Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Engineering design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Challenges and Lessons Learned from an Analysis of Three Zero Energy Buildings

Zero energy buildings, or zero energy ready buildings, which are designed and operated by public or private commercial property owners can play an important role in reducing carbon emissions. This paper discusses lessons learned and key takeaways from an in-depth analysis of three zero energy buildings that took an integrated design and construction approach to significantly reduce energy use. Two of these projects are new construction and one is a retrofit to zero energy. Findings are based on project literature review, data analysis, and in-depth interviews with the building design teams and staff who were involved during the design, construction, and operation of the buildings. The paper addresses value proposition and cost data in such a way that other building owners can replicate the strategies and technology solutions in response to regulatory mandates or organizational goals. It also provides details on operational improvements taken at each zero energy building to enhance energy performance and increase the potential for load flexibility, and discusses challenges and lessons gleaned from design teams and building staff. The findings serve as a reference for building owners, designers, engineers, contractors, or others interested in, or involved with, the design, construction, or use of new or existing buildings. The paper also includes recommended pathways for widespread adoption of zero energy strategies that can be applied in various locations.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

A conceptual study of the potential for automotive-derived and free-piston Stirling engines in 30- to 400-kilowatt stationary power applications

The technical feasibility of applying automotive-derived kinematic and free-piston Stirling engine concepts for stationary applications was explored. Automotive-derived engines offer cost advantages by providing a mature and developd engine technology base with downrating and parts commonality options for specific applications. Two engine sizes (30 and 400 kW), two Stirling engine configurations (kinematic and free-piston), and two output systems (crankshaft and hydraulic pump) were studied. The study includes the influences of using either hydrogen or helium as the working gas. The first kinematic configuration selects an existing Stirling engine design from an automotive application and adapts it to stationary requirements. A 50,000-hour life requirement was established by downrating the engine to 40 kW and reducing auxiliary loads. Efficiency improvements were gained by selective material and geometric variations and peak brake efficiency of 36.8 percent using helium gas was achieved. The second design was a four-cylinder, 400 kW engine, utilizing a new output drive system known as the z-crank, which provides lower friction losses and variable stroke power control. Three different material and working gas combinations were considered. Brake efficiency levels varied from 40.5 percent to 45.6 percent. A 37.5 kW single-cycle, free-piston hydraulic output design was generated by scaling one cylinder of the original automotive engine and mating it to a counterbalanced reciprocal hydraulic pump. Metallic diaphragms were utilized to transmit power.

Vatsky, A.↗

Status of advanced orbital transfer propulsion

A new Orbital Transfer Vehicle (OTV) propulsion system that will be used in conjunction with the Space Shuttle, Space Station and Orbit Maneuvering Vehicle is discussed. The OTV will transfer men, large space structures and conventional payloads between low Earth and higher energy orbits. Space probes carried by the OTV will continue the exploration of the solar system. When lunar bases are established, the OTV will be their transportation link to Earth. Critical engine design considerations based upon the need for low cost payload delivery, space basing, reusability, aeroassist maneuvering, low g transfers of large space structures and man rating are described. The importance of each of these to propulsion design is addressed. Specific propulsion requirements discussed are: (1) high performance H2/O2 engine; (2) multiple engine configurations totalling no more than 15,000 lbf thrust 15 to 20 hr life; (3) space maintainable modular design; (4) health monitoring capability; and (5) safety and mission success with backup auxiliary propulsion.

Cooper, L. P.↗

Status of advanced orbital transfer propulsion

A new Orbital Transfer Vehicle (OTV) propulsion system that will be used in conjunction with the Space Shuttle, Space Station and Orbit Maneuvering Vehicle is discussed. The OTV will transfer men, large space structures and conventional payloads between low earth and higher energy orbits. Space probes carried by the OTV will continue the exploration of the solar system. When lunar bases are established, the OTV will be their transportation link to earth. Critical engine design considerations based upon the need for low cost payload delivery, space basing, reusability, aeroassist maneuvering, low g transfers of large space structures and man rating are described. The importance of each of these to propulsion design is addressed. Specific propulsion requirements discussed are: (1) high performance H2/O2 engine; (2) multiple engine configurations totalling no more than 15,000 lbf thrust 15 to 20 hr life; (3) space maintainable modular design; (4) health monitoring capability; and (5) safety and mission success with backup auxiliary propulsion.

Cooper, L. P.↗

Conservative buffering of approximate nonlinear constraints

In engineering design practice behavior is usually predicted based on some known nominal design. However, when the design is fabricated it will differ from the nominal design because of manufacturing tolerances. In order to generate nominal designs that will still satisfy behavior constraints in the presence of manufacturing tolerances, engineers resort to the use of safety factors, over and above those introduced to account for other uncertainties (e.g., in load conditions, material properties, analysis modeling). The accurate selection of the values of these manufacturing tolerances safety factors is dependent on the capability of the engineer to determine the sensitivity of the critical constraints to changes in the design variables. This process usually leads to overly conservative designs. The task of choosing safety factors is much more difficult in structural synthesis because: (1) it is not known which constraints will be active at the final design, (2) as the design changes during the synthesis process the sensitivities of the constraints with respect to the design variables also change, and (3) the imposition of the safety factors themselves may change the set of critical constraints. These difficulties can be overcome with the approximation concepts approach to structural synthesis by buffering the approximate constraints with quantities that are related to the design variable tolerances and the accurate sensitivities of the constraints with respect to the design variable. Designs generated by this approach tend to be feasible but not overly conservative.

Thomas, H. L.↗

NASA James Webb Space Telescope Engineering of the Primary Mirror Segment Assemblies (PMSA) and the Primary Mirror Backplane Support Structure (PMBSS)

The design, engineering tests of the PMSAs PMBSS show that we have a robust system that not only meets but exceeds (better than) the design requirements for these components. In the next 2 years the Telescope Observatory will be subjected to a simulated launch environment (sine vibeacoustics) and operations tests at cryogenic temperatures. Launch is schedule for the last quarter of 2018.

PMBSS↗

MAN-004 Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.

42 ENGINEERING↗

The New S-RAM Air Variable Compressor/Expander for Heat Pump and Waste Heat to Power Application

S-RAM Dynamics (S-RAM) has designed an innovative heat pump system targeted for commercial and industrial applications. This new heat pump system is more efficient than anything currently on the market and utilizes air as the refrigerant instead of hydrofluorocarbon (HFC) refrigerants, leading to lower operating costs, minimal environmental costs or concerns, and lower maintenance costs. The heat pumps will be manufactured in the United States. This project was aimed at determining the feasibility of utilizing additive manufacturing to make the heat exchanger device for the new heat pump system. ORNL and S-RAM Dynamics collaborated on determining the prototype performance and subsequently printing of the prototype using additive manufacturing. Complex heat exchanger designs were fabricated using the Arcam electron beam melting (EBM) powder bed technology using Ti-6Al-4V material. An ultrasonic welding system was utilized in order to remove the powder from the small openings of the heat exchanger. The majority of powder in the small chambers was removed, however, the amount of powder remaining in the heat exchanger was a function of geometry. Therefore, only certain geometries of heat exchangers could be fabricated. SRAM Dynamics evaluated a preliminary heat exchanger design. Although the results of the additive manufacturing of the heat exchanger were not optimum, a less complex geometry was demonstrated. A sleeve valve was used as a demonstration piece, as engine designs from S-RAM Dynamics require the engine to have a very high density. Preliminary designs of this geometry were successfully fabricated using the EBM technology.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Model-Based Systems Engineering in Concurrent Engineering Centers

Concurrent Engineering Centers (CECs) are specialized facilities with a goal of generating and maturing engineering designs by enabling rapid design iterations. This is accomplished by co-locating a team of experts (either physically or virtually) in a room with a focused design goal and a limited timeline of a week or less. The systems engineer uses a model of the system to capture the relevant interfaces and manage the overall architecture. A single model that integrates other design information and modeling allows the entire team to visualize the concurrent activity and identify conflicts more efficiently, potentially resulting in a systems model that will continue to be used throughout the project lifecycle. Performing systems engineering using such a system model is the definition of model-based systems engineering (MBSE); therefore, CECs evolving their approach to incorporate advances in MBSE are more successful in reducing time and cost needed to meet study goals. This paper surveys space mission CECs that are in the middle of this evolution, and the authors share their experiences in order to promote discussion within the community.

systems engineering↗

Model-Based Systems Engineering in Concurrent Engineering Centers

Concurrent Engineering Centers (CECs) are specialized facilities with a goal of generating and maturing engineering designs by enabling rapid design iterations. This is accomplished by co-locating a team of experts (either physically or virtually) in a room with a narrow design goal and a limited timeline of a week or less. The systems engineer uses a model of the system to capture the relevant interfaces and manage the overall architecture. A single model that integrates other design information and modeling allows the entire team to visualize the concurrent activity and identify conflicts more efficiently, potentially resulting in a systems model that will continue to be used throughout the project lifecycle. Performing systems engineering using such a system model is the definition of model-based systems engineering (MBSE); therefore, CECs evolving their approach to incorporate advances in MBSE are more successful in reducing time and cost needed to meet study goals. This paper surveys space mission CECs that are in the middle of this evolution, and the authors share their experiences in order to promote discussion within the community.

Iwata, Curtis↗

Model-Based Systems Engineering in Concurrent Engineering Centers

Concurrent Engineering Centers (CECs) are specialized facilities with a goal of generating and maturing engineering designs by enabling rapid design iterations. This is accomplished by co-locating a team of experts (either physically or virtually) in a room with a narrow design goal and a limited timeline of a week or less. The systems engineer uses a model of the system to capture the relevant interfaces and manage the overall architecture. A single model that integrates other design information and modeling allows the entire team to visualize the concurrent activity and identify conflicts more efficiently, potentially resulting in a systems model that will continue to be used throughout the project lifecycle. Performing systems engineering using such a system model is the definition of model-based systems engineering (MBSE); therefore, CECs evolving their approach to incorporate advances in MBSE are more successful in reducing time and cost needed to meet study goals. This paper surveys space mission CECs that are in the middle of this evolution, and the authors share their experiences in order to promote discussion within the community.

MODEL↗

Compound cycle engine for helicopter application

The Compound Cycle Engine (CCE) is a highly turbocharged, power compounded, ultra-high power density, light-weight diesel engine. The turbomachinery is similar to a moderate pressure ratio, free power turbine engine and the diesel core is high speed and a low compression ratio. This engine is considered a potential candidate for future military light helicopter applications. This executive summary presents cycle thermodynamic (SFC) and engine weight analyses performed to establish general engine operating parameters and configuration. An extensive performance and weight analysis based on a typical two hour helicopter (+30 minute reserve) mission determined final conceptual engine design. With this mission, CCE performance was compared to that of a T-800 class gas turbine engine. The CCE had a 31% lower-fuel consumption and resulted in a 16% reduction in engine plus fuel and fuel tank weight. Design SFC of the CCE is 0.33 lb-HP-HR and installed wet weight is 0.43 lbs/HP. The major technology development areas required for the CCE are identified and briefly discussed.

Castor, Jere G.↗

Making Coal Relevant for Small Scale Applications: Modular Gasification for Syngas/Engine CHP Applications in Challenging Environments

This Front-End Engineering Design (FEED) study is funded by the US Department of Energy (DOE), and managed by the National Energy Technology Laboratory (NETL) through a Cooperative Agreement awarded to the University of Alaska Fairbanks (UAF) to perform a technical and cost study for the design and installation of a Hamilton-Maurer International (HMI) gasifier for generating a clean syngas for firing in reciprocating engines. An existing diesel engine generator (DEG) and a commercially available spark ignition engine are used to generate electricity with the low-Btu syngas. Other than the HMI gasifier, only commercially available technologies were assumed for this study. An important objective of this design study was to estimate capital and operating costs of small modular coal and coal/biomass fired generating units to provide wind regulation services. Although this study is based on retrofitting an existing coal fired power plant with the HMI gasifier, sufficient data was developed to characterize greenfield units. The original concept was to provide clean syngas and tars/oils from the gasification process to the existing Colt-Pielstick PC2.6B diesel engine generator (9.6 MWe) installed at the UAF Atkinson Power Plant. The intent was to convert the diesel engine to operate in a dual fuel mode, firing both syngas and tars/oils. As the project progressed, Fairbanks Morse Engine (FME), current licensee for the Colt-Pielstick engine line, was not able to develop a modification package for the engine to allow for syngas firing. Although this type of modification is available for firing natural gas, the capability does not extend to syngas. Western Energy Systems, distributor for Innio Jenbacher, was able to offer the Jenbacher Model JMS620 engine. After review of available options, the project team selected a design configuration using two Jenbacher engines rated at 1965 kWe each to fire the syngas, with the oils/tars directed to the Colt Pielstick diesel to be blended with ultra-low sulfur diesel oil (ULSD). The Jenbacher engines are expected to operate at continuous base load, with some load-following ability, while the existing diesel engine will operate in grid support service, with loads varying from a nominal 25% to 100%. An annual capacity factor for the diesel engine is projected to be between 50% and 60%. The overall gasifier and gas clean-up system is sized to produce enough syngas to adequately fuel three Jenbacher Engines for a nominal power output of 5.9 MWe, but this study assumes that only two Jenbacher engines will be installed due to space constraints in the Atkinson Power Plant, and because of expected air emission permit limitations. There is still potential that the excess syngas capacity equivalent to about 2 MWe could be used as supplemental fuel for the DEG. The exhaust from the Jenbacher engines is passed through heat recovery units to generate low pressure steam, thereby providing a significant portion of the steam required for operating the gasifier. The overall performance of the HMI gasifier/engine configuration is summarized as follows: 1) Overall electric efficiency, Jenbacher and diesel engines, based on gasifier fuel production (syngas and pyrolysis liquids) is 35.2% LHV, 2) Overall cogenerating efficiency (electricity plus steam), based on gasifier fuel production (syngas and pyrolysis liquids) is 54.8% LHV, 3) Overall electric efficiency, Jenbacher and diesel engines, based on coal input, is 29.6% LHV, and 4) Overall cogenerating efficiency, electricity plus steam, based on coal input is 46.0%. This project is estimated to have a Bare Erected Cost (BEC) of $\$$ 33.4 million and a Total Plant Cost (TPC) of $\$$ 45.7 million. Based on the original scope, sending both the clean syngas and the oils and tars to the existing diesel engine, the BEC and TPC values would have been $\$$ 23.3 million and $\$$ 32.1 million, respectively. A variable Cost of Electricity (COE) is calculated to reflect only those costs that will be incurred by incremental operation of the system for the HMI gasifier/Jenbacher engine combination. Operation of the diesel engine is determined separately. The variable COE values are: Case 1: 100% Usibelli Coal: (a) HMI gasifier/Jenbacher Engines -- 8.3 cents/kWh; (b) Diesel Engine -- 20.2 cents/kWh, and Case 2: 80% Usibelli Coal + 20% wood chips (proportion based on Btu input, LHV basis): (a) HMI Gasifier/Jenbacher -- 13.7 cents/kWh; (b) Diesel Engine -- 20.2 cents/kWh. The incremental cost of operating the gasifier/Jenbacher system increases with co-firing of wood chips due to the high cost of this material, over five times as costly as Usibelli coal delivered to the Atkinson Power building. The diesel cost is constant as the oils and tars are priced at the same value as the ULSD for the purposes of fueling the diesel engine. Section 8 of this report provides details of the O&M costs. The overall power system is configured to be modular and scalable to provide a wide range of generating capacity using the same components. This allows for reduction in cost, risk, schedule time to engineer and construct, and provides some degree of repeatability for air permitting.

01 COAL, LIGNITE, AND PEAT↗

Acoustic and Laser Doppler Anemometer Results for Confluent, 22-Lobed, and Unique-Lobed Mixer Exhaust Systems for Subsonic Jet Noise Reduction

The objective of this task was to develop a design methodology and noise reduction concepts for high bypass exhaust systems which could be applied to both existing production and new advanced engine designs. Special emphasis was given to engine cycles with bypass ratios in the range of 4:1 to 7:1, where jet mixing noise was a primary noise source at full power takeoff conditions. The goal of this effort was to develop the design methodology for mixed-flow exhaust systems and other novel noise reduction concepts that would yield 3 EPNdB noise reduction relative to 1992 baseline technology. Two multi-lobed mixers, a 22-lobed axisymmetric and a 21-lobed with a unique lobe, were designed. These mixers along with a confluent mixer were tested with several fan nozzles of different lengths with and without acoustic treatment in GEAE's Cell 41 under the current subtask (Subtask C). In addition to the acoustic and LDA tests for the model mixer exhaust systems, a semi-empirical noise prediction method for mixer exhaust system is developed. Effort was also made to implement flowfield data for noise prediction by utilizing MGB code. In general, this study established an aero and acoustic diagnostic database to calibrate and refine current aero and acoustic prediction tools.

Salikuddin, M.↗

A method to select human-system interfaces for nuclear power plants

The new generation of nuclear power plants (NPPs) will likely make use of state-of-the-art technologies in many areas of the plant. The analysis, design, and selection of advanced human–system interfaces (HSIs) constitute an important part of power plant engineering. Designers need to consider the new capabilities afforded by these technologies in the context of current regulations and new operational concepts, which is why they need a more rigorous method by which to plan the introduction of advanced HSIs in NPP work areas. Much of current human factors research stops at the user interface and fails to provide a definitive process for integration of end user devices with instrumentation and control (I&C) and operational concepts. The current lack of a clear definition of HSI technology, including the process for integration, makes characterization and implementation of new and advanced HSIs difficult. This paper describes how new design concepts in the nuclear industry can be analyzed and how HSI technologies associated with new industrial processes might be considered. Furthermore, it also describes a basis for an understanding of human as well as technology characteristics that could be incorporated into a prioritization scheme for technology selection and deployment plans.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates. You must convey all documents describing work to the SNL/NM Project Manager in both hard copy and in an electronic format compatible with the SNL/NM-prescribed CADD and other software packages, and in accordance with a SNL/NM approved standard format. Print all hard copy versions of submitted documents (excluding drawings and renderings) double-sided when practical.

42 ENGINEERING↗