Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Long”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Control of the Plasma-Material Interface for Long Pulse Optimization in EAST Final Report

This final report describes the funded activity to understand and control the plasma-material interface to improve long pulse discharge control and performance on the EAST (Experimental Advanced Superconducting Tokamak) facility, located in Hefei, China. The primary focus of the research was long pulse recycling control via optimization of lithium (Li) delivery systems, including flowing liquid lithium plasma facing components (PFCs), because Li persists as the main wall conditioning technique. On EAST, lithium was primarily introduced using crucible evaporation, pellet injection, and gravitationally dropped powder. Overall, the introduction of lithium into the EAST plasma had strong and persistent effects on the ELM behavior during long pulse EAST discharges demonstrating overall improved performance. Additionally, a flexible impurity injection tool, a multi-chamber impurity powder dropper, was developed and deployed on EAST, to extend powder injection to elements other than Li. Finally, improvements to the Soft X-ray diagnostic system were introduced to improve measurements of impurity transport and electron temperature.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

First observation of the production of three massive vector bosons and search for long-lived particles using delayed photons in pp collisions at $\sqrt{s}=13\text{ TeV}$

This thesis presents the first observation of the production of three massive vector bosons (VVV with V = W, Z) in proton-proton collisions at the LHC at $\sqrt{s}=13\text{ TeV}$. The search was performed in final states with two same-sign charged leptons (electrons or muons) plus one or two jets, and three, four, five, or six leptons from WWW, WWZ, WZZ and ZZZ decays, with a data sample corresponding to an integrated luminosity of 137 fb -1 collected by the CMS experiment during 2016-2018. The observed (expected) significance of the combined VVV production is 5.7 (5.9) standard deviations, and the production cross section is measured to be 1010$^{+210}_{-200}$(stat) $^{+150}_{-120}$(syst) fb, corresponding to a signal strength of 1.02$^{+0.26}_{-0.23}$. We also found evidence for WWW and for WWZ production, with observed significances of 3.3 and 3.4 standard deviations, respectively. The measured production cross sections for individual VVV processes are also reported. The establishment of VVV production opens a new program of many standard model studies (such as gauge-gauge and Higgs-gauge couplings), and provides a new tool for many new physics searches (such as anomalous gauge coupling searches, new resonance searches). This thesis also reports a search for long-lived supersymmetry particles decaying to photons in proton-proton collisions at the LHC at $\sqrt{s} = 13 TeV$, with a data sample corresponding to an integrated luminosity of 77.4 fb -1 collected by CMS during 2016-2017. Results are interpreted with a gauge-mediated supersymmetry breaking model, where the long-lived particle is a neutralino and the lightest supersymmetry particle is a gravitino. For neutralino proper decay lengths of 0.1, 1, 10, and 100 m, masses up to 320, 525, 360, and 215 GeV are excluded at 95% confidence level, respectively. This result extends the limits from previous searches by one order of magnitude for the neutralino proper decay length and up to 100 GeV more for the neutralino mass. Motivated by the need for precision timing measurements for long-lived particle searches, as well as for improvements in general object reconstruction performance, the timing performance of two types of sensors are studied in this thesis: one with a Cerium doped Lutetium Yttrium Orthosilicate (LYSO:Ce) crystal as the scintillator and a silicon photomultiplier (SiPM) as the photodetector, another with a Cadmium-Telluride sensor as the active material for a sampling calorimeter. Both setups have been demonstrated with test beams to be able to provide timing measurements of particles with a resolution below 30 ps.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Combining Fluorescence and Phosphorescence to Achieve Very Long Lifetime and Efficient White OLEDs (Final Technical Report)

The objective of our project was to develop a high efficiency, long lived WOLED using a hybrid approach to harvesting singlet and triplet excitons, as described above. WE met out GONOGO metric at the end of year one, achieving an efficiency of nearly 50 lm/W for high quality white light emission. We faced an unforeseen problem in achieving this high efficiency level at high brightness. Our hybrid devices showed a significant roll off in device efficiency as the current is raised, such that our efficiency dropped to ca. 10 lm/W at 1000 nits. This roll off precluded us form achieving our send year targets with regards to efficiency at high brightness and long device lifetime. We spent the majority of our efforts in year two trying to decrease or eliminate this efficiency roll off, but this roll off prevented us from reaching our end of program target of high efficiency at high brightness with long device lifetime. Toward the end of the sixth quarter of the program we began to investigate a new approach, which involved a tandem WOLED, with a hybrid blue/red OLED stacked on a phosphorescent green OLED. The resultant emission from the stack will be white and the tandem structure relaxes the constraints on the materials, which we believe is key issue in the high roll off in efficiency.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Remote Detection of Radioactive Materials Using Long Wavelength Infrared Laser Driven Avalanche Breakdown [Slides]

The yearly goals of the "Remote Detection of Radioactive Materials Using Long Wavelength Infrared Laser Driven Avalanche Breakdown" experiment are broken into two parts. Year 1: Perform proof-of-concept scaling experiments for detection of radioactive materials at 10m standoff distance, characterizing avalanche breakdowns with the 9.2μm long pulse beam line and optimizing diagnostics. Years 2-3: Extend technique to 30m detection distance, characterizing the effect of long propagation paths on sensitivity, improving diagnostic sensitivity and resolution, and characterizing the effects of turbulence and aerosols.

61 RADIATION PROTECTION AND DOSIMETRY↗

Long-Term Stability of PVD/Sputtered Au Electrical Contacts to Thermoelectric Bi 2 Te 2 : Re-evaluation of SAND2015-7203

The fabrication of long-lived electrical contacts to thermoelectric Bi 2 Te 3 -based modules is a challenging problem due to chemical incompatibilities and rapid diffusion rates. Previously, technical guidance from SAND report 2015-7203 selected electroplated Au as the preferred method for fabrication of long-lived contacts because of concerns that the grain structure of sputtered/physical vapor deposited (PVD) Au contacts can evolve during aging. We have re- evaluated PVD Au contacts and show that they are appropriate for long-life service. We measure grain size and morphology at different aging times under accelerated temperature gradient conditions, and we show that the PVD Au contacts are stable and remain relatively unchanged. The PVD Au fabricated here is not subject to the deterioration observed in the previous report.

36 MATERIALS SCIENCE↗

Long-Term Stability of PVD/Sputtered Au Electrical Contacts to Thermoelectric Bi 2 Te 2 (Re-evaluation of SAND2015-7203)

The fabrication of long-lived electrical contacts to thermoelectric Bi 2 Te 3 -based modules is a challenging problem due to chemical incompatibilities and rapid diffusion rates. Previously, technical guidance from SAND report 2015-7203 selected electroplated Au as the preferred method for fabrication of long-lived contacts because of concerns that the grain structure of sputtered/physical vapor deposited (PVD) Au contacts can evolve during aging. We have re-evaluated PVD Au contacts and show that they are appropriate for long-life service. We measure grain size and morphology at different aging times under accelerated temperature gradient conditions, and we show that the PVD Au contacts are stable and remain relatively unchanged. The PVD Au fabricated here is not subject to the deterioration observed in the previous report.

36 MATERIALS SCIENCE↗

Nuclear Energy in Long-Term System Models: A Multi-Model Perspective

Long-term energy system models–including electric sector capacity expansion models–are widely used tools for informing planning, technology assessment, and policy analysis. Recent decarbonization goals and rapid technological change have increased the need to appropriately represent economic characteristics and technical details of energy system resources, including variable renewable energy, energy storage technologies, carbon-capture-equipped capacity, and nuclear energy. Nuclear power represents about 20% of electricity generation and 50% of carbon-free electricity in the United States as of 2021. However, there are many perspectives on the role of existing and new nuclear in the future U.S. energy system, which is reflected in the broad range of potential contributions reported in the literature. This project aims to understand how issues central to nuclear energy are represented in long-term energy models. Building on earlier collaborations that focused on variable renewable energy and energy storage, this project convenes four modeling teams that use national-scale long-term energy system models from the Electric Power Research Institute, the National Renewable Energy Laboratory, the U.S. Energy Information Administration, and the U.S. Environmental Protection Agency to share methods and data, update models, run coordinated scenarios, and identify research needs. Improving tools can provide more insightful analyses and ensure that methods are more transparent.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Long-Term Environmental Monitoring Systems (ALTEMIS) Artificial Intelligence Data Management Plan

Across the Department of Energy’s Environmental and Legacy Management sites, complex groundwater plumes exist that will require long-term monitoring to ensure remedial actions that have been put in place remain effective decades into the future. The current monitoring paradigm predominantly consists of groundwater well sampling, whereby samples are collected, concentrations analyzed, and plume anomalies are detected after they have occurred. The Advanced Long Term Environmental Monitoring Systems (ALTEMIS) program is a multi-lab, multi-institution team of researchers that is deploying spatially integrative technologies (i.e., real-time in situ sensor networks), coupled with artificial intelligence and machine learning, to establish a more proactive monitoring paradigm. Within this approach, plume anomalies can be predicted, and corrective actions can be established prior to the occurrence, offering a more cost-effective and robust approach to long-term monitoring. The team has deployed a variety of different in situ sensing technologies at the Savannah River Site’s F-Area Hazardous Waste Management Facility around the F-Area Seepage Basins, which are unlined basins that received 7 billion liters of acidic low-level radioactive waste from the 1950s until the late 1980s. The technologies and techniques that the team is deploying are intended to ensure that the remedial actions that have been taken by the site remain effective decades into the future. Foundational to this approach is a robust, integrated data management and analysis plan to ensure accurate and timely reporting from the variety of sensor systems that are in place. This report will outline the data management plan that has been implemented by the ALTEMIS team at the Savannah River Site and will serve as a blueprint as the technology is translated to new sites across the DOE Complex.

54 ENVIRONMENTAL SCIENCES↗

Solid State Solar Thermochemical Fuel (SoFuel) for Long Duration Storage

Efficient thermal storage systems, when coupled with renewable energy, enable the decarbonization of numerous industrial processes requiring high temperature steam or air, and provide a path for seasonal building heating, especially for colder climates. Existing thermal storage systems face a significant challenge due to losses inherent to all high temperature systems. A viable route to long-term storage is to use thermochemical reactions to convert concentrated solar energy to a fuel that is shelf-stable and can be stored at room temperature, thus eliminating losses associated with high temperature storage. The Solid-State Solar Thermochemical Fuel (SoFuel) technology developed by Michigan State University, Oregon State University, and Mississippi State University provides reactors and processes with minimal sensible heat losses and allows storing solar energy as a solid-state fuel at room temperature for long duration. The production of SoFuel occurs within a cylindrical cavity reduction chemical reactor that captures concentrated solar radiation from a solar field. Reactive magnesium manganese oxide (Mg-Mn-O) resides within the cylindrical cavity chemical reactor and undergoes thermal reduction as the temperature exceeds 1350°C. The thermally reduced Mg-Mn-O pellets (the SoFuel) are cooled down through a recuperative process and stored within a bin until used. The SoFuel can directly supply up to 1100°C heat to an adjacent power plant for electricity generation or industrial heating. Oxidation of SoFuel pellets occurs in a counter flow reactor and supplies heat to the user for electricity generation or industrial processing, after which the fuel is returned to the concentrating solar field where it is regenerated for re-use. Both reactors can be controlled well using a variety of strategies. With the low cost of the material, its cyclability, and the possibility of using the pelletized with on-sun reactors, or with electricity that would be curtailed, this project offers a viable option of medium- and long-term thermal energy storage.

14 SOLAR ENERGY↗

HydroForecast Long-term: Improving hydropower’s resilience to climate change through accurate climate-scale

With hydrologic patterns and water availability across the globe shifting due to climate change, advancements in hydrologic prediction systems can help significantly reduce the uncertainties that utilities and water supply entities have in their decision making. Understanding and estimating hydrology at the climate scale is critical for managing water resources under changing climate scenarios. This project focuses on integrating state-of-the-art neural network modeling with downscaled climate projections to deliver the reliable water supply projections decades into the future to meet an urgent need from hydropower operators and water utilities. In this Phase 1 DOE SBIR proposal, we developed and validated a theory-guided neural network model, HydroForecast Long-term, for climate-scale hydrology and implemented the model within existing HydroForecast infrastructure. HydroForecast Long-term combines the most accurate streamflow modeling system with a flexible and scalable data architecture to generate water supply projections out to the year 2100. This report illustrates that we have achieved our four objectives: 1) create a prototype of HydroForecast Long-term, building the neural network prediction model, 2) build an automated data input pipeline that processes large amounts of data from the latest global temperature and precipitation climate models; 3) benchmark the accuracy of the hydrologic model over the recent two decades over a large set of diverse basins, and 4) create a set of output visuals and summary metrics informed by customer feedback that connect the data to critical decision points. This work empowers water users to make data-informed decisions supporting a resilient, renewable-powered grid and water system. The results advance the Department of Energy’s mission by addressing critical gaps in water supply planning under climate change.

13 HYDRO ENERGY↗

Solid State Solar Thermochemical Fuel (SoFuel) for Long Duration Storage

Efficient thermal storage systems, when coupled with renewable energy, enable the decarbonization of numerous industrial processes requiring high temperature steam or air, and provide a path for seasonal building heating, especially for colder climates. Existing thermal storage systems face a significant challenge due to losses inherent to all high temperature systems. A viable route to long-term storage is to use thermochemical reactions to convert concentrated solar energy to a fuel that is shelf-stable and can be stored at room temperature, thus eliminating losses associated with high temperature storage. The Solid-State Solar Thermochemical Fuel (SoFuel) technology developed by Michigan State University, Oregon State University, and Mississippi State University provides reactors and processes with minimal sensible heat losses and allows storing solar energy as a solid-state fuel at room temperature for long duration. The production of SoFuel occurs within a cylindrical cavity reduction chemical reactor that captures concentrated solar radiation from a solar field. Reactive magnesium manganese oxide (Mg-Mn-O) resides within the cylindrical cavity chemical reactor and undergoes thermal reduction as the temperature exceeds 1350°C. The thermally reduced Mg-Mn-O pellets (the SoFuel) are cooled down through a recuperative process and stored within a bin until used. The SoFuel can directly supply up to 1100C heat to an adjacent power plant for electricity generation or industrial heating. Oxidation of SoFuel pellets occurs in a counter flow reactor and supplies heat to the user for electricity generation or industrial processing, after which the fuel is returned to the concentrating solar field where it is regenerated for re-use. Both reactors can be controlled well using a variety of strategies. With the low cost of the material, its cyclability, and the possibility of using the pelletized with on-sun reactors, or with electricity that would be curtailed, this project offers a viable option of medium- and long-term thermal energy storage.

25 ENERGY STORAGE↗

Predicting long-term stress relaxation on Alloy 709 using the crystal plasticity finite element method

This report summarizes the results of physics-based, crystal plasticity simulations for the long-term stress relaxation behavior of Alloy 709. The purpose of the study was to provide insight into five key questions related to long-term behavior in high temperatures materials which are difficult or impossible to answer experimentally: (1) is there a threshold stress for long-term relaxation? (2) is there strain threshold for relaxation damage, below which significant damage does not accumulate? (3) does damage continue to accumulate as the material relaxes or will damage accumulation plateau under some loading conditions? (4) does stress relaxation loading inevitably lead to failure? and (5) which, if any, engineering models for relaxation damage accumulation reasonably match the simulation results? The report summarizes the numerical simulations used to address these five questions and provides at least partial answers to each question.

36 MATERIALS SCIENCE↗

Long Island Steatite Sourcing from Rhode Island Quarries During the Late Holocene Era

This study aimed to investigate the possible sourcing of Long Island steatite artifacts from quarries in Rhode Island. Seven steatite samples from archeological sites on Long Island including Nassau County, Suffolk County (North Fork and South Fork) and Shelter Island were compared to two Rhode Island quarry sample putative sources using X-ray fluorescence (XRF) microscopy at the Submicron Resolution X-ray spectroscopy (SRX) beamline of the National Synchrotron Light Source II at Brookhaven National Laboratory. The site-derived steatite samples displayed numerous similarities in elemental composition compared to the two Rhode Island quarries, Oaklawn and Ochee Springs. This study provides new evidence to support the possible sourcing of Long Island steatite from Rhode Island during the late Holocene era.

54 ENVIRONMENTAL SCIENCES↗

Zambia : long-term generation expansion study - executive summary.

The objective of this study is to analyze possible long-term development options of the Zambian electric power system in the period up to 2015. The analysis involved the hydro operations studies of the Zambezi river basin and the systems planning studies for the least-cost generation expansion planning. Two well-known and widely accepted computer models were used in the analysis: PC-VALORAGUA model for the hydro operations and optimization studies and the WASP-III Plus model for the optimization of long-term system development. The WASP-III Plus model is a part of the Argonne National Laboratory's Energy and Power Evaluation Model (ENPEP). The analysis was conducted in close collaboration with the Zambia Electricity Supply Corporation (ZESCO). On the initiative from The World Bank, the sponsor of the study, ZESCO formed a team of experts that participated in the analysis and were trained in the use of computer models. Both models were transferred to ZESCO free of charge and installed on several computers in the ZESCO corporate offices in Lusaka. In September-October 1995, two members of the ZESCO National Team participated in a 4-week training course at Argonne National Laboratory near Chicago, U.S.A., focusing on the long-term system expansion planning using the WASP and VALORAGUA models. The hydropower operations studies were performed for the whole Zambezi river basin, including the full installation of the Kariba power station, and the Cahora Bassa hydro power station in Mozambique. The analysis also included possible future projects such as Itezhi-Tezhi, Kafue Gorge Lower, and Batoka Gorge power stations. As hydropower operations studies served to determine the operational characteristics of the existing and future hydro power plants, it was necessary to simulate the whole Zambezi river basin in order to take into account all interactions and mutual influences between the hydro power plants. In addition, it allowed for the optimization of reservoir management and optimization of hydro cascades, resulting in the better utilization of available hydro potential. Numerous analyses were performed for different stages of system development. These include system configurations that correspond to years 1997, 2001, 2015 and 2020. Additional simulations were performed in order to determine the operational parameters of the three existing hydro power stations Victoria Falls, Kariba, and Kafue Gorge Upper, that correspond to the situation before and after their rehabilitation. The rehabilitation works for these three major power stations, that would bring their operational parameters and availability back to the design level, are planned to be carried out in the period until 2000. The main results of the hydro operations studies are presented in Table ES-1. These results correspond to VALORAGUA simulations of system configurations in the years 2001 and 2015. The minimum, average, and maximum electricity generation is based on the simulation of monthly water inflows that correspond to the chronological series of unregulated water inflows at each hydro profile in the period from April 1961 to March 1990. The recommended hydrology dataset provided in the Hydrology Report of the SADC Energy Project AAA 3.8 was used for this study.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long Duration Testing of Type C Thermocouples at 1500 °C

Experience with Type C thermocouples operating for long periods in the 1400 to 1600 °C temperature range indicate that significant decalibration occurs, often leading to expensive downtime and material waste. As part of an effort to understand the mechanisms causing drift in these thermocouples, the Idaho National Laboratory conducted a long duration test at 1500 °C containing eight Type C thermocouples. As report in this document, results from this long duration test were adversely affected due to oxygen ingress. Nevertheless, results provide key insights about the impact of precipitate formation on thermoelectric response. Post-test examinations indicate that thermocouple signal was not adversely impacted by the precipitates detected after 1,000 hours of heating at 1,500 °C and suggest that the signal would not have been adversely impacted by these precipitates for longer durations (if oxygen ingress had not occurred in this test).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Test Plan for Long-Term Operation of a Ten-Cell High Temperature Electrolysis Stack

This document defines a test plan for a long-term (2500 Hour) test of a ten-cell high-temperature electrolysis stack to be performed at INL during FY09 under the Nuclear Hydrogen Initiative. This test was originally planned for FY08, but was removed from our work scope as a result of the severe budget cuts in the FY08 NHI Program. The purpose of this test is to evaluate stack performance degradation over a relatively long time period and to attempt to identify some of the degradation mechanisms via post-test examination. This test will be performed using a planar ten-cell Ceramatec stack, with each cell having dimensions of 10 cm × 10 cm. The specific makeup of the stack will be based on the results of a series of shorter duration ten-cell stack tests being performed during FY08, funded by NGNP. This series of tests was aimed at evaluating stack performance with different interconnect materials and coatings and with or without brazed edge rails. The best performing stack from the FY08 series, in which five different interconnect/coating/edge rail combinations were tested, will be selected for the FY09 long-term test described herein.

08 HYDROGEN↗

Long-Term Carbon Injection Field Test for 90% Mercury Removal for a PRB Unit a Spray Dryer and Fabric Filter

The power industry in the U.S. is faced with meeting regulations to reduce the emissions of mercury compounds from coal-fired plants. Injecting a sorbent such as powdered activated carbon (PAC) into the flue gas represents one of the simplest and most mature approaches to controlling mercury emissions from coal-fired boilers. The purpose of this test program was to evaluate the long-term mercury removal capability, long-term mercury emissions variability, and operating and maintenance (O&M) costs associated with sorbent injection on a configuration being considered for many new plants. Testing was conducted by ADA Environmental Solutions (ADA) at Rocky Mountain Power’s (RMP) Hardin Station through funding provided by DOE/NETL, RMP, and other industry partners. The Hardin Station is a new plant rated at 121 MW gross that was first brought online in April of 2006. Hardin fires a Powder River Basin (PRB) coal and is configured with selective catalytic reduction (SCR) for NOx control, a spray dryer absorber (SDA) for SO2 control, and a fabric filter (FF) for particulate control. Based upon previous testing at PRB sites with SCRs, very little additional mercury oxidation from the SCR was expected at Hardin. In addition, based upon results from DOE/NETL Phase II Round I testing at Holcomb Station and results from similarly configured sites, low native mercury removal was expected across the SDA and FF. The main goal of this project was met—sorbent injection was used to economically and effectively achieve 90% mercury control as measured from the air heater (AH) outlet to the stack for a period of ten months. This goal was achieved with DARCO® Hg-LH, Calgon FLUEPAC®-MC PLUS and ADA Power PAC PREMIUM brominated activated carbons at nominal loadings of 1.5–2.5 lb/MMacf. An economic analysis determined the twenty-year levelized cost to be 0.87 mills/kW-hr, or $15,000/lb Hg removed. No detrimental effects on other equipment or plant operations were observed. The results of this project also filled a data gap for plants firing PRB coal and configured with an SCR, SDA, and FF, as many new plants are being designed today. Another goal of the project was to evaluate, on a short-term basis, the mercury removal associated with coal additives and coal blending with western bituminous coal. The additive test showed that, at this site, the coal additive known as KNX was affective at increasing mercury removal while decreasing sorbent usage. Coal blending was conducted with two different western bituminous coals, and West Elk coal increased native capture from nominally 10% to 50%. Two additional co-benefits were discovered at this site. First, it was found that native capture increased from nominally 10% at full load to 50% at low load. The effect is believed to be due to an increase in mercury oxidation across the SCR caused by a corresponding decrease in ammonia injection when the plant reduces load. Less ammonia means more active oxidation sites in the SCR for the mercury. The second co-benefit was the finding that high ammonia concentrations can have a negative impact on mercury removal by powdered activated carbon. For a period of time, the plant operated with a high excess of ammonia injection necessitated by the plugging of one-third of the SCR. Under these conditions and at high load, the mercury control system could not maintain 90% removal even at the maximum feed rate of 3.5 lb/MMacf (pounds of mercury per million actual cubic feet). The plant was able to demonstrate that mercury removal was directly related to the ammonia injection rate in a series of tests where the ammonia rate was decreased, causing a corresponding increase in mercury removal. Also, after the SCR was refurbished and ammonia injection levels returned to normal, the mercury removal performance also returned to normal. Another goal of the project was to install a commercial-grade activated carbon injection (ACI) system and integrate it with new-generation continuous emissions monitors for mercury (Hg-CEMs) to allow automatic feedback control on outlet mercury emissions. This was accomplished and the plant can now be operated to control carbon injection based on either the overall mercury removal or an outlet mercury emission rate. By integrating these systems, it was determined that the plant could reduce powdered activated carbon consumption, especially at low load, because, at Hardin, native mercury capture increases from less than 20% to about 50% at low load and the carbon injection rate can be decreased accordingly. Currently, the plant is operating to automatically control emissions to below 0.9 lb/TBtu (pounds of mercury per million British thermal units) at carbon loadings of 0.5 to 1.5 lb/MMacf. During the final phase of the Long-Term test, the ACI system was operated by plant personnel. The estimated O&M cost for a single Hg-CEM system is $15,500/yr. The Hg-CEMs performed well throughout the project. This project began shortly after Thermo Fisher first offered the Mercury Freedom System™ on a commercial basis and progressed though several iterations, improvements, and upgrades to the hardware and software. Indeed, there was a ten-fold increase in the precision and accuracy of the units during the course of the project due to several successful upgrades. In their present condition, the Hg-CEMs measure mercury to a precision of about ± 0.05 μg/wscm (micrograms of mercury per wet standard cubic meter of gas), and only require occasional fine-tuning of the calibration coefficients. The quality assurance/quality control (QA/QC) protocol required to keep the units operating at their optimal performance was also developed and perfected during the course of the project. ADA Environmental Solutions (ADA) developed a daily calibration procedure that surpasses the requirements specified in the Clean Air Mercury Rule (CAMR), and a weekly diagnostic program that ensures that the systems are operating properly and receive the necessary maintenance. For the most part, the systems passed the daily, weekly, and quarterly QA/QC requirements as well as four performance verification tests using the Ontario Hydro (O-H) and Sorbent Trap Methods (STM) for the first test and the EPA Method 30A (M30A) procedure for the remaining three. However, some improvements are still necessary before the system can meet all of the requirements. These involve tests that challenge the system with oxidized mercury (Hg+2). These tests could not be passed at Hardin in spite of trying several improvements suggested by ADA or Thermo Fisher.

20 FOSSIL-FUELED POWER PLANTS↗

Search for a Neutral Long-Lived Particle Decaying to B-Jets

The existence of the Higgs boson is required by the Standard Model of particle physics, yet it has not been observed. The precise nature of the Higgs boson is unknown and the mechanism by which it interacts with known Standard Model particles is also not known. Long-lived, electrically neutral hadrons have recently been proposed in hidden-valley models and could constitute a pathway through which the Higgs boson communicates with the Standard Model. Such a scenario may provide a novel path to Higgs discovery at the Tevatron. This thesis describes a search for a neutral, long-lived particle produced in decays of Higgs bosons in p$\bar{p}$ collisions at a center-of-mass energy of √s = 1.96 TeV, which decays to b-jets and lives long enough to travel at least 1.6 cm before decaying. This analysis uses 3.65 fb -1 of data recorded with the Run II D0 detector at the Fermilab Tevatron collider from April 2002 to August of 2008. We perform a search for eight possible hidden-valley scenarios resulting from a Higgs decay. No significant excess over background is observed and cross-section limits are placed at 95% CL.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗