasibility study of different concepts and a computer analysis of four arrestment systems. The principal conclusion was that a system referred to as the FAA system appears to offer the greatest promise. In this system, standard arresting gear cables are stretched across the roof-top, at roughly 100-foot intervals, but are shielded over the 100-foot-wide primary landing strip. Thus a pilot can land with an arresting hook down, but will not contact the cable unless he swerves off the landing strip, either because he has made a bad landing, or because his landing gear has failed. It was also noted that a suitable curb or guard rail should be developed. Presently available arresting gears and nylon net barriers were considered satisfactory for the overshoot problem.

Haviland, J. K.↗

Marching methods for elliptic problems. II, III

Higher-order operators for marching methods for elliptic equations are considered. Higher-order is understood in the sense of higher-order accuracy solutions to second-order Poisson equations, and in the sense of higher-order elliptic equations such as the biharmonic equation. The use of deferred corrections for overcoming stability problems is illustrated. Direct and iterative methods of extending the mesh size are considered. Multiple marching, patching, and influence extending techniques are described.

Roache, P. J.↗

Solution of inverse problem of fuzzy relational equation by using perceptron model

A Max-Min fuzzy system can be regarded as a network of max and min operational elements. Thus, the inverse problem of a fuzzy relational equation is interpreted as an input estimation problem from output values in the corresponding network. An approximate network model of a fuzzy relational system is proposed. An algorithm for obtaining an approximate solution of the system is presented for using a neural network technique.

Hirota, Kaoru↗

Short-distance and short-time structure of a unitary Fermi gas

We consider the operator product expansions for unitarity fermions. We compute the dynamic structure factor S(q,{omega}) at large frequency and wave number away from the one-particle peak. The overall normalization of S(q,{omega}) is determined by Tan's contact parameter, and the dependence on q and {omega} is obtained in closed analytic form. We also find energy deposited into the system by small, rapid variations of the inverse scattering length.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Developing a Drilling Optimization System for Improved Overall Rate of Penetration in Geothermal Wells

Geothermal energy is renewable, reliable and environmentally friendly source of energy. The major cost in the development of geothermal wells is the actual drilling of the wells. The main objective of this paper is to introduce a new real-time drilling optimization system designed for granite formation to reduce the overall drilling cost. In this study, a drilling optimization system is verified using drilling data from Utah-Forge well 58-32. The drilling optimization system used the Utah-Forge well 58-32 data to achieve real-time unconfined compressive strength (UCS). Based on the UCS value from the previous feet, the system simulates the ROP for the next drilling feet. The drilling optimization system utilizes the Differential Evolution Algorithm (DEA), which is a metaheuristic method to search the space of solution, to find the best operating parameters (i.e. WOB and RPM) for the next drilling foot. The optimization algorithm takes a maximum cutter temperature into account as a constraint and avoids the accelerated wear. The developed drilling optimization system improves ROP responses and reduces the drilling cost of geothermal wells. The simulated ROP results from the system show a good agreement with the ROP from Utah-Forge well 58-32 drilling data. The drilling time before and after optimization for both intervals were presented.

15 GEOTHERMAL ENERGY↗

Scattering anomalies in a resonator above the thresholds of the continuous spectrum

We consider the Dirichlet spectral problem for the Laplace operator in a multi-dimensional domain with a cylindrical outlet to infinity, a Helmholtz resonator. Using asymptotic analysis of the scattering matrix we demonstrate different types of reflection of high-amplitude near-threshold waves. One scattering type or another, unstable or stable with respect to variations of the resonator shapes, is determined by the presence or absence of stabilizing solutions at the threshold frequency, respectively. In a waveguide with two cylindrical outlets to infinity, we discover the effect of almost complete passage of the wave under 'fine tuning' of the resonator. Bibliography: 26 titles.

97 MATHEMATICS AND COMPUTING↗

Scattering from condensates in turbulent jets

An analysis is made of the scattering signal levels to be expected from condensed water vapor droplets for crossed-beam instruments operating in the wavelength region. 18 to 4.3 microns. The results show that scattering should not present a problem for the infrared system operating under conditions typical of the IITRI jet facility. Actual measurements made for comparison indicate that scattering levels are appreciable, and presumably result from oil mist added by the facility air compressors.

Wilson, L. N.↗