Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Distributed Energy Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Predictive Scheduling for Electric Vehicles Considering Uncertainty of Load and User Behaviors

Un-coordinated Electric Vehicle (EV) charging can create unexpected load in local distribution grid, which may degrade the power quality and system reliability. The uncertainty of EV load, user behaviors and other baseload in distribution grid, is one of challenges that impedes optimal control for EV charging problem. Previous researches did not fully solve this problem due to lack of real-world EV charging data and proper stochastic model to describe these behaviors. In this paper, we propose a new predictive EV scheduling algorithm (PESA) inspired by Model Predictive Control (MPC), which includes a dynamic load estimation module and a predictive optimization module. The user-related EV load and base load are dynamically estimated based on the historical data. At each time interval, the predictive optimization program will be computed for optimal schedules given the estimated parameters. Only the first element from the algorithm outputs will be implemented according to MPC paradigm. Current-multiplexing function in each Electric Vehicle Supply Equipment (EVSE) is considered and accordingly a virtual load is modeled to handle the uncertainties of future EV energy demands. This system is validated by the real-world EV charging data collected on UCLA campus and the experimental results indicate that our proposed model not only reduces load variation up to 40% but also maintains a high level of robustness. Finally, IEC 61850 standard is utilized to standardize the data models involved, which brings significance to more reliable and large-scale implementation.

Wang, Bin↗

AENET–LAMMPS and AENET–TINKER : Interfaces for accurate and efficient molecular dynamics simulations with machine learning potentials

Machine-learning potentials (MLPs) trained on data from quantum-mechanics based first-principles methods can approach the accuracy of the reference method at a fraction of the computational cost. To facilitate efficient MLP-based molecular dynamics and Monte Carlo simulations, an integration of the MLPs with sampling software is needed. Here, we develop two interfaces that link the atomic energy network (ænet) MLP package with the popular sampling packages TINKER and LAMMPS. The three packages, ænet, TINKER, and LAMMPS, are free and open-source software that enable, in combination, accurate simulations of large and complex systems with low computational cost that scales linearly with the number of atoms. Scaling tests show that the parallel efficiency of the ænet–TINKER interface is nearly optimal but is limited to shared-memory systems. The ænet–LAMMPS interface achieves excellent parallel efficiency on highly parallel distributed memory systems and benefits from the highly optimized neighbor list implemented in LAMMPS. We demonstrate the utility of the two MLP interfaces for two relevant example applications: the investigation of diffusion phenomena in liquid water and the equilibration of nanostructured amorphous battery materials.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS↗

Practice Summary: Improved Reliability via Optimization in Residential Microgrids

Southern Company is an electric utility that is embracing residential microgrids as a platform for distributed energy. The first residential microgrid in the southeastern United States was constructed in Hoover, Alabama, as a testbed for development. To operate the microgrid, we developed an optimization model for unit commitment and economic dispatch. We report the optimization model was implemented in a microgrid central controller and tested under various operational scenarios. Challenges also include developing a pricing algorithm to deliver price forecasts to the residential homes in the microgrid and open-source software restrictions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A data-driven network optimisation approach to coordinated control of distributed photovoltaic systems and smart buildings in distribution systems

The increasing integration of distributed energy resources, including demand-side resources and distributed photovoltaics (PVs), into distribution systems has resulted in more complicated power system operation. A data-driven network optimisation approach is proposed to coordinate the control of distributed PVs and smart buildings in distribution networks considering the uncertainties of solar power, outdoor temperature and heat gain associated with building thermal dynamics. These uncertain parameters have a significant impact on the operation and control of distributed PVs and smart buildings, bringing challenges to the distribution system operation. In the proposed data-driven distributionally robust optimisation (DRO) approach, the Wasserstein ball is used to construct an ambiguity set for the uncertain parameters, which does not require the probability distributions to be known. Furthermore, a conditional value-at-risk is incorporated into the Wasserstein-based DRO model and converted into a computationally tractable mixed-integer convex optimisation problem. Benchmarked with robust optimisation and chance-constrained programming, the proposed data-driven model can give a less conservative robust solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fusion product measurements by nuclear diagnostics in the Joint European Torus deuterium–tritium 2 campaign (invited)

We report a new deuterium–tritium experimental, DTE2, campaign has been conducted at the Joint European Torus (JET) between August 2021 and late December 2021. Motivated by significant enhancements in the past decade at JET, such as the ITER-like wall and enhanced auxiliary heating power, the campaign achieved a new fusion energy world record and performed a broad range of fundamental experiments to inform ITER physics scenarios and operations. New capabilities in the area of fusion product measurements by nuclear diagnostics were available as a result of a decade long enhancement program. These have been tested for the first time in DTE2 and a concise overview is provided here. Confined alpha particle measurements by gamma-ray spectroscopy were successfully demonstrated, albeit with limitations at neutron rates higher than some 10 17 n/s. High resolution neutron spectroscopy measurements with the magnetic proton recoil instrument were complemented by novel data from a set of synthetic diamond detectors, which enabled studies of the supra-thermal contributions to the neutron emission. In the area of escaping fast ion diagnostics, a lost fast ion detector and a set of Faraday cups made it possible to determine information on the velocity space and poloidal distribution of the lost alpha particles for the first time. This extensive set of data provides unique information for fundamental physics studies and validation of the numerical models, which are key to inform the physics and scenarios of ITER.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

AmeriFlux FLUXNET-1F US-Bar Bartlett Experimental Forest

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Bar Bartlett Experimental Forest. This is the FLUXNET version of the carbon flux data for the site US-Bar Bartlett Experimental Forest produced by applying the standard ONEFlux (1F) software. Site Description - The Bartlett Experimental Forest (448170 N, 71830 W) is located within the White Mountains National Forest in north-central New Hampshire, USA. The 1050 ha forest extends across an elevational range from 200 to 900 m a.s.l. It was established in 1931 and is managed by the USDA Forest Service Northeastern Research Station in Durham, NH. The climate is humid continental with short, cool summers (mean July temperature, 19.8C) and long, cold winters (mean January temperature, 9.8C). Annual precipitation averages 130 cm and is distributed evenly throughout the year. Soils are developed from glacial till and are predominantly shallow, well-drained spodosols. At lowto mid-elevation, vegetation is dominated by northern hardwoods (American beech, Fagus grandifolia; sugar maple, Acer saccharum; yellow birch, Betula alleghaniensis; with some red maple, Acer rubrum and paper birch, Betula papyrifera). Conifers (eastern hemlock, Tsuga canadensis; eastern white pine, Pinus strobus; red spruce, Picea rubens) are occasionally found intermixed with the more abundant deciduous species but are generally confined to the highest (red spruce) and lowest (hemlock and pine) elevations. In 2003, the site was adopted as a NASA North American Carbon Program (NACP) Tier-2 field research and validation site. A 26.5 m high tower was installed in a low-elevation northern hardwood stand in November, 2003, for the purpose of making eddy covariance measurements of the forest–atmosphere exchange of CO2, H2O and radiant energy. Continuous flux and meteorological measurements began in January, 2004, and are ongoing. Average canopy height in the vicinity of the tower is approximately 20–22 m. In the tower footprint, the forest is predominantly classified into red maple, sugar maple, and American beech forest types. Leaf area index in the vicinity of the tower is 3.6 as measured by seasonal litterfall collection, and 4.5 as measured by the optically based Li-Cor LAI-2000 instrument. Further site information: http://www.fs.fed.us/ne/durham/4155/bartlett.htm

Richardson, Andrew↗

Smart Methane Emission Detection System Development Final Report

Working with the Department of Energy's National Energy Technology Laboratory, Southwest Research Institute® (SwRI®) developed a system to identify methane leaks reliably, accurately, and autonomously at critical midstream sections of the natural gas distribution network in real- time for the purpose of mitigating methane emissions using Optical Gas Imaging (OGI) cameras. SwRI's Smart Leak Detection – Methane (SLED/M) adds a high degree of automation to the process of methane leak detection to minimize sources of human error, minimize response time to a leak event, and maximize midstream visibility. Furthermore, SwRI has been working towards integrating Quantitative OGI (QOGI) capabilities into this existing technology. By leveraging Deep Learning, SwRI now has the capability to estimate fugitive emission leak rates quickly and reliably, which allows operators to detect emissions, quantify leak rate, prioritize repairs, and validate the repairs in a single instrument. The next generation QOGI technology leverages the same cameras used in Leak Detection and Repair (LDAR) programs, with improvements in safety and speed for traditional quantification-based repairs, ultimately leading to less overhead cost for the operators.

03 NATURAL GAS↗

Overlapping Domain Coupling of Multidimensional and System Codes in NEAMS - Pronghorn and SAM

This report describes the implementation and testing of domain-overlapping coupling of the Pronghorn and SAM codes. Both Pronghorn and SAM are codes developed by the DOE Nuclear Energy Advanced Modeling and Simulation (NEAMS) program for analysis of advanced nuclear reactors. Pronghorn focuses on analyzing multi-dimensional core flow conditions, while SAM focuses on analysis of the entire system including, among other components, piping, pumps, and heat exchangers. It is desirable for many advanced reactor thermal-hydraulics simulations to couple Pronghorn and SAM to obtain self-consistent solutions in the core and the system. The domain-overlapping coupling approach provides a robust and numerically efficient candidate for this coupling. We describe the algorithm for obtaining self-consistent solutions between a SAM network of flow channels and an overlapped multi-dimensional Pronghorn domain. The algorithm is tested for a variety of simple canonical test problems and a model of the Molten Salt Reactor Experiment (MSRE). Results demonstrate that the domain overlapping coupling approach provides consistent pressure, mass flow rate, enthalpy, and passive scalar distributions between Pronghorn and SAM and converges reliably and efficiently (at most 15 iterations, usually much less than 10) for the considered test problems.

97 MATHEMATICS AND COMPUTING↗

Fuel-Coolant Interaction Results for High Energy In-Pile LWR Fuels Experiments

Fuel-coolant interaction (FCI) has long been a subject of interest in severe-accident reactor safety applications. Significant chemical interaction also frequently results at the high temperature associated with these events in a water environment. Historical rapid, high energy transient irradiation test results are reviewed for experiments performed in transient experimental reactors in Idaho. Though such events are not credible for any deployed nuclear reactor technology, the pressure waves produced by FCI on surrounding containment structures are of importance to advanced light water reactor designs and for transient experiment design considerations. A brief introduction to steam explosion and related studies is provided in the context of these experiments. Extensive reactivity initiated accident testing programs were carried out in the Transient REActor Test (TREAT) facility, the Special Power Excursion Reactor Test (SPERT) facility, and the Power Burst Facility (PBF) from the 1960’s through the late 1970’s. A variety of fuel forms including waterlogged rods were tested in capsules containing water coolant at standard temperature pressure. A few tests were performed at high pressure and temperature in the water loop of PBF. In many of these experiments, energy deposition was high enough to greatly exceed melting temperatures of the fuel, resulting in some fraction of the fuel being dispersed into the coolant. A purpose of many of these tests was to determine the nuclear-to-mechanical energy conversion ratio as well as the extent of metal-water reaction. Relevant data collected from these tests included transient energy deposition, pressure response of the coolant, water column velocity, total hydrogen generation, and resulting particle size distributions and particle characterization. In this paper, the mechanical configuration of each experiment facility is reviewed and discussed relative to the measured responses. The empirical results for source pressure and extent of metal-water reaction are presented in the context of the experimental conditions. The results of these experiments provide a unique understanding for behavior of fuel under severe accident conditions in a reactor environment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

Cybersecurity for the Operational Technology Environment (CyOTE) (Final Technical Report)

Electric grids have historically been susceptible to both physical attacks and environmental hazards but the implementation of smart grids, remote management, and self-healing networks, has now made the grid vulnerable to cyber attacks. To address risks introduced by routable connectivity, utilities must establish dynamic solutions to identify, protect, detect, respond to, and recover from cyber security threats and vulnerabilities. In response to the evolving threat landscape U.S. Department of Energy-Office of Cybersecurity, Energy Security, and Emergency Response (DOE CESER) initiated the Cybersecurity for the OT Environment (CyOTE) pilot program, a U.S. Department of Energy (DOE) effort designed to leverage U.S. intelligence capabilities to prevent, detect, or mitigate a cyber attack on utility operational technology (OT) networks. As part of the CyOTE pilot, The Southern Company (Southern Company or Southern) researched, evaluated and deployed emerging Commercial off the Shelf (COTS) technologies and cyber security monitoring architectures to provide previously unrealized network visibility and situational awareness through deep packet inspection and data analytics. This Final Scientific/Technical Report documents the objectives, methodology, lessons learned, and results of Southern Company’s participation in the CyOTE pilot from December 2018 to September 2023.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Search for a diffuse flux of photons with energies above tens of PeV at the Pierre Auger Observatory

Diffuse photons of energy above 0.1 PeV, produced through the interactions between cosmic rays and either interstellar matter or background radiation fields, are powerful tracers of the distribution of cosmic rays in the Galaxy. Furthermore, the measurement of a diffuse photon flux would be an important probe to test models of super-heavy dark matter decaying into gamma-rays. In this work, we search for a diffuse photon flux in the energy range between 50 PeV and 200 PeV using data from the Pierre Auger Observatory. For the first time, we combine the air-shower measurements from a 2 km 2 surface array consisting of 19 water-Cherenkov surface detectors, spaced at 433 m, with the muon measurements from an array of buried scintillators placed in the same area. Using 15 months of data, collected while the array was still under construction, we derive upper limits to the integral photon flux ranging from 13.3 to 13.8 km -2 sr -1 yr -1 above tens of PeV. We extend the Pierre Auger Observatory photon search program towards lower energies, covering more than three decades of cosmic-ray energy. This work lays the foundation for future diffuse photon searches: with the data from the next 10 years of operation of the Observatory, this limit is expected to improve by a factor of ∼20.

cosmic rays detectors↗

Renewable Firming EnergyFarm Final Report

The American Recovery and Reinvestment Act (ARRA) of 2009 (Recovery Act) provided the U.S. Department of Energy (DOE) with funds to modernize the electric power grid. One program under this initiative is the Smart Grid Demonstration program (SGDP). The SGDP mandate is to demonstrate how a suite of existing and emerging smart grid technologies can be innovatively applied and integrated to prove technical, operational, and business-model feasibility. Primus Power is a provider of low cost, long life and long duration energy storage systems. The Company’s flow batteries are shipping to US and international microgrid, utility, military, commercial and industrial customers. Primus Power’s EnergyPod® is a modular battery system for grid scale applications available in configurations ranging from 25 kW to more than 25 MW. The EnergyPod provides nameplate power for 5 hours. This long duration unlocks economic benefits on both sides of the electric meter. It allows commercial and industrial customers to shift low cost electricity purchased at night to offset afternoon electrical peaks to reduce utility demand charges. It also allows utilities to economically reduce power peaks and defer costly upgrades to distribution infrastructure. An EnergyPod contains one or more EnergyCells-a highly engineered flow battery core made from low cost, readily available materials. An EnergyCell includes a membrane-free stack of titanium electrodes located above a novel liquid electrolyte management system. This patented design enables reliable, low maintenance operation for decades. It is safe and robust, featuring non-flammable aqueous electrolyte, sophisticated fault detection and built-in secondary containment. Unlike Li Ion batteries, the EnergyCell is not susceptible to thermal runaway. This cooperative agreement project was started in Feb 2010. The objectives of the project are: 1. Trigger rapid adoption of grid storage systems in the US by demonstrating a low cost, robust and flexible EnergyFarm®. 2. Accelerate adoption of renewable energy and enhance grid stability by firming the output of wind & solar farms. 3. Demonstrate improved grid asset utilization by storing energy during off-peak periods for dispatch during local load peaks. 4. Establish an advanced battery manufacturing industry in the U.S. 5. Reduce CO2 emissions from utilities. This report summarizes the key milestones, data, results and lessons learned from the project. The desired goals and benefits of the cooperative agreement with the DOE have all been achieved. The project has contributed to reducing power costs, accelerating adoption of renewable energy resources, reducing greenhouse gas emissions and establishing advanced battery manufacturing in the U.S. The Recovery Act funds provided thru the DOE have been leveraged multiple times by additional private equity investment. Primus Power continues to ship low cost, long life and long duration EnergyPod® flow battery systems to utilities, commercial/industrial, microgrid and data center customers. After the conclusion of this project, Primus Power has modified the EnergyPod® design to optimize around energy performance. Primus Power has moved to a prefabricated enclosure instead of multiple EnergyCells in a container. This lowers capital and maintenance costs and can optimize site design. Utilities are starting to adopt energy storage for a variety of functions. The market will grow as the technology is proven and profitable applications expand.

25 ENERGY STORAGE↗

Nuclear Safety [Vol. 32, No. 4, October-December 1991]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 477 Report on the International Symposium on the Use of Probabilistic Safety Assessment for Operational Safety—PSA '91, S. Chakraborty and M. Khatib-Rahbar; 488 Good Relationships Are Pivotal in Nuclear Data Bases, A. S. Heger and B. V. Koen; 494 Technical Note: The Interagency Nuclear Safety Review Panel's Evaluation of the Ulysses Space Mission, J. A. Sholtis, Jr., D. A. Huff, L. B. Gray, N. P. Klug, and R. O. Winchester; ACCIDENT ANALYSIS: 502 The Severe Accident Analysis Program for the Savannah River Nuclear Production Reactors, M. L. Hyder; CONTROL AND INSTRUMENTATION: 511 A Framework for Selecting Suitable Control Technologies for Nuclear Power Plant Systems, R. A. Kisner; DESIGN FEATURES: 521 Containments for Gas-Cooled Power Reactors History and Status, P.W. Williams; ENVIRONMENTAL EFFECTS: 537 Indoor Radon: A Natural Risk, N. H. Harley and J.H. Harley; On the Importance of the Atmospheric Parameters in the Fission Products Distribution of a Severe Reactor Accident, M. C. Barla and A. R. Bayulken; Book Review: Health Effects of Exposure to Low Levels of Ionizing Radiation BEIR V, C. R. Richmond; WASTE AND SPENT FUEL MANAGEMENT: 555 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver OPERATING EXPERIENCES: 567 Effects of Component Aging on the Westhinghouse Control Rod Drive System, K. Sullivan and W. Gunther; 577 Reactor Shutdown Experience, Compiled by J. W. Cletcher, 580 Selected Safety-Related Events, Compiled by G. A. Murphy; 582 Operating U 8 Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver, RECENT DEVELOPMENTS: 596 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 610 Reports, Standards, and Safety Guides, D. S. Queener; 614 Proposed Rule Changes as of June 30, 1991; ANNOUNCEMENTS: 520 Workshop on PC PRAISE: A Probabilistic Fracture Mechanics Personal Computer Code for Nuclear Power Plant Piping Reliability Assessment; 536 Fifth Workshop on Nuclear Power Plant Containment Integrity; 624 New OECD "International Information System on Occupational Exposure (ISOE)"; 625 Harvard School of Public Health Announces Short Courses; 625 Eighth Power Plant Dynamics, Control and Testing Symposium; 626 Second Training Course on Off-Site Emergency Planning and Response for Nuclear Accidents; 618 The Authors; 622 Reviewers of Nuclear Safety, Vol 32.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Validation of NEAMS Tools Using MSRE Data

This report documents the benchmarks developed and performed for the tools and codes developed under the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program utilizing the MSRE experiment data. There are three focus areas explored in this work: fuel evolution, CFD, and system transient analyses. Fuel depletion is important for MSR reactor physics and fuel cycle analysis. Fuel depletion capability is currently being developed in the Griffin reactor physics code. To support this, a benchmark problem is developed using the MSRE data and an existing depletion code with flowing fuel analysis functionality (ADDER) to validate this new capability in Griffin. The ADDER calculation is compared with the TRITON-MSR results as well as the MSRE experimental data. This benchmark can be directly used to verify and validate the Griffin fuel depletion capability in future years. For CFD simulation, the MSRE CAD model is obtained from the Copenhagen Atomics and a mesh is generated for the MSRE inlet plenum. The Nek5000 code will be employed to find the flow distribution in the MSRE inlet plenum based on the mesh generated. For system analysis, a simple benchmark problem for three types of MSR system transients is developed. The SAM and SPECTRA codes are used to solve the simple problem, and the results from the two codes agree well. The SAM code is also employed to obtain the frequency response of the MSRE system at the 5 and 8 MWt power levels. The results agree well with the experiment measurements. These verification and validation efforts gives SAM users more confidence in MSR system transient simulations using SAM. Lastly, the SAM-Griffin Multiphysics coupling work is initiated. A simple one-way coupling of evaluating the precursor drift effect on the MSRE k-eff is demonstrated. This preliminary coupling work serves as the basis for future more complex Multiphysics simulation and modelling.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

DOE Data Days 2023 Report

The DOE Data Days (D3) workshop brings together data managers, developers, researchers, and program managers across the Department of Energy (DOE) and national laboratories to highlight data management successes, identify potential synergies and common problems, and establish channels for collaboration across the DOE data management community. The fourth D3 workshop was held on October 24th to 26th, 2023 held entirely in-person at Lawrence Livermore National Laboratory (LLNL). The workshop was organized by a multi laboratory committee in an effort to bring data management practitioners at the DOE laboratories together to share their work and results, facilitating knowledge transfers and best practices across project teams. Tools and platforms to support data management and analysis are rapidly evolving and provide enormous opportunities. This report summarizes the important discussions and recommendations from the different working sessions and contains the agenda, submitted abstracts, presentations with links to recorded presentations, breakout session summaries, list of registered attendees, and lessons learned for future organizing committee. The report will be distributed to the DOE, each participating institution’s programmatic stakeholders, and attendees. The dedicated D3 website will host presentations, agenda, and report that is accessible by all labs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Equity Considerations in Siting Consolidated Interim Storage Facilities for Commercial Spent Nuclear Fuel

Questions of equity and fairness are often raised by representatives from State, Tribal and local governments and members of the public when resolving conflicts over siting of nuclear facilities. However, the two terms are not synonymous: equity can be quantified while fairness is much more subjective. The Department of Energy's (DOE) December 2021 Request for Information sought input on how to site federal facilities for the temporary, consolidated storage of spent nuclear fuel (SNF) using a consent-based approach. It is anticipated that just such questions about equity and fairness associated with the potential emergence of more than one host site may be raised by the twelve groups of university, nonprofit and private sector partners (Consortia) working to support community engagement, inclusively involve stakeholders, build relationships, and develop innovative forms of mutual learning and public capacity to participate in the consent-based siting process for a federal consolidated interim storage facility during the current Planning & Capacity Building stage of the consent-based siting process. In terms of DOE's Integrated Waste Management System (IWMS), sociopolitical equity concepts are a factor in all aspects of IWMS development and operations and will be particularly applicable should two or more host sites become a possibility, either by the emergence of multiple volunteer hosts or by pursuit as a IWMS program strategy. This paper summarizes recent analyses that explore how four equity metrics - number of states, division of the projected SNF total by the year 2083, current population and land area - might be perceived by host communities, states and regions if two, three or four sites for hosting federal consolidated interim storage facilities were to be contemporaneously realized. Existing institutional arrangements, including Nuclear Regulatory Commission regions, Federal Energy Regulatory Commission regions and Low-Level Radioactive Waste Disposal Compacts, were selected to create hypothetically merged two, three and four-region scenarios to calculate how the four metrics balance out. Projected SNF burden was prioritized with regional contiguity of the consolidated regions a requirement for a functional scenario. The intent was not to promote or suggest any construct as a program objective; the configurations are geopolitical abstractions only to explore potential perceptions of equity. Understanding the possible issues of equity that could arise may benefit program efforts toward achieving a cooperative federalism wherein both the federal and multiple State governments share the goal of manifesting more than one federal consolidated interim storage facility. The main finding is that it is not possible to optimize for all four metrics simultaneously. The analyses demonstrate that trying to create a sense of equity by backfitting a solution to a random population and land distribution will always contain a degree of artificiality.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗