Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “INSTALLATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Development and Validation of a High-Vacuum Thermal Conductivity Testbed for Aerospace Interface Materials

Spacecraft thermal margins depend on the temperature penalty of installed interfaces, yet catalog conductivity omits bondline thickness, mating surfaces, preload, and environment. The Testbed for Advanced Interface Materials in Vacuum (TAIMV) addresses this engineering-data gap by converting ambient/vacuum temperature fields from a four-coupon stack into quantities usable in spacecraft thermal models. Its 17-node steady-state model resolves axial conduction, parasitic fixture paths, grease-filled contact, radiation, and ambient convection. Four monolithic checks gave axial heat-rate ratios of 0.90–1.02, and Braycote calibration self-recovery gave 2.20% casewise mean absolute percentage error (MAPE) and 2.85% maximum difference. With transferable fixture terms frozen, Krytox LVP tested cross-material transfer against a manufacturer-derived external relation. The six Krytox cases gave 2.28% MAPE, 5.10% maximum difference, and full-field residual root-mean-square values of 0.553 °C ambient and 1.306 °C vacuum. Installed-joint resistance spanned 6.39–7.15 × 10⁻⁴ m²·K/W for Braycote and 4.09–4.49 × 10⁻⁴ m²·K/W for Krytox, corresponding to 2.33–6.66 K per modeled interface over the tested heat-flux range. TAIMV therefore supplies directly usable installed-joint resistance and conductance, plus apparent installed conductivity and explicitly model-conditioned grease conductivity/contact terms.

heat transfer↗

Process-Based Balance-of-System Cost Modeling for Offshore Wind Power Plants in the United States: Preprint

This work describes the development of a process based and open source balance of system cost model which provides the capability to evaluate both existing and novel offshore wind technologies. Individual design and installation steps are represented with bottom-up engineering models that compute the times and costs associated with the process; furthermore, operational constraints are assigned to each process so that delays due to weather and presence of marine mammals may be accounted for in the overall project timeline. The model structure, assumptions, inputs, and results are vetted with industry partners and compared against actual projects for validation; installation times are shown to agree with real data with relative errors of less than 35\%. Case studies are presented to demonstrate the functionality of the model. First, individual vessel efficiencies are computed for varying numbers of installation vessels and weather time series to show the diminishing returns of more than two feeder barges. Then, array cable capital costs and installation times are determined for a representative project with different turbine sizes. This quantifies the cost benefit tradeoffs of decreasing number of turbines, increased turbine spacing, and fewer turbine terminations and shows a net cost savings. These results demonstrate that the BOS model features the accuracy, functionality, and accessibility to serve as the foundation for a wide range of analyses to identify cost reduction potentials for offshore wind energy in the United States.

17 WIND ENERGY↗

Closing the Loops on Solar Photovoltaics Modules: An Agent-Based Modeling Approach for the Study of Circular Economy Strategies

Solar photovoltaics (PV) installed capacity have grown exponentially since the early 2000s (average annual growth rate of 50%). With 4,700 GW projected installed capacity by 2050, the volume of PV panels waste is also expected to become substantial. Though renewables are a sine qua non to the establishment of a truly circular economy (CE), the issue arising from their end-of-life management needs to be resolved. The management of PV end-of-life also represent a singular opportunity to create value, from recovered valuable, rare or critical materials (e.g. silver, tellurium, indium). Moreover, the PV case illustrates some of the current barriers to CE; for instance, the need for a common definition of waste (PV are defined as e-waste in the European Union but as general waste in the United States) and potential loss of innovations' advantages (PV average efficiency has continuously grown the past 10 years). In this study, an agent-based modeling (ABM) approach is proposed to simulate PV end-of-life management in the United States. The model explores how the decisions of the various actors involved in handling PV waste affect the quantities of PV that are reused, recycled, or land-filled. In the model, manufacturers, residential, and nonresidential PV owners, installers, and recyclers are represented by agents while governmental policies and regulations are treated as exogenous variables. PV-market data are used to define agents' characteristics (e.g., installed PV capacities or producing costs). Agents' decision rules draw on the literature related to industrial symbiosis (IS) and peoples' waste behaviors as they appear as the most widely used model to implement CE principles at a meso level. Specifically, the concepts of mutual trust between IS actors and knowledge about the IS philosophy are yielded to define the agents' decision process. The primary outputs of the ABM are the costs and volume of waste associated with each end-of-life pathway. Preliminaries results indicate recycling of residential PV is affected by the cost, perceived difficulty of recycling behaviors, and social norms. Moreover, the type of network connecting agents and the initial recycling rate strongly influence results. The model also highlights the crucial role of recycling behavior adoption: in case of early failure of PV, recycled volumes increase by about 40%. This represents an additional 5.7 billion USD from potential recovered silver. Finally, although results for the PV case are presented here, the developed ABM aims at being a general tool for the study of CE strategies and the CE transition. Furthermore, steps of this research include extending the model to encompass circular economy strategies (e.g., design for recycling or lifetime extension) and validating its general architecture from various case studies.

14 SOLAR ENERGY↗

Characterization of Mechanical Ventilation Systems in New US Homes: What types of systems are out there and are they functioning as intended?

As the airtightness of homes improves to meet energy efficiency goals, it becomes more important for mechanical ventilation systems to help maintain a comfortable and healthy indoor air environment. ASHRAE Standard 62.2 provides national guidance for mechanical ventilation system design and installation, however adoption of those guidelines into local building codes has occurred at different rates. Once provisions for mechanical ventilation are adopted in a local code, are mechanical ventilation systems properly designed, installed, commissioned and operated according to code or above code program requirements? Is there a need for further industry and homeowner education to ensure systems function as intended? This paper presents results from field studies that include characterization of mechanical ventilation systems in over 150 new homes in CA, CO, FL, GA, IL, OR, and SC built between 2011 and 2018. In each of the study homes, airflow of local (kitchen, bathrooms) and whole-house ventilation were measured. Occupant usage of the mechanical ventilation systems were monitored for one week in each home. Installed performance is compared to inferred design intent. The paper also includes homeowner perceptions about, and interactions with, the installed mechanical ventilation systems.

Martin, Eric↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

Solar Photovaltaics Durability and Resilience - A Win-Win

Solar photovoltaics (PV) will play a crucial role in decarbonizing the electrical grid and limit the effects of detrimental climate change. Long lifetimes of PV installations are a win-win situation, as it not only reduces carbon emissions directly through avoidance of fossil fuel emissions but also indirectly, as it reduces the demand of needed materials and potentially recycling. However, during their decades-long lifetime expectations installations are also more commonly exposed to extreme weather events. Building durable solar system to withstand extreme weather events is essential in the electrification of the economy and will save lives, particularly when they power critical infrastructure such as hospitals. As more PV is installed in regions prone to extreme weather events, high-quality materials, installation and monitoring practices can mitigate risk. Evaluating resilience requires combined computational, analytical, and experimental capabilities that are best leveraged by teams working across multiple disciplines.

durability↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Programa de Diseno, Fabricacion y Pruebas del Sistema de Desalinizacion por Olas del NREL: Preprint (Spanish Translation)

To de-risk the U.S. Department of Energy's Waves to Water Prize, the National Renewable Energy Laboratory (NREL) developed a modular, wave powered desalination system. The prize was open to wave energy converter (WEC) designs that generate electricity or WECs that desalinate water mechanically. This added installation risks due to the variance in competitor devices, and the aggressive installation timeline. To reduce these risks NREL developed a wave energy converter (WEC) that the installation team could use to practice installation techniques prior to the competitors arriving to ensure all steps had been considered prior to the event. This was achieved by developing a WEC with a modular power-take-off (PTO). The modular PTO can be configured in one configuration to drive an electric generator that sends electricity to a pier. The electricity that is generated is converted, and stored, so that it can be used to power an electric pump that feeds water to a Reverse Osmosis (RO) desalination unit. In the other configuration the generator is replaced with a pump and seawater is pumped to the RO system on the pier without any electrons being generated. This WEC is formally known as the Hydraulic and Electric Reverse Osmosis (HERO) WEC. For the English version of this report, see NREL/CP-5700-86623 (https://www.nrel.gov/docs/fy24osti/86623.pdf).

laboratory testing↗

Creating a Universal PV Plug and Socket Standard

Photovoltaic connectors are designed to be quick and easy to install. Current connector qualification standards, such as UL 6703 and IEC 62852, are only intended to evaluate connectors from the same manufacturer and were recently changed to explicitly proscribe the mating of connectors from different manufacturers. Unfortunately, the industry has chosen to design connectors that will commonly connect together with those from other manufacturers. This is done to simplify installation avoiding the situations such as when the connectors on a microinverter, or other module level power electronics, do not match the connectors on the modules in the system. This rampant violation of electrical codes worldwide indicates that there is a strong desire and need to develop a universal connector standard. Here we present the initial approach and philosophy behind the formation of an IEC subgroup under TC82 WG2 looking at this problem. We intend to develop a standard where the materials and geometry of construction are specified to ensure compatibility and the design is intended to be of the highest quality. We expect that this connector will be more costly but especially in rooftop installations where power electronics requires matching components from several manufacturers, that this may still result in a net cost savings. These connectors must be of the highest quality because we wouldn’t want to develop a connector that precluded the manufacturing of a higher quality product, and because these will most commonly be used on rooftop installations where safety is more of a concern. Additionally, because we do not know which brands of connectors will be used together, we cannot simply rely on test results to ensure safety but must create a design that is as inherently safe as possible.

connectors↗

Challenges and Opportunities for Basic Efficiency Measures in Low-Income Homes: A Southeast Alaska Case Study

Juneau, Alaska is the state's capital city and has a renewable energy goal to reach 80% renewable energy for the space heating and transportation sectors by 2045. In practical terms, this indicates a need to electrify both sectors, to take advantage of the inexpensive hydropower available from the local electric utility, Alaska Energy Light & Power. In an effort to complement and enable electrification, researchers examined the feasibility to deploy storm windows via a case study of installing storm windows in two local low-income homes. Newer models of storm windows provide an extra layer of insulation over existing windows, while preserving operability and views. They can also improve comfort and reduce noise. Researchers worked with the regional housing authority and a local builder to install the storm windows and replace inoperable windows in the two houses in 2021, in addition to conducting pre- and post-installation air leakage tests, energy monitoring, and occupant interviews. The team encountered several challenges, including a lack of egress windows, energy data from a wide variety of heating systems, extremely leaky homes, and installation issues such as windows that were not square. These results point to several barriers to widespread deployment of storm windows in the area, but also open the door to opportunities to design deployment programs that improve safety as well as efficiency.

cold climate↗

Ductless Heat Pump Energy Monitoring in a Cold Climate

In 2018, the City and Borough of Juneau, Alaska set the goal of reaching 80% renewable energy for heating and transportation by 2045. An important factor to help reach this goal is finding energy efficiency home heating technologies such as ductless air source heat pumps (DHPs), which rely on the local hydropower electric grid to provide space heating for an entire home or a main living area. To help residents reduce energy costs and move toward the community renewable energy goal, a team of local, state, and national partners joined to run Thermalize Juneau 2021, an energy campaign that provided education, a simplified installation process, and a bulk purchase discount. Overall, the campaign enrolled 165 participants, resulting in 75 DHP installations and over 30 energy efficiency improvements. To evaluate the reliability and energy use of the DHPs installed during the Thermalize Juneau campaign, researchers installed energy monitors on heat pumps of 14 participants and conducted interviews with homeowners. Data from two heating seasons (2021-2022 and 2022-2023) has allowed researchers to examine the accuracy of pre-campaign energy savings predictions, establish energy savings for a small group of households, and provide insights on the energy use and occupant satisfaction of DHPs which will help to inform future heat pump deployment efforts in the area.

air source heat pump↗

Challenges and Opportunities for Basic Efficiency Measures in Low-Income Homes: A Southeast Alaska Case Study

Juneau, Alaska, is the state's capital city and aims to reach 80% renewable energy for the space heating and transportation sectors by 2045. This goal highlights a need to electrify both sectors to take advantage of the inexpensive hydropower available from the local electric utility, Alaska Electric Light and Power. To that end, researchers examined the feasibility of deploying storm windows via a case study of installing storm windows in two local low-income homes. Newer models of storm windows provide an extra layer of insulation over existing windows while preserving operability and views. They can also improve comfort and reduce noise. In addition to conducting pre- and post-installation air leakage tests, energy monitoring, and occupant interviews, researchers worked with the regional housing authority and a local builder to install the storm windows and replace inoperable windows in the two houses in 2021. The team encountered several challenges, including a lack of egress windows, energy data from a wide variety of heating systems, extremely leaky homes, and installation issues, such as windows that were not square. These results point to several barriers to the widespread deployment of window upgrades in the area and open the door to opportunities to design deployment programs that improve safety and efficiency.

cold climate↗

Ductless Heat Pump Energy Monitoring in a Cold Climate

In 2018, the City and Borough of Juneau, Alaska, set the goal of reaching 80% renewable energy for heating and transportation by 2045. An important factor to help reach this goal is energy-efficient home heating technologies such as ductless air- source heat pumps (DHPs), which rely on the local hydropower electric grid to provide space heating for an entire home or a main living area. To help residents reduce energy costs and move toward the community renewable energy goal, a team of local, state, and national partners joined together to run Thermalize Juneau 2021, an energy campaign that provided education, a simplified installation process, and a bulk purchase discount. Overall, the campaign enrolled 165 participants, resulting in 75 DHP installations and over 30 other energy efficiency improvements. To evaluate the reliability and energy use of the DHPs installed during the Thermalize Juneau campaign, researchers installed energy monitors on heat pumps of 14 participants and conducted interviews with homeowners. Data from two heating seasons (2021-2022 and 2022-2023) allowed researchers to examine the accuracy of pre-campaign energy savings predictions, establish energy savings for a small group of households, and provide insights on the energy use and occupant satisfaction of DHPs, which will help inform future heat pump deployment efforts in the area.

air source heat pump↗

Stripline Block Sensor System

The Long Baseline Neutrino Facility requires a secondary sensor system to aid in the installation and replacement of the stripline blocks. These blocks are responsible for delivering large amounts of current to the horn and must be installed with high precision to avoid possible physical damage. There are many constraints due to the modules' surroundings, such as small clearances and a highly radioactive environment. Existing systems have already been implemented within the process; however, these systems offer limited information, leaving much risk during operations. This calls for a sufficiently accurate sensor system, which has a small space requirement and provides valuable information throughout the replacement period. A variety of methods and technologies were explored to provide an applicable approach to the issue. The proposed solution consisted of the use of retroreflective and target, however, it cannot provide positional feedback throughout the entire process. A proposed alternative utilizes a three-dimensional indoor positioning system to provide the operator with real-time positioning and rotational information. Sensors placed on the module and stripline would communicate with fixed receivers surrounding the target hall to provide precise positional feedback. However, this solution may still contain line-of-sight issues as well as installation complications due to the radioactive environment. Future work would consist of finding vendors capable of providing technology that fits our constraints, proof of concept tests for both solutions, implementation planning, and trials within the target hall itself. Due to its ability to provide continuous positional and rotational feedback, the indoor positioning system is the most suitable solution for accurately installing the stripline block.

Espinoza, David [Unlisted, US]↗

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve assembly quality of prefabricated components, we developed a sealant that can be installed at the plant and triggered at the jobsite. Additionally, we used this opportunity to lower the use of fossil fuel derived feedstocks and introduced bio-based alternatives to decrease the embodied carbon of the new sealant. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of biogenic carbon, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one part sealant allowing shelf stability to an otherwise fast curing system. When the microcapsules are broken and activated by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The shelf stability of these sealants and the on-demand triggering of the curing reactions enable installation on prefabricated components and storage prior to delivery and assembly at a jobsite, which could result in consistent sealant application with lower installation time than tapes and caulks at the construction site.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468↗

Impact of fused silica debris shields and enhanced mitigation techniques on large-aperture beam-sampling optics for the National Ignition Facility

Here, we show that the large-scale routine use of the fused silica debris shield (FSDS) maintains the ∼100× reduction in damage initiation rate and 70% increase in the install lifetime of a new grating debris shield (GDS) observed during pilot operations. Furthermore, we show that the install lifetimes of recycled GDS optics are nearly tripled using additional mitigation strategies such as expanding mitigation processing to include all damage sites larger than 10 μm (LT10) rather than just larger than 50 μm (LT50) and FSDS. We note that there is still a 50% difference between new and recycled optic installation lifetimes. We show that recycled optics have a 3.5× higher apparent initiation rate than new optics when exposed to nominally identical laser conditions.

FSDS↗

Children Of the Sun Solar Initiative (COSSI) (Final)

The Children Of the Sun Solar Initiative (COSSI) project is a pivotal step towards energy independence for the Spokane Tribe and the Spokane Indian Housing Authority (SIHA). It involves evaluating the solar potential of 32 SIHA and Tribal buildings, with a goal of achieving energy autonomy through renewable sources. By installing 652.5 kW of solar photovoltaic (PV) systems, the project significantly reduces carbon emissions, lowers energy costs, and enhances sustainability. Key Points: (1) COSSI's mission is to empower the Spokane Tribe and SIHA with clean energy solutions, aligning with their Long-Term Energy Vision. (2) The project includes solar installations on 32 buildings, generating approximately 700,000 kWh annually. (3) It also involves collaboration with SIHA's Weatherization Program and offers training opportunities for tribal members. (4) The installations aid energy efficiency and cost reduction for high-energy-use structures. (5) The initiative advances the Tribe's economic infrastructure, fostering renewable resources and sustainable practices. (6) COSSI serves as a model for leveraging federal funding and tax credits to establish clean energy projects, while generating training and job prospects. (7) The project contributes to energy independence through the adoption of evolving solar technologies. Overall, COSSI is a forward-looking effort to usher in clean energy, enhance infrastructure, and inspire similar projects across tribal and housing authorities.

14 SOLAR ENERGY↗

LTE Electrolyzer Data Collection

The goal for NREL is to collect, develop and publish performance metrics relative to low temperature electrolyzer installations. This will be done through the development of: Secure storage solution to house the collection of data from multiple projects Standardization of data to be collected and analyzed. This will be done using data templates developed with the help of partners involved with electrolyzer installations. Analysis that produces metrics of interest for all stakeholders Aggregation of results from multiple projects to view industry progress as a whole Publication of aggregated results in the form of composite data products (CDPs) Collaboration with Idaho National Lab and their work with high temperature electrolyzer installations will enable efficient use of storage and analysis tools.

data↗