Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FEET”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Mercury Dispersion Modeling and Purge Ventilation Stack Height Determination for SDUs

The SRNL Atmospheric Technologies Group performed an analysis to determine the minimum stack height necessary to avoid exceedance of the ACGIH (American Conference of Governmental Industrial Hygienists) 15-minute Short-Term Exposure Limit (STEL) and 8-hour Time Weighted Average (TWA) ambient standards for worst case hazardous chemical emissions from the Z-Area Mega SDUs. The American Meteorological Society/Environmental Protection Agency Regulatory Model (AERMOD) was used as the dispersion modeling tool for this analysis. Receptors were placed to represent the breathing level concentrations that workers might have, placed 6-ft above the working surface (ground or SDU tank surface). Based on the analysis conducted, the minimum SDU exhaust release height to avoid exceeding STEL and TWA is 6 feet above the SDU roof level for flow rates between 300 and 1200 cfm. The configuration of Mega SDUs, while large structures, do not produce an aerodynamic wake that impacts the stack releases and causes exceedances to the worker exposure limits.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ENERGY STAR for Tenants: An Online Energy Estimation Tool for Commercial Office Building Tenants

The commercial building sector consumes over 18% of the total energy in the United States. According to the 2012 Commercial Building Energy Consumption Survey (CBECS), office buildings comprise nearly 16 billion square feet of floor space and consume 253 billion kWh of energy annually. Office buildings represent nearly one-fifth of the energy consumed by commercial buildings, more than any other building type. Therefore, monitoring and reducing energy consumption in office buildings has become an increasingly important focus across the United States. The goal of the ENERGY STAR for Tenants program is to recognize office building tenants who demonstrate commitment to energy efficiency and environmental stewardship. Tenants seeking recognition must complete five major steps: estimate energy use, meter energy use, use efficient lighting, use efficient equipment, and share data. NREL is responsible for the underlying analysis performed for step one, estimating energy use. An online survey was developed for tenants to input information about their office space and its internal loads. NREL performed a parametric analysis across a large parameter space of office buildings. The analysis results were processed to map the user inputs to output energy ranges. The mappings enable the web tool to provide users with instant energy usage estimates based on a limited number of inputs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lighting Technology Energy Solutions (LiTES) (Final Technical Report)

The Lighting Technologies Energy Solutions (LiTES) Program Final Technical Report is a collaborative effort between NextEnergy, Consumers Energy, DTE Energy (DTE) and the Detroit Joint Apprentice Training Center (DJATC) to evaluate customer and contractor experiences deploying advanced/networked lighting controls systems (ALC/NLC). The LiTES Program, funded by the US Department of Energy (DOE), sought to reduce energy use in small and medium commercial buildings (SMCB) by accelerating the adoption of ALC/NLC through contractor training and technology deployment. Leveraging recommendations already outlined by the Design Lights Consortium Commercial Advanced Lighting Controls (DLC CALC) project, NextEnergy led an effort to train contractors, evaluate the experience of ALC/NLC demonstration projects, identify opportunities to reduce market barriers, and accelerate the increased adoption of ALC/NLC technologies within SMCB. The LiTES Program defined SMCB as commercial buildings under 100,000 square feet. The LiTES Program efforts also included evaluating current ALC/NLC utility incentives, piloting ALC/NLC incentives specific to SMCB, and identifying opportunities to better align utility incentives with current ALC/NLC technology to support accelerating the adoption of ALC/NLC in SMCB. This report shares the survey results and M&V data findings, including energy savings, market barriers, experience of installations, impact of incentives/financing programs and provides recommendations for the increased deployment of ALC/NLC systems in small and medium commercial buildings. Utility survey results, incentive alternatives and recommendations, including a cost benefit analysis outlining energy and economic impacts of the provided ALC/NLC incentives on SMCB projects are also provided.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sequim Campus Master Plan

Based in Richland, Washington, Pacific Northwest National Laboratory (PNNL) is one of ten U.S. Department of Energy (DOE) Office of Science (SC) national laboratories. PNNL is DOE’s premier chemistry, earth sciences, and data analytics laboratory, delivering vital mission impacts in energy resiliency and national security. PNNL has 19 core capabilities, each a powerful combination of world-class staff, state-of-the- art equipment, and mission-ready facilities. These capabilities represent a collective set of skills and a body of world-leading scientific and engineering work that provides exceptional value and mission delivery to DOE, the National Nuclear Security Administration (NNSA), the U.S. Department of Homeland Security (DHS), and other federal agencies and industry through strategic partnership projects on a not-to-interfere basis. Currently operated by Battelle Memorial Institute, PNNL occupies more than 2.3 million gross square feet (GSF) of buildings and employs approximately 4,700 staff members. PNNL has implemented a rolling 10-year campus strategy, initiated in fiscal year 2013, designed to deliver the foundation for the multidisciplinary science and engineering expertise, equipment, instrumentation, facilities, and infrastructure required to continue providing exceptional value and mission delivery. This strategy is incorporated into PNNL’s annual Laboratory Plan, which serves as DOE-SC’s equivalent of the Five- Year Site Plan required by DOE Order 430.1C Chg. 1, Real Property Asset Management. The PNNL Sequim Campus is located in Clallam County, just outside of Sequim, Washington. PNNL Sequim builds upon a rich history of research related to marine and coastal resources, environmental chemistry, water resources modeling, ecotoxicology, biotechnology, and national security. Facilities at the PNNL Sequim Campus were designed to take advantage of two unique locational assets: the pristine coastal ocean water in Sequim Bay and the region’s exceptionally clean air. Research facilities on the waterfront are supplied with up to 200 gallons per minute (gpm) of seawater and/or groundwater that enables research on aquatic systems ranging from fully seawater to fresh water, with an onsite water treatment system that removes all biological and hazardous chemical residues prior to discharge. Multiple large seawater tanks outside the waterfront laboratories, along with a boat ramp, pier, and floating dock, enable lab-to-field research. The uplands facility takes advantage of the amazing air quality and is built and operated to enable ultratrace chemical/radiological analytical chemistry. This combination of capabilities is not available at any other marine laboratory in the nation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Building Tune-Up Accelerator Program (Final Technical Report)

In 2016, the City of Seattle passed a mandatory Building Tune-Up requirement for all commercial buildings 50,000 square feet (SF) and larger as part of its Climate Action strategy. The requirement is phased in by size with large buildings (greater than 200,000 SF) required first. This allowed Seattle’s Office of Sustainability & Environment (OSE) to offer the Building Tune-Up Accelerator (TUA) Program to the “mid-size” building market (less than 100,000 SF) to meet the requirements early. With funding from the US DOE, a package of technical and financial support was developed for building owners and energy service providers to encourage this hard-to-reach market to participate in the tune-up—and even go beyond requirements for greater energy savings. Seattle City Light, the municipal electric utility, offered participants a simple per square foot financial incentive. Partners at the University of Washington Integrated Design Lab, Smart Buildings Center and Pacific Northwest National Lab (PNNL) offered service provider trainings, analytical tools and technical support. This final technical report summarizes the program, projected energy and emissions savings and lessons learned from program development to implementation to final evaluation for the 102 buildings that participated.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Atomic Cannon: Upshot-Knothole Grable

The May 25, 1952, Upshot-Knothole Grable event, aka Atomic Annie, proof tested a tactical nuclear weapon fashioned into a 280 mm cannon shell and fired from the Army’s M65 artillery piece. Travelling nearly seven miles downrange, Grable detonated with a force of fifteen kilotons 500 feet over a dry lake bed on the Nevada Test Site known as Frenchman Flat.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

2018 Long-Term Hydrologic Monitoring Program Report for Rio Blanco, Colorado, Site

This report presents the monitoring data collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Rio Blanco, Colorado, Site (Figure 1). The Rio Blanco site was the location of an underground nuclear test during which three nuclear devices were detonated nearly simultaneously in a single borehole in 1973. The test resulted in residual radionuclide contamination at the detonation depths of 5840, 6230, and 6690 feet (ft) (DOE 2015). Monitoring includes the collection of samples from groundwater wells and surface water locations near the site to assess for any potential impacts that may be attributed to the Rio Blanco nuclear test. This report summarizes the laboratory analytical results obtained from the sampling event conducted in 2018. This annual report and previous reports are available on the LM public website at https://www.lm.doe.gov/rio_blanco/Sites.aspx. Data collected during this and previous monitoring events are available on the Geospatial Environmental Mapping System (GEMS) website at https://gems.lm.doe.gov/#site=RBL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Trinity

At 5:29:45 am Mountain War Time, on July 16, 1945, the world’s first atomic bomb, codenamed Trinity, exploded in a blinding flash 100 feet over a portion of the southern New Mexican desert known as the Jornada del Muerto – the Journey of Death – temporarily blinding a future Nobel Laureate, Richard Feynman. Forty seconds after the detonation, Noble laureate Enrico Fermi dropped small pieces of paper before, during, and after the blast wave passed him. From the lateral dispersion of the paper, he calculated a yield of ten kilotons. Another laureate, I.I. Rabi, won the betting pool for Trinity’s yield. Arriving late, he bought the last available number, eighteen kilotons. The yield was later calculated to be twenty kilotons. On August 9th, a copy of the Trinity device, dubbed Fat Man, was dropped on Nagasaki.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Component-In-Grout Model Implementation for the E-Area Low-Level Waste Facility's Performance Assessment

The component-in-grout (CIG) disposal units are below grade earthen trenches that contain grout encapsulated waste components. Components disposed of within the CIG segments consist of large radioactively contaminated equipment and smaller waste forms (e.g., B-25 boxes and SeaLand containers) to fill the space around and above the large equipment. In the 2022 revision of the E-Area Low-Level Waste Facility’s (ELLWF) performance assessment, groundwater radionuclide contaminant transport through the vadose zone will be modeled using the PORFLOW software package for nine existing CIG segments located within the Slit Trench (ST) 23 footprint - no additional CIG segments are planned for at this time. The nine CIG segments have been placed within two of the nominally 20-foot-wide by 656-foot-long ST segments and are surrounded by no less than 1 foot of grout on all sides and up to 4 feet of backfill material. The two most recently placed CIG segments have an additional reinforced concrete mat to improve structural stability.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The ASD Scorpius Accelerator at the NNSS. Recruitment Slides for the University of Nevada, Reno [Slides]

The Scorpius Accelerator: Supports the maintenance of the US nuclear stockpile, helps the US not return to nuclear testing, is one of four diagnostics being installed 963 feet below ground, probes subcritical implosions of nuclear material, and supports the validation of LANL and LLNL computer codes. We are searching engineers and scientists with experienced in: Mechanical Engineering, Electrical Engineering, Pulsed Power, Plasma Physics, Controls, Diagnostics, and Fluids and pressure systems.

42 ENGINEERING↗

Nevada National Security Site 2019 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). This report summarizes the 2019 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (Mission Support and Test Services, LLC 2019, 2020a, 2020b). Direct radiation monitoring data indicate exposure levels at the Area 3 and Area 5 RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data at the Area 3 and Area 5 RWMSs show that tritium concentrations in water vapor and americium and plutonium concentrations in air particles are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS are below established investigation levels. Leachate samples collected from the leachate collection systems at the Area 5 mixed low-level waste disposal unit are below established contaminant regulatory limits. During 2019, precipitation at the Area 3 RWMS was 77 percent above average, and precipitation at the Area 5 RWMS was 69 percent above average. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter at the Area 5 RWMS dries the soil and prevents downward percolation of precipitation more effectively than evaporation as measured from the bare-soil weighing lysimeter. Vadose zone monitoring in the Area 3 and Area 5 RWMS soil covers shows no evidence of precipitation percolating through the covers to the waste. Moisture from precipitation did not percolate below 120 centimeters (3.9 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS during 2019. There was no drainage through 2.4 meters (8 ft) of soil as indicated from the Area 3 drainage lysimeters that received only natural precipitation. At the Area 3 RWMS, which received three times the natural precipitation, 57 percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter. All 2019 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facilities’ PAs.

2019↗

Operational and Mission Highlights A Monthly Summary of Top Achievements

In September 2020, the Laboratory’s Chemical Microscopy Facility tripled in size, expanding to 1,000 square feet. Located at TA-46, Building158, this facility houses a unique Laboratory resource. Operated by the Physical Chemistry and Applied Spectroscopy (C-PCS) group, this facility was established to renew the Laboratory’s rich history in radiobiology. The facility combines biological research capabilities with isotope production, as well as radioanalytical and chemical infrastructure. This facility provides space for Biosafety Level 2 (BSL-2) research, with alpha-emitting and other radionuclides of interest associated with biological systems. Equipped with a Class ll/A2 biological safety cabinet, a radiological fume hood and a host of other analytical equipment, this facility serves an effective resource to evaluate the efficacy of targeted alpha therapeutics, as well as the deleterious effects of radiological materials on living organisms. The facility receives funding through LDRD- 20180005DR, “Establishing a Radiotherapeutic Capability to Counter Biothreats,” and the BES Heavy Element Chemistry Program at the Laboratory.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

PNNL 2017 Richland Campus Master Plan

Based in Richland, Washington, Pacific Northwest National Laboratory (PNNL) is one of 10 United States (U.S.) Department of Energy (DOE) Office of Science (SC) national laboratories. PNNL is DOE’s premier chemistry, earth sciences and data analytics Laboratory, delivering vital mission impacts in energy resiliency and national security. PNNL has 19 core capabilities, each a powerful combination of world-class staff, state-of-the-art equipment, and mission ready facilities. These capabilities represent a collective set of skills and a body of world-leading scientific and engineering work that provides exceptional value and mission delivery to DOE, the National Nuclear Security Administration (NNSA), the U.S. Department of Homeland Security (DHS), and the missions of other federal agencies and industry through strategic partnership projects. Operated by Battelle Memorial Institute (Battelle), PNNL has more than: 2.3 million gross square feet and 4,400 staff members. PNNL is implementing a rolling 10-year campus strategy (initiated in FY 2013) designed to deliver the foundation for the multidisciplinary science and engineering expertise, equipment, instrumentation, facilities, and infrastructure required to continue providing exceptional value and mission delivery. PNNL’s annual ten-year plan is published with SC’s Ten-Year Plans for the Science National Laboratories. The most recent publication is available at: https://science.energy.gov/lp/laboratory-planning-process/. This edition of the PNNL Richland Campus Master Plan (CMP) is an update to the 2012 CMP.

99 GENERAL AND MISCELLANEOUS↗

Los Alamos National Laboratory Floodplain Assessment for the West Road Maintenance Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing to take action at Los Alamos National Laboratory (LANL) and do maintenance on West Road at locations along its entirety from the intersection with West Jemez Road/New Mexico State Road 501 (NM 501) to the intersection with Dulce Street through Los Alamos Canyon. The proposed West Road Maintenance Project is intended to improve vehicular and pedestrian safety on West Road by reducing traffic hazards associated with poor road conditions and unsafe roadside parking. Proposed road maintenance and improvement activities throughout the length of West Road include asphalt milling and resurfacing of approximately 2.06 miles (mi.) of the road. West Road crosses approximately 0.35 mi. (1,900 feet (ft.)) of the Los Alamos Canyon floodplain at the bottom of Los Alamos Canyon. Project activities within the floodplain include: 1) mill and resurface the roadway, 2) replace existing guardrails, 3) block access to the informal roadside parking along either side of West Road in Los Alamos Canyon, 4) install trail signage and perform trail maintenance, and 5) restore habitat and reduce wildland fire risk through invasive species removal.

54 ENVIRONMENTAL SCIENCES↗

State Charlton & MRCSP 1 Characterization Well Report

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership initiative. Since its founding, MRCSP has made significant strides toward making CCUS a viable option for states in the region. The public/private consortium, funded through the DOE Regional Carbon Sequestration Initiative, brings together nearly 40 industry partners and 10 states. Battelle, as the project lead, oversees research, development and operations and coordinates activities among the partners. The incremental, phased approach has built a valuable knowledge base for the industry and paved the way for commercial-scale adoption of CCUS technologies. From 2008 to 2020, MRCSP Phase III focused on the development of large-scale injection projects. This report is part of a series of reports prepared under the Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase). These reports summarize and detail the findings of the work conducted under the Phase III project. This report describes the efforts to drill and complete a well in the St. Peter sandstone for characterization and evaluation of storage potential in norther Michigan. However, as presented in this report, the well was not drilled and completed up to the intended target intervals due to drilling related difficulties. While the drilling issues were being resolved, the new Class VI injection well regulations were finalized by the US EPA. MRCSP efforts focused on evaluating CO 2 storage and containment using site characterization, modeling, and monitoring in conjunction with the ongoing CO 2 -EOR operations in the same area. This report describes work associated with the initial test well, the State Chester and MRCSP Well No. 1, drilled to a depth of about 7,968 feet TVD, and subsequently plugged and designated as temporarily abandoned. A high-level overview of data collected and analyzed is provided for shallower units.

01 COAL, LIGNITE, AND PEAT↗

July 2, 2020 -“Cone Of Silence” Issues & Lightning Indicator Study

Using previous studies that showed that when a developing storm has a 35dbz radar echo at a height inside the cloud where the temperature drops to -10 degrees C, yields an estimated 85% chance of future lightning occurring, we put this storm that developed on 7/2/20 to the same parameters. The Pantex LMA (Lightning Mapping Array) detected “charge densities” at 13:56. These can be precursors to future lightning. The Pantex LMA picked these charge densities up 10 minutes after the 35 dbz core reached 25,000 feet.

54 ENVIRONMENTAL SCIENCES↗

Demonstration and Validation of Additively Manufactured Intensified Device for Enhanced Carbon Capture

In FY 2018 and 2019, ORNL personnel designed, prototyped, characterized, and tested the enhancement of amine-based carbon capture using additively manufactured intensified devices, i.e., devices combining multiple thermodynamic and kinetic processes into one unit operation. State of the art scrubbing technology often employs inter-stage cooling which requires multiple stages of single-purpose unit operations, leading to larger equipment size, higher capital cost, and sometimes less than optimal operating conditions for each piece of equipment. It was proposed that integrating multiple thermodynamic and kinetic operations into one unit could mitigate or negate these drawbacks. Heat and mass transfer studies demonstrated that an additively manufactured intensified device could significantly improve capture efficiency at bench scale. This project is a continuation of FEAA130 and aims at (1) demonstration and validation of enhanced CO 2 capture with 3D printed intensified devices (i.e., mass exchanger packing with internal cooling channels), for low-aqueous-solvent (LAS) based capture at the ORNL-constructed laboratory-scale (4.5-feet tall) column, namely Column A, with built-in cooling and (2) computational scoping on the conceptual design of a flexible and modular larger column, namely Column B, at ORNL for further demonstration of enhanced capture for aqueous solvent. To execute this multi-faceted project scope, an integrated project team from ORNL’s Manufacturing Science Division is tasked with applying capabilities in computational fluid dynamics (CFD), additive manufacturing, and absorber-scale demonstration/validation experiments.

42 ENGINEERING↗

High-Performance Integrated Window and Façade Solutions for California

The researchers developed a new generation of high-performance façade systems and supporting design and management tools to support industry in meeting California’s greenhouse gas reduction targets, reduce energy consumption, and enable an adaptable response to minimize real-time demands on the electricity grid. The project resulted in five outcomes: (1) The research team developed an R-5, 1-inch thick, triplepane, insulating glass unit with a novel low-conductance aluminum frame. This technology can help significantly reduce residential cooling and heating loads, particularly during the evening. (2) The team developed a prototype of a windowintegrated local ventilation and energy recovery device that provides clean, dry fresh air through the façade with minimal energy requirements. (3) A daylight-redirecting louver system was prototyped to redirect sunlight 15–40 feet from the window. Simulations estimated that lighting energy use could be reduced by 35–54 percent without glare. (4) A control system incorporating physics-based equations and a mathematical solver was prototyped and field tested to demonstrate feasibility. Simulations estimated that total electricity costs could be reduced by 9-28 percent on sunny summer days through adaptive control of operable shading and daylighting components and the thermostat compared to state-of-the-art automatic façade controls in commercial building perimeter zones. (5) Supporting models and tools needed by industry for technology R&D and market transformation activities were validated. Attaining California’s clean energy goals require making a fundamental shift from today’s ad-hoc assemblages of static components to turnkey, intelligent, responsive, integrated building façade systems. These systems offered significant reductions in energy use, peak demand, and operating cost in California.

24 POWER TRANSMISSION AND DISTRIBUTION↗